Lab. Code No.

: CNT150236 Page 1 of 8
Report No. : 131053CNT150236(4)

Report for Flourescent Magnetic Particle Inspection

Information Supplied by Client

Client : CLP Power Hong Kong Ltd.


Client Address : GED Office, Black Point Power Station, Lung Yiu Street,
Tuen Mun, N.T., Hong Kong.
Project : Provision of Specialized Service - NDT
Location of test : Black Point Power Station Unit: C6 Plant: Turbine
Component description : LP Steam Rotor (Serration)
Welding Process : Not Applicable
Component Material : Steel
Acceptance Standard : All Indications to be reported
New Engineering Contract No. : 4600005331
W.O. Number : 80638586

Laboratory Information

Date Tested : 12 & 13-Feb-2022


Inspection procedure no. : MI-17.5.1-N020
Magnetization Method : Flux Flow, Continuous
Pole Direction : Two directions approx. 90° apart
Pole Spacing : Max. 150mm
Pole Dimension : 25mm x 25mm
Viewing Condition : UV-A 1000µW/cm 2 intensity and white light not exceed 20 lux on test surface
Surface Condition : As Smooth, Dry and Clean
Medium Application : Spraying

Equipment ID. & Consumable Used :-


- Magnetization Equipment : N-026-32 & EQ-NDT-MP-003
- Background Media : N-027-8 & 9
- Detecting Media : MAGNAFLUX 14AM

Remarks : 1. All test results are as at time of testing.


2. All test locations are as directed by the client.
3. See the attached sketch for test locations.
4. This report is a supplement to our previous test report no. 131053CNT150236.

Results Summary:
Parts with deviation : : --
Parts with no deviation : : --

Remarks :

NT-R-77 (01/12/2008) P.1


Lab. Code No. : CNT150236 Page 2 of 8
Report No. : 131053CNT150236(4)

Report for Fluorescent Magnetic Particle Inspection


Test Results A
B

Black Point C1 Turbine - LP


Convex Face 1
Blade Root View From Outlet Side 2
3
All measurement taken from outlet side 4
A = Measurement from outlet edge to start 5 Indication
of indication Serration Nos.
B = Measurement of indication length Example
Slot No. Serration A (mm) B (mm) Comment
101 -- -- -- No Recordable Indication
102 -- -- -- No Recordable Indication
103 -- -- -- No Recordable Indication
104 -- -- -- No Recordable Indication
105 -- -- -- No Recordable Indication
106 -- -- -- No Recordable Indication
107 -- -- -- No Recordable Indication
108 -- -- -- No Recordable Indication
109 -- -- -- No Recordable Indication
110 -- -- -- No Recordable Indication
111 -- -- -- No Recordable Indication
112 -- -- -- No Recordable Indication
113 -- -- -- No Recordable Indication
114 -- -- -- No Recordable Indication
115 -- -- -- No Recordable Indication
116 -- -- -- No Recordable Indication
117 -- -- -- No Recordable Indication
118 -- -- -- No Recordable Indication
119 -- -- -- No Recordable Indication
120 -- -- -- No Recordable Indication
121 -- -- -- No Recordable Indication
122 -- -- -- No Recordable Indication
123 -- -- -- No Recordable Indication
124 -- -- -- No Recordable Indication
125 -- -- -- No Recordable Indication
126 -- -- -- No Recordable Indication
127 -- -- -- No Recordable Indication
128 -- -- -- No Recordable Indication
129 -- -- -- No Recordable Indication
130 -- -- -- No Recordable Indication
131 -- -- -- No Recordable Indication
132 -- -- -- No Recordable Indication
133 -- -- -- No Recordable Indication

Y.Y.Leung / K.H.Ho / K.L.Li /


PCN-MT-Level II /
Tested by : C.Y.Kong / W.K.Leung / N.C.Lau Qualification : ASNT-SNT-TC-1A Level II Date :

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-MT-Level 3
NT-R-77 (01/12/2008) P.2
Indication

