Professional Documents
Culture Documents
Pressed
Pressed
Transformer
2 A TPN MCB W W W
B A Ammeter B
ASS A ASS Three Way And Off Ammeter Selector Switch
51 51N 27 59 51N Directional Earth Fault Relay
6 A TPN MCB R G A 51 Directional Over Current Relay
VSS V
50 High Set Instantaneous Over
Current Protective Device
MPR-1 Over Current Protective Device
51
63x Auxiliary Relay
86 Master Trip Relay
94 Anti Pumping Relay
CL 1.0 630/5
CL 1.0 1000/5
CL 1.0 100/5
CL 1.0 1250/5
CL 1.0 250/5
CL 1.0 250/5
CL 1.0 630/5
CL 1.0 400/5
CL 1.0 400/5
CL 1.0 400/5
CL 1.0 250/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 400/5
R
R R R R R R R R R R R R
Hight Set Instantaneous
C G
G G G G G
R
G G G G G
R
G G G
50N Earth Fault Protective Device C
G
51N Earth Fault Protective Device
ASS ASS ASS ASS ASS ASS
ASS ASS ASS ASS ASS ASS ASS ASS
ASS 27 Under Voltage Relay
A
A A A A A A A A A A A A A 59 Over Voltage Relay
A
CL 1.0 1250/5
CL 1.0 200/5
MPR-1
CL 1.0 400/5
CL 1.0 100/5
CL 1.0 400/5
CL 1.0 250/5
CL 1.0 400/5
CL 1.0 200/5
CL 1.0 400/5
CL 1.0 400/5
CL 1.0 200/5
CL 1.0 250/5
CL 1.0 200/5
CL 1.0 100/5
CL 1.0 250/5
CL 1.0 400/5
CL 1.0 250/5
CL 1.0 250/5
CL 1.0 400/5
CL 1.0 400/5
CL 1.0 250/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 1000/5
CL 1.0 400/5
CL 1.0 63/5
CL 1.0 250/5
CL 1.0 250/5
CL 1.0 250/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 63/5
CL 1.0 250/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 250/5
CL 1.0 63/5
CL 1.0 63/5
R R R R R R R R R R R R R R R R R R R R R R R R R R R
R R R R R R R R R R R R R R R R
G G G G G G G G G G G G G G G G G G G G G G G G G G G
G G G G G G G G G G G G G G G G
ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS
ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS
A A A A A A A A A A A A A A A A A A A A A A A A A A A
A A A A A A A A A A A A A A A A
G G
H H
MPR-2
R G A
MPR-1H (0-1250A)
ASS A
1250/5A,15VA, CL1.0
A/M
J CONTACTOR
R G
CONTACTOR CONTACTOR CONTACTOR CONTACTOR CONTACTOR CONTACTOR CONTACTOR J
R G R G R G R G R G R G R G
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS COUNTER SIGNED BY
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR MAHARASHTRA METRO
PROJECT: PUNE METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. The Orion Building, 1st Floor, Opposite Don Bosco
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Center, Near Saint Mira's Girls College, Koregaon K
FOR GFC / NO OBJECTION'.
