RIYADH GEOTECHNIQUE & FOUNDATIONS CO.

Contract No. 4800000121

Contract Title Neom Desalination Plant to Gayal Transmission System

Work/Service Order No. SO-003

Work Order Title Topographic Survey, Geotechnical and Geophysical Investigations

FACTUAL GEOTECHNICAL INVESTIGATION REPORT FOR

LAYDOWN AREAS (LD-1, LD-3 & LD-5)

Document No. 11-180000-4800000121-RGF-GEO-RPT-000004


Document Revision History:
Prepared by Checked by Approved by
Rev. Revision Description Status Date (Geotechnical (Sr. Geotechnical (Manager, Western
(Reason for Issue)
Engineer) Engineer) Region)

Mohammed
01 Original For Review 30.03.2022 Shahzad Shafiq Hamid Ismail
Aboueishe

Signatures:

Document Review Status Date: Name/Signature:

1 - Work May Proceed


2 - Incorporate Comments – Proceed
3 - Revise & Re-submit. Do NOT proceed
4 - Review Not Required – Proceed

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 1 OF 20


FACTUAL GEOTECHNICAL INVESTIGATION REPORT

FOR LAYDOWN AREAS (LD-1, LD-3 & LD-5)

11-180000-4800000121-RGF-GEO-RPT-000004 R e v 0 1 , M a r c h 2 0 2 2

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 2 OF 20


Document history

Revision code Description of changes Purpose of issue Date

01 Original For Review 30.03.2022

Document approval

Prepared by Reviewed by Approved by


Name Shahzad Shafiq Mohammed Aboueishe Hamid Ismail

Job Title Geotechnical Engineer Sr. Geotechnical Engineer Manager, Western Region

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 3 OF 20


SO-003 NEOM DESALINATION PLANT TO GAYAL
LAYDOWN AREAS (LD-1, LD-3 & LD-5)

TABLE OF CONTENTS

DESCRIPTION Page No.


-------------------------------------------------------------------------------------------------------------------------
1. INTRODUCTION 7

2. PURPOSE AND SCOPE OF WORK 9

3. FIELD INVESTIGATION 11
3.1 Excavation of Trial Pits 11
3.2 Percolation Test 11
3.3 Insitu CBR Test 12
3.3.1 Procedure 13
3.4 Plate Load Tests 13

4. LABORATORY TESTING 15
4.1 General 15
4.2 Soil Classification Tests 16
4.3 Proctor Test and CBR Tests 16
4.4 Chemical Tests 16

5. REGIONAL AND SITE GEOLOGY 17


5.1 Regional Geology 17
5.1.1 Cambrian Deposits 17
5.1.2 Paleozoic Sedimentary Rocks 17
5.1.3 Tertiary Deposits 18
5.1.4 Quaternary Deposits 18
5.2 Site Geology 19
5.2.1 The Subsurface Soil Stratigraphy 19

FIGURES

TABLES

APPENDIX-A FIELD DATA


Laydown No. 01
- Trial Pit Logs
- Field Density Tests
- Double Cycle Plate Load Tests
- Percolation Test
- Insitu CBR Tests

Laydown No. 02
- Trial Pit Logs
- Field Density Tests
- Double Cycle Plate Load Tests
- Percolation Test
- Insitu CBR Tests

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


TABLE OF CONTENTS

DESCRIPTION
-------------------------------------------------------------------------------------------------------------------------
APPENDIX-A FIELD DATA
Laydown No. 05
- Trial Pit Logs
- Field Density Tests
- Double Cycle Plate Load Tests
- Percolation Test
- Insitu CBR Tests

APPENDIX-B LABORATORY TESTING RESULTS


Laydown No. 01
- Moisture Content
- Particle Size Distribution
- Atterberg Limits
- Modified Proctor Tests
- California Bearing Ratio Tests
Laydown No. 03
- Moisture Content
- Particle Size Distribution
- Atterberg Limits
- Modified Proctor Tests
- California Bearing Ratio Tests
Laydown No. 05
- Moisture Content
- Particle Size Distribution
- Atterberg Limits
- Modified Proctor Tests
- California Bearing Ratio Tests

APPENDIX-C PHOTOGRAPHS
Laydown No. 01
- Trial Pits
Laydown No. 03
- Trial Pits
Laydown No. 05
- Trial Pits

APPENDIX-D APPROVED LABORATORY TESTING SCHEDULES


Laydown No. 01
Laydown No. 03
Laydown No. 05

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


MAIN REPORT

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 6 OF 20


1. INTRODUCTION

Neom has embarked on the construction of Water Transmission system


(pipeline), Pump Stations and Laydown area between Neom Desalination
Plant to Gayal. The sites are situated in the northern part of Saudi Arabia.
Riyadh Geotechnique & Foundations Co. (RGF) has been awarded a
Contract under Service Order No. 3 to carry out the subsurface geotechnical
investigation and laboratory testing services at the above mentioned project.
The scope of services includes drilling of boreholes, in-situ testing &
sampling, excavation of trial pits, logging & sampling, groundwater level
observations and laboratory testing of the selected soil and rock samples
retrieved during the field works and preparation of factual and interpretive
reports.

This factual report relates to three (3) Laydown Areas (LD-1, LD-3 & LD-5).
The scope of work for Laydown Areas includes excavation of trial pits as well
as relevant insitu & laboratory testing. All field and laboratory works were
performed according to the stipulated scope and specifications.

Upon receipt of the Service Order from Neom and getting permissions from
concerned authorities, Riyadh Geotechnique and Foundations (RGF)
mobilized necessary equipment and personnel at Laydown site on
December 27, 2021 on the project site and the field investigation was
completed on January 29, 2022.

This geotechnical report presents a general description of the site, details of


investigation performed for remaining work, a general assessment of the
project area. The report also presents the assessments of the subsurface

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 7 OF 20


soil data obtained from the trial pits incorporating the laboratory test results
from the selected soil/rock samples.

The field test results are presented in APPENDIX-A, whereas the laboratory
test results are presented in APPENDIX-B of this report. The as-built
coordinates and elevations of the trial pits are shown on TABLE-A.
Photographs of trial pits are presented as a separate APPENDIX-C to this
report. Laboratory testing schedules for trial pits were prepared by RGF and
forwarded to EPM for necessary approval. The approved laboratory testing
schedules are presented in APPENDIX-D of this report.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 8 OF 20


2. PURPOSE AND SCOPE OF WORK

The purpose of the present investigation was to assess the prevailing


subsurface geotechnical conditions at the site and to verify the geo-
engineering properties of the various subsurface soil/rock layers. The scope
of work for LD-01, LD-03 & LD-05 comprised of the following tasks:

1. Laydown No. 01

a) Excavation of six (6) trial pits down to 3.0 meters depth or refusal,
whichever comes first, field density test and collection of bulk
samples for classification & CBR testing.

b) Performance of six (6) double cycle Plate Load tests at 0.5 meter
depth in trial pits.

c) Performance of six (6) Percolation test in trial pits using BRE-365


Method.

d) Performance of six (6) insitu CBR test at 0.5 meter depth in trial pits.

2. Laydown No. 03

a) Excavation of nine (9) trial pits down to 3.0 meters depth or refusal,
whichever comes first, field density test and collection of bulk
samples for classification & CBR testing.

b) Performance of nine (9) double cycle Plate Load tests at 0.5 meter
depth in trial pits.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 9 OF 20


c) Performance of nine (9) Percolation test in trial pits using BRE-365
Method.

d) Performance of nine (9) insitu CBR test at 0.5 meter depth in trial
pits.

3 Laydown No. 05

a) Excavation of nine (9) trial pits down to 3.0 meters depth or refusal,
whichever comes first, field density test and collection of bulk
samples for classification & CBR testing.

b) Performance of nine (9) double cycle Plate Load tests at 0.5 meter
depth in trial pits.

c) Performance of nine (9) Percolation test in trial pits using BRE-365


Method.

d) Performance of nine (9) insitu CBR test at 0.5 meter depth in trial
pits.

4. Conducting laboratory tests on representative soil samples, retrieved


from the trial pits.

5. Preparation of a factual geotechnical report presenting the investigation


procedures and the results of the in-situ and laboratory tests.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 10 OF 20


3. FIELD INVESTIGATION

The actual field investigation program comprised of excavation of twenty-four


(24) trial pits, twenty-four (24) insitu CBR, twenty-four (24) Plate load test and
twenty-four (24) Soakaway tests and are presented in APPENDIX-A. Survey
coordinates of all investigation points are presented on individual trial pit logs
and summarized in TABLE-A. Trial pits locations are shown in FIGURE-1.

3.1 EXCAVATION OF TRIAL PITS

The field investigation program also included excavation of twenty-four (24)


trial pits and field density tests (FDT) at designated locations as shown in
FIGURE-1. The pits were excavated mechanically down to 3.0 meters depth
or to hard pan, whichever came first. All test pits were logged, photographed
and representative bulk soil samples were collected from various depths in
the trial pits and later transported to RGF laboratory for further evaluation
and testing. The test pit logs are presented in APPENDIX-A. Photographs of
trial pits are presented in APPENDIX-C.

3.2 PERCOLATION TEST

The percolation tests were performed in pre-excavated trial pits, in


accordance with BRE Digest 365. The test procedure is described below:

1. Excavate a trial pit of the appropriate size and depth.


2. Record the area of the base of the trial pit.
3. Record the area of the pit at the depth, upto which water will be filled
during the test.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 11 OF 20


4. Record the area of the pit at 50% depth.
5. Fix graduated scale in the test pit to record the water depth.
6. Fill the pit with water to the desired level.
7. Record the elapsed time between 75% and 25% of the water depth.

Following relationship was used to estimate the percolation/infiltration


coefficient at site.

q=

Vp= Storage volume of the pit between 75% and 25% of the water depth
ap= Area of the base and sides of the pit at 50% of the water depth
tp= Elapsed time to empty between 75% and 25% of the water depth

Results of percolation test are presented in APPENDIX-A.

3.3 IN-SITU CBR TEST

In-situ field California Bearing Ratio tests were performed at 0.5 meter depth
in trial pits to determine in situ CBR value in accordance with ASTM D4429
at designated locations.

A loaded truck was used for applying the load by means of a mechanical
screw jack. The other equipment used are 5 cm diameter loading plunger,
extension rods, jacks, proving ring assembly, dial gauge, datum frame,
annular surcharge plate 25 cm in diameter and 5 kg. in weight, with a central
hole and slot width of 5.32 cm.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 12 OF 20


3.3.1 PROCEDURE

A circular area of about 30 cm in diameter is trimmed and leveled. Care was


taken at the center where the plunger is to be seated. The surcharge load of
15 kg is placed on this surface and the plunger is seated properly. The dial
gauge to measure the penetration is attached to the plunger from an
independent datum frame. A seating load of 4 kg is applied, and the load
and penetration dials are set to zero.

The load is applied to the plunger by means of the jack such that the rate of
penetration is approximately 1.3mm/minute. The load readings are noted for
penetrations 0.0, 0.6, 1.27, 1.91, 2.54, 3.81, 5.08, 6.35, 7.62, 8.89 and
10.16mm. The load is released, and moisture content specimen is taken
from underneath the plunger.

The load-penetration curve is plotted and the CBR value is calculated.


Results of field CBR are presented in APPENDIX-A

3.4 PLATE LOAD TESTS

Twenty-four (24) Plate Load tests were performed at designated locations to


evaluate the load settlement behavior of the upper soil layers. The applied
pressure on a rigid steel plate was measured by the Bourdon gauge
connected to the pressure line of the hydraulic jack and the settlement of the
plate was recorded by observing readings on three dial gauges clamped to
independently supported reference beams. The procedure for Plate Load
test consists of the following steps:

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 13 OF 20


1. A 600 mm diameter rigid steel plate was firmly seated on the leveled
ground at each test location.

2. The loading jack, the reference beams and the gauges for observing
settlements were installed.

3. The test plate was loaded in equal load increments to the maximum plate
pressure. Plate settlements were noted against each load increment.

4. After reaching the maximum plate pressure the plate was unloaded in
three decrements and rebound for each decrement was recorded.

5. All pressure versus settlement data was recorded in tabular form and
presented as pressure versus settlement curves for each plate load test.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 14 OF 20


4. LABORATORY TESTING

4.1 GENERAL

The samples retrieved from the boreholes and trial pits were logged,
examined in the field, preserved and transported to RGF testing laboratory
in Jeddah for relevant laboratory testing. Laboratory test schedules were
prepared for each exploratory borehole and presented to EPM for approval.
The laboratory test results are presented in APPENDIX-B of this report.

Soil samples collected from the boreholes were subjected to the following
tests as per latest ASTM / BS or equivalent Standards.

● Grain size Analysis (ASTM D 421, 422) including hydrometer


● Atterberg Limits (ASTM D 4318)
● Natural Moisture Content (ASTM D 2216)
● Laboratory Compaction of Soil using Modified Effort (ASTM D 1557)
● 3 Point Soaked CBR (ASTM D 1883)
● Water Soluble Sulphates Content (BS 1377 Part 3)
● Water Soluble Chloride Content (BS 1377 Part 3)
● pH (BS 1377 Part 3)

Brief description of the laboratory tests performed are outlined in the


following sections:

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 15 OF 20


4.2 SOIL CLASSIFICATION TESTS

The classification test performed on selected representative samples of


subsurface materials consisted of determination of natural moisture content
(ASTM D2216), Liquid Limit and Plastic Limits (ASTM D4318), Grain Size
Analysis (ASTM D422) and sedimentation by Hydrometer (ASTM D422).

4.3 PROCTOR TEST AND CBR TESTS

Proctor tests and CBR tests were performed on the bulk soil samples
according to testing schedule. The tests were performed according to the
ASTM D1557 and ASTM D1883, respectively.

4.4 CHEMICAL TESTS

Chemical tests were performed on the selected soil samples. The testing
program included determination of pH (BS-1377), Acid Soluble Chloride
(BS-1377), Acid Soluble Sulphate (BS-1377) and Carbonate Contents
(ASTM D4737) of soil samples.

All laboratory test results are presented in APPENDIX-B.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 16 OF 20


5. REGIONAL & SITE GEOLOGY

5.1 REGIONAL GEOLOGY

The Bad Quadrangle (Sheet 28A) & Al-Muwaylih (Sheet 27A) lies in the
north province of Arabian Shield, on the eastern edge of Red Sea rift
(between latitude 28o 00’ and 29o 00’ N and longitude 34o30’ and 36o30’.
FIGURE-2 shows the location of the Al- Bad & Al-Muwaylih Quadrangle
(sheet 28A & 27A). The quadrangle is in the northern part of the Hijaz
region. A flat low-laying coastal plain is succeeded eastwards by the rock
mountains. The regional geology applicable to NEOM site is presented as
follows:

5.1.1 CAMBRIAN DEPOSITS

Oldest deposits in this site area are numerous small granitic plugs and
irregular bodies that are intruded into other formations and the oldest granitic
plutons. The small intrusions are diffucklt to recognise. They are variable in
mineralogy, composition and appearance. Most consists of medium grained
leucocratic monzogranite, some of syenogranite and micrograinte, there
intrusions are of various ages and some shows resemblances to Aliya or
Lawz units.

5.1.2 PALEOZOIC SEDIMENTARY ROCKS

Paleozoic sedimentary rocks crop-out in the western area of the site. The
Cambrian Siq Sandstone unconformably overlies the Proterozoic basement.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 17 OF 20


It is composed of coarse grained quartz sandstone that is well bedded and
locally cross-bedded. It is dark red to reddish brown. Quartz pebble
scattered throughout the sequence and there is thin quartz pebble
conglomerate at the base. North of Wadi Abu Khurma, it is cut-out by
Quweira sandstone which is mainly light reddish brown, massive, medium to
coarse grained arkosic sandstone. Ram and Umm Sahm sandstone
conformably overlie the Queweira sandstone. It mainly consists of light
brown to white massive quartz sandstone and of subordinate brown, sandy
shale or siltstone.

5.1.3 TERTIARY DEPOSITS

The thin sequence of Predominantly Miocene sedimentary rocks exposed in


the Aynunah area was named the Khuraybah formation named after the
village of Al-Khuraybah, it is mainly shallow water limestone sequence
marked by many facies changes but it contains interbedded sandstone and
minor pebbly conglomerate. An isolated are of gypsum-anhydrite limestone
beds.

The lower part of the Khuraybah formation consists of reefal limestone that
flanks the edge of the proterozoic basement rocks along the al-Khurabah
coastal section.

5.1.4 QUATERNARY DEPOSITS

Quaternary deposits in the area are of continental and marine origin. Along
the Al-Khurabah coastal section, alluvial gravel sheets and terraces slope

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 18 OF 20


gently toward the Red Sea, each level reflecting a relative uplift of the land
during the early Quaternary. It consists mainly of poorly sorted and crudely
layered. Pebble and cobble gravels having a sandy, silty or clayey matrix.
Other undifferentiated sand and gravel deposits consists of Wadi alluvium
and minor Wadi terrace deposits found throughout the area. Immediately
adjacent to the coast, alluvial out was that forms much of the surficial cover
are windblown sand and shell bearing beach sand.

5.2 SITE GEOLOGY

The description of the subsurface soil strata is based on the inspection of


soil samples retrieved from the boreholes and later refinements done after
obtaining laboratory test results. Based on the above procedure the
subsurface soil for Neom to Gayal Water Transmission System site is
described in the following paras.

5.2.1 THE SUBSURFACE SOIL STRATIGRAPHY

5.2.1.1 LAYDOWN AREA-1

Layer-1 The sub-soil strata encountered in trial pits at LD-1 is described


as Light brown, silty medium to fine SAND with gravel. Gravel
are angular to sub-rounded medium to coarse igneous origin

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 19 OF 20


5.2.1.2 LAYDOWN AREA-3

Layer-1 The sub-soil strata encountered in tiral pits at LD-3 is described


as Brownish grey to, silty medium to fine SAND with gravel and
cobbles or poorly to well SAND with gravel. Gravels are angular
to sub-rounded medium to coarse igneous origin. However in
one trial pits (TP-03) highly weathered Limestone was
encountered at 1.80 meter depth below existing ground level.

5.2.1.3 LAYDOWN AREA-5

Layer-1 The sub-soil strata encountered in trial pits at LD-5 is described


as Brownish grey, silty medium to fine SAND with gravel and
cobble or brownish grey, well-graded GRAVEL with silt and
sand. Gravels are angular to sub rounded medium to coarse of
igneous origin

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01 PAG E 20 OF 20


FIGURES

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


LEGEND

CLIENT :
NEOM

PROJECT NAME:
NEAM DESALINATION PLANT TO
GAYAL TRANSMISSION SYSTEM
CONTRACTOR :

FIGURE 2

Geological Map of the Site


TABLES

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


TABLE-A (As-built Coordinates and Elevation)
Client : NEOM
Project : NEOM Desalination Plant to Gayal Transmission System (Laydown-01,-3 & 05)
Project No. 21J4037
TRIAL PITS (Laydown-1)
Sr. No. TP ID Depth (m) Northing Easting Elevation
1 LD-1-TP-01 3 3110471.526 705196.53 31.169
2 LD-1-TP-02 3 3110281.485 705581.103 25.557
3 LD-1-TP-03 3 3110162.036 705337.308 31.134
4 LD-1-TP-04 3 3110041.178 705090.578 26.093
5 LD-1-TP-05 3 3109853.102 705477.878 21.146
6 LD-1-TP-06 3 3109791.184 705262.804 25.338
TRIAL PITS (Laydown-3)
Sr. No. TP ID Depth (m) Northing Easting Elevation
1 LD-3-TP-01 3 3104698.048 719331.445 39.789
2 LD-3-TP-02 3 3104655.664 719637.063 41.753
3 LD-3-TP-03 3 3104810.556 719707.366 42.945
4 LD-3-TP-04 3 3104891.76 719979.722 45.884
5 LD-3-TP-05 3 3104763.027 720203.212 46.851
6 LD-3-TP-06 3 3104613.32 719942.773 43.743
7 LD-3-TP-07 3 3104440.341 719661.073 33.184
8 LD-3-TP-08 3 3104480.215 719369.012 32.173
9 LD-3-TP-09 3 3104712.618 719029.401 36.893
TRIAL PITS (Laydown-5)
Sr. No. TP ID Depth (m) Northing Easting Elevation
1 LD-5-TP-01 3 3077839.172 740298.291 45.582
2 LD-5-TP-02 3 3077693.304 740100.679 41.974
3 LD-5-TP-03 3 3077530.892 739870.782 37.618
4 LD-5-TP-04 3 3077318.443 740010.37 40.843
5 LD-5-TP-05 3 3077533.489 740213.606 43.493
6 LD-5-TP-06 3 3077555.815 740427.565 43.768
7 LD-5-TP-07 3 3077342.986 740284.625 40.751
8 LD-5-TP-08 3 3077122.984 740138.787 37.584
9 LD-5-TP-09 3 3077085.353 739819.845 36.638
CLIENT : NEOM Company PROJECT NO.: 21J4037

PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-01)

TABLE-B
SUMMARY OF LABORATORY TESTS RESULTS OF TRIAL PITS (LD-01)

CBR
TRIAL Natural
Sample % Passing Through Open.Sieve (mm) Atterberg Limit Modified Proctor
PIT Moisture
Depth (m) Description of Material Symbol AASHTO
90% MDD 95% MDD 100% MDD

MDD 0.1" 0.2" 0.1" 0.2" 0.1" 0.2"


No. No. 19.000 4.75 0.425 0.075 Content % LL PL PI O.M.C %
(g/cm3) Pene. Pene. Pene. Pene. Pene. Pene.

TP-01 B-1 0.60 100 98 53 5 1.30 - NP - 1.92 6.1 13 15 18 21 24 28 Brown, poorly-graded SAND. SP A-3

" B-2 1.20 97 95 50 5 1.36 - NP - - - - - - - - - Brown, poorly-graded SAND with silt. SP-SM A-3

" S-6 2.50 100 95 25 5 0.82 - NP - - - - - - - - - Brown, poorly-graded SAND with silt. SP-SM A-1-b

TP-02 B-1 0.60 97 90 43 6 1.82 - NP - 1.94 6.1 15 18 21 24 26 30 Brown, poorly-graded SAND with silt. SP-SM A-1-b

" B-2 1.20 94 85 42 4 0.91 - NP - - - - - - - - - Light brown, poorly-graded SAND. SP A-1-b

" S-5 2.00 95 92 35 6 0.82 - NP - - - - - - - - - Brown, poorly-graded SAND with silt. SP-SM A-1-b

TP-03 B-1 0.60 99 90 40 15 4.02 - NP - - - - - - - - - Brown, silty SAND. SM A-1-b

Brown, well-graded SAND with silt and


" B-2 1.00 90 80 40 11 1.51 - NP - 2.01 6.1 19 22 24 28 29 34 SW-SM A-1-b
gravel.

Brown, poorly-graded SAND with silt and


" S-5 2.00 91 76 36 9 1.40 - NP - - - - - - - - - SP-SM A-1-b
gravel.

T-04 B-1 0.60 100 98 50 8 2.00 - NP - 1.93 6.1 14 16 20 23 25 28 Brown, poorly-graded SAND with silt. SP-SM A-1-b

PL = Plastic Limit NP = Non-Plastic PI = Plasticity Index


CLIENT : NEOM Company PROJECT NO.: 21J4037

PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-01)

TABLE-B
SUMMARY OF LABORATORY TESTS RESULTS OF TRIAL PITS (LD-01)

CBR
TRIAL Natural
Sample % Passing Through Open.Sieve (mm) Atterberg Limit Modified Proctor
PIT Moisture
Depth (m) Description of Material Symbol AASHTO
90% MDD 95% MDD 100% MDD

MDD 0.1" 0.2" 0.1" 0.2" 0.1" 0.2"


No. No. 19.000 4.75 0.425 0.075 Content % LL PL PI O.M.C %
(g/cm3) Pene. Pene. Pene. Pene. Pene. Pene.

TP-04 B-3 1.60 100 96 57 12 1.01 - NP - - - - - - - - - Brown, silty SAND. SM A-2-4

" S-6 2.50 98 93 34 10 1.71 - NP - - - - - - - - - Brown, well-graded SAND with silt. SW-SM A-1-b

TP-05 B-1 0.60 96 89 15 4 2.83 - NP - - - - - - - - - Brown, poorly-graded SAND. SP A-1-b

" B-2 1.00 100 98 76 31 1.89 - NP - 2.02 6.0 15 18 20 24 28 32 Light brown, silty SAND. SM A-2-4

TP-06 B-1 0.60 100 97 42 8 4.86 - NP - 1.96 6.9 13 16 19 22 25 29 Brown, well-graded SAND with silt. SW-SM A-1-b

" B-2 1.10 96 88 23 6 1.94 - NP - - - - - - - - - Brown, well-graded SAND with silt. SW-SM A-1-b

Greyish brown, poorly-graded SAND with silt


" S-6 2.00 92 79 20 6 1.73 - NP - - - - - - - - - SP-SM A-1-b
and gravel.

- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -

PL = Plastic Limit NP = Non-Plastic PI = Plasticity Index


CLIENT : NEOM Company PROJECT NO.: 21J4037

PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-03)

TABLE-C
SUMMARY OF LABORATORY TESTS RESULTS OF TRIAL PITS (LD-03)

CBR
TRIAL Natural
Sample % Passing Through Open.Sieve (mm) Atterberg Limit Modified Proctor
PIT Moisture
Depth (m) Description of Material Symbol AASHTO
90% MDD 95% MDD 100% MDD

MDD 0.1" 0.2" 0.1" 0.2" 0.1" 0.2"


No. No. 19.000 4.75 0.425 0.075 Content % LL PL PI O.M.C %
(g/cm3) Pene. Pene. Pene. Pene. Pene. Pene.

Greyish brown, well-graded SAND with silt


TP-01 B-1 0.60 83 59 14 6 0.82 - NP - 2.00 6.1 27 32 36 42 43 48 SW-SM A-1-a
and gravel.

Greyish brown, well-graded SAND with


" B-2 1.20 87 72 20 5 0.84 - NP - - - - - - - - - SW A-1-a
gravel.

Greyish brown, well-graded SAND with


" S-6 2.50 83 66 10 3 0.68 - NP - - - - - - - - - SW A-1-a
gravel.

