Weigh Bridge

(Depth GFL‐1,500?)

1600T Press pit


(Depth GFL‐6,000)
Conveyor pit
(Depth GFL‐3,200) 2,750
Conveyor pit is closed
by concrete slab
2,500 (LL=10t/m2)Like a
tunnel.
This area is opened
for maintenance
800T BL pit (Length 4.0m)
(Depth GFL‐4,000)
2,750

2,350
300T Machine 3000T Press pit
Supported by (Depth GFL‐6,500)
2 Steel Beams

500T Press pit 2,750


(Depth GFL‐3,100)
(1) 1600 t Press Pit detail

10500

Connect to
Conveyor pit
7300

2,750
Depth
6000

*Based on 20231107 Drawing


(2) 3000 t Press Pit detail

Connect to
Conveyor pit

8350

2,750
11500
Depth
6500
(3) 800 BL Pit detail

7300
Depth
4000

5200
Connect to
Conveyor pit

2,350
(4) 500 DSP Pit detail

* To be confirmed on 11th
Dec. Please proceed with
6700mm.
6700

4000
Depth:3100mm