DRAINAGE
DRAINAGE
5 4 3
Contractor:
Ø110 RWP F/A & Ø110 RWP F/A & Ø110 RWP F/A & Long term stocking area : (LTSA)
FREE DISCHARGE
ABOVE 15cm FROM F.F.L
UP UP
FREE DISCHARGE
ABOVE 15cm FROM F.F.L
FREE DISCHARGE
UP
ABOVE 15cm FROM F.F.L
Alghanim International
C
Internal mule recharging area : (IMR) C
General Trading & Contracting Co.W.L.L
IT ROOM
Restricted area : (RA)
G013 -
ITAR
G001
-
AREA =40m
Fly Away kit area : (FAKA)
FORKLIFT ROUTE
WALKWAY
FORKLIFT ROUTE
Offices : (OF) Sub Contractor:
RIA LTSA
Toilets : (WC) FE C
G011 - G012 -
AREA =300m AREA =600m
ITAR area : (ITAR)
Quarantine area : (Q) NOTES:-
STORAGE AREA =300m STORAGE AREA =300m 1. ALL DIMENSIONS ARE IN MILLIMETERS
OTHERWISE MENTIONED.
LEGEND:-
IMR
Q
G002 - RAIN WATER PIPE - (R.W.P)
SOIL PIPE - (S.P)
WASTE PIPE - (W.P)
WALKWAY
VENT PIPE - (V.P)
PANTRY
F.D FLOOR DRAIN
Ø110mm SP @ U/G
G008 -
FORKLIFT ROUTE Ø110 WP F.C.O
UP
FLOOR CLEAN OUT
F/A-TO U/G
S=1%
50
I.C INSPECTION CHAMBER
Ø
FD F/A FROM ABOVE
Ø
Ø110 SP
F/B FROM BELOW
11
0
W
CORRIDOR G014 - T/A TO ABOVE
P
G.T Ø110
RA T/B TO BELOW
FAKA GCO
G003 - FCO I.C H/L HIGH LEVEL
AREA =38m
G004 -
AREA =150m Ø110mm SP @ U/G
AREA =200m S=1% F/H/L FROM HIGH LEVEL
Ø
FD T/H/L TO HIGH LEVEL
50
OFFICE- OFFICE -
WC
Ø50 VP
Ø110 SP F/A-TO U/G
Ø110 SP
G006 G007 G009 - U/G UNDER GROUND
AREA =17.30m AREA =17.30m
WC Ø50 VP F/B-T/A T/U/G TO UNDER GROUND
OFFICE
G010FD - F/U/G FROM UNDER GROUND
G005 -
50
AREA =28m S SLOPE
Ø
FCO Ø DIAMETER
cm CENTIMETER
UP
UP UP mm MILLIMETER
Ø110 RWP F/A & Ø110 RWP F/A & Ø110 RWP F/A & T.O.S TOP OF SLAB
FREE DISCHARGE FREE DISCHARGE FREE DISCHARGE
F.F.L FINISH FLOOR LEVEL
ABOVE 15cm FROM F.F.L ABOVE 15cm FROM F.F.L ABOVE 15cm FROM F.F.L
I.L.P INVERT LEVEL OF PIPE
B B
GROUND FLOOR
(SCALE 1:100)
Key Plan:
NORTH
QUEBLA
1 2 3 4 5
10
6 7 8 9 (Not Used)
13a
11a 11b 12a 12b (Not Used)
Project Name:
INFRASTRUCTURE FACILITIES
FOR EUROFIGHTER TYPHOON
AT AL-SALEM AIR FORCE BASE
DESIGN DRAWING
Project Number: K16081-0100D
PANTRY
M008 -
Ø110 WP H/L/B-T/B
01 AB. 13/05/2023 FOR APPROVAL
50
0 AB. FOR APPROVAL
Ø
Ø110 WP @ H/L/B Ø110 WP @ H/L/B Ø110 WP @ H/L/B Ø110 WP @ H/L/B
A RE
FD
A Rev Phase Date Description Appr
S=1% S=1% S=1% S=1% CORRIDOR
10 9 8 7 6 5 4 3 2 1
Ø110 FFD
Ø110 SP
M009 -
Revisions : 01
D.V & O.F
2 RE File Name:
Ø110 WP @ H/L/B
Ø110 WP H/L/B-T/B
Ø50 VP F/B-T/A
LOBBY ELEC.
SCALE: AS SHOWN
S=1%
Ø
50
4 WC-M
FD
OFFICE-1 M007 -
DESIGNED BY:
OFFICE-2
Ø50 VP
Ø110 SP
FIRE FIGHTING PUMP
D.V & O.F
5
M004 - M005 - CHECKED BY: ENG.ANTON
WC-F FD
APPROVED BY:
6 Ø110 FFD M006 -
50
Sheet Title
RE
Ø
FCO
DW DESIGN PROPOSAL FOR
G.R.P WATER TANK NEW STORAGE
10 x 6 x 2 = 120 m.cub
Ø110 RWP F/A-T/B WITH COMPLETE ACCESS Ø110 RWP F/A-T/B Ø110 RWP F/A-T/B GROUND & MEZZANINE FLOOR
(FIRE FIGHTING)
DARAINAGE LAYOUT
Sheet No.
DI/ARCH/ST/PL/001 REV-00
MEZZANINE FLOOR Approved SD No.
(SCALE 1:100)
Transmittal No.
5 4 3