Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Doc.

No FORM-SIKB-EXE-FAB-026-E
FORM PT. SAIPEM INDONESIA KARIMUN BRANCH
Rev. 01 Date 29/07/20

Page 1 of 1
PROJECT DOCUMENT TRANSMITTAL
Doc. Ref. WI-PTSI-EXE-FAB-023-E

Transmittal No: 840501-SIKB-PBI-TR-0002 Date: 13 April 2021


To : PT. Prospera Brillar Indonesia
Send:
Attn : Noormansyah Munaf, Aryo Djatmiko By: Soft Copy

From : DCC – SIKB Subject: TORTUE VENDOR DOCUMENT

Action
Status
Ite QTY *Info
Doc/Dwg. No. TITLE Rev
m (pages) /Action/Revi
ew/
Approval

1. - Tekla Model (56 items) - - Information

Drawings
2. - -Shop Drawings - - Information
-Design Drawings

3. - Matrix of Communication - - Information

4. - HSE Documents - - Information

Issued by:
Nilawati
SIKB Document Control Leader/Coordinator 13 April 2021

Name & Designation Signature Date


Acknowledge receipt by:

Name & Designation Signature Date


Please acknowledge Receipt and Return the signed Transmittal via Email: Nilawati@saipem.com

This documents is the property of PT Saipem Indonesia Karimun Branch. All rights reserved.

You might also like