Remarks
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--

13-Feb-2022
Lab. Code No. : CNT150236 Page 2 of 8
Report No. : 131053CNT150236(4)

Report for Fluorescent Magnetic Particle Inspection


Test Results A
B

Black Point C1 Turbine - LP


Convex Face 1
Blade Root View From Outlet Side 2
3
All measurement taken from outlet side 4
A = Measurement from outlet edge to start 5 Indication
of indication Serration Nos.
B = Measurement of indication length Example
Slot No. Serration A (mm) B (mm) Comment
134 -- -- -- No Recordable Indication
135 -- -- -- No Recordable Indication
136 -- -- -- No Recordable Indication
137 -- -- -- No Recordable Indication
138 -- -- -- No Recordable Indication
139 -- -- -- No Recordable Indication
140 -- -- -- No Recordable Indication
141 -- -- -- No Recordable Indication
142 -- -- -- No Recordable Indication
143 -- -- -- No Recordable Indication
144 -- -- -- No Recordable Indication
145 -- -- -- No Recordable Indication
146 -- -- -- No Recordable Indication
147 -- -- -- No Recordable Indication
148 -- -- -- No Recordable Indication
149 -- -- -- No Recordable Indication
150 -- -- -- No Recordable Indication
151 -- -- -- No Recordable Indication
152 -- -- -- No Recordable Indication
153 -- -- -- No Recordable Indication
154 -- -- -- No Recordable Indication
155 -- -- -- No Recordable Indication
156 -- -- -- No Recordable Indication
157 -- -- -- No Recordable Indication
158 -- -- -- No Recordable Indication
159 -- -- -- No Recordable Indication
160 -- -- -- No Recordable Indication
161 -- -- -- No Recordable Indication
162 -- -- -- No Recordable Indication
163 -- -- -- No Recordable Indication
164 -- -- -- No Recordable Indication
165 -- -- -- No Recordable Indication
166 -- -- -- No Recordable Indication

Y.Y.Leung / K.H.Ho / K.L.Li /


PCN-MT-Level II /
Tested by : C.Y.Kong / W.K.Leung / N.C.Lau Qualification : ASNT-SNT-TC-1A Level II Date :

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-MT-Level 3
NT-R-77 (01/12/2008) P.2
Indication

Remarks
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--

13-Feb-2022
Lab. Code No. : CNT150236 Page 2 of 8
Report No. : 131053CNT150236(4)

Report for Fluorescent Magnetic Particle Inspection


Test Results A
B

Black Point C1 Turbine - LP


Convex Face 1
Blade Root View From Outlet Side 2
3
All measurement taken from outlet side 4
A = Measurement from outlet edge to start 5 Indication
of indication Serration Nos.
B = Measurement of indication length Example
Slot No. Serration A (mm) B (mm) Comment
166 -- -- -- No Recordable Indication
167 -- -- -- No Recordable Indication
168 -- -- -- No Recordable Indication
169 -- -- -- No Recordable Indication
170 -- -- -- No Recordable Indication
171 -- -- -- No Recordable Indication
- End -

Y.Y.Leung / K.H.Ho / K.L.Li /


PCN-MT-Level II /
Tested by : C.Y.Kong / W.K.Leung / N.C.Lau Qualification : ASNT-SNT-TC-1A Level II Date :

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-MT-Level 3
NT-R-77 (01/12/2008) P.2
Indication

Remarks
--
--
--
--
--
--

13-Feb-2022
Lab. Code No. : CNT150236 Page 8 of 8
Report No. : 131053CNT150236(4)

Report for Fluorescent Magnetic Particle Inspection

C6 Turbine - LP Steam Rotor (Serration)

Stage 4
Stage 3
Stage 2
Stage 1
Stage 5

Generator Side

Gas Turbine Side Daturn Point

Test Location

Test Location for LP Steam Rotor (Serration)

Remark: This sketch is not in scale.


Tested Area
NT-R-77 (01/12/2008) P.3