Greyish brown, well-graded SAND with clay


TP-02 B-1 0.60 87 77 30 11 1.76 30 21 9 2.05 6.2 29 34 39 44 48 55 SW A-2-4
and gravel.

Greyish brown, well-graded SAND with clay


" B-2 1.20 87 78 27 12 1.50 32 22 10 - - - - - - - - SW A-2-4
and gravel.

Greyish brown, well-graded SAND with silt


" S-5 2.00 79 67 20 9 1.92 - NP - - - - - - - - - SW-SM A-1-a
and gravel.

TP-03 B-1 0.60 100 95 33 6 4.93 - NP - - - - - - - - - Greyish brown, poorly-graded SAND with silt. SP-SM A-1-b

" B-2 1.20 100 95 27 6 4.50 - NP - 1.95 6.2 12 14 18 21 23 27 Greyish brown, well-graded SAND with silt. SW-SM A-1-b

" B-3 1.80 93 87 29 71 3.22 - NP - - - - - - - - - Greyish brown, well-graded SAND with silt. SW-SM A-1-b

Greyish brown, well-graded SAND with silt


TP-04 B-1 0.60 91 80 25 9 0.83 - NP - - - - - - - - - SW-SM A-1-b
and gravel.

PL = Plastic Limit NP = Non-Plastic PI = Plasticity Index


CLIENT : NEOM Company PROJECT NO.: 21J4037

PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-03)

TABLE-C
SUMMARY OF LABORATORY TESTS RESULTS OF TRIAL PITS (LD-03)

CBR
TRIAL Natural
Sample % Passing Through Open.Sieve (mm) Atterberg Limit Modified Proctor
PIT Moisture
Depth (m) Description of Material Symbol AASHTO
90% MDD 95% MDD 100% MDD

MDD 0.1" 0.2" 0.1" 0.2" 0.1" 0.2"


No. No. 19.000 4.75 0.425 0.075 Content % LL PL PI O.M.C %
(g/cm3) Pene. Pene. Pene. Pene. Pene. Pene.

Greyish brown, well-graded SAND with clay


TP-04 B-2 1.20 75 55 15 7 0.88 28 21 7 2.06 6.2 26 32 38 45 54 62 SW-SC A-1-a
and gravel.

" B-3 2.00 99 93 25 6 3.8 30 22 8 - - - - - - - - Greyish brown, well-graded SAND with clay. SW-SC A-2-4

Greyish brown, poorly-graded SAND with silt


TP-05 B-1 0.60 81 58 21 7 0.83 - NP - 2.11 6.1 29 34 43 50 57 66 SP-SM A-1-a
and gravel.

Greyish brown, poorly-graded SAND with


" B-2 1.20 84 68 19 4 1.3 - NP - - - - - - - - - SP A-1-b
gravel.

Greyish brown, poorly-graded SAND with


" S-6 2.00 78 63 15 3 1.8 - NP - - - - - - - - - SP A-1-b
gravel.

Greyish brown, poorly-graded SAND with silt


TP-06 B-1 0.60 79 63 28 8 0.97 - NP - 2.12 6.0 29 34 48 54 67 74 SP-SM A-1-b
and gravel.

Greyish brown, well-graded GRAVEL with silt


" B-2 1.20 71 42 9 5 0.61 - NP - - - - - - - - - GW-GM A-1-a
and sand.

" B-3 2.00 81 49 14 4 1 - NP - - - - - - - - - Brown, poorly-graded GRAVEL with sand. GP A-1-a

TP-07 B-1 0.6 100 98 32 3 2.78 - NP - 1.98 6.9 13 17 19 23 24 29 Brown, poorly-graded SAND. SP A-1-b

" S-7 2.5 94 78 22 3 4.48 - NP - Brown, poorly-graded SAND with gravel. SP A-1-b

PL = Plastic Limit NP = Non-Plastic PI = Plasticity Index


CLIENT : NEOM Company PROJECT NO.: 21J4037

PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-03)

TABLE-C
SUMMARY OF LABORATORY TESTS RESULTS OF TRIAL PITS (LD-03)

CBR
TRIAL Natural
Sample % Passing Through Open.Sieve (mm) Atterberg Limit Modified Proctor
PIT Moisture
Depth (m) Description of Material Symbol AASHTO
90% MDD 95% MDD 100% MDD

MDD 0.1" 0.2" 0.1" 0.2" 0.1" 0.2"


No. No. 19.000 4.75 0.425 0.075 Content % LL PL PI O.M.C %
(g/cm3) Pene. Pene. Pene. Pene. Pene. Pene.

Brown, well-graded SAND with silt and


TP-08 B-2 0.80 99 85 35 8 4.48 - NP - 1.95 7.3 19 22 24 28 29 34 SW-SM A-1-b
gravel.

" B-3 1.20 93 82 23 3 1.76 - NP - - - - - - - - - Brown, well-graded SAND with gravel. SW A-1-b

Brown, poorly-graded SAND with silt and


TP-09 B-1 0.30 86 71 36 8 2.76 - NP - 2.05 6.2 24 28 37 42 52 58 SP-SM A-1-b
gravel.

Brown, poorly-graded SAND with silt and


" B-3 1.20 90 72 30 8 3.33 - NP - - - - - - - - - SP-SM A-1-b
gravel.

Brown, poorly-graded SAND with silt and


" S-6 2.00 89 61 25 9 3.58 - NP - - - - - - - - - SP-SM A-1-b
gravel.

- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -

PL = Plastic Limit NP = Non-Plastic PI = Plasticity Index


CLIENT : NEOM Company PROJECT NO.: 21J4037

PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-05)

TABLE-D
SUMMARY OF LABORATORY TESTS RESULTS OF TRIAL PITS (LD-05)

CBR
TRIAL Natural
Sample % Passing Through Open.Sieve (mm) Atterberg Limit Modified Proctor
PIT Moisture
Depth (m) Description of Material Symbol AASHTO
90% MDD 95% MDD 100% MDD

MDD 0.1" 0.2" 0.1" 0.2" 0.1" 0.2"


No. No. 19.000 4.75 0.425 0.075 Content % LL PL PI O.M.C %
(g/cm3) Pene. Pene. Pene. Pene. Pene. Pene.

Brown, well-graded SAND with silt and


TP-01 B-1 0.60 90 66 15 7 4.01 - NP - 2.21 6.2 16 18 40 47 66 71 SW-SM A-1-a
gravel.

" S-5 2.00 80 45 9 2 1.01 - NP - - - - - - - - - Brown, well-graded GRAVEL with sand. GW A-1-a

TP-02 B-1 0.60 84 54 11 5 2.62 - NP - 2.16 7.0 14 16 38 43 57 62 Brown, well-graded SAND with gravel. SW A-1-a

" S-4 1.50 84 59 12 5 3.36 - NP - - - - - - - - - Brown, well-graded SAND with gravel. SW A-1-a

Brown, well-graded SAND with silt and


TP-03 B-1 0.60 92 68 15 8 4.17 - NP - 2.23 6.0 18 20 47 53 71 75 SW-SM A-1-a
gravel.

Brown, well-graded GRAVEL with silt and


" S-5 2.00 88 49 11 6 2.28 - NP - - - - - - - - - GW-GM A-1-a
sand.

TP-04 B-1 0.60 68 39 8 3 3.13 - NP - 2.19 6.7 14 16 38 42 63 68 Brown, well-graded GRAVEL with sand. GW A-1-a

Brown, well-graded GRAVEL with silt and


" S-4 1.50 78 40 19 9 3.37 - NP - - - - - - - - - GW-GM A-2-4
sand.

TP-05 B-2 1.20 93 66 23 13 7.08 - NP - 2.18 7.1 15 18 40 45 60 65 Brown, silty SAND with gravel. SM A-1-a

" S-5 2.00 79 45 8 5 2.16 - NP - - - - - - - - - Brown, well-graded GRAVEL with sand. GW A-1-a

PL = Plastic Limit NP = Non-Plastic PI = Plasticity Index


CLIENT : NEOM Company PROJECT NO.: 21J4037

PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-05)

TABLE-D
SUMMARY OF LABORATORY TESTS RESULTS OF TRIAL PITS (LD-05)

CBR
TRIAL Natural
Sample % Passing Through Open.Sieve (mm) Atterberg Limit Modified Proctor
PIT Moisture
Depth (m) Description of Material Symbol AASHTO
90% MDD 95% MDD 100% MDD

MDD 0.1" 0.2" 0.1" 0.2" 0.1" 0.2"


No. No. 19.000 4.75 0.425 0.075 Content % LL PL PI O.M.C %
(g/cm3) Pene. Pene. Pene. Pene. Pene. Pene.

Greyish brown, well-graded SAND with silt


TP-06 B-1 0.60 94 75 21 7 4.93 - NP - 2.05 6.5 27 31 40 46 56 64 SW-SM A-1-b
and gravel

" S-5 1.50 97 85 60 18 1.31 - NP - - - - - - - - - Brown, silty SAND with gravel. SM A-2-4

Brown, well-graded SAND with silt and


TP-07 B-2 1.20 80 53 13 5 4.23 - NP - 2.13 5.5 28 32 43 48 62 68 SW-SM A-1-b
gravel.

Greyish brown, poorly-graded SAND with silt


" S-6 2.50 78 54 22 6 2.28 - NP - - - - - - - - - SP-SM A-1-a
and gravel.

TP-08 B-1 0.60 87 66 24 13 1.85 - NP - 2.07 6.5 26 31 42 46 58 64 Brown, silty SAND with gravel. SM A-1-a

Brown, well-graded SAND with silt and


" S-4 1.50 83 67 22 10 2.26 - NP - - - - - - - - - SW-SM A-1-a
gravel.

Greyish brown, well-graded GRAVEL with silt


TP-09 B-1 0.60 72 53 16 7 1.69 - NP - 2.13 5.5 32 36 52 56 69 76 GW-GM A-1-a
and sand.

Greyish brown, well-graded GRAVEL with


" S-6 2.00 74 46 9 4 4.72 - NP - - - - - - - - - GW A-1-a
sand.

- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -

PL = Plastic Limit NP = Non-Plastic PI = Plasticity Index


APPENDIX-A

FIELD TEST DATA

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


TRIAL PIT LOGS
LAYDOWN No. 1

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 01

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3110471.526


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-01)
31.169 E: 705196.530
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 24-Jan-22 24-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brown, silty medium to fine SAND with gravel. Bulk Sample at 0.60 & 1.20
Gravels are angular to sub-rounded medium to meters
coarse igneous origin.
B-1

1
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00 meters

5
TRIAL PITS GAYAL-LD-1.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 02

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3110281.485


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-01)
25.557 E: 705581.103
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 24-Jan-22 24-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Unstable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brown, silty medium to fine SAND with gravel. Bulk Sample at 0.60 & 1.20
Gravels are angular to sub-rounded medium to meters
coarse of igneous origin.
B-1

1
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00 meters

5
TRIAL PITS GAYAL-LD-1.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 03

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3110162.036


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-01)
31.134 E: 705337.308
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 25-Jan-22 25-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~1.00 meters Bulk Sample at 0.60, 1.00 &


Brown, slightly cemented silty medium to fine 1.20 meters
SAND with gravel and cobbles. Gravels are angular
to sub-rounded medium to coarse.
B-1 Field CBR Test at 0.50
meters
1
From 1.00~3.00 meters B-2
Light brown, silty medium to fine SAND with gravel. B-3 Plate Load Test at 0.50
Gravel are angular to sub-rounded medium to meters
coarse of igneous origin.

Field Density Test at 0.50,


2 1.00, 1.50, 2.00, 2.50 & 3.00
meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at 0.00, 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
meters

5
TRIAL PITS GAYAL-LD-1.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 04

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3110041.178


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-01)
26.093 E: 705090.578
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 26-Jan-22 26-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~1.60 meters Bulk Sample at 0.60, 1.20 &


Brown, slightly cemented silty medium to fine 1.60 meters
SAND with gravel. Gravels are angular to
sub-rounded medium to coarse of igneous origin.
B-1

1
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
From 1.60~3.00 meters B-3 Field Density Test at 0.50,
Light brown, poorly-graded medium to fine SAND. 1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed
Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00 meters
3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-1.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 05

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3109853.102


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-01)
21.146 E: 705477.878
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 27-Jan-22 27-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~1.00 meters Bulk Sample at 0.60, 1.00 &


Brown, silty medium to coarse SAND with gravel. 1.20 meters
Gravels are angular to sub-rounded of igneous
origin.
B-1

1
B-2 Field CBR Test at 0.50
From 1.00~3.00 meters B-3 meters
Greyish brown, silty medium to fine SAND with Plate Load Test at 0.50
gravel, cobble & boulders. Gravel and are angular meters
to sub-rounded of limestone. Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed

Small Sample at 0.00 ,0.50,


1.00, 1.50, 2.00, 2.50 & 3.00
meters
3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-1.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 06

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3109791.184


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-01)
25.338 E: 705262.804
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 29-Jan-22 29-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~1.10 meters Bulk Sample at 0.60, 1.10 &


Brown, silty fine to medium SAND with traces of 1.20 meters
gravel of igneous origin.
B-1

1
Field CBR Test at 0.50
From 1.10~3.00 meters B-2 meters
Greyish brown, weakly cemented silty SAND with B-3 Plate Load Test at 0.50
gravel and cobble of cemented sand. meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed
Small Sample at 0.00 ,0.50,
1.00, 1.10, 1.50, 2.00, 2.50 &
3.00 meters
3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-1.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
FIELD DENSITY TESTS
LAYDOWN No. 1

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-1 / TP - 01 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 24.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 25.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. B-19 XP-9 B-18 B-17 XP-1 XP-6


WT. OF WET SOIL + CAN gm 402.20 290.20 332.70 352.60 363.00 344.30
WT OF DRY SOIL + CAN gm 397.00 288.30 330.00 350.70 361.00 342.20
WT. OF MOISTURE gm 5.20 1.90 2.70 1.90 2.00 2.10
WT. OF CAN gm 50.65 42.71 41.23 46.49 42.13 45.79
WT. OF DRY SOIL gm 346.35 245.59 288.77 304.21 318.87 296.41
MOISTURE CONTENT % 1.50 0.77 0.94 0.62 0.63 0.71

WT. OF WET SOIL gm 4655 5130 4770 5165 4763 4550


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2910 2929 2893 2899 2901 2910
WT. OF SAND USED gm 6090 6071 6107 6101 6099 6090
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4840 4821 4857 4851 4849 4840
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3336 3323 3347 3343 3342 3336
WET DENSITY OF SOIL g/cc 1.396 1.544 1.425 1.545 1.425 1.364
DRY DENSITY OF SOIL g/cc 1.375 1.532 1.412 1.535 1.416 1.354
MAXIMUM DRY DENSITY g/cc 1.92 1.92 1.92 1.92 1.92 1.92
COMPACTION % 71.6 79.8 73.5 80.0 73.8 70.5
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-1 / TP - 02 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 24.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 25.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. B-4 B-3 XP-2 XP-7 B-1 B-10


WT. OF WET SOIL + CAN gm 372.00 369.30 392.30 387.80 341.70 366.00
WT OF DRY SOIL + CAN gm 367.30 366.90 389.20 385.40 338.80 364.10
WT. OF MOISTURE gm 4.70 2.40 3.10 2.40 2.90 1.90
WT. OF CAN gm 41.41 56.51 48.60 46.79 47.62 46.52
WT. OF DRY SOIL gm 325.89 310.39 340.60 338.61 291.18 317.58
MOISTURE CONTENT % 1.44 0.77 0.91 0.71 1.00 0.60

WT. OF WET SOIL gm 4589 4618 4423 4823 4763 4528


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2910 2893 2919 2885 2905 2897
WT. OF SAND USED gm 6090 6107 6081 6115 6095 6103
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4840 4857 4831 4865 4845 4853
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3336 3347 3329 3353 3339 3345
WET DENSITY OF SOIL g/cc 1.376 1.380 1.328 1.438 1.426 1.354
DRY DENSITY OF SOIL g/cc 1.356 1.369 1.316 1.428 1.412 1.346
MAXIMUM DRY DENSITY g/cc 1.94 1.94 1.94 1.94 1.94 1.94
COMPACTION % 69.9 70.6 67.9 73.6 72.8 69.4
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-1 / TP - 03 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 25.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 26.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. B-14 B-9 XP-15 N-2 XP-16 N-3


WT. OF WET SOIL + CAN gm 288.00 382.10 325.80 329.50 304.40 391.50
WT OF DRY SOIL + CAN gm 278.30 375.20 322.50 325.80 300.20 385.50
WT. OF MOISTURE gm 9.70 6.90 3.30 3.70 4.20 6.00
WT. OF CAN gm 49.35 58.04 48.70 53.19 47.89 47.45
WT. OF DRY SOIL gm 228.95 317.16 273.80 272.61 252.31 338.05
MOISTURE CONTENT % 4.24 2.18 1.21 1.36 1.66 1.77

WT. OF WET SOIL gm 5095 5310 5930 5210 5520 5447


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2920 2870 2905 2900 2890 2925
WT. OF SAND USED gm 6080 6130 6095 6100 6110 6075
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4830 4880 4845 4850 4860 4825
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3329 3363 3339 3343 3349 3325
WET DENSITY OF SOIL g/cc 1.531 1.579 1.776 1.559 1.648 1.638
DRY DENSITY OF SOIL g/cc 1.468 1.545 1.755 1.538 1.621 1.609
MAXIMUM DRY DENSITY g/cc 2.06 2.06 2.06 2.06 2.06 2.06
COMPACTION % 71.3 75.0 85.2 74.7 78.7 78.1
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-1 / TP - 04 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 26.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 27.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. A-6 B-5 B-16 A-4 S-1 S-9


WT. OF WET SOIL + CAN gm 392.10 380.20 402.20 399.90 245.80 318.40
WT OF DRY SOIL + CAN gm 387.70 377.30 398.90 397.80 243.60 316.80
WT. OF MOISTURE gm 4.40 2.90 3.30 2.10 2.20 1.60
WT. OF CAN gm 23.58 49.47 47.68 23.56 18.37 20.49
WT. OF DRY SOIL gm 364.12 327.83 351.22 374.24 225.23 296.31
MOISTURE CONTENT % 1.21 0.88 0.94 0.56 0.98 0.54

WT. OF WET SOIL gm 5060 5012 5035 4850 5140 5240


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2915 2825 2923 2900 2805 2883
WT. OF SAND USED gm 6085 6175 6077 6100 6195 6117
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4835 4925 4827 4850 4945 4867
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3332 3394 3327 3343 3408 3354
WET DENSITY OF SOIL g/cc 1.519 1.477 1.514 1.451 1.508 1.562
DRY DENSITY OF SOIL g/cc 1.500 1.464 1.499 1.443 1.494 1.554
MAXIMUM DRY DENSITY g/cc 1.93 1.93 1.93 1.93 1.93 1.93
COMPACTION % 77.7 75.8 77.7 74.8 77.4 80.5
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-1 / TP - 05 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 27.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 28.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. XP-4 S-2 M-10 M-33 S-5 M-9


WT. OF WET SOIL + CAN gm 320.30 340.40 373.40 363.50 261.20 326.00
WT OF DRY SOIL + CAN gm 312.10 336.90 367.50 356.90 254.20 318.30
WT. OF MOISTURE gm 8.20 3.50 5.90 6.60 7.00 7.70
WT. OF CAN gm 47.39 20.35 26.63 26.46 19.97 26.60
WT. OF DRY SOIL gm 264.71 316.55 340.87 330.44 234.23 291.70
MOISTURE CONTENT % 3.10 1.11 1.73 2.00 2.99 2.64

WT. OF WET SOIL gm 4810 5280 5325 5916 5435 4929


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2887 2905 2910 2893 2890 2915
WT. OF SAND USED gm 6113 6095 6090 6107 6110 6085
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4863 4845 4840 4857 4860 4835
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3351 3339 3336 3347 3349 3332
WET DENSITY OF SOIL g/cc 1.435 1.581 1.596 1.767 1.623 1.479
DRY DENSITY OF SOIL g/cc 1.392 1.564 1.569 1.733 1.576 1.441
MAXIMUM DRY DENSITY g/cc 2.02 2.02 2.02 2.02 2.02 2.02
COMPACTION % 68.9 77.4 77.7 85.8 78.0 71.3
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-1 / TP - 06 REPORT DATE : 06.02.2022
SAMPLING DATE : - TEST START DATE : 29.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 30.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. S-11 M-16 M-10 M-33 M-12 A-8


WT. OF WET SOIL + CAN gm 289.00 339.80 380.50 363.50 321.00 353.60
WT OF DRY SOIL + CAN gm 277.10 334.50 374.60 356.90 319.00 351.10
WT. OF MOISTURE gm 11.90 5.30 5.90 6.60 2.00 2.50
WT. OF CAN gm 19.47 26.40 30.50 26.46 26.52 23.45
WT. OF DRY SOIL gm 257.63 308.10 344.10 330.44 292.48 327.65
MOISTURE CONTENT % 4.62 1.72 1.71 2.00 0.68 0.76

WT. OF WET SOIL gm 4270 4710 5350 5438 5565 5900


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2875 2893 2900 2810 2904 2910
WT. OF SAND USED gm 6125 6107 6100 6190 6096 6090
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4875 4857 4850 4940 4846 4840
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3360 3347 3343 3405 3340 3336
WET DENSITY OF SOIL g/cc 1.271 1.407 1.601 1.597 1.666 1.769
DRY DENSITY OF SOIL g/cc 1.215 1.383 1.574 1.566 1.655 1.755
MAXIMUM DRY DENSITY g/cc 1.96 1.96 1.96 1.96 1.96 1.96
COMPACTION % 62.0 70.6 80.3 79.9 84.4 89.6
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
DOUBLE CYCLE PLATE LOAD TESTS
LAYDOWN No. 1

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-1 / TP - 01
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 24.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 2.52
30 3723.0 1.32 0.80 30 3723.0 1.32 3.31
60 7486.0 2.65 1.45 60 7486.0 2.65 3.87
80 9924.6 3.51 2.14 80 9924.6 3.51 4.51
100 12627.6 4.47 2.83 100 12627.6 4.47 5.19
120 15136.8 5.35 3.45 120 15136.8 5.35 5.90
140 17605.2 6.23 4.08 140 17605.2 6.23 6.54
120 15136.8 5.35 4.05 120 15136.8 5.35 6.50
100 12627.6 4.47 3.97 100 12627.6 4.47 6.45
80 9924.6 3.51 3.80 80 9924.6 3.51 6.29
60 7486.0 2.65 3.55 60 7486.0 2.65 6.13
30 3723.0 1.32 3.14 30 3723.0 1.32 5.98
0 0.0 0.00 2.52 0 0.0 0.00 5.78

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 4.08 2.52
UNSOAKED

2nd Load Cycle


17605.2 6.23 6.54 5.78
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-1 / TP-01
(Test Date: 24.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

1.0

2.0
Settlement (mm)

3.0

4.0

5.0

6.0

7.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-1 / TP - 02
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 24.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 6.38
30 3723.0 1.32 1.14 30 3723.0 1.32 7.97
60 7486.0 2.65 2.38 60 7486.0 2.65 9.91
80 9924.6 3.51 3.75 80 9924.6 3.51 11.53
100 12627.6 4.47 5.30 100 12627.6 4.47 13.91
120 15136.8 5.35 6.78 120 15136.8 5.35 14.78
140 17605.2 6.23 8.04 140 17605.2 6.23 15.97
120 15136.8 5.35 8.01 120 15136.8 5.35 15.70
100 12627.6 4.47 7.94 100 12627.6 4.47 15.60
80 9924.6 3.51 7.80 80 9924.6 3.51 15.45
60 7486.0 2.65 7.45 60 7486.0 2.65 15.18
30 3723.0 1.32 6.97 30 3723.0 1.32 14.77
0 0.0 0.00 6.38 0 0.0 0.00 14.14

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 8.04 6.38
UNSOAKED

2nd Load Cycle


17605.2 6.23 15.97 14.14
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-1 / TP-02
(Test Date: 24.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0

6.0
Settlement (mm)

8.0

10.0

12.0

14.0

16.0

18.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-1 / TP - 03
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 25.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 13.80
30 3723.0 1.32 3.08 30 3723.0 1.32 15.24
60 7486.0 2.65 7.72 60 7486.0 2.65 17.12
80 9924.6 3.51 9.95 80 9924.6 3.51 18.43
100 12627.6 4.47 12.04 100 12627.6 4.47 19.22
120 15136.8 5.35 14.05 120 15136.8 5.35 20.12
140 17605.2 6.23 15.86 140 17605.2 6.23 20.99
120 15136.8 5.35 15.82 120 15136.8 5.35 20.95
100 12627.6 4.47 15.74 100 12627.6 4.47 20.87
80 9924.6 3.51 15.59 80 9924.6 3.51 20.68
60 7486.0 2.65 15.33 60 7486.0 2.65 20.42
30 3723.0 1.32 14.91 30 3723.0 1.32 19.96
0 0.0 0.00 13.80 0 0.0 0.00 19.30

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 15.86 13.80
UNSOAKED

2nd Load Cycle


17605.2 6.23 20.99 19.30
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-1 / TP-03
(Test Date: 25.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

5.0
Settlement (mm)

10.0

15.0

20.0

25.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-1 / TP - 04
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 26.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 3.59
30 3723.0 1.32 1.02 30 3723.0 1.32 4.15
60 7486.0 2.65 3.08 60 7486.0 2.65 4.69
80 9924.6 3.51 3.76 80 9924.6 3.51 4.93
100 12627.6 4.47 4.38 100 12627.6 4.47 5.23
120 15136.8 5.35 4.82 120 15136.8 5.35 5.81
140 17605.2 6.23 4.93 140 17605.2 6.23 6.40
120 15136.8 5.35 4.88 120 15136.8 5.35 6.36
100 12627.6 4.47 4.79 100 12627.6 4.47 6.31
80 9924.6 3.51 4.65 80 9924.6 3.51 6.20
60 7486.0 2.65 4.39 60 7486.0 2.65 5.84
30 3723.0 1.32 4.03 30 3723.0 1.32 5.34
0 0.0 0.00 3.59 0 0.0 0.00 4.75