DDC / CONTRACTOR CONTRACTOR / DDC Park, Pune - 411001, MH, India
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO PMRP
DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NAME: RUPESH NAME: NEHA NAME: ANCHAL NAME: AJAY NAME: DATE: DATE: LOCATION: VANAZ DEPOT
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME: ELECTRICAL SCHEMATIC (PART 1 OF 4)
TITLE:
Consultant- Enia
L SYSTRA-AECOM-EGIS-RITES SCALE: AS SPECIFIED DATE: 04.07.2018 STATUS: TENDER DRAWINGS REVISION NO:
L
The Orion Building, 1st Floor, Opposite Don
TENDER DRAWINGS
PROOFCONSULTANT Bosco Center, Near Saint Mira's Girls DRG NO:
A0.1 04.07.2018
College, Koregaon Park, Pune - 411001, MH, DED01-ENI-EL-PRM-DEV-SLD-3031 A1.0
REV NO DATE DESCRIPTION SIGN India
1 2 3 4 5 6 7 8 9 10 11 12 15 16 1110
plot scale
TBA 50mm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LEGEND
SYMBOL DESCRIPTION
Transformer
CL 1.0 200/5
CL 1.0 400/5
CL 1.0 250/5
CL 1.0 250/5
CL 1.0 630/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 250/5
CL 1.0 100/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
EFR EARTH FAULT RELEASE
R R R R R R R R R R R R R R R R R R R R
APFCR Automatic Power Factor Correction Relay
G G G G G G G G G G G G G G G G G G G G Auto/Manual Selector Switch
Capacitor Bank
E ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS Push Button E
Contactor
A A A A A A A A A A A A A A A A A A A A
A Trip Circuit Healthy
R Breaker ON
G
Breaker OFF
W Phase healthy indicating lamp
B SPRING CAHRGED
Distribution Board
F F
MPR-1
G W W W G
A G R 2 A TPN MCB
A ASS 1000/5A
15VA, CL1.0
6 A TPN MCB
H V VSS MPR-2
H
59 27 51N 51 1000/5A
15VA, CL5P10
MPR-3
CL 1.0 400/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 100/5
CL 1.0 250/5
CL 1.0 200/5
CL 1.0 200/5
CL 1.0 250/5
CL 1.0 400/5
CL 1.0 400/5
CL 1.0 200/5
CL 1.0 250/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
CL 1.0 63/5
R R R R R R R R R R R R R R R R
R R R R R R
G G G G G G G G G G G G G G G G G G G G G
I I
ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS ASS
A A A A A A A A A A A A A A A A A A A A A
AUTO PATH: C:\USERS\ENLPT-013\DESKTOP\VANAZ SUBMISSION\TENDER SUBMISSION\DED02-ENI-EL-PRM-DEV-SLD-3031,32,33,34.DWG
J J
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS COUNTER SIGNED BY
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR MAHARASHTRA METRO
PROJECT: PUNE METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. The Orion Building, 1st Floor, Opposite Don Bosco
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Center, Near Saint Mira's Girls College, Koregaon K
FOR GFC / NO OBJECTION'.
DDC / CONTRACTOR CONTRACTOR / DDC Park, Pune - 411001, MH, India
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO PMRP
DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NAME: RUPESH NAME: NEHA NAME: ANCHAL NAME: AJAY NAME: DATE: DATE: LOCATION: VANAZ DEPOT
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME: ELECTRICAL SCHEMATIC (PART 2 OF 4)
TITLE:
Consultant- Enia
L SYSTRA-AECOM-EGIS-RITES SCALE:AS SPECIFIED DATE: 04.07.2018 STATUS: TENDER DRAWINGS REVISION NO:
L
The Orion Building, 1st Floor, Opposite Don
TENDER DRAWINGS
PROOFCONSULTANT Bosco Center, Near Saint Mira's Girls DRG NO:
A0.1 04.07.2018
College, Koregaon Park, Pune - 411001, MH, DED01-ENI-EL-PRM-DEV-SLD-3032 A1.0
India
1 2 3 4 5 6 7 8 9 10 11 12 15 16 1111