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 4.93 3.59
UNSOAKED

2nd Load Cycle


17605.2 6.23 6.40 4.75
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-1 / TP-04
(Test Date: 26.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

1.0

2.0
Settlement (mm)

3.0

4.0

5.0

6.0

7.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-1 / TP - 05
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 27.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 4.76
30 3723.0 1.32 1.74 30 3723.0 1.32 6.90
60 7486.0 2.65 4.22 60 7486.0 2.65 10.00
80 9924.6 3.51 5.37 80 9924.6 3.51 12.54
100 12627.6 4.47 6.55 100 12627.6 4.47 14.18
120 15136.8 5.35 7.66 120 15136.8 5.35 15.61
140 17605.2 6.23 8.29 140 17605.2 6.23 17.08
120 15136.8 5.35 8.24 120 15136.8 5.35 17.05
100 12627.6 4.47 8.13 100 12627.6 4.47 16.92
80 9924.6 3.51 7.74 80 9924.6 3.51 16.64
60 7486.0 2.65 7.05 60 7486.0 2.65 16.19
30 3723.0 1.32 5.94 30 3723.0 1.32 15.63
0 0.0 0.00 4.76 0 0.0 0.00 15.04

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 8.29 4.76
UNSOAKED

2nd Load Cycle


17605.2 6.23 17.08 15.04
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-1 / TP-05
(Test Date: 27.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0

6.0
Settlement (mm)

8.0

10.0

12.0

14.0

16.0

18.0

20.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-1 / TP - 06
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 29.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 4.16
30 3723.0 1.32 1.99 30 3723.0 1.32 5.73
60 7486.0 2.65 3.48 60 7486.0 2.65 7.83
80 9924.6 3.51 4.38 80 9924.6 3.51 9.91
100 12627.6 4.47 5.49 100 12627.6 4.47 11.47
120 15136.8 5.35 6.30 120 15136.8 5.35 12.88
140 17605.2 6.23 6.79 140 17605.2 6.23 13.91
120 15136.8 5.35 6.74 120 15136.8 5.35 13.86
100 12627.6 4.47 6.62 100 12627.6 4.47 13.75
80 9924.6 3.51 6.31 80 9924.6 3.51 13.53
60 7486.0 2.65 4.96 60 7486.0 2.65 12.96
30 3723.0 1.32 4.71 30 3723.0 1.32 12.33
0 0.0 0.00 4.16 0 0.0 0.00 11.53

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 6.79 4.16
UNSOAKED

2nd Load Cycle


17605.2 6.23 13.91 11.53
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-1 / TP-06
(Test Date: 29.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0

16.0
UNSOAKED SOAKED
PERCOLATION TEST
LAYDOWN No. 1

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-1 DATE : 29.01.2022
DESCRIPTION : - TEST NO.: TP - 01

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160 180
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 8 min
Time for 75% Outflow (tp75): 88 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.75E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-1 DATE : 29.01.2022
DESCRIPTION : - TEST NO.: TP - 02

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 20 min
Time for 75% Outflow (tp75): 145 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 4.80E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-1 DATE : 29.01.2022
DESCRIPTION : - TEST NO.: TP - 03

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160 180 200
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 10 min
Time for 75% Outflow (tp75): 91 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.70E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-1 DATE : 29.01.2022
DESCRIPTION : - TEST NO.: TP - 04

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 8 min
Time for 75% Outflow (tp75): 56 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.25E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-1 DATE : 30.01.2022
DESCRIPTION : - TEST NO.: TP - 05

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 10 min
Time for 75% Outflow (tp75): 74 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 4.69E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-1 DATE : 30.01.2022
DESCRIPTION : - TEST NO.: TP - 06

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 11 min
Time for 75% Outflow (tp75): 78 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 4.48E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


INSITU CBR TESTS
LAYDOWN No. 1

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-1 / TP - 01 REPORT DATE : 30.01.2022
TEST DEPTH : 0.5 m TEST DATE : 24.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


100
Penetration Dial Load Bearing Bearing
90
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 80
Bearing Value (lb/in2)

0.0000 0.00 0 0 70
0.0250 3.00 27 9
60
0.0500 5.00 46 15
50
0.0750 7.00 64 21
40
0.1000 11.00 101 34 3
30
0.1500 14.00 128 43

0.2000 17.00 156 52 3 20

0.2500 21.00 192 64 10

0.3000 24.00 220 73 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 26.00 238 79
Penetration (in)
0.4000 30.00 275 92

REMARKS : CBR value at 0.1" = 3 CBR value at 0.2" = 3


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-1 / TP - 02 REPORT DATE : 30.01.2022
TEST DEPTH : 0.5 m TEST DATE : 24.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


100
Penetration Dial Load Bearing Bearing
90
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 80
Bearing Value (lb/in2)

0.0000 0.00 0 0 70
0.0250 3.00 27 9
60
0.0500 5.00 46 15
50
0.0750 8.00 73 24
40
0.1000 11.00 101 34 3
30
0.1500 14.00 128 43

0.2000 16.00 147 49 3 20

0.2500 19.00 174 58 10

0.3000 21.00 192 64 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 24.00 220 73
Penetration (in)
0.4000 29.00 266 89

REMARKS : CBR value at 0.1" = 3 CBR value at 0.2" = 3


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-1 / TP - 03 REPORT DATE : 30.01.2022
TEST DEPTH : 0.5 m TEST DATE : 25.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


180
Penetration Dial Load Bearing Bearing
Gauge value Ratio 160

(in) Reading (Lbs.) (lb/in2) (Cor.CBR)


140
Bearing Value (lb/in2)

0.0000 0.00 0 0
120
0.0250 4.00 37 12

0.0500 9.00 82 27 100

0.0750 14.00 128 43 80

0.1000 17.00 156 52 5


60
0.1500 21.00 192 64
40
0.2000 25.00 229 76 5

0.2500 29.00 266 89 20

0.3000 35.00 321 107 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 45.00 412 137
Penetration (in)
0.4000 51.00 467 156

REMARKS : CBR value at 0.1" = 5 CBR value at 0.2" = 5


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-1 / TP - 04 REPORT DATE : 30.01.2022
TEST DEPTH : 0.5 m TEST DATE : 26.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio
120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)

0.0000 0.00 0 0 100

0.0250 3.00 27 9
80
0.0500 6.00 55 18

0.0750 9.00 82 27 60
0.1000 13.00 119 40 4

0.1500 16.00 147 49 40

0.2000 20.00 183 61 4


20
0.2500 24.00 220 73

0.3000 29.00 266 89 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 34.00 311 104
Penetration (in)
0.4000 40.00 366 122

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-1 / TP - 05 REPORT DATE : 30.01.2022
TEST DEPTH : 0.5 m TEST DATE : 27.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


120
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
100
Bearing Value (lb/in2)

0.0000 0.00 0 0
80
0.0250 3.00 27 9

0.0500 5.00 46 15
60
0.0750 8.00 73 24

0.1000 11.00 101 34 3


40
0.1500 15.00 137 46

0.2000 19.00 174 58 4 20


0.2500 23.00 211 70

0.3000 27.00 247 82 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 32.00 293 98
Penetration (in)
0.4000 37.00 339 113

REMARKS : CBR value at 0.1" = 3 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-1 / TP - 06 REPORT DATE : 06.02.2022
TEST DEPTH : 0.5 m TEST DATE : 29.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio
120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)

0.0000 0.00 0 0 100

0.0250 3.00 27 9
80
0.0500 6.00 55 18

0.0750 9.00 82 27 60
0.1000 13.00 119 40 4

0.1500 17.00 156 52 40

0.2000 21.00 192 64 4


20
0.2500 26.00 238 79

0.3000 31.00 284 95 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 36.00 330 110
Penetration (in)
0.4000 42.00 385 128

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TRIAL PIT LOGS
LAYDOWN No. 3

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 01

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104698.048


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
39.789 E: 719331.445
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 15-Jan-22 15-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brownish grey, silty medium to fine SAND with Bulk Sample at 0.60 & 1.20
gravel and cobbles. Gravels are angular to meters
sub-rounded medium to coarse of igneous origin.
B-1

1
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00 meters

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 02

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104655.664


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
41.753 E: 719637.063
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 16-Jan-22 16-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brown, silty medium to fine SAND with gravel. Bulk Sample at 0.60 & 1.20
Gravels are angular to sub-rounded medium to meters
coarse of igneous origin.
B-1

1
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00 meters

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 03

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104810.556


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
42.945 E: 719707.366
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 16-Jan-22 16-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~1.80 meters Bulk Sample at 0.60, 1.20 &


Brown, poorly-graded SAND with gravel. Gravels 1.80 meters
are angular to sub-angular medium to coarse of
igneous origin.
B-1 Field CBR Test at 0.50
meters
1
B-2 Plate Load Test at 0.50
meters

Brown, fine to medium SAND with gravel, cobbles B-3 Field Density Test at 0.50,
2 and boulders. (Slightly weathered limestone). 1.00, 1.50 & 2.00 meters

----Trial Pit Terminated due to hard limestone at Soakaway Test performed


2.30 meters----

3
Small Sample at 0.50, 1.00,
1.50, 2.00 & 2.30 meters

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 04

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104891.760


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
45.884 E: 719979.722
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 17-Jan-22 17-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Form 0.00~2.00 meters Bulk Sample at 0.60, 1.20 &


Brownish grey, silty medium to fine SAND with 2.00 meters
gravel. Gravels are angular to sub-rounded
medium to coarse of igneous origin.
B-1

1
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
From 2.00~3.00 meters B-3
Brown, slightly cemented silty medium to fine Soakaway Test performed
SAND wtih gravel. Gravels are angular to Small Sample at
sub-rounded medium to coarse of igneous origin. 0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00 meters
3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 05

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104763.027


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
46.851 E: 720203.212
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 18-Jan-22 18-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~0.60 meters Bulk Sample at 0.60 & 1.20


Brownish grey, slightly cemented silty medium to meters
fine SAND with gravel and cobbles. Gravels are
angular to sub-angular medium to coarse of
igneous origin. B-1

1
Field CBR Test at 0.50
From 0.60~3.00 meters B-2 meters
Greyish brown, silty fine to medium SAND with Plate Load Test at 0.50
gravel and boulders. Gravels are angular fine of meters
igneous origin. Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Soakaway Test performed
Small Sample at 0.00 ,0.50,
0.60, 1.00, 1.50, 2.00, 2.50 &
3.00 meters
3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 06

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104613.320


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
43.743 E: 719942.773
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 19-Jan-22 19-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~2.00 meters Bulk Sample at 0.60, 1.20 &


Brownish grey, silty medium to fine SAND with 2.00 meters
gravel and cobbles. Gravels are angular to
subrounded medium to coarse of igneous origin.
B-1 Field CBR Test at 0.50
meters
1
B-2 Plate Load Test at 0.50
meters

2
From 2.00~3.00 meters B-3 Field Density Test at 0.50,
Brown, slightly cemented silty medium to fine 1.00, 1.50, 2.00, 2.50 & 3.00
SAND with gravel. Gravels are angular to meters
sub-rounded medium to coarse of igneous origin. Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00 meters

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 07

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104440.341


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
33.184 E: 719661.073
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 20-Jan-22 20-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~1.30 meters B-1 Bulk Sample at 0.60, 1.20 &


Brownish grey, silty medium to fine SAND with 1.30 meters
gravel. Gravels are angular to rounded medium to
coarse of igneous origin.
Field CBR Test at 0.50
meters
1
B-2 Plate Load Test at 0.50
From 1.30~3.00 meters B-3 meters
Brown, slightly cemented, silty fine to medium
SAND with gravel and cobbles. Gravels are angular
to sub-angular fine to coarse of cemented sand.
2
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at 0.00,0.50,
1.00, 1.30, 1.50, 2.00, 2.50 &
3.00 meters

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 08

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104480.215


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
32.173 E: 719369.012
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 20-Jan-22 20-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~0.80 meters Bulk Sample at 0.60, 0.80&


Brownish grey, slightly cemented silty medium to 1.20 meters
fine SAND with gravel and cobbles. Gravels are
angular to subrounded.
B-1 Field CBR Test at 0.50
From 0.80~3.00 meters B-2 meters
1 Light brownish grey, poorly-graded SAND with
gravel. Gravels are angular to sub-rounded
B-3 Plate Load Test at 0.50
medium to coarse of igneous origin.
meters

2
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at 0.00,0.50,
0.80, 1.00, 1.50, 2.00, 2.50 &
3.00 meters

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 09

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3104712.618


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-03)
36.893 E: 719029.401
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 22-Jan-22 22-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~0.30 meters Bulk Sample at 0.30, 0.60 &


Brown, silty medium to fine SAND with gravel and 1.20 meters
cobbles. Gravels are angular to sub-rounded B-1
medium to coarse of igneous origin.
B-2 Field CBR Test at 0.50
From 0.30~3.00 meters
meters
1 Reddish brown, slightly cemented fine to coarse
SAND with gravel. Gravels are angular to
sub-rounded medium to coarse of igneous origin. B-3 Plate Load Test at 0.50
meters

2
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
meters
Soakaway Test performed

3
----End of Trial Pit at 3.00 meters---- Small Sample at 0.00, 0.30,
0.50, 1.00, 1.50, 2.00, 2.50 &
3.00 meters

5
TRIAL PITS GAYAL-LD-3.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
FIELD DENSITY TESTS
LAYDOWN No. 3

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 01 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 15.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 16.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. M-12 XP-2 XP-9 M-16 B-18 S-3


WT. OF WET SOIL + CAN gm 435.30 365.60 389.60 383.60 371.50 362.30
WT OF DRY SOIL + CAN gm 431.00 363.20 387.70 381.40 369.20 360.90
WT. OF MOISTURE gm 4.30 2.40 1.90 2.20 2.30 1.40
WT. OF CAN gm 26.52 48.60 42.71 26.90 41.23 19.34
WT. OF DRY SOIL gm 404.48 314.60 344.99 354.50 327.97 341.56
MOISTURE CONTENT % 1.06 0.76 0.55 0.62 0.70 0.41

WT. OF WET SOIL gm 5915 5820 5866 5932 5810 5941


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2614 2602 2541 2341 2473 2513
WT. OF SAND USED gm 6386 6398 6459 6659 6527 6487
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 5136 5148 5209 5409 5277 5237
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3540 3548 3590 3728 3637 3609
WET DENSITY OF SOIL g/cc 1.671 1.640 1.634 1.591 1.598 1.646
DRY DENSITY OF SOIL g/cc 1.654 1.628 1.625 1.581 1.586 1.639
MAXIMUM DRY DENSITY g/cc 2.14 2.14 2.14 2.14 2.14 2.14
COMPACTION % 77.3 76.1 75.9 73.9 74.1 76.6
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 02 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 16.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 17.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. S-2 M-18 A-6 M-33 M-10 N-2


WT. OF WET SOIL + CAN gm 352.70 375.50 499.60 423.30 418.50 415.50
WT OF DRY SOIL + CAN gm 349.20 369.90 494.30 418.80 412.90 410.20
WT. OF MOISTURE gm 3.50 5.60 5.30 4.50 5.60 5.30
WT. OF CAN gm 20.35 25.42 23.58 26.46 26.63 53.19
WT. OF DRY SOIL gm 328.85 344.48 470.72 392.34 386.27 357.01
MOISTURE CONTENT % 1.06 1.63 1.13 1.15 1.45 1.48

WT. OF WET SOIL gm 5530 5325 5100 5480 4970 5735


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2885 2920 2917 2890 2904 2910
WT. OF SAND USED gm 6115 6080 6083 6110 6096 6090
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4865 4830 4833 4860 4846 4840
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3353 3329 3331 3349 3340 3336
WET DENSITY OF SOIL g/cc 1.649 1.600 1.531 1.636 1.488 1.719
DRY DENSITY OF SOIL g/cc 1.632 1.574 1.514 1.618 1.467 1.694
MAXIMUM DRY DENSITY g/cc 2.16 2.16 2.16 2.16 2.16 2.16
COMPACTION % 75.6 72.9 70.1 74.9 67.9 78.4
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 03 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 16.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 17.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4
LAYER : - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00

CAN NO. M-27 A-8 Xp-16 Xp-1


WT. OF WET SOIL + CAN gm 311.70 261.90 371.10 344.80
WT OF DRY SOIL + CAN gm 295.60 246.80 352.70 331.30
WT. OF MOISTURE gm 16.10 15.10 18.40 13.50
WT. OF CAN gm 26.84 23.45 47.89 42.13
WT. OF DRY SOIL gm 268.76 223.35 304.81 289.17
MOISTURE CONTENT % 5.99 6.76 6.04 4.67

WT. OF WET SOIL gm 4310 4650 4330 4545


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2531 2487 2561 2637
WT. OF SAND USED gm 6469 6513 6439 6363
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 5219 5263 5189 5113
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3597 3627 3576 3524
WET DENSITY OF SOIL g/cc 1.198 1.282 1.211 1.290
DRY DENSITY OF SOIL g/cc 1.131 1.201 1.142 1.232
MAXIMUM DRY DENSITY g/cc 1.95 1.95 1.95 1.95
COMPACTION % 58.0 61.6 58.6 63.2
COMPACTION REQUIRED % - - - -
TEST STATUS - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 04 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 17.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 18.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.00 2.00

CAN NO. M-5 XP-6 M-19 A-10 M-14 S-6


WT. OF WET SOIL + CAN gm 441.50 345.70 361.70 265.90 429.80 299.80
WT OF DRY SOIL + CAN gm 438.20 343.20 350.20 258.60 427.00 297.20
WT. OF MOISTURE gm 3.30 2.50 11.50 7.30 2.80 2.60
WT. OF CAN gm 26.28 45.79 26.50 20.22 27.54 20.48
WT. OF DRY SOIL gm 411.92 297.41 323.70 238.38 399.46 276.72
MOISTURE CONTENT % 0.80 0.84 3.55 3.06 0.70 0.94

WT. OF WET SOIL gm 5492 5430 5450 5476 5428 5330


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2541 2367 2456 2561 2546 2471
WT. OF SAND USED gm 6459 6633 6544 6439 6454 6529
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 5209 5383 5294 5189 5204 5279
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3590 3710 3649 3576 3586 3638
WET DENSITY OF SOIL g/cc 1.530 1.464 1.494 1.531 1.513 1.465
DRY DENSITY OF SOIL g/cc 1.518 1.451 1.443 1.486 1.503 1.451
MAXIMUM DRY DENSITY g/cc 2.18 2.18 2.18 2.18 2.18 2.18
COMPACTION % 69.6 66.6 66.2 68.2 68.9 66.6
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 05 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 17.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 18.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.00 2.00

CAN NO. B-19 B-3 B-17 A-4 M-8 M-13


WT. OF WET SOIL + CAN gm 388.20 399.00 402.10 391.10 405.30 318.00
WT OF DRY SOIL + CAN gm 385.00 396.10 395.90 385.90 397.10 312.80
WT. OF MOISTURE gm 3.20 2.90 6.20 5.20 8.20 5.20
WT. OF CAN gm 50.65 56.51 46.49 23.56 27.76 19.50
WT. OF DRY SOIL gm 334.35 339.59 349.41 362.34 369.34 293.30
MOISTURE CONTENT % 0.96 0.85 1.77 1.44 2.22 1.77

WT. OF WET SOIL gm 5670 5860 5720 5486 5710 5485


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2451 2476 2513 2467 2503 2500
WT. OF SAND USED gm 6549 6524 6487 6533 6497 6500
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 5299 5274 5237 5283 5247 5250
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3652 3635 3609 3641 3616 3618
WET DENSITY OF SOIL g/cc 1.553 1.612 1.585 1.507 1.579 1.516
DRY DENSITY OF SOIL g/cc 1.538 1.599 1.557 1.485 1.545 1.490
MAXIMUM DRY DENSITY g/cc 2.20 2.20 2.20 2.20 2.20 2.20
COMPACTION % 69.9 72.7 70.8 67.5 70.2 67.7
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 06 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 19.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.00 2.00

CAN NO. S-11 M-09 S-1 A-12 M-15 S-9


WT. OF WET SOIL + CAN gm 351.20 353.10 356.60 455.30 402.30 314.10
WT OF DRY SOIL + CAN gm 349.50 351.60 354.30 451.60 398.70 311.60
WT. OF MOISTURE gm 1.70 1.50 2.30 3.70 3.60 2.50
WT. OF CAN gm 19.47 26.60 17.37 26.92 26.60 20.49
WT. OF DRY SOIL gm 330.03 325.00 336.93 424.68 372.10 291.11
MOISTURE CONTENT % 0.52 0.46 0.68 0.87 0.97 0.86

WT. OF WET SOIL gm 5970 5766 4710 5405 4825 5004


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2503 2462 2543 2573 2563 2481
WT. OF SAND USED gm 6497 6538 6457 6427 6437 6519
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 5247 5288 5207 5177 5187 5269
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3616 3644 3589 3568 3575 3631
WET DENSITY OF SOIL g/cc 1.651 1.582 1.313 1.515 1.350 1.378
DRY DENSITY OF SOIL g/cc 1.642 1.575 1.304 1.502 1.337 1.366
MAXIMUM DRY DENSITY g/cc 1.98 1.98 1.98 1.98 1.98 1.98
COMPACTION % 83.0 79.5 65.8 75.8 67.5 69.0
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 07 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 21.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.00 2.00

CAN NO. M-30 B-3 A-9 S-5 S-4 A-17


WT. OF WET SOIL + CAN gm 297.20 399.00 341.80 232.10 248.20 338.60
WT OF DRY SOIL + CAN gm 293.20 396.10 332.60 223.20 242.00 325.10
WT. OF MOISTURE gm 4.00 2.90 9.20 8.90 6.20 13.50
WT. OF CAN gm 27.42 56.51 24.40 19.97 19.55 22.28
WT. OF DRY SOIL gm 265.78 339.59 308.20 203.23 222.45 302.82
MOISTURE CONTENT % 1.51 0.85 2.99 4.38 2.79 4.46

WT. OF WET SOIL gm 4790 4794 5275 4770 5140 5055


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2731 2752 2869 2749 2687 2963
WT. OF SAND USED gm 6269 6248 6131 6251 6313 6037
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 5019 4998 4881 5001 5063 4787
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3459 3445 3364 3447 3489 3299
WET DENSITY OF SOIL g/cc 1.385 1.392 1.568 1.384 1.473 1.532
DRY DENSITY OF SOIL g/cc 1.364 1.380 1.523 1.326 1.433 1.467
MAXIMUM DRY DENSITY g/cc 2.02 2.02 2.02 2.02 2.02 2.02
COMPACTION % 67.5 68.3 75.4 65.6 70.9 72.6
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 08 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 21.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.00 2.00

CAN NO. M-35 XP-4 XP-15 N-3 M-31 XP-7


WT. OF WET SOIL + CAN gm 305.80 356.40 365.40 378.90 375.40 344.80
WT OF DRY SOIL + CAN gm 298.40 351.70 362.60 373.60 371.30 340.30
WT. OF MOISTURE gm 7.40 4.70 2.80 5.30 4.10 4.50
WT. OF CAN gm 40.20 47.39 48.70 49.45 26.80 46.79
WT. OF DRY SOIL gm 258.20 304.31 313.90 324.15 344.50 293.51
MOISTURE CONTENT % 2.87 1.54 0.89 1.64 1.19 1.53

WT. OF WET SOIL gm 4710 5660 5120 4925 5470 5725


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2920 2890 2875 2917 2925 2895
WT. OF SAND USED gm 6080 6110 6125 6083 6075 6105
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4830 4860 4875 4833 4825 4855
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3329 3349 3360 3331 3325 3346
WET DENSITY OF SOIL g/cc 1.415 1.690 1.524 1.479 1.645 1.711
DRY DENSITY OF SOIL g/cc 1.376 1.664 1.510 1.455 1.626 1.685
MAXIMUM DRY DENSITY g/cc 2.02 2.02 2.02 2.02 2.02 2.02
COMPACTION % 68.1 82.4 74.8 72.0 80.5 83.4
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-3 / TP - 09 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 22.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 23.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.00 2.00

CAN NO. A-10 M-30 M-5 M-31 M-13 M-2


WT. OF WET SOIL + CAN gm 442.90 338.00 391.00 374.90 389.20 334.10
WT OF DRY SOIL + CAN gm 435.70 335.10 388.00 369.70 385.60 330.60
WT. OF MOISTURE gm 7.20 2.90 3.00 5.20 3.60 3.50
WT. OF CAN gm 20.22 27.42 26.28 26.85 25.90 25.75
WT. OF DRY SOIL gm 415.48 307.68 361.72 342.85 359.70 304.85
MOISTURE CONTENT % 1.73 0.94 0.83 1.52 1.00 1.15

WT. OF WET SOIL gm 5365 5031 5460 4935 5220 5080


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 2910 2915 2890 2904 2883 2900
WT. OF SAND USED gm 6090 6085 6110 6096 6117 6100
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4840 4835 4860 4846 4867 4850
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 3336 3332 3349 3340 3354 3343
WET DENSITY OF SOIL g/cc 1.608 1.510 1.630 1.478 1.556 1.520
DRY DENSITY OF SOIL g/cc 1.581 1.496 1.617 1.456 1.541 1.503
MAXIMUM DRY DENSITY g/cc 2.16 2.16 2.16 2.16 2.16 2.16
COMPACTION % 73.2 69.2 74.8 67.4 71.3 69.6
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
DOUBLE CYCLE PLATE LOAD TESTS
LAYDOWN No. 3

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 01
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 15.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 5.61
30 3723.0 1.32 2.28 30 3723.0 1.32 6.69
60 7486.0 2.65 3.44 60 7486.0 2.65 7.32
80 9924.6 3.51 4.35 80 9924.6 3.51 7.90
100 12627.6 4.47 5.33 100 12627.6 4.47 8.50
120 15136.8 5.35 6.27 120 15136.8 5.35 9.36
140 17605.2 6.23 7.61 140 17605.2 6.23 10.61
120 15136.8 5.35 7.56 120 15136.8 5.35 10.56
100 12627.6 4.47 7.41 100 12627.6 4.47 10.46
80 9924.6 3.51 7.16 80 9924.6 3.51 10.23
60 7486.0 2.65 6.76 60 7486.0 2.65 9.94
30 3723.0 1.32 6.35 30 3723.0 1.32 9.47
0 0.0 0.00 5.61 0 0.0 0.00 8.93

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 7.61 5.61
UNSOAKED

2nd Load Cycle


17605.2 6.23 10.61 8.93
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-01
(Test Date: 15.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 02
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 16.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 27.40
30 3723.0 1.32 3.65 30 3723.0 1.32 30.55
60 7486.0 2.65 9.16 60 7486.0 2.65 33.34
80 9924.6 3.51 14.02 80 9924.6 3.51 36.33
100 12627.6 4.47 18.42 100 12627.6 4.47 38.94
120 15136.8 5.35 22.42 120 15136.8 5.35 41.00
140 17605.2 6.23 28.21 140 17605.2 6.23 42.98
120 15136.8 5.35 28.15 120 15136.8 5.35 42.63
100 12627.6 4.47 28.05 100 12627.6 4.47 42.54
80 9924.6 3.51 27.92 80 9924.6 3.51 42.30
60 7486.0 2.65 27.79 60 7486.0 2.65 42.01
30 3723.0 1.32 27.66 30 3723.0 1.32 41.58
0 0.0 0.00 27.40 0 0.0 0.00 41.11

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 28.21 27.40
UNSOAKED

2nd Load Cycle


17605.2 6.23 42.98 41.11
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-02
(Test Date: 16.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

5.0

10.0

15.0
Settlement (mm)

20.0

25.0

30.0

35.0

40.0

45.0

50.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 03
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 16.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 7.40
30 3723.0 1.32 1.32 30 3723.0 1.32 8.58
60 7486.0 2.65 2.93 60 7486.0 2.65 10.06
80 9924.6 3.51 5.28 80 9924.6 3.51 10.93
100 12627.6 4.47 7.54 100 12627.6 4.47 12.40
120 15136.8 5.35 9.64 120 15136.8 5.35 13.65
140 17605.2 6.23 11.82 140 17605.2 6.23 14.96
120 15136.8 5.35 11.77 120 15136.8 5.35 14.72
100 12627.6 4.47 11.67 100 12627.6 4.47 14.70
80 9924.6 3.51 11.21 80 9924.6 3.51 14.64
60 7486.0 2.65 10.41 60 7486.0 2.65 13.50
30 3723.0 1.32 9.26 30 3723.0 1.32 12.82
0 0.0 0.00 7.40 0 0.0 0.00 11.30

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 11.82 7.40
UNSOAKED

2nd Load Cycle


17605.2 6.23 14.96 11.30
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-03
(Test Date: 16.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0

16.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 04
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 17.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 5.44
30 3723.0 1.32 1.87 30 3723.0 1.32 6.34
60 7486.0 2.65 3.50 60 7486.0 2.65 6.94
80 9924.6 3.51 4.28 80 9924.6 3.51 8.04
100 12627.6 4.47 5.10 100 12627.6 4.47 9.12
120 15136.8 5.35 5.56 120 15136.8 5.35 10.82
140 17605.2 6.23 6.02 140 17605.2 6.23 12.52
120 15136.8 5.35 6.00 120 15136.8 5.35 12.50
100 12627.6 4.47 5.96 100 12627.6 4.47 12.38
80 9924.6 3.51 5.83 80 9924.6 3.51 12.22
60 7486.0 2.65 5.71 60 7486.0 2.65 12.01
30 3723.0 1.32 5.63 30 3723.0 1.32 11.54
0 0.0 0.00 5.44 0 0.0 0.00 11.00

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 6.02 5.44
UNSOAKED

2nd Load Cycle


17605.2 6.23 12.52 11.00
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-04
(Test Date: 17.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 05
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 17.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 9.09
30 3723.0 1.32 3.21 30 3723.0 1.32 10.45
60 7486.0 2.65 5.99 60 7486.0 2.65 11.34
80 9924.6 3.51 7.43 80 9924.6 3.51 12.08
100 12627.6 4.47 8.72 100 12627.6 4.47 13.13
120 15136.8 5.35 10.04 120 15136.8 5.35 13.87
140 17605.2 6.23 11.43 140 17605.2 6.23 14.76
120 15136.8 5.35 11.38 120 15136.8 5.35 14.71
100 12627.6 4.47 11.28 100 12627.6 4.47 14.62
80 9924.6 3.51 10.93 80 9924.6 3.51 14.30
60 7486.0 2.65 10.46 60 7486.0 2.65 13.80
30 3723.0 1.32 9.68 30 3723.0 1.32 13.12
0 0.0 0.00 9.09 0 0.0 0.00 12.42

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 11.43 9.09
UNSOAKED

2nd Load Cycle


17605.2 6.23 14.76 12.42
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-05
(Test Date: 17.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0

16.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 06
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 18.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 3.44
30 3723.0 1.32 1.55 30 3723.0 1.32 4.66
60 7486.0 2.65 2.22 60 7486.0 2.65 5.56
80 9924.6 3.51 3.00 80 9924.6 3.51 6.44
100 12627.6 4.47 4.00 100 12627.6 4.47 7.04
120 15136.8 5.35 4.92 120 15136.8 5.35 8.16
140 17605.2 6.23 5.62 140 17605.2 6.23 9.33
120 15136.8 5.35 5.59 120 15136.8 5.35 9.28
100 12627.6 4.47 5.51 100 12627.6 4.47 9.20
80 9924.6 3.51 5.41 80 9924.6 3.51 9.10
60 7486.0 2.65 5.25 60 7486.0 2.65 8.71
30 3723.0 1.32 4.84 30 3723.0 1.32 8.16
0 0.0 0.00 3.44 0 0.0 0.00 7.10

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 5.62 3.44
UNSOAKED

2nd Load Cycle


17605.2 6.23 9.33 7.10
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-06
(Test Date: 18.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

1.0

2.0

3.0
Settlement (mm)

4.0

5.0

6.0

7.0

8.0

9.0

10.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 07
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 20.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 15.07
30 3723.0 1.32 3.20 30 3723.0 1.32 17.23
60 7486.0 2.65 7.24 60 7486.0 2.65 20.25
80 9924.6 3.51 10.94 80 9924.6 3.51 22.31
100 12627.6 4.47 13.67 100 12627.6 4.47 24.31
120 15136.8 5.35 16.09 120 15136.8 5.35 25.68
140 17605.2 6.23 19.09 140 17605.2 6.23 27.69
120 15136.8 5.35 19.04 120 15136.8 5.35 27.65
100 12627.6 4.47 18.96 100 12627.6 4.47 27.55
80 9924.6 3.51 18.70 80 9924.6 3.51 27.39
60 7486.0 2.65 18.30 60 7486.0 2.65 26.97
30 3723.0 1.32 17.16 30 3723.0 1.32 26.23
0 0.0 0.00 15.07 0 0.0 0.00 25.09

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 19.09 15.07
UNSOAKED

2nd Load Cycle


17605.2 6.23 27.69 25.09
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-07
(Test Date: 20.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

5.0

10.0
Settlement (mm)

15.0

20.0

25.0

30.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 08
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 20.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 1.96
30 3723.0 1.32 0.75 30 3723.0 1.32 2.68
60 7486.0 2.65 1.36 60 7486.0 2.65 3.43
80 9924.6 3.51 1.93 80 9924.6 3.51 3.74
100 12627.6 4.47 2.57 100 12627.6 4.47 4.13
120 15136.8 5.35 3.14 120 15136.8 5.35 4.49
140 17605.2 6.23 3.83 140 17605.2 6.23 4.92
120 15136.8 5.35 3.80 120 15136.8 5.35 4.89
100 12627.6 4.47 3.73 100 12627.6 4.47 4.80
80 9924.6 3.51 3.59 80 9924.6 3.51 4.64
60 7486.0 2.65 3.39 60 7486.0 2.65 4.46
30 3723.0 1.32 3.02 30 3723.0 1.32 3.88
0 0.0 0.00 1.96 0 0.0 0.00 3.44

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 3.83 1.96
UNSOAKED

2nd Load Cycle


17605.2 6.23 4.92 3.44
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-08
(Test Date: 20.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

1.0

2.0
Settlement (mm)

3.0

4.0

5.0

6.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-3 / TP - 09
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 22.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 6.27
30 3723.0 1.32 1.99 30 3723.0 1.32 6.71
60 7486.0 2.65 3.81 60 7486.0 2.65 7.52
80 9924.6 3.51 4.67 80 9924.6 3.51 8.32
100 12627.6 4.47 5.73 100 12627.6 4.47 9.46
120 15136.8 5.35 6.81 120 15136.8 5.35 10.34
140 17605.2 6.23 7.83 140 17605.2 6.23 11.29
120 15136.8 5.35 7.79 120 15136.8 5.35 11.25
100 12627.6 4.47 7.71 100 12627.6 4.47 11.16
80 9924.6 3.51 7.61 80 9924.6 3.51 11.05
60 7486.0 2.65 7.43 60 7486.0 2.65 10.92
30 3723.0 1.32 7.17 30 3723.0 1.32 10.41
0 0.0 0.00 6.27 0 0.0 0.00 9.98

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 7.83 6.27
UNSOAKED

2nd Load Cycle


17605.2 6.23 11.29 9.98
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-3 / TP-09
(Test Date: 22.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0
UNSOAKED SOAKED
PERCOLATION TEST
LAYDOWN No. 3

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 17.01.2022
DESCRIPTION : - TEST NO.: TP - 02

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 10 20 30 40 50 60 70 80 90
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 8 min
Time for 75% Outflow (tp75): 58 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.00E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 16.01.2022
DESCRIPTION : - TEST NO.: TP - 01

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 6 min
Time for 75% Outflow (tp75): 56 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.00E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 17.01.2022
DESCRIPTION : - TEST NO.: TP - 03

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 22 min
Time for 75% Outflow (tp75): 132 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 2.73E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 17.01.2022
DESCRIPTION : - TEST NO.: TP - 04

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 40 min
Time for 75% Outflow (tp75): 150 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 2.73E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 20.01.2022
DESCRIPTION : - TEST NO.: TP - 05

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 10 20 30 40 50 60
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 7 min
Time for 75% Outflow (tp75): 34 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 1.11E-02 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 20.01.2022
DESCRIPTION : - TEST NO.: TP - 06

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 10 20 30 40 50 60
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 8 min
Time for 75% Outflow (tp75): 44 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 8.33E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 22.01.2022
DESCRIPTION : - TEST NO.: TP - 07

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160 180 200
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 10 min
Time for 75% Outflow (tp75): 115 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 2.86E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 23.01.2022
DESCRIPTION : - TEST NO.: TP - 08

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30 35 40 45 50
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 4.5 min
Time for 75% Outflow (tp75): 27 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 1.33E-02 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-3 DATE : 23.01.2022
DESCRIPTION : - TEST NO.: TP - 09

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160 180 200
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 10 min
Time for 75% Outflow (tp75): 92 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.66E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


INSITU CBR TESTS
LAYDOWN No. 3

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 01 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 15.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


180
Penetration Dial Load Bearing Bearing
Gauge value Ratio 160

(in) Reading (Lbs.) (lb/in2) (Cor.CBR)


140
Bearing Value (lb/in2)

0.0000 0.00 0 0
120
0.0250 5.00 46 15

0.0500 9.00 82 27 100

0.0750 13.00 119 40 80

0.1000 18.00 165 55 5


60
0.1500 22.00 201 67
40
0.2000 27.00 247 82 5

0.2500 33.00 302 101 20

0.3000 40.00 366 122 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 45.00 412 137
Penetration (in)
0.4000 51.00 467 156

REMARKS : CBR value at 0.1" = 5 CBR value at 0.2" = 5


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 02 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 16.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio
120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)

0.0000 0.00 0 0 100

0.0250 3.00 27 9
80
0.0500 6.00 55 18

0.0750 10.00 92 31 60
0.1000 13.00 119 40 4

0.1500 16.00 147 49 40

0.2000 20.00 183 61 4


20
0.2500 25.00 229 76

0.3000 29.00 266 89 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 34.00 311 104
Penetration (in)
0.4000 39.00 357 119

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 03 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 16.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


120
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
100

Bearing Value (lb/in2)


0.0000 0.00 0 0
80
0.0250 2.00 18 6
0.0500 4.00 37 12
60
0.0750 7.00 64 21
0.1000 10.00 92 31 3
40
0.1500 13.00 119 40
0.2000 16.00 147 49 3 20
0.2500 19.00 174 58
0.3000 24.00 220 73 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 28.00 256 85
Penetration (in)
0.4000 33.00 302 101

REMARKS : CBR value at 0.1" = 3 CBR value at 0.2" = 3


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 04 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 17.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


50
Penetration Dial Load Bearing Bearing
45
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 40
Bearing Value (lb/in2)

0.0000 0.00 0 0 35
0.0250 2.00 18 6
30
0.0500 4.00 37 12
25
0.0750 5.00 46 15
20
0.1000 6.00 55 18 2
15
0.1500 8.00 73 24

0.2000 9.00 82 27 2 10

0.2500 11.00 101 34 5

0.3000 12.00 110 37 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 13.00 119 40
Penetration (in)
0.4000 15.00 137 46

REMARKS : CBR value at 0.1" = 2 CBR value at 0.2" = 2


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 05 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 17.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


120
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
100
Bearing Value (lb/in2)

0.0000 0.00 0 0
80
0.0250 3.00 27 9

0.0500 5.00 46 15
60
0.0750 8.00 73 24

0.1000 12.00 110 37 4


40
0.1500 14.00 128 43

0.2000 18.00 165 55 4 20


0.2500 22.00 201 67

0.3000 26.00 238 79 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 30.00 275 92
Penetration (in)
0.4000 34.00 311 104

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 06 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 18.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


120
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
100
Bearing Value (lb/in2)

0.0000 0.00 0 0
80
0.0250 3.00 27 9

0.0500 6.00 55 18
60
0.0750 8.00 73 24

0.1000 13.00 119 40 4


40
0.1500 15.00 137 46

0.2000 19.00 174 58 4 20


0.2500 24.00 220 73

0.3000 28.00 256 85 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 34.00 311 104
Penetration (in)
0.4000 37.00 339 113

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 07 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 20.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


200
Penetration Dial Load Bearing Bearing
180
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 160
Bearing Value (lb/in2)

0.0000 0.00 0 0 140


0.0250 5.00 46 15
120
0.0500 9.00 82 27
100
0.0750 14.00 128 43
80
0.1000 20.00 183 61 6
60
0.1500 25.00 229 76

0.2000 32.00 293 98 7 40

0.2500 40.00 366 122 20

0.3000 46.00 421 140 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 52.00 476 159
Penetration (in)
0.4000 59.00 540 180

REMARKS : CBR value at 0.1" = 6 CBR value at 0.2" = 7


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 08 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 20.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio
120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)

0.0000 0.00 0 0 100

0.0250 3.00 27 9
80
0.0500 6.00 55 18

0.0750 8.00 73 24 60
0.1000 11.00 101 34 3

0.1500 15.00 137 46 40

0.2000 18.00 165 55 4


20
0.2500 22.00 201 67

0.3000 27.00 247 82 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 33.00 302 101
Penetration (in)
0.4000 41.00 375 125

REMARKS : CBR value at 0.1" = 3 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-3 / TP - 09 REPORT DATE : 23.01.2022
TEST DEPTH : 0.5 m TEST DATE : 22.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


400
Penetration Dial Load Bearing Bearing
Gauge value Ratio 350
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)

300
0.0000 0.00 0 0

0.0250 10.00 92 31 250

0.0500 21.00 192 64


200
0.0750 32.00 293 98

0.1000 43.00 394 131 13 150

0.1500 60.00 549 183 100


0.2000 69.00 632 211 14
50
0.2500 78.00 714 238

0.3000 87.00 797 266 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 105.00 962 321
Penetration (in)
0.4000 120.00 1099 366

REMARKS : CBR value at 0.1" = 13 CBR value at 0.2" = 14


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TRIAL PIT LOGS
LAYDOWN No. 5

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 01

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077839.172


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
45.582 E: 740298.291
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 27-Dec-21 27-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Greyish brown, silty medium to coarse SAND with Bulk Sample at 0.60m &
gravel and cobbles. Gravels are angular medium to 1.20m
coarse of igneous origin.
Brown, well-graded SAND with silt, gravel and B-1
cobble of igneous origin.
1
Field CBR Test at 0.50
Brown, well-graded GRAVEL with sand and cobble. B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 02

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077693.304


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
41.974 E: 740100.679
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 28-Dec-21 28-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~0.60 meters Bulk Sample at 0.60m &


Greyish brown, silty medium to fine SAND with 1.20m
gravel. Gravels are angular to sub-rounded of
igneous origin.
B-1
Brown, well-graded SAND with gravel of igneous
1 origin.
Greyish brown, slightly cemented silty medium to Field CBR Test at 0.50
fine SAND with gravel and cobbles. Gravels are B-2 meters
angular to sub-rounded of igneous origin. Plate Load Test at 0.50
Brown, well-graded SAND with gravel and cobble meters
of igneous origin. Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 03

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077530.892


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
37.618 E: 739870.782
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 29-Dec-21 29-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brownish grey, slightly cemented silty medium to Bulk Sample at 0.60m &
fine SAND with gravel and cobbles. Gravels are 1.20m
angular to sub-rounded medium to coarse of
igneous origin.
B-1
Brown, well-graded SAND with silt, gravel and
1 cobbles of igneous origin.
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Brown, well-graded GRAVEL wioth silt and sand.
Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 04

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077318.443


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
40.843 E: 740010.370
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 29-Dec-21 29-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brownish grey, slightly cemented silty medium to Bulk Sample at 0.60m &
fine SAND with gravel and cobbles. Gravels are 1.20m
angular to sub-rounded medium to coarse of
igneous origin.
B-1
Brown, well-graded GRAVEL with sand and
1 cobbles.
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
Brown, well-graded GRAVEL with silt, sand and meters
cobbles. Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 05

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077533.489


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
43.493 E: 740213.606
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 30-Dec-21 30-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brownish grey, slightly cemented silty medium to Bulk Sample at 0.60m &
fine SAND with gravel and cobbles. Gravels are 1.20m
angular to sub-rounded of igneous origin.
B-1

1
Field CBR Test at 0.50
Brown, silty SAND with gravel and cobbles of B-2 meters
igneous origin. Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Brown, well-graded GRAVEL with sand and
cobbles of igneous origin. Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 06

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077555.815


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
43.768 E: 740427.565
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 01-Jan-22 01-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

0.00m~0.80m Bulk Sample at 0.60m &


Greyish brown, silty medium to fine SAND with 1.20m
gravel. Gravels are angular to sub-rounded
medium to coarse of igneous origin.
B-1
0.80m~1.50m
1 Brownish grey, slightly cemented silty medium to Field CBR Test at 0.50
fine SAND with gravel and cobbles. Gravels are meters
B-2
angular to subrounded medium to coarse of Plate Load Test at 0.50
igneous origin. meters
--Ditto-- Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Small Sample at 0.00, 0.50,
0.80, 1.00, 1.50, 2.00, 2.50 &
3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 07

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077342.986


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
40.751 E: 740284.625
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 30-Dec-21 30-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brownish grey, slightly cemented silty medium to Bulk Sample at 0.60m &
fine SAND with gravel and cobbles. Gravels are 1.20m
angular to sub-rounded medium to coarse of
igneous origin.
B-1

1
Field CBR Test at 0.50
Brown, well-graded SAND with silt, gravel and B-2 meters
cobbles of igneous origin. Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
Greyish brown, poorly-graded SAND with silt, 2.50 & 3.00m
gravel and cobbles of igneous origin.
3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 08

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077122.984


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
37.584 E: 740138.787
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 02-Jan-22 02-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brownish grey to greyish brown, silty medium to Bulk Sample at 0.60m &
fine SAND with gravel and cobbles. Gravels are 1.20m
angular to sub-rounded medium to coarse of
igneous origin.
B-1

1
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
Brown, well-graded SAND with silt, gravel and meters
cobbles of igneous origin. Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Small Sample at
0.00,0.50,1.00, 1.50, 2.00,
2.50 & 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 09

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3077085.353


NEOM Desalination Plant to Gayal Transmission System (Laydown Area-05)
36.638 E: 739819.845
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 12-Jan-22 12-Jan-22
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~0.60 meters Bulk Sample at 0.60m &


Brownish grey, silty medium to fine SAND with 1.20m
gravel and cobble. Gravels are angular to
subrounded medium to coarse of igneous origin.
B-1
Brownish grey, well-graded GRAVEL with silt and
1 sand.
Field CBR Test at 0.50
B-2 meters
Plate Load Test at 0.50
meters
Field Density Test at 0.50,
1.00, 1.50, 2.00, 2.50 & 3.00
2 meters
Greyish brown, well-graded GRAVEL with sand.
Small Sample at 0.00, 0.50,
0.60, 1.00, 1.50, 2.00, 2.50 &
3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PITS GAYAL-LD-5.GPJ RGME.GDT 23-3-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C
FIELD DENSITY TESTS
LAYDOWN No. 5

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 01 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 26.12.2021
SAMPLE RECEIVING DATE : TEST FINISH DATE : 27.12.2021
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. ANP BPD BDC CB-1 RL-4 SA-9


WT. OF WET SOIL + CAN gm 470.0 385.0 450.0 560.0 500.0 460.0
WT OF DRY SOIL + CAN gm 452.1 370.6 433.5 551.8 489.5 449.1
WT. OF MOISTURE gm 17.9 14.4 16.5 8.2 10.5 10.9
WT. OF CAN gm 24.0 22.0 23.0 23.0 25.0 27.0
WT. OF DRY SOIL gm 428.1 348.6 410.5 528.8 464.5 422.1
MOISTURE CONTENT % 4.18 4.13 4.02 1.55 2.26 2.58

WT. OF WET SOIL gm 5230 5155 5282 5312 5221 5366


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 4015 3981 3817 3901 3942 3849
WT. OF SAND USED gm 4985 5019 5183 5099 5058 5151
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3735 3769 3933 3849 3808 3901
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2574 2598 2711 2653 2624 2688
WET DENSITY OF SOIL g/cc 2.032 1.985 1.949 2.003 1.989 1.996
DRY DENSITY OF SOIL g/cc 1.950 1.906 1.873 1.972 1.945 1.946
MAXIMUM DRY DENSITY g/cc 2.21 2.21 2.21 2.21 2.21 2.21
COMPACTION % 88.2 86.2 84.8 89.2 88.0 88.0
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 02 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 28.12.2021
SAMPLE RECEIVING DATE : TEST FINISH DATE : 29.12.2021
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. JND JUD AL-4 CK-9 RLP GM-1


WT. OF WET SOIL + CAN gm 501.0 481.0 487.0 496.0 480.0 457.0
WT OF DRY SOIL + CAN gm 487.2 469.3 473.8 480.9 463.3 440.2
WT. OF MOISTURE gm 13.8 11.7 13.2 15.1 16.7 16.8
WT. OF CAN gm 28.0 21.0 25.0 29.0 30.0 43.0
WT. OF DRY SOIL gm 459.2 448.3 448.8 451.9 433.3 397.2
MOISTURE CONTENT % 3.01 2.61 2.94 3.34 3.85 4.23

WT. OF WET SOIL gm 5570 5505 5580 5330 5260 5305


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3812 3853 3671 3691 3715 3752
WT. OF SAND USED gm 5188 5147 5329 5309 5285 5248
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3938 3897 4079 4059 4035 3998
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2714 2686 2811 2797 2781 2755
WET DENSITY OF SOIL g/cc 2.052 2.050 1.985 1.905 1.892 1.925
DRY DENSITY OF SOIL g/cc 1.992 1.998 1.928 1.844 1.821 1.847
MAXIMUM DRY DENSITY g/cc 2.16 2.16 2.16 2.16 2.16 2.16
COMPACTION % 92.2 92.5 89.3 85.4 84.3 85.5
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 03 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 26.12.2021
SAMPLE RECEIVING DATE : TEST FINISH DATE : 27.12.2021
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. KLV VL JV S-11 U-39 A-41


WT. OF WET SOIL + CAN gm 520.6 484.0 522.0 541.0 566.0 445.0
WT OF DRY SOIL + CAN gm 501.2 465.5 504.0 528.4 551.2 429.9
WT. OF MOISTURE gm 19.4 18.5 18.0 12.6 14.8 15.1
WT. OF CAN gm 29.5 24.0 38.0 25.0 41.0 40.0
WT. OF DRY SOIL gm 471.7 441.5 466.0 503.4 510.2 389.9
MOISTURE CONTENT % 4.11 4.19 3.86 2.50 2.90 3.87

WT. OF WET SOIL gm 5570 5350 5196 5665 5385 5200


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3891 3783 3812 3762 3799 3807
WT. OF SAND USED gm 5109 5217 5188 5238 5201 5193
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3859 3967 3938 3988 3951 3943
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2660 2734 2714 2748 2723 2717
WET DENSITY OF SOIL g/cc 2.094 1.957 1.915 2.061 1.978 1.914
DRY DENSITY OF SOIL g/cc 2.012 1.878 1.843 2.011 1.922 1.842
MAXIMUM DRY DENSITY g/cc 2.23 2.23 2.23 2.23 2.23 2.23
COMPACTION % 90.2 84.2 82.7 90.2 86.2 82.6
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 04 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 29.12.2021
SAMPLE RECEIVING DATE : TEST FINISH DATE : 30.12.2021
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. JAV BRC KBD DBG DE BOM


WT. OF WET SOIL + CAN gm 537.0 456.0 476.0 500.0 523.0 502.0
WT OF DRY SOIL + CAN gm 521.9 442.6 459.3 485.2 505.7 485.4
WT. OF MOISTURE gm 15.1 13.4 16.7 14.8 17.3 16.6
WT. OF CAN gm 27.0 26.0 23.0 33.0 34.0 44.0
WT. OF DRY SOIL gm 494.9 416.6 436.3 452.2 471.7 441.4
MOISTURE CONTENT % 3.05 3.22 3.83 3.27 3.67 3.76