plot scale
TBA 50mm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
6A,TPN,MCB 6A,TPN,MCB
VSS V VSS V 6A,TPN,MCB
400A TPN 0-500V R G A
0-500V R G A VSS V
MCCB,35KA W W W
400A TPN
A ASS kWH A ASS kWH MCCB,35KA W W W
400/5A
15VA,CL-1 250/5A A ASS kWH
15VA,CL-1 400/5A
500A TPN CU BUSBAR 300A TPN CU BUSBAR 15VA,CL-1
500A TPN CU BUSBAR
250A,TPN 250A,TPN 63A,TPN 40A,TPN 40A,TPN 40A,TPN 40A,TPN 40A,TPN 40A,TPN 40A,TPN 40A,TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 32A TPN 32A TPN 32A TPN 32A TPN 32A TPN 32A TPN 100A TPN 100A TPN 100A TPN 100A TPN 100A TPN 32A TPN 32A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 32A TPN
35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA
R R R R R R R R R R R R R R R R R R R R R R R R R
R R R R R R R R R R R
B G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G B
TO PDB- HIGH MAST
FEEDER PILLAR-1
FEEDER PILLAR-2
COMPRESSOR
P1 P3 P4 P5 P6 P7 P8 P9 P 10 P 11
20 A 3PHASE
32 A 3PHASE
20 A 3PHASE
20 A 3PHASE
SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
SUMP PUMP
P2
SUMP PUMP
CHARGING
63A 3Ø SOCKET
SHUNTER
N-L+PDB-1
N-L+PDB-2
SOCKET
SOCKET
SOCKET
SOCKET
N-L+PDB-7
SPARE
CHARGER
CHARGER
N-L+PDB-6
BATTERY
BATTERY
SPARE SPARE
VTPN - SMALL
SPARE
OUTLET
VTPN - 2
PARTS
C C
6A,TPN,MCB
VSS V 6A,TPN,MCB
0-500V R G A VSS V
400A TPN 0-500V R G A
6A,TPN,MCB MCCB,35KA W W W
400A TPN
VSS V
0-500V R G A
A ASS kWH MCCB,35KA W W W
63A 3Ø SOCKET
63A 3Ø SOCKET
63A 3Ø SOCKET
63A 3Ø SOCKET
SPARE SPARE SPARE SPARE
AUTOMATIC
AUTOMATIC
CL-10.00 KW
MD-9.00 KW
SUM PUMP
SUM PUMP
N - P DB-11
N - L DB-10
VTPN DB-3
BOGIE TEST
N - L DB-8
N- P DB-9
N-L+PDB-5
SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
OUTLET
OUTLET
OUTLET
OUTLET
VTPN DB-1
BENCH
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15
E E
HIGH MAST-1
HIGH MAST-2
HIGH MAST-3
HIGH MAST-4
HIGH MAST-5
HIGH MAST-6
HIGH MAST-7
HIGH MAST-8
HIGH MAST-9
F F
200/5A
A ASS kWH
A ASS kWH 200A TPN
200/5A 200/5A
A ASS kWH
MCCB,35KA W W W
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11
P1 P2 P3 P4 P5 P6 P7
SPARE SPARE SPARE SPARE SPARE SPARE SPARE
N-L+PDB-1
N-L+PDB-2
P7
N-L+P DB-12
P2 P6 P8
N-L+P DB-13
P3 P4
VTPN -1
VTPN -2
SPARE P1 P5
N-L+P DB-3
SPARE
N-P DB-2
N-L DB-1
P1 P2 P3 P4 P5 P6 P7
SPARE SPARE SPARE
N- P DB-15
N- P DB-16
N- P DB-17
N- L DB-13
N- L DB-14
SPARE SPARE
N-L+PDB-1
N-L+PDB-2
N-L+PDB-3
N-L+PDB-6
N-L+PDB-4
H H
6A,TPN,MCB
VSS V
I 0-500V R G A I
250A TPN
MCCB,35KA W W W
A ASS kWH
250/5A
300A TPN CU BUSBAR
15VA,CL-1
63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN
35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB 35KA,MCCB
AUTO PATH: C:\USERS\ENLPT-013\DESKTOP\VANAZ SUBMISSION\TENDER SUBMISSION\DED02-ENI-EL-PRM-DEV-SLD-3031,32,33,34.DWG
R R R R R R R R R R R R R R R
G G G G G G G G G G G G G G G
J J
P1 P2 P2 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15
N -P DB-11
N - P DB-8
N - L DB-5
N - L DB-6
N - L DB-9
N -P DB-7
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS COUNTER SIGNED BY
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR MAHARASHTRA METRO
PROJECT: PUNE METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. The Orion Building, 1st Floor, Opposite Don Bosco
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Center, Near Saint Mira's Girls College, Koregaon K
FOR GFC / NO OBJECTION'.
DDC / CONTRACTOR CONTRACTOR / DDC Park, Pune - 411001, MH, India
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO PMRP
DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NAME: RUPESH NAME: NEHA NAME: ANCHAL NAME: AJAY NAME: DATE: DATE: LOCATION: VANAZ DEPOT
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME: ELECTRICAL SCHEMATIC (PART 3 OF 4)
TITLE:
Consultant- Enia
L SYSTRA-AECOM-EGIS-RITES SCALE:AS SPECIFIED DATE: 04.07.2018 STATUS: TENDER DRAWINGS REVISION NO:
L
The Orion Building, 1st Floor, Opposite Don
TENDER DRAWINGS
PROOFCONSULTANT Bosco Center, Near Saint Mira's Girls DRG NO:
A0.1 04.07.2018
College, Koregaon Park, Pune - 411001, MH, DED01-ENI-EL-PRM-DEV-SLD-3033 A1.0
REV NO DATE DESCRIPTION SIGN India
1 2 3 4 5 6 7 8 9 10 11 12 15 16 1112
plot scale
TBA 50mm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
B B
6A,TPN,MCB 6A,TPN,MCB 6A,TPN,MCB
VSS V VSS V
VSS V
100/5A
A ASS kWH
G G G G G G G G G G G G G G G G G G G G G G G G G G
G G G G G G G
C C
63A 3Ø SOCKET
32A 3Ø SOCKET
20A 3Ø SOCKET
32A 3Ø SOCKET
20A 3Ø SOCKET
SPARE SPARE SPARE SPARE P1 P3 P4 P5 P6 P7 P8 P9 P10 P11
EOT CRANE
P2
EOT CRANE
SPARE SPARE SPARE
E-L+PDB-1
E-L+PDB-2
E-L+PDB-3
E-L+PDB-4
E-L+PDB-5
E-L+PDB-6
E-L+PDB-1
OUTLET
OUTLET
OUTLET
OUTLET
OUTLET
OUTLET
UPS DB -5(ADMIN)
UPS DB -6(ADMIN)
UPS DB -7(ADMIN)
UPS DB -8(ADMIN)
SPARE SPARE SPARE
(MAINTENANCE)
UPS DB -3(TSO)
UPS DB -1(ETU)
UPS DB -2(ETU)
UPS DB -4
GR. FLR.
S. FLR.
S. FLR.
F. FLR.
F. FLR.
D D
6A,TPN,MCB
VSS V
0-500V R G A 6A,TPN,MCB 6A,TPN,MCB
200A TPN VSS V
W W W
MCCB,35KA VSS V
0-500V R G A
200/5A ASS 0-500V R G A 400A TPN
250A TPN CU BUSBAR 15VA,CL-1
A KWH
200A TPN MCCB,35KA W W W
E MCCB,35KA W W W
A ASS kWH
E
32A,TPN 32A,TPN 63A,TPN 63A,TPN 63A,TPN 63A,TPN 63A,TPN 63A,TPN 63A,TPN 32A,TPN 32A,TPN 32A,TPN 32A,TPN 32A,TPN 32A,TPN 32A,TPN A ASS kWH 400/5A
36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 36KA,MCCB 200/5A 500A TPN CU BUSBAR 15VA,CL-1
R R R R R R R R R R R R R R R R
250A TPN CU BUSBAR
15VA,CL-1
G G G G G G G G G G G G G G G G 100A TPN 100A TPN 32A TPN 32A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 32A TPN
32A TPN 32A TPN 32A TPN 32A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 63A TPN 32A TPN 32A TPN 32A TPN 32A TPN 32A TPN MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA MCCB,35KA
R R R R R R R R R R R
MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA MCCB,36KA
R R R R R R R R R R R R R R R R G G G G G G G G G G G
G G G G G G G G G G G G G G G G
FEEDER PILLAR-2
F SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE P1 P2 P3 P4 P5 P6 P7 P8 P9 P 10 P 11 F
32A 3Ø SOCKET
63A 3Ø SOCKET
63A 3Ø SOCKET
SPARE SPARE SPARE SPARE
20A 3Ø SOCKET
P1 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 SPARE SPARE SPARE SPARE
E-L+PDB-5
E-L+PDB-6