WT. OF WET SOIL gm 5510 5400 5415 5660 5400 5625


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3809 3712 3642 3723 3812 3756
WT. OF SAND USED gm 5191 5288 5358 5277 5188 5244
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3941 4038 4108 4027 3938 3994
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2716 2783 2831 2775 2714 2753
WET DENSITY OF SOIL g/cc 2.029 1.940 1.913 2.039 1.990 2.044
DRY DENSITY OF SOIL g/cc 1.969 1.880 1.842 1.975 1.919 1.969
MAXIMUM DRY DENSITY g/cc 2.19 2.19 2.19 2.19 2.19 2.19
COMPACTION % 89.9 85.8 84.1 90.2 87.6 89.9
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 05 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 26.12.2021
SAMPLE RECEIVING DATE : TEST FINISH DATE : 27.12.2021
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. RPG BGM JHK JAS HOL MAK


WT. OF WET SOIL + CAN gm 460.6 506.0 511.0 522.0 508.0 470.0
WT OF DRY SOIL + CAN gm 438.8 479.4 480.3 511.4 496.0 456.3
WT. OF MOISTURE gm 21.8 26.6 30.7 10.6 12.0 13.7
WT. OF CAN gm 24.3 38.0 46.0 47.0 50.0 25.0
WT. OF DRY SOIL gm 414.5 441.4 434.3 464.4 446.0 431.3
MOISTURE CONTENT % 5.26 6.03 7.07 2.28 2.69 3.18

WT. OF WET SOIL gm 4925 4775 4210 4760 4910 4905


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3612 3782 3793 3812 3846 3787
WT. OF SAND USED gm 5388 5218 5207 5188 5154 5213
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 4138 3968 3957 3938 3904 3963
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2852 2735 2727 2714 2691 2731
WET DENSITY OF SOIL g/cc 1.727 1.746 1.544 1.754 1.825 1.796
DRY DENSITY OF SOIL g/cc 1.641 1.647 1.442 1.715 1.777 1.741
MAXIMUM DRY DENSITY g/cc 2.18 2.18 2.18 2.18 2.18 2.18
COMPACTION % 75.3 75.5 66.1 78.7 81.5 79.8
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 06 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 01.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 02.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. M-16 B-2 XP-16 M-10 M-2 M-7


WT. OF WET SOIL + CAN gm 760.6 815.4 805.6 775.7 805.8 750.5
WT OF DRY SOIL + CAN gm 750.5 797.6 782.2 750.9 778.4 722.6
WT. OF MOISTURE gm 10.1 17.8 23.4 24.8 27.4 27.9
WT. OF CAN gm 195.9 180.6 185.7 202.5 185.6 188.5
WT. OF DRY SOIL gm 554.6 617.1 596.6 548.4 592.8 534.1
MOISTURE CONTENT % 1.82 2.88 3.92 4.52 4.63 5.22

WT. OF WET SOIL gm 5560 5560 5065 5132 5230 5330


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3814 3864 3812 3789 3836 3764
WT. OF SAND USED gm 5186 5136 5188 5211 5164 5236
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3936 3886 3938 3961 3914 3986
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2713 2678 2714 2730 2697 2747
WET DENSITY OF SOIL g/cc 2.050 2.076 1.866 1.880 1.939 1.940
DRY DENSITY OF SOIL g/cc 2.013 2.018 1.796 1.799 1.853 1.844
MAXIMUM DRY DENSITY g/cc 2.16 2.16 2.16 2.16 2.16 2.16
COMPACTION % 93.2 93.4 83.1 83.3 85.8 85.4
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 07 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 30.12.2021
SAMPLE RECEIVING DATE : TEST FINISH DATE : 01.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. N-3 K-9 M-18 F-6 B-18 D-30


WT. OF WET SOIL + CAN gm 852.5 827.1 814.3 825.3 800.5 785.4
WT OF DRY SOIL + CAN gm 838.3 808.7 792.6 797.7 772.5 755.8
WT. OF MOISTURE gm 14.3 18.4 21.7 27.6 28.1 29.6
WT. OF CAN gm 205.6 180.5 165.9 188.5 195.5 175.5
WT. OF DRY SOIL gm 632.7 628.2 626.7 609.2 577.0 580.4
MOISTURE CONTENT % 2.25 2.93 3.46 4.53 4.86 5.10

WT. OF WET SOIL gm 5400 5165 5560 6520 5385 5410


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3864 3823 3867 3791 3826 3867
WT. OF SAND USED gm 5136 5177 5133 5209 5174 5133
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3886 3927 3883 3959 3924 3883
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2678 2706 2676 2728 2704 2676
WET DENSITY OF SOIL g/cc 2.016 1.908 2.078 2.390 1.991 2.022
DRY DENSITY OF SOIL g/cc 1.972 1.854 2.008 2.286 1.899 1.924
MAXIMUM DRY DENSITY g/cc 2.17 2.17 2.17 2.17 2.17 2.17
COMPACTION % 90.9 85.4 92.5 105.4 87.5 88.6
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 08 REPORT DATE : 12.01.2022
SAMPLING DATE : - TEST START DATE : 02.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 03.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. XP-02 M-20 XP-9 M-33 A-17 F-15


WT. OF WET SOIL + CAN gm 835.6 780.5 850.5 805.4 780.9 760.3
WT OF DRY SOIL + CAN gm 824.2 769.0 836.6 791.0 765.2 744.2
WT. OF MOISTURE gm 11.4 11.5 13.9 14.4 15.7 16.1
WT. OF CAN gm 200.6 185.5 185.8 210.5 190.4 210.1
WT. OF DRY SOIL gm 623.6 583.5 650.8 580.6 574.8 534.1
MOISTURE CONTENT % 1.83 1.97 2.14 2.48 2.72 3.01

WT. OF WET SOIL gm 5340 5220 5065 5820 5126 5020


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3789 3745 3856 3837 3781 3861
WT. OF SAND USED gm 5211 5255 5144 5163 5219 5139
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3961 4005 3894 3913 3969 3889
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2730 2760 2684 2697 2735 2680
WET DENSITY OF SOIL g/cc 1.956 1.891 1.887 2.158 1.874 1.873
DRY DENSITY OF SOIL g/cc 1.921 1.855 1.848 2.106 1.824 1.818
MAXIMUM DRY DENSITY g/cc 2.16 2.16 2.16 2.16 2.16 2.16
COMPACTION % 88.9 85.9 85.5 97.5 84.5 84.2
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
FIELD DENSITY TEST
ASTM-1556/D-1556M-e1
CLIENT : NEOM Company
PROJECT : NEOM Desalination Plant to Gayal Transmission System PROJECT NO. : 21J4037
LOCATION : LD-5 / TP - 09 REPORT DATE : 20.01.2022
SAMPLING DATE : - TEST START DATE : 12.01.2022
SAMPLE RECEIVING DATE : TEST FINISH DATE : 13.01.2022
SAMPLING BY: R.G.F. ENV. CONDITION TEMP. : - HUMIDITY : -
DESCRIPTION :

TEST NO.: 1 2 3 4 5 6
LAYER : - - - - - -
SAMPLE DEPTH : m 0.50 1.00 1.50 2.00 2.50 3.00

CAN NO. B-5 B-16 B-10 B-9 B-14 M-8


WT. OF WET SOIL + CAN gm 377.9 363.6 388.4 403.5 351.0 401.1
WT OF DRY SOIL + CAN gm 373.4 360.1 382.7 399.1 347.2 396.3
WT. OF MOISTURE gm 4.5 3.5 5.7 4.4 3.8 4.8
WT. OF CAN gm 50.0 47.7 46.5 58.0 49.4 27.7
WT. OF DRY SOIL gm 323.4 312.4 336.2 341.1 297.9 368.6
MOISTURE CONTENT % 1.39 1.12 1.70 1.29 1.28 1.30

WT. OF WET SOIL gm 4879 5280 5411 5240 5130 5402


WT. OF SAND + APP. BEFORE USE gm 9000 9000 9000 9000 9000 9000
WT. OF SAND + APP. AFTER USE gm 3867 3643 3854 3791 3829 3756
WT. OF SAND USED gm 5133 5357 5146 5209 5171 5244
WT. OF SAND TO FILL CONE gm 1250 1250 1250 1250 1250 1250
WT. OF SAND TO FILL HOLE gm 3883 4107 3896 3959 3921 3994
UNIT WEIGHT OF SAND g/cc 1.451 1.451 1.451 1.451 1.451 1.451
VOLUME OF HOLE g/cc 2676 2830 2685 2728 2702 2753
WET DENSITY OF SOIL g/cc 1.823 1.865 2.015 1.920 1.898 1.963
DRY DENSITY OF SOIL g/cc 1.798 1.845 1.982 1.896 1.874 1.937
MAXIMUM DRY DENSITY g/cc 2.22 2.22 2.22 2.22 2.22 2.22
COMPACTION % 81.0 83.1 89.3 85.4 84.4 87.3
COMPACTION REQUIRED % - - - - - -
TEST STATUS - - - - - -
P = Field Test Meet The Specification (Pass) F= Field Test DoF= Field Test Does Not Meet The Specification (Fail)

REMARKS :

TESTED BY : Sajid CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:

(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-14.02
15.07.2019
DOUBLE CYCLE PLATE LOAD TESTS
LAYDOWN No. 5

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 01
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 26.12.2021
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 8.67
30 3723.0 1.32 2.38 30 3723.0 1.32 10.73
60 7486.0 2.65 5.06 60 7486.0 2.65 12.19
80 9924.6 3.51 6.80 80 9924.6 3.51 13.49
100 12627.6 4.47 8.30 100 12627.6 4.47 14.69
120 15136.8 5.35 9.47 120 15136.8 5.35 15.94
140 17605.2 6.23 10.62 140 17605.2 6.23 17.07
120 15136.8 5.35 10.61 120 15136.8 5.35 17.03
100 12627.6 4.47 10.57 100 12627.6 4.47 16.96
80 9924.6 3.51 10.48 80 9924.6 3.51 16.85
60 7486.0 2.65 10.29 60 7486.0 2.65 16.63
30 3723.0 1.32 9.78 30 3723.0 1.32 16.39
0 0.0 0.00 8.67 0 0.0 0.00 15.96

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 10.62 8.67
UNSOAKED

2nd Load Cycle


17605.2 6.23 17.07 15.96
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-01
(Test Date: 26.12.2021)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0

6.0
Settlement (mm)

8.0

10.0

12.0

14.0

16.0

18.0

20.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 02
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 28.12.2021
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 5.42
30 3723.0 1.32 1.90 30 3723.0 1.32 6.23
60 7486.0 2.65 3.74 60 7486.0 2.65 7.13
80 9924.6 3.51 4.49 80 9924.6 3.51 8.04
100 12627.6 4.47 5.43 100 12627.6 4.47 8.76
120 15136.8 5.35 5.79 120 15136.8 5.35 9.96
140 17605.2 6.23 6.58 140 17605.2 6.23 11.03
120 15136.8 5.35 6.53 120 15136.8 5.35 11.01
100 12627.6 4.47 6.47 100 12627.6 4.47 10.97
80 9924.6 3.51 6.40 80 9924.6 3.51 10.92
60 7486.0 2.65 6.29 60 7486.0 2.65 10.89
30 3723.0 1.32 6.09 30 3723.0 1.32 10.54
0 0.0 0.00 5.42 0 0.0 0.00 9.55

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 6.58 5.42
UNSOAKED

2nd Load Cycle


17605.2 6.23 11.03 9.55
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-02
(Test Date: 28.12.2021)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 03
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 29.12.2021
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 8.57
30 3723.0 1.32 2.97 30 3723.0 1.32 13.19
60 7486.0 2.65 5.27 60 7486.0 2.65 16.00
80 9924.6 3.51 6.55 80 9924.6 3.51 18.80
100 12627.6 4.47 7.83 100 12627.6 4.47 21.33
120 15136.8 5.35 9.03 120 15136.8 5.35 23.51
140 17605.2 6.23 10.12 140 17605.2 6.23 25.51
120 15136.8 5.35 10.10 120 15136.8 5.35 25.49
100 12627.6 4.47 10.07 100 12627.6 4.47 25.45
80 9924.6 3.51 10.00 80 9924.6 3.51 25.42
60 7486.0 2.65 9.93 60 7486.0 2.65 25.38
30 3723.0 1.32 9.60 30 3723.0 1.32 25.18
0 0.0 0.00 8.57 0 0.0 0.00 24.74

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 10.12 8.57
UNSOAKED

2nd Load Cycle


17605.2 6.23 25.51 24.74
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-03
(Test Date: 29.12.2021)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

5.0

10.0
Settlement (mm)

15.0

20.0

25.0

30.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 04
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 29.12.2021
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 4.80
30 3723.0 1.32 1.44 30 3723.0 1.32 5.40
60 7486.0 2.65 2.37 60 7486.0 2.65 6.01
80 9924.6 3.51 3.09 80 9924.6 3.51 6.57
100 12627.6 4.47 3.84 100 12627.6 4.47 6.95
120 15136.8 5.35 4.65 120 15136.8 5.35 7.30
140 17605.2 6.23 5.51 140 17605.2 6.23 7.54
120 15136.8 5.35 5.44 120 15136.8 5.35 7.50
100 12627.6 4.47 5.25 100 12627.6 4.47 7.31
80 9924.6 3.51 5.39 80 9924.6 3.51 7.12
60 7486.0 2.65 5.15 60 7486.0 2.65 6.93
30 3723.0 1.32 4.98 30 3723.0 1.32 6.75
0 0.0 0.00 4.80 0 0.0 0.00 6.53

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 5.51 4.80
UNSOAKED

2nd Load Cycle


17605.2 6.23 7.54 6.53
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-04
(Test Date: 29.12.2021)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

1.0

2.0
Settlement (mm)

3.0

4.0

5.0

6.0

7.0

8.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 05
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 30.12.2021
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 3.34
30 3723.0 1.32 1.17 30 3723.0 1.32 4.03
60 7486.0 2.65 2.38 60 7486.0 2.65 5.10
80 9924.6 3.51 3.02 80 9924.6 3.51 5.59
100 12627.6 4.47 3.68 100 12627.6 4.47 6.15
120 15136.8 5.35 4.02 120 15136.8 5.35 6.63
140 17605.2 6.23 4.26 140 17605.2 6.23 7.17
120 15136.8 5.35 4.23 120 15136.8 5.35 7.15
100 12627.6 4.47 4.18 100 12627.6 4.47 7.10
80 9924.6 3.51 4.03 80 9924.6 3.51 6.98
60 7486.0 2.65 3.79 60 7486.0 2.65 6.82
30 3723.0 1.32 3.60 30 3723.0 1.32 6.68
0 0.0 0.00 3.34 0 0.0 0.00 6.38

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 4.26 3.34
UNSOAKED

2nd Load Cycle


17605.2 6.23 7.17 6.38
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-05
(Test Date: 30.12.2021)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

1.0

2.0
Settlement (mm)

3.0

4.0

5.0

6.0

7.0

8.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 06
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 01.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 4.94
30 3723.0 1.32 1.79 30 3723.0 1.32 6.26
60 7486.0 2.65 3.25 60 7486.0 2.65 8.17
80 9924.6 3.51 4.52 80 9924.6 3.51 9.54
100 12627.6 4.47 5.47 100 12627.6 4.47 10.70
120 15136.8 5.35 6.37 120 15136.8 5.35 11.50
140 17605.2 6.23 6.85 140 17605.2 6.23 12.35
120 15136.8 5.35 6.79 120 15136.8 5.35 12.31
100 12627.6 4.47 6.65 100 12627.6 4.47 12.25
80 9924.6 3.51 6.32 80 9924.6 3.51 12.13
60 7486.0 2.65 5.88 60 7486.0 2.65 11.89
30 3723.0 1.32 5.41 30 3723.0 1.32 11.77
0 0.0 0.00 4.94 0 0.0 0.00 11.29

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 6.85 4.94
UNSOAKED

2nd Load Cycle


17605.2 6.23 12.35 11.29
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-06
(Test Date: 01.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 07
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 30.12.2021
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 5.63
30 3723.0 1.32 1.74 30 3723.0 1.32 6.82
60 7486.0 2.65 3.81 60 7486.0 2.65 7.76
80 9924.6 3.51 5.21 80 9924.6 3.51 8.95
100 12627.6 4.47 6.10 100 12627.6 4.47 10.04
120 15136.8 5.35 6.61 120 15136.8 5.35 10.60
140 17605.2 6.23 7.06 140 17605.2 6.23 11.09
120 15136.8 5.35 6.99 120 15136.8 5.35 11.02
100 12627.6 4.47 6.78 100 12627.6 4.47 10.84
80 9924.6 3.51 6.58 80 9924.6 3.51 10.62
60 7486.0 2.65 6.36 60 7486.0 2.65 10.37
30 3723.0 1.32 6.16 30 3723.0 1.32 10.08
0 0.0 0.00 5.63 0 0.0 0.00 9.80

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 7.06 5.63
UNSOAKED

2nd Load Cycle


17605.2 6.23 11.09 9.80
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-07
(Test Date: 30.12.2021)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 08
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 02.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 7.23
30 3723.0 1.32 1.65 30 3723.0 1.32 8.01
60 7486.0 2.65 3.92 60 7486.0 2.65 8.95
80 9924.6 3.51 5.76 80 9924.6 3.51 9.53
100 12627.6 4.47 7.07 100 12627.6 4.47 10.33
120 15136.8 5.35 7.93 120 15136.8 5.35 10.91
140 17605.2 6.23 8.71 140 17605.2 6.23 11.83
120 15136.8 5.35 8.67 120 15136.8 5.35 11.80
100 12627.6 4.47 8.60 100 12627.6 4.47 11.60
80 9924.6 3.51 8.45 80 9924.6 3.51 11.38
60 7486.0 2.65 8.18 60 7486.0 2.65 11.02
30 3723.0 1.32 7.84 30 3723.0 1.32 10.47
0 0.0 0.00 7.23 0 0.0 0.00 9.80

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 8.71 7.23
UNSOAKED

2nd Load Cycle


17605.2 6.23 11.83 9.80
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-08
(Test Date: 02.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : LD-5 / TP - 09
DESCRIPTION : DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
2
Plate Area : 2827.8 cm Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 12.01.2022
Tested By : Sajid
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 6.32
30 3723.0 1.32 2.33 30 3723.0 1.32 8.40
60 7486.0 2.65 4.02 60 7486.0 2.65 10.24
80 9924.6 3.51 5.08 80 9924.6 3.51 11.34
100 12627.6 4.47 6.19 100 12627.6 4.47 12.39
120 15136.8 5.35 6.94 120 15136.8 5.35 13.34
140 17605.2 6.23 7.59 140 17605.2 6.23 14.13
120 15136.8 5.35 7.58 120 15136.8 5.35 14.11
100 12627.6 4.47 7.53 100 12627.6 4.47 14.05
80 9924.6 3.51 7.44 80 9924.6 3.51 13.94
60 7486.0 2.65 7.34 60 7486.0 2.65 13.85
30 3723.0 1.32 6.90 30 3723.0 1.32 12.90
0 0.0 0.00 6.32 0 0.0 0.00 12.32

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 7.59 6.32
UNSOAKED

2nd Load Cycle


17605.2 6.23 14.13 12.32
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
LD-5 / TP-09
(Test Date: 12.01.2022)

Pressure (kg/cm2)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0

16.0
UNSOAKED SOAKED
PERCOLATION TEST
LAYDOWN No. 5

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 27.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 01

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30 35 40
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 4 min
Time for 75% Outflow (tp75): 16 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 1.88E-02 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 29.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 02

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30 35 40
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 3 min
Time for 75% Outflow (tp75): 18 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 1.67E-02 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 30.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 03

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 10 20 30 40 50 60 70 80 90
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 7 min
Time for 75% Outflow (tp75): 47 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.38E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 30.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 04

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 10 20 30 40 50 60 70 80
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 9 min
Time for 75% Outflow (tp75): 37 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 8.11E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 01.01.2022
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 05

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250 300
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 43 min
Time for 75% Outflow (tp75): 146 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 2.05E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 02.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 06

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 10 20 30 40 50 60
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 8 min
Time for 75% Outflow (tp75): 25 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 1.20E-02 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 01.01.2022
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 07

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 3.5 min
Time for 75% Outflow (tp75): 9.5 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.16E-02 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 12.01.2022
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 08

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30 35 40 45 50
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 4.5 min
Time for 75% Outflow (tp75): 20.5 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 1.46E-02 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System LD-5 DATE : 13.01.2022
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 09

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160 180 200
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 10 min
Time for 75% Outflow (tp75): 82 min
Volume of Water Outflowing (Vp75-Vp25) 3.375 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.66E-03 m/min

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : M. Wasim Shahid


INSITU CBR TESTS
LAYDOWN No. 5

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 01 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 22.12.2021
MATERIAL DESCRIPTION :

BEARING RATIO DATA


80
Penetration Dial Load Bearing Bearing
Gauge value Ratio 70
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2) 60
0.0000 0.00 0 0
0.0250 2.00 18 6 50

0.0500 4.00 37 12
40
0.0750 6.00 55 18
0.1000 8.00 73 24 2 30

0.1500 10.00 92 31
20
0.2000 12.00 110 37 2
10
0.2500 15.00 137 46
0.3000 17.00 156 52 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 20.00 183 61
Penetration (in)
0.4000 23.00 211 70

REMARKS : CBR value at 0.1" = 2 CBR value at 0.2" = 2


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 02 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 28.12.2021
MATERIAL DESCRIPTION :

BEARING RATIO DATA


80
Penetration Dial Load Bearing Bearing
Gauge value Ratio 70
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2) 60
0.0000 0.00 0 0
0.0250 3.00 27 9 50

0.0500 5.00 46 15
40
0.0750 6.00 55 18
0.1000 8.00 73 24 2 30

0.1500 11.00 101 34


20
0.2000 13.00 119 40 3
10
0.2500 15.00 137 46
0.3000 17.00 156 52 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 20.00 183 61
Penetration (in)
0.4000 22.00 201 67

REMARKS : CBR value at 0.1" = 2 CBR value at 0.2" = 3


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 03 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 29.12.2021
MATERIAL DESCRIPTION :

BEARING RATIO DATA


80
Penetration Dial Load Bearing Bearing
Gauge value Ratio 70
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)

0.0000 0.00 0 0 Bearing Value (lb/in2) 60

0.0250 2.00 18 6 50

0.0500 3.00 27 9
40
0.0750 5.00 46 15
0.1000 6.00 55 18 2 30

0.1500 9.00 82 27
20
0.2000 12.00 110 37 2
10
0.2500 14.00 128 43
0.3000 17.00 156 52 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 20.00 183 61
Penetration (in)
0.4000 23.00 211 70

REMARKS : CBR value at 0.1" = 2 CBR value at 0.2" = 2


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 04 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 29.12.2021
MATERIAL DESCRIPTION :

BEARING RATIO DATA


120
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
100

0.0000 0.00 0 0 Bearing Value (lb/in2)


80
0.0250 3.00 27 9
0.0500 8.00 73 24
60
0.0750 11.00 101 34
0.1000 13.00 119 40 4
40
0.1500 17.00 156 52
0.2000 20.00 183 61 4 20
0.2500 24.00 220 73
0.3000 28.00 256 85 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 32.00 293 98
Penetration (in)
0.4000 37.00 339 113

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 05 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 30.12.2021
MATERIAL DESCRIPTION :

BEARING RATIO DATA


250
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 200

0.0000 0.00 0 0 Bearing Value (lb/in2)

0.0250 5.00 46 15
150
0.0500 10.00 92 31
0.0750 15.00 137 46
100
0.1000 20.00 183 61 6
0.1500 27.00 247 82
0.2000 32.00 293 98 7 50

0.2500 40.00 366 122


0.3000 48.00 440 147 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 56.00 513 171
Penetration (in)
0.4000 64.00 586 195

REMARKS : CBR value at 0.1" = 6 CBR value at 0.2" = 7


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 06 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 01.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


90
Penetration Dial Load Bearing Bearing
Gauge value Ratio 80
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
70
Bearing Value (lb/in2)
0.0000 0.00 0 0
60
0.0250 3.00 27 9
0.0500 5.00 46 15 50

0.0750 8.00 73 24 40

0.1000 11.00 101 34 3


30
0.1500 15.00 137 46
20
0.2000 17.00 156 52 3
0.2500 19.00 174 58 10

0.3000 21.00 192 64 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 23.00 211 70
Penetration (in)
0.4000 25.00 229 76

REMARKS : CBR value at 0.1" = 3 CBR value at 0.2" = 3


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 07 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 30.12.2021
MATERIAL DESCRIPTION :

BEARING RATIO DATA


80
Penetration Dial Load Bearing Bearing
Gauge value Ratio 70
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2) 60
0.0000 0.00 0 0
0.0250 2.00 18 6 50

0.0500 4.00 37 12
40
0.0750 6.00 55 18
0.1000 8.00 73 24 2 30

0.1500 10.00 92 31
20
0.2000 12.00 110 37 2
10
0.2500 15.00 137 46
0.3000 18.00 165 55 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 21.00 192 64
Penetration (in)
0.4000 24.00 220 73

REMARKS : CBR value at 0.1" = 2 CBR value at 0.2" = 2


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 08 REPORT DATE : 12.01.2022
TEST DEPTH : 0.5 m TEST DATE : 02.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio 120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)

0.0000 0.00 0 0 Bearing Value (lb/in2) 100

0.0250 4.00 37 12
80
0.0500 8.00 73 24
0.0750 10.00 92 31 60
0.1000 12.00 110 37 4
0.1500 17.00 156 52 40

0.2000 21.00 192 64 4


20
0.2500 26.00 238 79
0.3000 31.00 284 95 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 37.00 339 113
Penetration (in)
0.4000 43.00 394 131

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : LD-5 / TP - 09 REPORT DATE : 20.01.2022
TEST DEPTH : 0.5 m TEST DATE : 12.01.2022
MATERIAL DESCRIPTION :

BEARING RATIO DATA


90
Penetration Dial Load Bearing Bearing
Gauge value Ratio 80

(in) Reading (Lbs.) (lb/in2) (Cor.CBR)


70
0.0000 0.00 0 0 Bearing Value (lb/in2)
60
0.0250 2.00 18 6
0.0500 4.00 37 12 50

0.0750 6.00 55 18 40

0.1000 8.00 73 24 2
30
0.1500 11.00 101 34
20
0.2000 14.00 128 43 3
0.2500 17.00 156 52 10

0.3000 19.00 174 58 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 22.00 201 67
Penetration (in)
0.4000 25.00 229 76

REMARKS : CBR value at 0.1" = 2 CBR value at 0.2" = 3


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
APPENDIX-B

LABORATORY TESTING
RESULTS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


Moisture Content, Particle Size Distribution,
Atterberg Limits, Proctor Test and CBR Test

LAYDOWN No. 1

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


.i _... _r­
'C:..-L:..-~U I!, ~~ ~ '-:?-' f;:..r~
An ERI C<>m"" ..." RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.o., Ur»)(I 30,27:1. •...anbu N--5'naly~h • .J....'1'VAS ::5:1000" K:fiA Tt\Hcphone-: t~;(i.6- of""''} 32.5(.)992 I 32S099:l Fnx: .966 (14) U:l!>094t5 E4n;..:;H! ,.ltf-.... ~n.b;uiU>"'(';tl4:H:.&<.,.'H·i.~-e:LCQm
lJO.<.atk'>ro:. .A.\.NaW'.anand S1:r~otrt. H.al AI_Molh¥nl r ..h'tficl'. R,C., "Vannu JU·Sj~.,.ah

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 01 Depth: O.60m DATE RECEIVED:


------
SAMPlLE DESCRIPTION : Brown graded SAND. Sample NO.: B-1
-------1

ENVT. COND TEMP 24.2oC HUMIDITY: 37%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
--------

SAMPLE NO: B-1

NO: K-9

WT. OF SAMPLE + CAN (WET) (gms) 631.07


WT. OF SAMPLE + CAN (DRY) (gms) 621.56
WT. OF WATER (gms) 9.51
WT. OF CAN (gms) 45.36
WT. OF DRY SAMPLE (gms) 576.20
WATER CONTENT (%) 1.65

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY-SOIL-15·02
01.08.2021 Copy Right Resrved by RGF
t../,-=?-' I ~
P~O. Do)t 302:',:1, ....anl'KJ M4iin;lv~h. MVAS 5-:;l000.. KSA TC!!h!·ph~~ +~6 (',11'1) 1l::'-S.O:t..'192 I !lI25-0993 F.&)(~ +S)G6 (.14) 3250.1>",,6 F.rn:,)!l~ ,(Or~yanbu@~~lae-c>s.<:.h.tn'(;'t:.c<>:n')
"~':",,,*'(>o-: A~~NAA_.an,""nd ,~l:l"~OI:rt. I-t,.1 A)-rvlOl)'_an (',.hVk:t. n.<:.••
'V,a!,\bU A.i~S1n."lrl'r'<J'/:l

CLIENT : N£OM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to saya/ transmisssion system. (LD-01 ) DATE SAMPLED: 24.01.2022
SOURCE: TP : 01 Depth: 1.20m DATE RECEIVED: 31.01.2022
------
SAMPLLE DESCRIPTION : Brown graded SAND with silt. Sample NO.: 8-2
-------1

ENVT. COND TEMP B.8°C HUMIDITY: 35%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
--------

NO: 8-2

K-3
OF SAMPLE + CAN (WET) (gms) 529.77
OF SAMPLE + CAN (DRY) (gms) 521.78
• OF WATER (gms) 7.99
31.40
WT. OF DRY SAMPLE (gms) 490.38
CONTENT (%) 1.63

Tested 8y: A-Rahman Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNS·PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
I ~~ ~lc.-L:.-~(j/~ -:: ·~~~~~I~
An EftD Company .~.=~. ~ RIYADH GEOTECHNIClUE & FOUNDATIONS CO.
P~O. Uo>e 3027'1, Vfln.l».J AI"S-.,...;:'ly,,*h. MYI\S 5;1000.. K~A "c>J0J3hone~ +!£HS()' {11l.} a;;(::>099~ I 32"5Q!).93 1"',..,,)(; .966 (.l.4t a:l:5C94t6 Errtl\U!: ItV..yitf'ob"H!1'crl3>1!'~t1Jlth:.'lt!!l"CO""'"
I.c,,>-I;,,>,ak.o:\ Al·Nol)'.......:H'J1H," ~tr«':'..,t. th~1 A)-""'ah~n DohtTtcl;, R.<:•• ""'",nbu Af~Sln.;lol'i!l?h

CLIENT : NEDM. PROJECT NO.:


--------J
PROJECT Neorn desalination DATE SAMPLED: 24.01.2022
SOURCE: TP : 01 Depth: 2.50 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: 5-5
-------1

ENVT. COND TEMP 24.1 0 C HUMIDITY: 38%

Test Started Date 01.02.2022 Test Completed Date: 02.02.2022


-------­

SAMPLE NO: 5-5


CAN NO: XP-1

OF SAMPLE + CAN (WET) (gms) 363.00


OF SAMPLE + CAN (DRY) (gms) 361.00
OF WATER (gms) 2.00
WT. OF CAN (gms) 42.13
318.87
R CONTENT (%) 0.63

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
~ID [r; 1 1_::'A ..::_--,_::--/U I ~ -;;,
-'
-~~:
-:;. ----U.
t../'" ~~ ,-~
::.r:.. .
AnERlcCH"P<'"Y '~.!';'.l'?:.!' v_M RIVADH GEOTECHNIOUE & FOUNDATIONS CO_
P.o. DOM 30".27:1, V.:iIt'JIbu AI,...s'n;1y:'1"I~ MYAS 5::1000.. KSA TeJi!Z"phol"'\e~ .. 9<>6 (:1"'1) 32:s..0992 132S0993 Fr.,..! .9154 (14) 32509.,.6 Et't\:a.1J-:: "'-R'...yanbil-l@et'a.eo~i:enc:e~.colYl
1.0000:.<1otlon! ......1"N.-:w.......-..u ....<1ond StJ""""",t. "I<.~I Ai-MOlhan Dblid:ct. n.c., 'V<3n.bu AJ_Sfn..:;It.,.iJh

TP : 01 Depth: 3.00 m DATE RECEIVED:

E DESCRIPTION Sample NO.: S-6


--------1

ENVT. COND TEMP 24.1 °c HUMIDITY: 38%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO: S-6


CAN NO: XP-6

• OF SAMPLE + CAN (WET) (gms) 344.30


• OF SAMPLE + CAN (DRY) (gms) 342.20
• OF WATER (gms) 2.10
WT. OF CAN (gms) 45.79
WT. OF DRY SAMPLE (gms) 296.41
WATER CONTENT (%) 0.71

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF· YNB·PHY·SOIL·15·02
01.08.2021 Copy Right Resrved by RGF
~

-c.:.- L::-L:::..--'U J~ J*" ~./ , ~


RIVADH GEOTECHNIClUE & FOUNDATIONSCC>_
. 'P~O~ Oo)(SUl'.:l:71. V:..nbU AI.-5ln;'ly-ah. M .... AS 51000., KSA Tete-phone: ... ~~ (14) a;2;5.0;9$'~ / ,325-OQOg
Lo,catroo~. Al-N.a\.V.anand .Sb~~~ :twl.A.t-lVIqh;M~

: Neom desalination plant to gayal transmisssion system. (WoO 1) DATE SAMPLED: 24.01.2022
TP : 02 Depth: 0.50 m DATE RECEIVED: 31.01.2022
I;)AMt"LLI:. DESCRIPTION Sample NO.: S-1

ENVT. COND TEMP 23.7 0 C HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO: S-1


CAN NO: B-4
WT. OF SAMPLE + CAN (WET) (gms) 372.00
WT. OF SAMPLE + CAN (DRY) (gms) 367.30
WT. OF WATER (gms) 4.70
WT. OF CAN (gms) 41.41
WT. OF DRY SAMPLE (gms) 325.89
WATER CONTENT (%) 1.44

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01082021 Copy Right Resrved by RGF
.,....::-l..;;;......~U l,!!t :.: w ~~~ ~l:?/ f ~
An ERB Company I l?g RIVADH GEOTECHNIClUE & FOUNDATIONS CO_
, ""',..~"'" ..."" Fnx~ ¥.S)G-6. (.14) 32:s.o946 Frntsotl1 rtlr-Y.:lnbu(!'j)~tl'&«"l':XlGtlt::rtc~ ..,eon'S
-_. -> - ~-~ -_. Dh.tric.t. R.C.~ Y,a,ubu Al--SlrulV.itI~

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neomdesalination plant to gaya/ transmisssion system. (LD-01) DATE SAMPLED: 24.01.2022
SOURCE: TP: 02 Depth: 1.00 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: S-2

ENVT. COND TEMP 23.7 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO: S-2


CAN NO: B-3
LE + CAN (WET) (gms) 369.30
366.90
2.40
56.51
. OF DRY SAMPLE (gms) 310.39
R CONTENT (%) 0.77

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY -SOIL -15-02


01082021 Copy Righi Resrved by RGF
-c:....L:::-l.;;:.....-'U 1.1} if y~ I ~
An EDI Company RIVADH GEOTECHNJOUE & FOUNDATIONS CO.
p~o. Do>c 1l027~. YAbbu N,ti;n;;HY:l:th~ MYAS S:1000... K5A TIH~j."lhooe~ .96G ('14) 32:>-0992 I 42s.o!nn~
l~)-C.·_·...,tfoo:. ,Aj.N>l'......~o~n(.f 5t~ll>'t. tt",. AJ-M~h;ln

CLIENT : NEOM. PROJECT NO.: 21J4037

PROJECT Neom desalination to gayal transmisssion system. (LD·O 1) DATE SAMPLED: 24.01.2022

SOURCE: TP: 02 Depth: 1.50 m DATE RECEIVED: 31.01.2022

SAMPlLE DESCRIPTION Sample NO.: 5-3


---------1

ENVT. COND TEMP 23.7 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO: 5-3

CAN NO: XP-2.


WT. OF SAMPLE + CAN (WET) (gms) 392.30
WT. OF SAMPLE + CAN (DRY) (gms) 389.20
WT. OF WATER (gms) 3.10
WT. OF CAN (gms) 48.60
WT. OF DRY SAMPLE (gms) 340.60
WATER CONTENT (%) 0.91

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF -YNB·PHY -SOIL -15-02


0108.2021 Copy RighI Resrved by RGF
1...::...- L:::-l...:::---' UI~ ._ ~ j~./I~
An ERI Company RIYADH GEOTECHNIClUE & FOUNDATIONS CO_
:p~o" 00)4 3027:1, Y.t'u~bu Af~in;rY,""h. '....'yAS 5:1000.. y'$A T~'~pl'lO~: -1>966 ('1") zt2:s.o?9:t I a;1~93
J,~_-~tk~o1-AJ·N~""""'''H~;;H\(f St,~\trt~
t'WIl Af-"-"'dhmH

TP : 02 Depth: 2.00 m DATE RECEIVED:

Sample NO.: S-4

ENVT. COND TEMP 23.7°C HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO: 5-4


CAN NO: XP-7

• OF SAMPLE + CAN (WET) (gms) 387.80


• OF SAMPLE + CAN (DRY) (gms) 385.40
• OF WATER (gms) 2.40
WT. OF CAN (gms) 46.79
WT. OF DRY SAMPLE (gms) 338.61
WATER CONTENT (%) 0.71

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF -YNB-PHY-SOIL-15-02
01,08,2021 Copy Right Resrved by RGF
-t!"""'ilc.-L::.-~IJI.!fI ::;:: ~~~~~./j::.r~
-' -- + -..-­
I -"

A., ~aa. Company ~' ~J RIVADH GEOTECHNIQUE & F OUNDAT!ONS CO.


f""O~ fh:>>4: ,902\';,;<:1. V.... nb4,t AJx6foi'tl Y \:>h. MVAS 5:1000.. K:!;A 'c-J".4lhon~~ .9-ti~ (:14) H·2.5-0!n')2 132!H.Y'>!);} f-;}><:t .;96<> 11.4) .9:lf,i0946. £rtlo3i,-! '".EJrvy.o:t.... b1..@~tleitt>"'.::t'e,.,c-oe~"~om
\ cw.",Ii<.tton" Aj.Naw-an.a~ull 5t"r"'lWf. H.;.~' .Ai~Mah"H f.lbh"k.'. f{,(-;,. Y;;;'" \l1'u Af-sln."~."'ilih

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 02 Depth: 2.50 m DATE RECEIVED:

DESCRIPTION Sample NO.: 5-5


-------

ENVT. COND TEMP 23.7 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO: 5-5


CAN NO: B-1
WT. OF SAMPLE + CAN (WET) (gms) 341.70
WT. OF SAMPLE + CAN (DRY) (gms) 338.80
WT. OF WATER (gms) 2.90
WT. OF CAN (gms) 47.62
OF DRY SAMPLE (gms) 291.18
CONTENT (%) 1.00

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
0108_2021 Copy Right Resrved by RGF
/ " ' . -;+---u • I --.1 ··/~ __
1 ~'ID ~ "C- L:..-<......::.--' U I ~ :.:: ~~;:-C i../ ~___ f ~------
A" ERII C<>",,,..ny "2.... ,om· ~ RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
J.~_O. nOM 30,27'1. YIH.. bu AhSi"';'l'V~h. MYAS 5;1000, Y.5.A 'tI'J",phone~ +966 (:1'1) a:2.s.o99~ 13:250'",,)93 f.'.'3r)o!! -..966 C14) a~S0'94(i. Ert1o";).H~ r,"'~y,l)nbu@lCl'~g'IN!>:i,.C,i-er..::>e::I.ccu'n
I.OC..a-I~';'O~ A1-N.::tIN".ill'H>.nd St"H"J'tl:t". H<\I A~-tvlah~_n rJObu-tc". H.";--:., Y .., u'lbu N-S~n.<1ol.,. ... h

CLIENT
PROJECT

SOURCE: TP : 02 Depth: 3.00 m DATE RECEIVED:

SAMPLLE DESCRIPTION Sample NO.: S-6


-----------j

ENVT. COND TEMP 23.7 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO: S-6


CAN NO: B-10
WT. OF SAMPLE + CAN (WET) (gms) 366.00
WT. OF SAMPLE + CAN (DRY) (gms) 364.10
WT. OF WATER (gms) 1.90
WT. OF CAN (gms) 46.52
WT. OF DRY SAMPLE (gms) 317.58
WATER CONTENT (%) 0.60

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
~~
C_ [lJ]
v "'----'" l.;::_A_::.--V I~ _...
¥ -
-~:
----7 -1! ~ L.;:..;./
.. f~
:"'!1 Eftl corr>panY~.!' v.~~ RIVADH GEOTECHNIGUE & FOUNDATIONS CO_
P.O. 8o)ot g0271. YOlnbU AA.6h~;'ty~h. MYAS ~:tOOO. t':.SA T~Jeophot""1 ~:!)6(50 ( .... A) a2:~~)!):Z 1.3:.l5-()!;)9~ V3~: ,*966 ('14). 325094G (;)TI,:aJ,,:: 'n'..y$lnbu«Jt-ef'l$;.~(>~i.ene:""ll,COtn
"".>i·.~tJ<'>n:.. A-l.Nik.....,nnand St1"~l(rt. ,. ••,H A,,"Mat"'''.Tl r-.H... :t'rt(:S-. R,C.• v,;,.nbu At-Slf~ly;Jh

Neom desalination

TP: 03 Depth: 0.50 m DATE RECEIVED:

Sample NO.: S-1

ENVT. COND TEMP 24.7 0 C HUMIDITY: 41%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------­

NO: S-1

8-14
OF SAMPLE + CAN (WET) (gms) 288.00
OF SAMPLE + CAN (DRY) (gms) 278.30
• OF WATER (gms) 9.70
• OF CAN (gms) 49.35
WT. OF DRY SAMPLE (gms) 228.95
WATER CONTENT (%) 4.24

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF· YNB-PHY·SOIL-15-02
01,08.2021 Copy Right Resrved by RGF
I ~lf)~ t.-I.....:::-L::...--U-' 13' ;:.;: -;. --il.
• ~~.;"O V
-::..r:.. . .
t...;:--'.-/ f - ~
AnERlcompa.ny ,,<?~J~J'. u.:" RIVADH GEOTECHNIGUE & FOUNDATIONS CO_
f'~<). ~)Q>l :;10,2,7-:1. Yant;;U AJ,..sft~;lY~h# -M.VAS S:1000~ KSA .,~)<! *9G<i (14) 3250946 Fn'lo:aHo:: rn'-y;;)nbU(@etf~~~rH::e".C::ot'rt
ettal At-tvt",h""n D~litTkt. R"C •• Y~n.lnJ N-$in..«tVOJh

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP: 03 Depth: 1.00 m DATE RECEIVED:

;)AMt"LLI:. DESCRIPTION Sample NO.: S-2


-------1

ENVT. COND TEMP 24.7 DC HUMIDITY: 41%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO: 5-2


CAN NO: 8-9
• OF SAMPLE + CAN (WET) (gms) 382.10
• OF SAMPLE + CAN (DRY) (gms) 375.20
• OF WATER (gms) 6.90
• OF CAN (gms) 58.04
WT. OF DRY SAMPLE (gms) 317.16
WATER CONTENT (%) 2.18

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
-r - 1.-
"'-- "'--"""~
{ ., ~U/ I~ ...... ~ t.../,-:?~I~
An ERD CO"'p".oy RIVADH GEOTECHNIOUE & FOUNDATIONS co.
'f'.O~ UQ)t Sa2;71., YnnbU N",<;.n~lYQ.h~ ",,<tVA."> 5"1000" Y.5A Te}~pho~~ ..96& (:tAl a:ZS0992 ; 32S>09903
\.().;-.aHt>n~ A)_Nowv..,.n.;:onU $>\;J-_t.... ~1 At-M~h.n.

TP: 03 Depth: 1.50 m DATE RECEIVED:

DESCRIPTION Sample NO.: S-3


--------1

.. ENVT. COND TEMP 24.7 0 C HUMIDITY: 41%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------­

SAMPLE NO: S-3


CAN NO: XP-15

• OF SAMPLE + CAN (WET) (gms) 325.80


• OF SAMPLE + CAN (DRY) (gms) 322.50
OF WATER (gms) 3.30
· OF CAN (gms) 48.70
OF DRY SAMPLE (gms) 273.80
WATER CONTENT (%) 1.21