P2
OUTLET
OUTLET
OUTLET
OUTLET
20A 3Ø SOCKET
32A 3Ø SOCKET
63A 3Ø SOCKET
63A 3Ø SOCKET
32A 3Ø SOCKET
20A 3Ø SOCKET
E- P DB- 6
EOT
E- L DB- 5
SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
E-L+PDB-7
E-L+PDB-8
OUTLET
OUTLET
OUTLET
OUTLET
OUTLET
OUTLET
G G
6A,TPN,MCB
VSS V
0-500V R G A 6A,TPN,MCB 6A,TPN,MCB
6A,TPN,MCB 63A TPN VSS V VSS V
VSS
0-500V
V
MCCB,35KA W W W 0-500V R G A 0-500V R G A
100A TPN
R G A
100A TPN 200A TPN
MCCB,35KA W W W MCCB,35KA W W W
MCCB,35KA W W W
G G G G G G G G G G G G G G G G G G G G G G G G
G G G G G G G G
P1 P2 P3 P4 P5 P6 P7 P8 P1 P2 P3 P4 P5 P6 P7 P8 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11
P1 P2 P3 P4 P5
E-L+PDB-10
SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
E-L+PDB-1
E-L+PDB-2
E-L+PDB-9
SPARE SPARE SPARE SPARE
E- P DB- 8
E- L DB- 7
E- P DB-10
SPARE
E- L DB-9
SPARE SPARE
E-L+PDB-1
E-L+PDB-2
LIFT
LIFT
I I
AUTO PATH: C:\USERS\ENLPT-013\DESKTOP\VANAZ SUBMISSION\TENDER SUBMISSION\DED02-ENI-EL-PRM-DEV-SLD-3031,32,33,34.DWG
J J
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS COUNTER SIGNED BY
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR MAHARASHTRA METRO
PROJECT: PUNE METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. The Orion Building, 1st Floor, Opposite Don Bosco
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Center, Near Saint Mira's Girls College, Koregaon K
FOR GFC / NO OBJECTION'.
DDC / CONTRACTOR CONTRACTOR / DDC Park, Pune - 411001, MH, India
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO PMRP
DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NAME: RUPESH NAME: NEHA NAME: ANCHAL NAME: AJAY NAME: DATE: DATE: LOCATION: VANAZ DEPOT
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME: ELECTRICAL SCHEMATIC (PART 4 OF 4)
TITLE:
Consultant- Enia
L SYSTRA-AECOM-EGIS-RITES SCALE: AS SPECIFIED DATE: 04.07.2018 STATUS: TENDER DRAWINGS REVISION NO:
L
The Orion Building, 1st Floor, Opposite Don
TENDER DRAWINGS
PROOFCONSULTANT Bosco Center, Near Saint Mira's Girls DRG NO:
A0.1 04.07.2018
College, Koregaon Park, Pune - 411001, MH, DED01-ENI-EL-PRM-DEV-SLD-3034 A1.0
REV NO DATE DESCRIPTION SIGN India
1 2 3 4 5 6 7 8 9 10 11 12 15 16 1113
plot scale
TBA 50mm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
FIRE LOOP-1
FIRE LOOP-2
FIRE LOOP-3
FIRE LOOP-4
FIRE LOOP-5
FIRE LOOP-6
FIRE LOOP-7
2 CORE ANNEALED TINNED COPPER CONDUCTOR PVC
SHEATHED FLEXIBLE FRLS 2 X 1.5 SQ MM CABLES
IN 16 GUAGE 25MM ∅ GI CONDUITS AS PER SPECS
LAN
LOCATION:
FIRE ALARM SYSTEM 1. FIRE ALARM SYSTEM AT DEPOT
REPEATER PANEL-1 CONTROL ROOM - DCC BUILDING
BATTERY BANK
2. FIRE REPEATER PANEL-1 AT
C RETURN TO FIRE PANEL
ASS BUILDING C
FOR ACCESS CONTROL FOR ELECT. ROOM
RI RI RI RI RI
FI MD SD MD FI MD MD SD MD SD SD MD SD
RI RI RI RI RI RI RI RI
MD MD SD MD SD MD MD SD FI MD SD SD MD SD MD SD MD MD SD MD
MD FI SD
RI
MD MD SD
RI
SD
RI
MD SD
RI
MD SD
RI
MD MD SD
RI
SD
RI
MD MD SD
RI
MD SD
RI
D
PS
24V DC SUPPLY
RI RI RI
WITH BATTERY BACKUP RI RI RI RI RI RI RI
SD MD SD MD MD SD MD SD SD MD SD MD SD MD SD MD SD MD FI MD SD MD
SD MD FI MD MD MD MD MD SD SD MD MD SD MD SD MD SD MD SD SD
RETURN TO FIRE PANEL
FOR FLOW S/W RI RI RI
RETURN TO FIRE PANEL RI RI RI RI RI RI RI
MD SD MD SD MD SD MD
RI RI RI
FOR ACCESS CONTROL FOR BATTERY RM. MD MD MD SD SD MD MD SD MCP SD MD MD SD SD MD SD MD FI FROM FIRE PANEL (LOOP - 5) FI FI SD MD SD MD SD MD
MD
TSS BUILDING MD SD MD MD SD SD MD SD MD SD MD SD MD SD FI MD SD MD SD
RI RI RI RI RI RI RI RI
FI SD MD SD MD FI SD MD MD MD MD SD MD SD MD SD MD SD MD SD MD
FOR ACCESS CONTROL FOR FLOODING GAS RETURN TO FIRE PANEL MCP
SD MD MD SD SD MD MD SD SD MD MD SD SD MD FI MD MD MD MCP FI RI RI RI RI RI RI RI RI
SD MD SD MD FI SD MD MD MD MD SD MD SD MD SD MD SD MD SD MD MCP
RI RI
MD MD
FOR FLOW S/W
MD SD MCP MD MD FI MD MD MD MD MD MD MD MD MD MD MCP SD RI RI RI RI RI RI RI
FI RETURN TO FIRE PANEL
MD SD MCP SD MD SD MD MD SD MD SD MD SD SD MD MD FI FROM FIRE PANEL (LOOP-4)
RI RI
FROM PANEL
MCP MCP MD MCP MD MD MD MD MD MD FI MD MD MD SD MD SD MD PS TELEPHONE BUS MCP MCP FI
24V DC SUPPLY PS
WITH BATTERY BACKUP 24V DC SUPPLY
MCP FI MD MCP MD MD MD MD MD MD MD MD MD MD MD MD MD FI FROM FIRE PANEL (LOOP-2) WITH BATTERY BACKUP
G PS
WORKSHOP BUILDING MEZZANINE FLOOR INSPECTION BAY G
24V DC SUPPLY
WITH BATTERY BACKUP FI
ETU WORKSHOP MCP MCP MCP MCP MCP MCP MCP MCP FI
FI RETURN TO FIRE PANEL
PS
RETURN TO TIME OFFICE MCP MCP FI 24V DC SUPPLY
FOR ACCESS CONTROL WITH BATTERY BACKUP
PS
FI MCP MD MD MD MD MCP MCP MD MD MD FI 24V DC SUPPLY
WITH BATTERY BACKUP
INTERNAL CLEANING
PS REPAIR BAY
24V DC SUPPLY
WITH BATTERY BACKUP
H FOR FLOW S/W H
SECURITY POST-2 FI MCP MCP FI FI
PS FOR ELECT. ROOM
FOR ACCESS CONTROL 24V DC SUPPLY RI RI RI RI
WITH BATTERY BACKUP MD SD MD MD MD MD MD MD MD MD FI MD MD SD SD MD MD SD MD
FI MCP MD MD MD MD MCP MCP MD MD MD FI
PIT WHEEL LATHE RI
FOR FLOW S/W
RI RI RI
PS MD MD MD MCP SD MD SD MD MD MD MD FI MD MD SD MD SD MD
24V DC SUPPLY
WITH BATTERY BACKUP FOR FLOW S/W RI RI RI RI RI
MD MD MD SD MD FI SD MD SD MD MD MD MD SD MD MCP MD SD MD
FI
SECURITY POST-1 FOR LIFT FOR ELECT. ROOM
FOR ELECT. ROOM RI
I RI RI RI RI
MD MD SD MD SD
RI
MD SD
RI
MCP MD SD
RI
MD MD MD SD
RI
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS COUNTER SIGNED BY
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR MAHARASHTRA METRO
PROJECT: PUNE METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. The Orion Building, 1st Floor, Opposite Don Bosco
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Center, Near Saint Mira's Girls College, Koregaon K
FOR GFC / NO OBJECTION'.