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB·PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
~~~";'if~/j~

".0.00)1302.7'1, ....lU.. b1-t AI~mf,>;'lY""h. MVAS SliOOO, KSA T~fe-phonf!o! .,.966 ('141a:::l5o(}>g!).2! ;a:"nsO",.,)!>::t
It><~~lk>o~. .Al·N"".......,;!."~,.t~d StHl'.....I• •• ~i Al-Muh;;,n

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neomdesalination plant to gayal transmisssion system.(LD·Ot) DATE SAMPLED: 25.01.2022
SOURCE: TP: 03 Depth : 2.00 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: S-4

ENVT. COND TEMP 24.7 0 C HUMIDITY: 41%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO: S-4


CAN NO : N-2
WT. OF SAMPLE + CAN (WET) (gms) 329.50
WT. OF SAMPLE + CAN (DRY) (gms) 325.80
WT. OF WATER (gms) 3.70
WT. OF CAN (gms) 53.19
OF DRY SAMPLE (gms) 272.61
R CONTENT (%) 1.36

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB-PHY·SOIL·15·02
01 08.2021 Copy Right Resrved by RGF
~n _ _ =_ vump~ny I
,-_.

. .-~~.
r.L

--.....-,
n "C.- L:-~U 11' ~~
.-y J" L;:./.,/ j ~
RIVADH GEOTECHNIOUE & FOUNDATIONS CO.
- . ":. ­
f>,O~ UO)oil .9027:1., V;u,):bti Ai",-«iln;tY::lt.. M'VA5 z,,1UOO, KSA TttJ~phol~::: ... 966 (.1.4} a2.~92 13..2s.ogg:3 I';;:;.;.:: t966 (14) 32S094q. tct'r.aU1 :t1lf'..y.a....bl-I@>.effg.e-03..::Jcellt.c;e"'.iI:'on')
lOf::atf<,a.. :. ,A)-Nil",a"~f\d $lTV"(l1"~ "'f!.~1 Ai_N"IUhliOf\ r..lt"".dc~. i't,C•• Y~ntH' Al-Sfnatv,ah

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gayal transmisssion system. (LD-Of ) DATE SAMPLED: 25.01.2022
SOURCE: TP: 03 Depth: 2.50 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: S-5
--------1

ENVT. COND TEMP 24.7 DC HUMIDITY: 41%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO: S-5


CAN NO: XP-16
OF SAMPLE + CAN (WET) (gms) 304.40
WT. OF SAMPLE + CAN (DRY) (gms) 300.20
OF WATER (gms) 4.20
OF CAN (gms) 47.89
WT. OF DRY SAMPLE (gms) 252.31
WATER CONTENT (%) 1.66

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB-PHY-SOIL-1S-02
01082021 Copy Right Resrved by RGF
C--t-::... A_=..--U I~ ,-- .... ~~ ~'-::;~f~
RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
p.o, no""- 30271. YntfuU Af~5Jt'>,alVi')h. MYAS 5;1000,. y.5.A Te,c.ph6he;; +966 {:l.4} a.250992 /325CY..,)9:<)
tot;·,""Uon~ .Aj-NiliJVan~nd St."-"'""""t~ t-l,... :
$r.J... MOlh<*H

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gaya/ transmisssion system.(LD-01) DATE SAMPLED: 25.01.2022
SOURCE: TP: 03 Depth: 3.00 m DATE RECEIVED: 31.02.2022
SAMPLLE DESCRIPTION Sample NO.: S-6

o
ENVT. COND TEMP 24.7 C HUMIDITY: 41%
Test Started Date 01.02.2022 Test Completed Date: 02.02.2022

S-6

N-3

OF SAMPLE + CAN (WET) (gms) 391.50


OF SAMPLE + CAN (DRY) (gms) 385.50
OF WATER (gms) 6.00
OF CAN (gms) 47.45
OF DRY SAMPLE (gms) 338.05
CONTENT (%) 1.77

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL.. 15..02
0108.2021 Copy Right Resrved by RGF
I <QlJ) I~lc::...- L::..-L:.----- u I" ,::
-'
Go
-;- Ai
--?"~,;' (..,/"' L2../ ,-~
- -::.r:.. .
AnlERlco<npany ".i'.!'f.!~' ~ RIVADH GEOTECHNIClUE & FOUNDATIONS CO_
1",0. (!.o)C 302:7:l. YlH~bu Al...-5ln;'yao. ,...,VAS 5:1000.. Y.SA Tt?-Jll-phoo..: -+966 (:14) 32S0992 I :9-25-0£>93 I;~x~ -4>966 (14-)- 3250"946 En'\~H! rn'.y~l'lbullf>oeltlg'l!'o~l-enc:oe:.$.cotn
Lt>.:-.a'I...... o~ .AI-Na.....,~\n~.nd Sl'¥'ff-<:>l~ H~l.A)-M<Jh:;,-n rJOhtv'o:;t. fi;,<,_ •• Y.ilntn..l Af_Sfn.;'~V.;:ah

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP: 04 Depth: 0.50 m DATE RECEIVED:

SAMPLLE DESCRIPTION Sample NO.: S-1


-----------l

ENVT. COND TEMP 23.9 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
--------

SAMPLE NO: S-1


CAN NO: A-6
WT. OF SAMPLE + CAN (WET) (gms) 392.10
WT. OF SAMPLE + CAN (DRY) (gms) 387.70
WT. OF WATER (gms) 4.40
WT. OF CAN (gms) 23.58
WT. OF DRY SAMPLE (gms) 364.12
WATER CONTENT (%) 1.21

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
~~
om,
~
,
'----"'L:-~U
.... - -' -- I"~
~ _ -- _ ~ ~ '----"
__ ~ "". ~~-. - I --v. 1--,_
--~.---.

AnERlco<npany ~.!'l'.!'m' ~ RIVADH GEOTECHNIClUE & FOUNDA.TIONS co.


P.o.. 00>1 3027'1, .... a"'bU A.J.51t">~lY~ho • .fI.AYAS 53.000.. KSA Tel;e-ph~~ .-966 (1,rt) 32s.D:L"'!l2 I 3250993 f.'~)(: ...966 (:14) 32509,,"6 F.fi'II:il.U.-:. 1·8'-yanbU@etJ8.oI!:O:!l.C'ence:6.CO~
loc.",'foo!. Al-No.tW'.an.and St"",""",r. H~I.A~r-JlHhi'in Dhf.Tll;"l, j'~,('~ •• Yanhu .A:I-Sfn..aly.tllh

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gayal transmisssion system_(LD-01) DATE SAMPLED: 26.01.2022
SOURCE: TP: 04 Depth: 1.00 m DATE RECEIVED: 31.01.2022
LLE DESCRIPTION Sample NO.: S-2
---------1

ENVT. COND TEMP 23.9 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO: S-2


CAN NO: B-5

• OF SAMPLE + CAN (WET) (gms) 380.20


• OF SAMPLE + CAN (DRY) (gms) 377.30
2.90
49.47
327.83
CONTENT (%) 0.88

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY-SOIL-15-02
01082021 Copy Right Resrved by RGF
,-=--, mel" n c... L:::.--l.....::.---' tJ-' Il ' ~.
-
_...
-1! t.,/'" ~
~:
_r-­
'I;:.f_ A..-/
-~~.
ERI RIYADH GEOTECHNIClUE & FOUNDATIONS CO.
P,o. {l¢~ :\lO,;t7'. YtuHHJ A'~~lt:"..aIVt)h~ "",,-VAS .51000.. Y.5A Tt':l"",ph~e: +!!)(>6 ( l 4 ' ~J,2S09~2 / S2509U'3 F;')X: +t;)G6 (:14) 32!,>Q!)l\(; €J't\alf~ tnf~y.,r.!bt:.tlXPfl~f3f!eos.clef'l"C:00 ••ebJh
It).<',\i:I!t/<'H'H ,(d"NAA .......~ln~"(1 $t,-o::-"",'... th.i A'_MOlh~n D~"'l'·~I;;~. {(,<;. •• V~nl~u Al~Sfn.al.,..,.h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 26.01.2022
SOURCE: TP: 04 Depth: 1.50 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: S·3

ENVT. COND TEMP 23.7°C HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

NO: $-3
B-16
OF SAMPLE + CAN (WET) (gms) 402.20
OF SAMPLE + CAN (DRY) (gms) 398.90
OF WATER (gms) 3.30
47.68
. OF DRY SAMPLE (gms) 351.22
CONTENT (%) 0.94

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy RighI Resrved by RGF
Eftl
~=-~-.il ..... -
~'---~
1.- I -- .~-'UI ..

RIVADH GEOTECHNIClUE & FOUNDATIONS CO.


--'"
_&
... -:.... .~--U.
~-~:-; '-"" -
;;,.~ jf::.r:a~
~ ~

,"..0. Uo:.o 3027'1, Y;tobu AJ6fn;lY~'h. J\.1l:YAS £3000., KSA Tn'4't'hftl;¥W!'; ..966 (:14) 325.0<_~92 13250993 Y:'Xf *9,,-di ~:14) 32509"" "'Ina"::' "-n/-yanb'I.J@>~ ... JB""'a-M:I*lrf\C~I(.COM
'Oi,'\;Ulfinl. ,Al.Nallv"tn.:tnd 1>t.To::l'"",t. H~I .Al~tv1<ih;;)n bhit1'tct. «.<':.•• Y,;u'\bu A1-S1n.llv.,h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination pla nt to gayal transmisssion system. (LO-O 1) DATE SAMPLED: 26.01.2022
SOURCE: TP : 04 Depth: 2.00 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: S-4
-------1

0
ENVT. COND TEMP 23.9 C HUMIDITY: 40%
Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
--------

SAMPLE NO: S-4


A-4
OF SAMPLE + CAN (WET) (gms) 399.90
OF SAMPLE + CAN (DRY) (gms) 397.80
WT. OF WATER (gms) 2.10
• OF CAN (gms) 23.56
. OF DRY SAMPLE (gms) 374.24
WATER CONTENT (%) 0.56

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY -SOll-1S-02


01.08.2021 Copy Right Resrved by RGF
r~~~ 'C.-L::.-L::----U I!, ~~ j t...;.:.-'../ f ~
AntEll. C"",pany ~=J'1l'J' .......~ RIVADH GEOTECHNICUE & FOUNDATIONS CC>_
$'.0.. lh~)t lH;').;;t7"1. Vnnbl..t At~:Sfr.;ly~h. MVAS 5;1000.. Y.SA T<.'-J<I'ptl'f'>I"I-e-; ... ~(j,6 (:14) :a,;r:;.o'P'';';.:.l1 ;H25O"J'!)o3; f'4X: +SHiG .;14) 325<)<)o1C; EJro'~lJ-! "8'...yar.lbu@erfge'C>M:;.it;:nc,.e•.c:ot'n
t..oc;-.atk>n; ,Aj:·NA\N'~H\,..nd 5u'''''"'':''t, H/Ull A)~Milh<'i,n l.J~Jpt1'l:c_Y. (l,<':•• Y.iJHnU Af.Sln.;\lvah

PROJECT Neom desalination plant to soyal transmisssion system. (LO-Ot) 26.01.2022


SOURCE: TP: 04 Depth: 2.50 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: S-5
--------J

0
ENVT. COND TEMP 23.9 C HUMIDITY: 40%
Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO: $-5


$-1
OF SAMPLE + CAN (WET) (gms) 245.80
243.60
OF WATER (gms) 2.20
. OF CAN (gms) 18.37
. OF DRY SAMPLE (gms) 225.23
CONTENT (%) 0.98

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
0108.2021 Copy Right Resrved by RGF
"t::.:-L::-L::.--'U /.!!J ~~
..... "'"
t-/ L::.--~
... f~ -
An ERB Compa:ny RIVADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Uo>t 3()27:1, .....,1u.. bu Af.SJn;"Yfih. -'V1YAS s:'tooo,.. KSA Ttbh:·pht:tna'~ .~& (-:J,4)a;l.~(}iH)21 B2S0!l93 J.'~: +~(f.6 (:14' <12509.116 F.rn"$ll~r(J.¥y.;)nbv@~t •.s.e;O:'l<i:tH·\C:'I!::s;,<Otn
l.Q~'i\1IH<"o~ Aj·,Na......... o;,)l'H' :$>tT~~ ......Ai--"""'Olh""H t'lh»tl1:Ct. Pt.C•• Y""nilu Ai-$J¥\.<.tV<J;h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gayal transmisssion system. (LO-O 1) DATE SAMPLED: 26.01.2022
SOURCE: TP: 04 Depth: 3.00 m DATE RECEIVED: 31.02.2022
SAMPLLE DESCRIPTION Sample NO.: S-6

ENVT. COND TEMP 23.9 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO: $-6


$-9
318.40
wr. OF SAMPLE + CAN (DRY) (gms) 316.80
. OF WATER (gms) 1.60
20.49
OF DRY SAMPLE (gms) 296.31
R CONTENT (%) 0.54

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01 08.2021 Copy Right Resrved by RGF
r-==-r"',,",,-" c.- L:-L::---'U I ~ ,";:: - ~~ J" l.::?~ f ~
AnERIi RIVADH GEOTECHNIClUE & FOUNDATIONS ,CO.
p~o_ no'll :J02:7'j;. Y~""'bU Al><Sin;l'!r';tl~~ MVAS ~::u:)(.)o'" Kr.A. TC''II'a:;hoh~~ .,966 (:1"l) 3750"~'92 I 325-O!:)9::l Fax~ 4-966- (:1..4) 32!;.Q,?4G fi,l'l'll';l)I,'Z. ru'-v.anb'um:t~tt.n.~O>1;.;::tet'l~>C.I'a:,col'll'1l
lO-t.--..-tk»n:. M.N ....YV.ao..lono :'i.1.r"",-w1. Hioll.Af-~ ... h.'in bi~lY·k.t. R,<..~ ..... "'nbu A;-shl.4>ty..h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to <layal transmisssion system. (L[)-O 1J DATE SAMPLED: 27.01.2022
SOURCE: TP: 05 Depth: 0.50 m DATE RECEIVED: 31.01.2022
SAMPLLE DESCRIPTION Sample NO.: S-1

o
ENVT. COND TEMP 23.6 C HUMIDITY: 40%
Test Started Date 01.02.2022 Test Completed Date: 02.02.2022

S-1

NO: XP-4

OF SAMPLE + CAN (WET) (gms) 320.30


OF SAMPLE + CAN (DRY) (gms) 312.10
8.20
WT. OF CAN (gms) 47.39

. OF DRY SAMPLE (gms) 264.71


ER CONTENT (%) 3.10

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
-;'...A.J • r
~'7f) [~II . . . . . . LA.....::_/f) 1J'i ~~~-:c
.". _ "" _ G>
~"'::-'.-/' I;..J____
_ I --. I w. ;A.. - / '

AnERlcompony '~.J:!l'J'/:\l' .. u.~~ RIVADH GEOTECHNIGUE &. FOUNDATIONS CO_


f".OO_ no)t :"}o;;t7i.. 'V~u·,bO A!pSln;:"Y-llh. M..YAS 5300{)"" 1<;5A Tti:Jil"~"h-one~ +!>6G <:14} :a2~9'.i)2 I 32SQ-0"9!l V.:!tXl +'i>(;6. (:14' <12509<1& E'wu.H< r.tl'Yyb",bu@'t~~'S.e;<>~'¢:"$;-e«.C6M
l<IJ.(':~nlr.>n,--,.·U_N_W';.~n:arut 51''''~ilI'l'. :ttaIAt-rAOJhan r,ti>t1'k.t. «.("e',. v,Hobu Ai-5~n;,1o~V~h

TP: 05 Depth; 1.00 m DATE RECEIVED:

LLE DESCRIPTION Sample NO.:


--------1

0
ENVT. COND TEMP 23.6 C HUMIDITY: 40%
Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------­

SAMPLE NO:
CAN NO: S-2
WT. OF SAMPLE + CAN (WET) (gms) 340.40
. OF SAMPLE + CAN (DRY) (gms) 336.90
• OF WATER (gms) 3.50
WT. OF CAN (gms) 20.35
WT. OF DRY SAMPLE (gms) 316.55
WATER CONTENT (%) 1.11

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB·PHY-SOIL·15·02
01082021 Copy Right Resrved by RGF
~ID IZlll...::-l..::.-~U I;, if'-=?/ I ~
AnERlcon>p~"y I~.-'''''':' v.~. RIVADH GEOTECHNIOUE & FOUNDATIONS CO~
p,o~ Ih~)oI302:7". ·.rnl':lUH AI""st",,;\.y ..h. N)YAS 5.1000.. ~5A "r~~ephOfle! +96.6 (:1.4) a2'!:>09!a2' /212'5.0!)'93
il~x:.. HtC)tl~ A}_N;,o......-... n,;:.n~i $t:rC)'II;!r-. 1-'till.nJ_"'-"ahllOH

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP: 05 Depth: 1.50 m DATE RECEIVED:

SAMPLLE DESCRIPTION Sample NO.: S-3


---------1

ENVT. COND TEMP 23.6 0 C HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO: S-3


CAN NO : M-10
WT. OF SAMPLE + CAN (WET) (gms) 373.40
WT. OF SAMPLE + CAN (DRY) (gms) 367.50
WT. OF WATER (gms) 5.90
WT. OF CAN (gms) 26.63
WT. OF DRY SAMPLE (gms) 340.87
WATER CONTENT (%) 1.73

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.082021 Copy Right Resrved by RGF
v '----'"
- "'---
I -" /
~ -- -ttl
v !J' _ft!_ _ ~ ~~...-Jj~
An ERI Company RIVADH GEOTECHNIOUE & FOUNDATIONS CO.
:P.O~ no.. ::J077:t. Y;),fibu N~-5ir.~'Y;H1<~ MVAS 53000".. K.5A T"'l~ph~! *966 (34) ~25<)9!)~,/ ;i);;l~::;)
t.o<<atfoo!. N-N ..."""an...nd Sl.,'.,.o(rt~ .~Qi AJ-Mllh~n

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 05 Depth: 2.00 m DATE R£CEIVED:

DESCRIPTION Sample NO.:


---------1

ENVT. COND TEMP 23.6°C HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

SAMPLE NO:

CAN NO: M-33


OF SAMPLE + CAN (WET) (gms) 363.50
• OF SAMPLE + CAN (DRY) (gms) 356.90
WT. OF WATER (gms) 6.60
WT. OF CAN (gms) 26.46
WT. OF DRY SAMPLE (gms) 330.44
WATER CONTENT (%) 2.00

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF -YN8-PHY-SOIL -15-02


01.08.2021 Copy Right Resrved by RGF
r ....
~"iff> LZJI1..:-1.....::.- L::.--' U J~ ;:-'"' -' -,;".-tJ.
~ --.<'"~.;-C L/'" ~.--J I ::r
~
-

An ERI Con>pany l.!!'.;~· ~ RIVADH GEOTEC":;NIClUE ;. ~OUN;;ATIONS CO.


P.O~ 11£>:W 3l0.<t'.7:t. Ynll1bu N,S;,..;tyallo, J'I,.'YAS $:.1.000.. v.;SA TefetlOhone; +'966 (:14) a·;;r.!:>O~2 I 3250'",,)93 "::'')(: +!I)t:>(;. <-3.4) 9.:2:SQ9Jt6 Frn~iI! "'ll'..yanbu.@<ttt~~.o...::.l""h1C>eI,CO£rl
t,or>(:;all.:'>o!- Al-N""w<)n·;,;.nd :SU''It~,. :H:..l,A\."""ah:;;n Dt!lt,,,-k~~ R ..<:~. V""",lloH ~-$ln~ty.,h

Neom desalination transmisssion <vstpm,lI 27.01.2022


TP : 05 Depth: 2.50 m DATE RECEIVED: 31.01.2022
DESCRIPTION Sample NO.:
-------1

ENVT. COND TEMP 23.6°C HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

SAMPLE NO:

CAN NO: S-5


WT. OF SAMPLE + CAN (WET) (gms) 261.20
WT. OF SAMPLE + CAN (DRY) (gms) 254.20
WT. OF WATER (gms) 7.00
WT. OF CAN (gms) 19.97
WT. OF DRY SAMPLE (gms) 234.23
CONTENT (%) 2.99

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01,08,2021 Copy Right Resrved by RGF
"c'-L:-L::...-U I~ ~~ ~'-=?../ I ~
An IEftl COlTlP''''Y I ''!II-'W~ ~I RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
P.O. OQ>O< 30;r.7'1. Y~nbU AI<1S(~;'I'!!I~h • .r.>'t'YA-:'!' 51000.. t(SA TtH.:il'~"'hone: +~(i~ (":i ...... a-2'SO"';'U2 I 32&099:;) F ..X: .~;(;.o(~ (14) U::t$O!')·'U" f>"ot'naa~ rf('.,.y':''''bu«P~t~g~¢>1l.?iel\C:'J!':'S,(;orrt
l<X.·atk.>n~ .AA~N""w'H'flnd 5t11·~ ..tr~ H;)l A\-r.IIuh.;.n OhJ;~l~'K. «..c .. 'Viwl,hl,~ A~-$i......,.tv~h

CLIENT
PROJECT

SOURCE: TP : 05 Depth: 3.00 m DATE RECEIVED:

SAMPLLE DESCRIPTION Sample NO.:


------~

ENVT. COND TEMP 23.6 DC HUMIDITY: 40%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

E NO:

CAN NO: M-9


WT. OF SAMPLE + CAN (WET) (gms) 326.00
WT. OF SAMPLE + CAN (DRY) (gms) 318.30
WT. OF WATER (gms) 7.70
WT. OF CAN (gms) 26.60
WT. OF DRY SAMPLE (gms) 291.70
WATER CONTENT (%) 2.64

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF· YNB·PHY·SOIL·15·02
01.08.2021 Copy Right Resrved by RGF
~~ v. ~t....::.-L.:::...--'U f!, ~~y
- _. i.../" ~/
­ I~
An ERI Compan:" ~~~"',u Gi!J1 RIVADH GEOTECHNIClUE & FOUNDATIONS CO_
P.o.. OQ)t 1>027'1. Y:lonbu Ahs'n~1y$jh~ MV/\$ 5;1000" Y.SA TeJ~phQ~: .!H:;6 (:14) 3:2!>Q<")9;J; I 32${.)993 :r"f"y,aht:ouII?J>1Ii1t;s.~I>!t,.clenc~._COM
....~,-~... lfoo!.A~,N.'l_ar.R .. ~d 'S'I;J"1r'(¥t. H~l AI··Mahan

CLIENT
PROJECT

SOURCE: TP : 06 Depth: 0.50 m DATE RECEIVED:

SAMPLLE DESCRIPTION Sample NO.:


---------1

ENVT. COND TEMP 24.5 DC HUMIDITY: 37%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

E NO:

S-11
OF SAMPLE + CAN (WET) (gms) 289.00
OF SAMPLE + CAN (DRY) (gms) 277.10
OF WATER (gms) 11.90
19.47
. OF DRY SAMPLE (gms) 257.63
R CONTENT (%) 4.62

Tested By: A-Rahman Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01,08.2021 Copy Right Resrved by RGF
€'j;{f) [~~l"-
v "'--" l.::.-~(J/~ '..
.. w .~.-y
_. if~
_ :::.r'If~
...... ERI C<>mpa"y I<;f. c.' i i'.l~ ~

RIVADH GEOTECHNIOUE & FOUNDATIONS co.


P-.O~ DO>t .:]O.}:7:t.. • .. ;:a,~bu ",*",Sft\;lyt)h. l\'1YA5 !>:lOOO~ KSA TeJe-pt10¥"K'!: -+~6G ('14) a:<!s.o99.2/ ::-"":250993 FZoX! -t9G6 414) 9:.?-SO".>4u "'.f'~b,1J! I"n"..yal'\bi..JD.ett$J.<t~l'!Qn.,;oeA.cOn'l
LO~;;Ilh'])n:< A\~NIJo:WAH~.ar\d SU-..;:<trt. utIlj At-MHhdcn Dhtrk:l:, R.C,. Vn,n"bu A'j·Sln••• tYffh

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Heorn desalination plant to gayal transrnisssion systern.(LD-01) DATE SAMPLED: 29.01.2022
SOURCE: TP : 06 Depth: 1.00 m DATE RECEIVED: 31.01.2022
::'AMt"LLI:. DESCRIPTION Sample NO.:
-------1

ENVT. COND TEMP 24.5 0 C HUMIDITY: 37%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
--------

SAMPLE NO:

CAN NO: M-16


WT. OF SAMPLE + CAN (WET) (gms) 339.80
WT. OF SAMPLE + CAN (DRY) (gms) 334.50
WT. OF WATER (gms) 5.30
OF CAN (gms) 26.40
308.10
CONTENT (%) 1.72

Tested By: A-Rahman Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
-=:;;;;:---~, c.- L:-l..:::----'U I.!' ;: G> -~. -1! ~ L:--~ I ~
~:~ ­
An ............ """'pany I ~I RIVADH GEOTECHNIOUE & FOUNDATIONS CO_
Oo>t 3027:1. YlU'.Ibu AlMSlr.;lyo»h. -IV1VA;:" 53000~ KSA TeJIli!'J"'hc:»H'!': +96.6 (3~) 32S.00c;:0s)2 /3250993 f':..x: -.966 (:1.4) 32509.0\-6 E".t'lo311.;."."',..ya ..... lbu@.etl.e.t!'t:>~i-.e,...:ce".c:orn
lo~::at~oo:.A~·N.,. ........U\.H.d 5tn:-ol"'. H..al AI-~uh<ln Dh;tTic.t. '{,c .• Y,;"nhu A;I~S~n~~~V ... h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP: 06 Depth: 1.50 m DATE RECEIVED:

SAMPLLE DESCRIPTION Sample NO.:


--------/

ENVT. COND TEMP 24.5 DC HUMIDITY: 37%

Test Started Date 01.02.2022 Test Completed Date: 02.02.2022


------­

SAMPLE NO:

CAN NO: M-10

WT. OF SAMPLE + CAN (WET) (gms) 380.50


WT. OF SAMPLE + CAN (DRY) (gms) 374.60
WT. OF WATER (gms) 5.90
WT. OF CAN (gms) 30.50
WT. OF DRY SAMPLE (gms) 344.10
WATER CONTENT (%) 1.71

Tested By: A-Rahman Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
0108.2021 Copy Right Resrved by RGF
r-=~~-n 'C.- L:::.-~(; f ~ ::: Go ~ .:;;;~ J" c;..,..,J I ~
AnERI RIYADH GEOTECHNIQUE; FOUN;;ATIONS CO.
P.O_ Box 30.;0',7:1, Ynobu AJ"SJt'4;lY;')h~ MYAYo S::tOOO.. KSA TCJC-tloho.n<o-~ +966 (:14) 325>0:992 132509?3 F:::lrX; ... ~(i<ij. (14) S:Z::'O'?4t:). ID"na'lJ~ '·n'o0f',u.r.bu@.e:Ha~~h.tn':;'I!z •.C<>M
"'tX,"'*tfoo::..l'Ll-N;.t\N.. u....;:H~d Sl.t,..."""et. H"'II Al-~""h~n rJOt"t.~I~~, R.C" ~""r(bu .A:k5jn.;,I>i".",h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination DATE SAMPLED: 29.01.2022

SOURCE: TP: 06 Depth: 2.00 m DATE RECEIVED: 31.01.2022

SAMPLLE DESCRIPTION Sample NO.:


-------f

0
ENVT. COND TEMP 24.5 C HUMIDITY: 37%
Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
------­

NO:

M-33
OF SAMPLE + CAN (WET) (gms) 363.50
OF SAMPLE + CAN (DRY) (gms) 356.90
OF WATER (gms) 6.60
26.46
WT. OF DRY SAMPLE (gms) 330.44

WATER CONTENT (%) 2.00

Tested By: A-Rahman Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1S-02
01.08.2021 Copy Right Resrved by RGF
~ I ." -"Uf !' --- -~' . .Ai, ;.,.~ 'l::.r:. A~
~~
, ",,- t." G>
~'!) V ""---" '----'-- _ -" ~~..,. 4.....-' _:/' ~

AnlERlccmpany RIVADH GEOTECHNIC:tUE &. FOUNDATIONS CO_


'p.o. no:;.! at027'1. Vu""bu Af~Slr.;'l"":Dh. MVAS 5"1.000.. kSA "tM¢phorte~ +9Ci6 (:l"') 32'.500-:992 I :a2S099:) 1'"3>0:1 .9~( :14) 32509"'6 Eft'\c;;l.U::: ~tl"~y.anbul:!Pel'f$,f.""'t>1K';rer..:,>f''',.e(>rt''t
\ "u,;)"ttno!. Al-N>;tw;;:\niOnd :Str~""'f. H .. J A'~fVUltulc1'\ [)h't.1·k~. t~,("~,. Yi.Jn'h.~ Af-Sin_\,IVll'h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination DATE SAMPLED: 29.01.2022

SOURCE: TP : 06 Depth: 2.50 m DATE RECEIVED: 31.01.2022

SAMPLLE DESCRIPTION Sample NO.:


--------1

NVT. COND TEMP 24.5 DC HUMIDITY: 37%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

NO:

M-12
OF SAMPLE + CAN (WET) (gms) 321.00
. OF SAMPLE + CAN (DRY) (gms) 319.00
. OF WATER (gms) 2.00
OF CAN (gms) 26.52
OF DRY SAMPLE (gms) 292.48
WATER CONTENT (%) 0.68

Tested By: A-Rahman Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY -SOIL-1S·02
01082021 Copy Right Resrved by RGF
1 fi.:~ ~1-c:.-L::.-~Ull' j-~~f~
An IERI C<>mpa"y ~.l':'.!~' ~ RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
r~~o. OQ>ot 30.>1:7:1. Yanbu At'Sin~IYiin'h> ,...,VAS 5:1000.. KSA Tcl.,e.phcJ1.-e; ,.,966 {14} a _ ;;l.!i.O~9:Z / 32509'97)
'.!;>Catioo::: A)-N •.nN".. ~n»ru'
$lr~("t ••• ",1 A~lV1ah;;.x\

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 06 Depth: 3.00 m IJA I E RECEIVED:

SAMPLLE DESCRIPTION Sample NO.:


--------1

ENVT. COND TEMP 24.5 0 C HUMIDITY: 37%


Test Started Date 01.02.2022 Test Completed Date: 02.02.2022
-------

NO:
A-8
OF SAMPLE + CAN (WET) (gms) 353.60
OF SAMPLE + CAN (DRY) (gms) 351.10
2.50
WT. OF CAN (gms) 23.45
. OF DRY SAMPLE (gms) 327.65
R CONTENT (%) 0.76

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YN6-PHY-SOIL-15-02
01082021 Copy Right Resrved by RGF
.;;.r --!! ~ l.;;.J
f An Eftl Com",,",
1'.0. no>\; .!KJV1, 'ian!".. A1~srn;'ly;o.h. MYA' $'1000, l:SA 'l'clfjphon¢:
t:.A..:::_l.:;;.,.r [II~ :.: _0.
RIYADH GEOTECHNIGUE & FOUNDATIONS CO.
+"'" (14) ::l:.I:!}0!)g2/3:t!!'~3
~+7 .,.Y'/::.r: ~4..;'

f<.,....:: +96G (14) ~2:S09AG til1">.;)IJ: I'ltf~ylOtlbu6>t'.IBcO~dHo«i~ ..;:U""


{u<:Miufl: I\j.N"wlil~l" !t~l. it,,! Af-,Mbm.h CHttl(:l# 1t..,c •• ....H',bd Ak!fl1,aJ'I.d.

NEOM. PROJECT NO.:


-----
PROJECT: Neam desalination plant ta gayat transmisssion system. (LO·Ot ) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE TP: 01 DEPTH: 0.60 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.:
ENVT. CONDo TEMP. 23.5 0 C HUMIDITY: 35%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. J-2
2" WT.(SOIL+CAN) WET: 2053.89 gms.
-----
1 112" WT.(SOIL+CAN) DRY; 2030.20 gms.
----
1" WI. OF WATER 23.69
3/4" 0.0 0.0 100.0 WI. OF CAN 207.70
3/S" 15.2 0.8 99.2 WI. OF DRY SOIL 18LL .:JU
#4 44.6 2.4 97.6 WATER CONTENT: 1.30 %
#10 187.2 10.3 89.7 REMARKS:
#20 485.3 26.6 73.4 NON PLASTIC
#40 862.2 47.3 52.7
#60 1324.0 72.6 27.4
#100 1611.8 88.4 11.6
#200 1737.1 95.3 4.7
PAN 1739.2
TOTAL SOIL WT. 1822.50 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
i;; 80
Q 70
Bi r60
:1
~~O
(5
;;:30
i;! 20
:s: 10
o
100 10 GRI\IN SIZE IN 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-------------------
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-Ol-04
01.08.2021 Copy Rights Reserved By RGF
Cl.:-l..;../V I~ ~.d i../ l;?..J I ~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
".0. tb"Jl !U)rt'1, Y"'hbuAt-5Tn~IY"'h> MYA5 !H(}(:)o. XSA TcIC):lhone; -..966 tIll) 3250(19".12 I :12!>C~9~ 1'...,,; .... 966 (t.,) :l:t50!:M(J f)h,,!1, ~R'.vanb,,@~,I"cQld(,fI(;C!U:Otn
l,t.<:"'lh)(,: A!,Ni:lw.uuod :st{~i!(. H~I At<MaW"t, Phlil<:t.lt.ot'.: .• V.llibu AI:.:$Ii .... 'yah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayat transmisssion system. (LD-01 ) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE TP: 01 DEPTH: 1.20 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt. SAMPLE NO.: B-2
ENVT. COND. TEMP. 24.1 0 C HUMIDITY: 36%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112"
2"
1 1/2" 0.0 0.0 100.0
1" 41.2 2.5 97.5
3/4" 41.2 2.5 97.5 gms.
3/8" 52.6 3.2 96.8 gms.
----
#4 82.5 5.0 95.0 %
#10 224.8 13.7 86.3
#20 496.6 30.2 69.8 NON PLASTIC
#40 819.0 49.8 50.2
#60 1200.2 73.0 27.0
#100 1446.2 88.0 12.0
#200 1560.4 94.9 5. 1
PAN 1562.8
TOTAL SOIL WT. 1643.70 gms I

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 '10 100 200


100
90
&; 80
¥ 70
;;;~O
tf)

«
~~O
r5 :;;30
i>2 20
5:: 10
o
100 10 (jRIIIN SilT IN JII.L1MITERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-------------------
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF -YNIl-PHY·SOIL-01-04
01.08.2021 Copy Rights Reservecl By RGF
f An EOI compnny
CA.~-l;./[JI~ ~ .~~ J"y..--l I ~ =
RIYADH GEOTECHNIGUE & FOUNDATIONS CO.
P.O. t).Q"aO:Y/1. Yanbu AkSfo;"YilIh, MVA1 5tO()O.;<s..A "tcleplu;w>e; -..96CS( )c4) ~2~()!}9Z I ~2!\.09:!i3 I'al<: -+966 (14) jZ:'H)94d tlnJlll: q:~"v'lI'1b\jMt::-{IK¢OrK.It'fi~(:).('Qm
t~"'U"h: Al.NJ"""j,'>OlIu(l $\f~~~. H,;! AI.M.'Ih:H. Oh.tlld. R.<: •• Yill,b'U Aj.,;Slilal., .. h

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE TP: 01 DEPTH: 2.50 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt. SAMPLE NO.: S-6
ENVT. CONDo TEMP. 23.8 o C HUMIDITY: 35%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

E I SPEC. WEIGHT % RETA.INED % PASSING


LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. P-4
2" WT.(SOIL+CAN) WET: 1721.62 gms.
1 112" WT.(SOIL'CAN) DRY: 1709.20 gms.
1" WT.OFWATER 12.42
3/4" 0.0 0.0 100.0 WT.OFCAN 194.30 gms.
3/8" 15.0 1.0 99.0 WT. OF DRY SOIL 1514.90 gms.
71.5 4.7 95.3 WATER CONTENT: 0.82 %
302.9 20.0 80.0 REMARKS:
740.4 48.9 51.1 NON PLASTIC
1133.6 74.8 25.2
1321.4 87.2 12.8
#100 1397.3 92.2 7.8
#200 1436.4 94.8 5.2
PAN 1438.3
TOTAL SOIL WT. 1514.90
AS!};

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM


6" 4" 3" 3/4" 3/8" 4 10 40 100 200

100 10 (ilV\IN SIZL IN JII.L1MFTLRS 0.1 0.G1 0.001

Checked By/Reviewed By: Si'!ppd Akhtar


-------------------
A-Aziz
Tested By: _______________ Approved By: Awais Nisar Yasin

RGF-YNB·PHY·SOIL·01-04
01.08.2021 Copy Rights Reserved By RGF
I(c~ ~ l.;../[JI~~~jy.)f~
f AnERlcompanv ~~.
(.',0', (..;tn., J)O~11. y",llhu Al~51n;Uy ..h. MYA$ 5"1000. X5A
v ...
t=.A..:.;__
RIVADH GEOTECHNIQUE & FOUNDATIONS CO.
"f>e!e-ph6ne< -.900 (14) :)2:S099.l/12~Q!J9.3 ,,,,xc ..
:1)6($ fl.t) :!'2!Sti9A(S :i1m')U; q.r·yl>nJ;".,@<:oIHeQli~t-a<,.,,. ..(,I;~,,,,,
lU;;:.tifJi)! Al,N;:tW3rui1tl(t st<~t. H~ AI-Mah",n l)fst(ki. h>C •• y..Iot.<J A),$ln.(>llI'.ah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gaya/ transmisssion system. (LD-01 ) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE TP: 02 DEPTH: 0.60 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt. SAMPLE NO.: B-1
0
ENVT. CONDo TEMP. 23.5 C HUMIDITY: 35%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. KSA
2" WT.(SOIL+CAN) WET: 1745.78 gms.
1 112" 0.0 0.0 100.0 WT.(SOIL+CAN} DRY: 1719.40 gms.
1" 18.9 1.3 98.7 WT.OFWATER 26.38
3/4" 41.4 2.9 97.1 WT.OFCAN 269.90 gms.
3/8" 78.7 5.4 94.6 WT. OF DRY SOIL 1449.50 gms.
#4 145.9 10.1 89.9 WATER CONTENT: 1.82 %
#10 316.5 21.8 78.2 REMARKS:
#20 529.9 36.6 63.4
#40 820.4 56.6 43.4
#60 1147.1 79.1 20.9
#100 1296.8 89.5 10.5
#200 1364.1 94.1 5.9
PAN 1366.2
TOTAL SOIL WT. 1449.50 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
in 80
l) 70
:z.
in t-BO
'"-<
~~O
ifi
5 30
~ 20
~ 10
o
100 10 GRAIN SIZE IN JILI.lMETI:RS 0.1 0.01 0.001

Checked By/Reviewed By:


- - Saeed
--- Akhtar
--­
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF·YNB·PHY·SOIL·01·04
01.08.2021 Copy Rights Reserved By RGF
'CL:-l.;;,/UI,,~~~Y..JI~
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P_O. tk!lt\, .,0271, VISr>bU A"1Jn~Jy::.h. MYA$ ~i()()o, kSA 'telt:l'hone; -.-!W-(i t~4~ a~~g:t I :)2~3 p",,,: ~9/$6 (til) 1\25094(5 !'rn.>1I, fiRf''I'anb''@\:'f18¢Q~dt"f'!(;e!l,-(.o>n
I.(](:.all(;of); j\.1-"'~ .......;(I"W:hd Sl(.:~t, tI,,1 AI,M3h~j, DI,.,hJ;;:t, R.,c,. y .. r.I.>1J Ah11fli.lyal1

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Heom desalination plant to gayal transmisssion system. (LD-O 1) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE TP: 02 DEPTH: 1.20 m DATE RECEIVED: 31.01 .2022
SAMPLE DESCRIPTION: Light Brown poorly graded SAND. SAMPLE NO.:
ENVT. CONDo TEMP. 24.2 o C HUMIDITY: 36%
DATE STARTED: 01.02.2022 COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
21/2" CAN NO. KT
2" WT.(SOIL+CAN) WET: 2180.71 gms.
----­
1 112" WT.(SOIL+CAN) DRY: 2163.50 gms.
----­
1" 0.0 0.0 100.0 WT.OFWATER 17.21
3/4" 113.9 6.0 94.0 WT.OFCAN 272.70 gms.
----­
18':1IJ.xlI
3/8" 185.4 9.8 90.2 WT. OF DRY SOIL gms.

#4 279.9 14.8 85.2 WATER CONTENT: 0.91 %


#10 461.0 24.4 75.6 REMARKS:
#20 705.4 37.3 62.7 NON PLASTIC
#40 1089.8 57.6 42.4
#60 1488.2 78.7 21.3
#100 1720.9 91.0 9.0
#200 1807.5 95.6 4.4
PAN 1809.2
TOTAL SOIL WT. 1890.80 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6H
4" 3" 3/4" 3/8" 4 10 40 100 200
100
90
1;; 80
o
z
70
C/i
C/)
<

~
w
22 20
g: 10
o
100 10 lmAIN SIZI: IN JIlUMFTFRS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar

Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF-YNB·PHY·SOIL·01-04
01.08.2021 Copy Rights Reserved By RGF
CL-l.:;../V I, ~t:?Y c../,-:-?.) r ~
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
V.O. tw. a027i.. YI)MU AI·,srt>;;"yp.. MVJ\S S1iX1O, /($A 'fele"hOf_e: .... ~6:1 h -.1) Zl:t~O~:l!' 1.):;t50!;1-93 frut; +<)(!/) f" 011) .,~:;og-a(S t'm03l1: c1\r..... ;!Inbll~I:".18C'U)de-n.cc,.>.etltrl
l{J(... tf{]A~ AI~Naw:.'lt.... u('I ~t'-e<tt. 1\.:0\ AI.M~h~h t>r",t/IcL A.C .... y,tlll!v AI,~lil$'y .. h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Nl?om desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE : TP: 02 DEPTH: 2.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with si It. SAMPLE NO.:
ENVT. CONDo TEMP. 24.2 o C HUMIDITY: 36%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE
SIZE
1 I
SPEC.
LIMIT
WEIGHT
RETAINED
% RETAIHED % PASSING

I
WATER CONTENT: (ASTM D 2216-19)
3"
21/2" CAN NO. K-9
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 2206.80 grm.
1 112" 89.1 4.5 95.5 WT.(SOIL+CAN) DRY: 2190.60 gms.
1" 89.1 4.5 95.5 WT.OFWATER 16.20
3/4" 107.6 5.4 94.6 WT.OFCAN 205.20 gms.
3/8" 136.4 6.9 93.1 WT. OF DRY SOIL 1985.40 gms.
166.1 8.4 91.6 WATER CONTENT: 0.82 %
361.9 18.2 81.8 REMARKS:
805.7 40.6 59.4 NON PLASTIC
1294.7 65.2 34.8
1617.4 81.5 18.5
#100 1786.7 90.0 10.0
#200 1857.1 93.5 6.5
PAN 1859.2
TOTAL SOIL WT. 1985.40
:ASTNl15 J2'lJ:2-V
U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
~ 80
v 70
z
Ui
CIl
<.
c..

Z
w
iii 20
g: 10
o
100 10 GRAIN SII'Y IN JII.I.IMI.TLRS
0,1 0,01 0,001

Saeed
Checked By/Reviewed By: _ _ _ __ Akhtar
_ _ __

Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF ·YNI3-PHY·SOIL·01·04
01.08.2021 Copy Rights Reserved By RGF
' -... -;,;:. .
f AnERlcompany
~m
~~~.
".0.00)(802"7:1, V .. nbu At-.S!n;ly;:ah, MYA'S !>'1O()(J, ~t>A
~ GL--l.::----V/~~~V'_=?.)I-~
U,,! RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
'telr'phone: ...966 (14) 3:.t:lo0992 13:.t50~9.3 t'al<:--+9GCi (101) ~2'S094Ci Em"lI; faf~yanbu@el!HeoK'(.onc(:~.com
~OC .. tlCJ('~ AI.N.dwanolJld !\tlor;'<:-t. lul j'lI.I\.~,:l.})""(, DBtilc.i. It.(~ V.!;,bu Ahjlil""t,..;.ah