DDC / CONTRACTOR CONTRACTOR / DDC Park, Pune - 411001, MH, India
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO PMRP
DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NAME: RUPESH NAME: NEHA NAME: ANCHAL NAME: AJAY NAME: DATE: DATE: LOCATION: VANAZ DEPOT
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME: FIRE DETECTION SCHEMATIC DIAGRAM SHEET 1 0F 2
TITLE:
Consultant- Enia
L SYSTRA-AECOM-EGIS-RITES SCALE:AS SPECIFIED DATE: 04.07.2018 STATUS: TENDER DRAWINGS REVISION NO:
L
The Orion Building, 1st Floor, Opposite Don
TENDER DRAWINGS
SUB CONSULTANT:-
PROOFCONSULTANT Bosco Center, Near Saint Mira's Girls DRG NO:
A0.1 04.07.2018 ROARK CONSULTANTS
ANALYST CONSULTANTS College, Koregaon Park, Pune - 411001, MH, DED01-ENI-EL-PRM-DEV-SLD-3041 A1.0
REV NO DATE DESCRIPTION SIGN AEON CONSULTANTS India
1 2 3 4 5 6 7 8 9 10 11 12 15 16 1114
plot scale
TBA 50mm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A LEGEND:- A
B
MULTI CRITERIA DETECTOR MD 499 B
MONITOR MODULE 34
FIRE LOOP-1
FIRE LOOP-2
FIRE LOOP-3
FIRE LOOP-4
FIRE LOOP-5
FIRE LOOP-6
FIRE LOOP-7
CONTROL MODULE 80
D FIRE ALARM CONTROL PANEL 01 D
NOTES:
220V MAIN FIRE ALARM
AC MODBUS CARD
F CONTROL PANEL F
14 LOOP
TELEPHONE BUS
G G
LOCATION:
H FIRE ALARM SYSTEM 1. FIRE ALARM SYSTEM AT DEPOT H
J J
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS COUNTER SIGNED BY
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR MAHARASHTRA METRO
PROJECT: PUNE METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. The Orion Building, 1st Floor, Opposite Don Bosco
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Center, Near Saint Mira's Girls College, Koregaon K
FOR GFC / NO OBJECTION'.
DDC / CONTRACTOR CONTRACTOR / DDC Park, Pune - 411001, MH, India
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO PMRP
DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: 04-07-2018 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NAME: RUPESH NAME: NEHA NAME: ANCHAL NAME: AJAY NAME: DATE: DATE: LOCATION: VANAZ DEPOT
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME: FIRE DETECTION SCHEMATIC DIAGRAM SHEET 2 0F 2
TITLE:
Consultant- Enia
L SYSTRA-AECOM-EGIS-RITES SCALE:AS SPECIFIED DATE: 04.07.2018 STATUS: TENDER DRAWINGS REVISION NO:
L
The Orion Building, 1st Floor, Opposite Don
TENDER DRAWINGS
SUB CONSULTANT:-
PROOFCONSULTANT Bosco Center, Near Saint Mira's Girls DRG NO:
A0.1 04.07.2018 ROARK CONSULTANTS
ANALYST CONSULTANTS College, Koregaon Park, Pune - 411001, MH, DED01-ENI-EL-PRM-DEV-SLD-3042 A1.0
REV NO DATE DESCRIPTION SIGN AEON CONSULTANTS India
1 2 3 4 5 6 7 8 9 10 11 12 15 16 1115
plot scale
TBA 50mm