Neom desalination plant to gayal transmisssion system. (LD-O 1) DATE SAMPLED: 25.01.2022
TP: 03 DEPTH: 0.60 m DATE RECEIVED: 31.01.Z0ZZ
SAMPLE DESCRIPTION: Brown silty SAND. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 23.2 a C HUMIDITY: 34%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112"
2" gms.
----­
1 112" 0.0 0.0 100.0 gms.
----­
1" 22.8 1.2 98.8
3/4" 22.8 1.2 98.8 gms.
3/8" 92.5 4.7 95.3 gms.
#4 193.0 9.9 90.1 %
#10 580.6 29.7 70.3
#20 929.4 47.5 52.5
#40 1177.0 60.1 39.9
#60 1440.4 73.6 26.4
#100 1586.6 81.0 19.0
#200 1663.7 85.0 15.0
PAN 1665.2
TOTAL SOIL WT. 1957.70 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 314" 3/8" 4 10 40 100 200


100
90
&; 80
Q 10
~ r-60
~~O
~ !flO
tE 30
~ 20
~ 10
o
100 10 (i1\i\IN SIZE IN NlII.L1ML:TLI\S 0,1 0,01 0,001

Checked By/Reviewed By: Saeed Akhtar


------------------­
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF ·YNB·PHY·SOIL·01·04
01.08,2021 Copy Rights Reserved By RGF
~.-------,-..,....." t.:...-L--l.:.---'U I~ ~~ J:'G..) I~ ..... __ of. ..

--'~-'----"-'--~"'==~-"'''''=' RIYADH GEOTECHNIGUE & FOUNDATIONS CO.


P.O. Do)o' 302"7.:1, V::lI>bu A1-.~n;lyah. MYAS !:'i-:1UOO, ,,:sA 'telephone: ;.-900 (1.<:1) )2!:'>t)g9Z 132~:93 t'/Jl<: ....966 (1~) ::S:Z509.4a ~ln.:tU; r'6"Y3nbu@~.tK~o~c.I(:·-nce".co",
1..0;.(,;1011(<(., AI.N~w;;H).:IH(I.!ot(-C-CI. ti~l AI.M~hMl DBttl<:i. It.C., Y;){ibu AkSft,.:.lolYolh

CLIENT: NEOM. PROJECT NO.: 21J4037


-------------------------------------------­
PROJECT: Neom desalination plant to gayal transmisssion system.{LD-01) DATE SAMPLED: 25.01.2022
SAMPLE SOURCE TP: 03 DEPTH: 1.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO.: 8-2
ENVT. CONDo TEMP. 23.4 DC HUMIDITY: 34%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 1/2" ----'­ - - - - - ­
CAN NO. JF-4
~~--

2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 3255.00 gms.


1 1/2" 187.7 6.5
----­
93.5 WT.(SOIL+CAN) DRY: 3211.20 gms.
----------­

1" 213.1 7.3 92.7 WT.OFWATER 43.80


3/4" 303.3 10.4 89.6 WT. OF CAN 305.40 gillS.

3/8" 426.8 14.7 85.3 WT. OF DRY SOIL 2905.80 gms.

#4 580.0 20.0 80.0 WATER CONTENT: 1.51 %


#10 899.2 30.9 69.1 REMARKS: NON-PLASTIC
#20 1266.2 43.6 56.4
#40 1737.2 59.8 40.2
#60 2333.3 80.3 19.7
#100 2528.3 87.0 13.0
#200 2598.3 89.4 10.6
PAN 2600.1
TOTAL SOIL WT. 2905.80 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
;;; 80
v 70
~ r-60
':2 ~50
:: tl!.40
i:i 3 30
2;! 20
it 10
o
100 10 (jRi\IN SII.I·: IN JIl.l.ltvlLTI'RS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: A-Rahman Approved By: Awais Nisar Yasin

RGF -YNB·PHY -SOIL-01-04


01.08.2021 Copy Rights Reserved By RGF
CL::.-l.:---'{jI~~~jG.)I~
f
P.O, 00)< 802'7:1,
AnERlcompany
Y~obu AI.Sln;l.,.l1h. MYA~ :)::l()()(), I<SA
-<, RIYADH GEOTEC':NIOUE
"telephone: ... ~Ot:t (1.4) :)250-<J'92' I ~250993
~ ~OUN~ATIONS CO_
I'~J<: -.906 (1.... ) :'t'l50940 l'ln"l1: ql.r.yanbu@l!llsco,"dt"Il(:e!>.<:om
t(><::;.Utll)~ Aj,N,:h'l:/II)<>lHf ~tNI:I. Hal AI.M~II ..(. Ojslfl<-I.I't,<:.• yoti'ltiIJ Ahj!i,.;I.,.::.h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LO-O 1) DATE SAMPLED: 25.01.2022
SAMPLE SOURCE TP: 03 DEPTH: 2.00 m DATE RECEIVED: 31.U1.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt & gravel. SAMPLE NO.: 5-5
0
ENVT. CONDo TEMP. 23.7 C HUMIDITY: 35%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. M-8
2" WT.(SOIL+CAN) WET: 1876.17 £ms.
1 1/2" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 1853.20 gms.
1" 55.8 3.4 96.6 WT. OF WATER 22.97
3/4" 154.4 9.4 90.6 WT.OFCAN 212.40 gms.
3/8" 267.7 16.3 83.7 WT. OF DRY SOIL 1640.80 gms.
#4 398.1 24.3 75.7 WATER CONTENT: 1.40 %
#10 660.3 40.2 59.8 REMARKS: NON-PLASTIC
#20 877.5 53.5 46.5
#40 1056.8 64.4 35.6
#60 1268.2 77.3 22.7
#100 1410.5 86.0 14.0
#200 1491.9 90.9 9.1
PAN 1495.2
TOTAL SOIL WT. 1640.80 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
;;; 80
CJ 10
~ r-60
::2 i§50
~ ~O
,,3:
W 30
~ 20
12 10
o
100 10 GI</\IN SliT IN JIII.IIVIUI:J<S
0,1 0.01 0,001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: A-Rahman Approved By: Awais Nisar Yasin

RGF·YNB-PHY ·SOIL-01-04
01.08.2021 Copy Rights Reserved Ily RGF
1~~Cl::-l.:..--iJl,::~ ·~~c./y..)l~
f An Enl Company "
QW>
W!~tohl"

P.O. nO'.. ti0271.l'aobL> At.:5{n~fyi:t.h. MYA!!; 51000. KSA


VilA!.
"'""';w""'''' """ RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
.~llI!'ilh(H)e: +!>dt) (s"') :S2~t)l)9.f: I :l2:">0!J93
ltl(;<.IoUi:l1\: AI.Naw;},)lWd ~ti':'-!l,
" ..,,: -+-9(,6 (14) 32~0941j £'lTu.lh r~r'Y"llbl,l{j}~tB~Q)'Cl.t-n(e).<;orn
H;}I Al.M.;)h"'I' DT'l-hl<..t. R.':: .• Yoi"nlJu AkSfl'..I.....1J

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (lO-O 1) DATE SAMPLED: 26.01.2022
SAMPLE SOURCE TP: 04 DEPTH: 0.60 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 23.2 C
o HUMIDITY: 34%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" .-...-.....-.. ---~
CAN NO. L-7
2" WT.(SOll+CAN) WET: 2192.80 gms.
1 112" WT.(SOll+CAN) DRY: 2153.90 gms.
1" WT.OFWATER 38.90
3/4" 0.0 0.0 100.0 WT. OF CAN 208.10 gms.
3/8" 8.7 0.4 99.6 WT. OF DRY SOil 1945.80 gms.
#4 39.8 2.0 98.0 WATER CONTENT: 2.00 %
#10 152.8 7.9 92. 1 REMARKS: NON-PLASTIC
#20 500.3 25.7 74.3
#40 974.8 50.1 49.9
#60 1447.1 74.4 25.6
#100 1664.5 85.5 14.5
#200 1795.6 92.3 7.7
PAN 1796.7
TOTAL SOIL WT. 1945.80 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" <I 10 40 tOO 200


100
90
£ 80
v 70
Sl rEO
~ G50
:: @40
iii ;3:30
;;2 20
1l: 10
o
100 10 GRAIN SIZE IN JILLltvlETERS 0.1 0,01 0,001

Checked By/Reviewed By: Saeed Akhtar

Tested By: A-Rahman Approved By: Awais Nisar Yasin

RGF-YNB-PHY -SOIL-01·04
01.08.2021 Copy Rights Reserved By RGF
III

C~L;./VI-, =: ·.:7~if,-:-?.)f~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. nOll ao:.t:r.1. Y:n'>tIUAI"!S1 ... ~! ....h. MVJ\$ :>"1000, KSA "t.;:lephooe: ·t966 (14) 32~"'92 / 32~'93 (~.,.; .96t1 114) ;a-Z~:H)94(} fFm,,!J; '1tf.'V.. nbu'@efr~o~dt'()CC:o'<';UJn
loe.. U","~ AI~N~w"fi')Hd st-h'o!l. Mal Al.M.3i• .,tl D!ihkt. A.C .• "I';;.-,"u Al"ihl;iotY.Joh

CLIENT: NfOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 26.01.2022
SAMPLE SOURCE TP: 04 DEPTH: 1.60 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Browil silty SAND. SAMPLE NO.: B-3
ENVT. COND. TEMP. ----2-3~.B-o~C-------H-U-M--ID-IT-Y-:--------- 34%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. R-B
2" WT.(SOIL+CAN) WET: 2350.29 gms.
1 112" WT.(SOIL+CAN) DRY: 2329.10 gms.
1" WT. OF WATER 21.19
3/4" 0.0 0.0 100.0 WT. OF CAN 231.40 gms.
3/8" 44.6 2.1 97.9 WT. OF DRY SOIL 2097.70 gms.
#4 79.2 3.8 96.2 WATER CONTENT: 1.01 %
#10 127.9 6.1 93.9 REMARKS: NON-PLASTIC
#20 262.1 12.5 87.5
#40 910.7 43.4 56.6
#60 1619.4 77.2 22.8
#100 1779.5 84.8 15.2
#200 1839.4 87.7 12.3
PAN 1843.2
TOTAL SOIL WT. 2097.70 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200

~
100
90
80
w
u 70
5';~o
~ 1§50
;:: 1l'40
@;$30
~ 20
15:: 10
o 1M 100 0.01 0.001
10 GRAIN SI/.E IN MII.J.JMETII(S 0.1

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: Attiya Approved By: Awais Nisar Yasin

RGF ·YNB·PHY ·SOIL·Ol·04


01.08.2021 Copy Rights Reserved By RGF
f AnERlcompany ~ .dl
~~'-j
"f,~~'
v

ft.O.IloJOl2JOZ"11. V .. obuAhSln~fyah. MYA'1 5:1000, k::SA


u',"
\ ..: .• ..(••; __ l.;:.../u/~~A~0.,)1~
- - -
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
"Tde,-,hone; -..911t) {1<:1} l2::>0992/l2!lo()99.3 to;:,.... : ....966 (14) Y.25094(i £!,n4l11; r~'.y~nbu@t:'.rKe03-c.l(.""ce,.(:oon
t<>;:",U.".: J\1~NAW;)rkU1d Stf~t. Hal AI.M.:.!):;" •• DBlt/('I. !'t.e., ..... j~lH.J AI.:$lflafJ';:Oh

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 26.01.2022
SAMPLE SOURCE TP: 04 DEPTH: 2.50 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.: S-6
ENvr. CONDo TEMP. 23.7 a C HUMIDITY: 36%
-----
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02,2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. XY
2" WT.(SOIL+CAN) WET: 2380.80 gms.

1 112" WT.(SOIL+CAN) DRY: 2345.10 gms.

1" 0.0 0.0 100.0 WT.OFWATER 35.70


3/4" 48.5 2.3 97.7 WT.OFCAN 253.50 gms.

3/8" 89.3 4.3 95.7 WT. OF DRY SOIL 2091.60 gms.

#4 151.5 7.2 92.8 WATER CONTENT: 1.71 %


#10 359.7 17.2 82.8 REMARKS: NON-PLASTIC
#20 716.3 34.2 65.8
#40 1378.4 65.9 34.1
#60 1693.6 81.0 19.0
#100 1815.3 86.8 13.2
#200 1887.1 90.2 9.8
PAN 1890.2
TOTAL SOIL WT. 2091.60 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
iC 80
CJ 70
~ r-60
C/)
«:
:= ~O
C5 30
~ 20
~ 10
o
100 10 GRAIN SIZI, IN JII.LltvlLITRS 0.1 0.01 0.001

Checked By/Reviewed By: SrlPpn Akhtar


-------------------
Tested By: Attiya Approved By: AWrli<; Nisar Yasin
-----------------

RGF·YNB-PHY -SOIL-01-04
01.08.2021 Copy Rights Reserved By RGF
~

P.O. IJOJOl
f An ERI Coml"'ny
ao,,.,, V~r>bu At<oSffj~lyah, <VIVA!) l)~OOO~ X!iA
CL-t..::---{JI~ ~~ ~l:?.) 1~
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
'Toe'~..hvne; ~() (14) :t2~? I :t2~3 t'a",; ... ;tSti (14j3'2:!>094i} f!HMIJ; qif~y"'nbu@ellfl:eu:K.!e~.(:om
LU<:t<UOO: Al.N .. wa'.iHwSt.... tt, Hal AI.Mah"f. ()j,.tth.t. It.<: •• V.lr.bu Ak$ltlatll'.:ih

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 27.01.2022
SAMPLE SOURCE TP: 05 DEPTH: 0.60 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.:
ENVT. CONDo TEMP. 23.5 0 C HUMIDITY: 34%
DATE STARTED: 01.02.2022 COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. C-7
2" WT.(SOIL+CAN) WET: 2022.89 gms.
1 112" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 1973.20 gms.
1" 25.1 1.4 98.6 WT. OF WATER 49.69
3/4" 68.0 3.9 96.1 WT. OF CAN 217.40 gms.
3/8" 108.4 6.2 93.8 WT. OF DRY SOIL 1755.80 gms.
#4 190.0 10.8 89.2 WATER CONTENT: 2.83 %
#10 639.4 36.4 63.6 REMARKS: NON-PLASTIC
#20 1148.9 65.4 34.6
#40 1486.4 84.7 15.3
#60 1605.5 91.4 8.6
#100 1653.9 94.2 5.8
#200 1679.5 95.7 4.3
PAN 1682.3
TOTAL SOIL WT. 1755.80 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
i;; 80 .... ­
Q 70
z
Vi
~

Z
l!.l
~ 20
g: 10
o I

100 10 GRAIN SI/J' IN ~IJ.L1MITr:I{S 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-------------------
Tested By: ATTIYA Approved By: AWClis Nisar Yasin
-----------------

RGF -YNB-PHY-SOIL·Ol-04
01.08.2021 Copy Rights Reserved By RGF
f An ER. Com""ny
""0. -aol'i ;30:C71. Y.;:.;f>bu At,!fJ~';'V.l>h. MYA$ $:{OOO, X!9J\
CL:-i....:-'U I~ ~~ cYl;?...J I
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
"telephone.: ..-960 (HI) 31'W992 I ~'250993 I'.. ,,! +9«:>~ ('-4) '~!if;l!:UH~ flm.lll. rnr,,,~oL>lJ@I':.le¢t;lM:;J(;'f),,::c"A:I:l,"
liJU\'U".fi: A"NAW':tIt... ~tI(' Stt-C"'!. Hitl AH,";3h..",. t>f~tO<.'" I\.C., "-,r,\I<.4 Ak!*,,,,,I)1>1h

CLIENT: NEOM. PROJECT NO.: 21J4037


----­
PROJECT: Heorn desalination plant to gayal transmisssion system. (LD-O t) DATE SAMPLED: 27.01.2022
SAMPLE SOURCE TP: 05 DEPTH: 1.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Light Brown silty SAND. SAMPLE NO.:
ENVT.COND.TEMP. ~--2-3-.6~o-C~-----H-UM--ID-ITY--:----3-5-%---
DATE STARTED: 01.02.2022 COMPLETED: 03.01.1021

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2116-19)
3"
2112" CAN NO. SP
2" WT.(SOIL·>CAN) WET: 2335.30 gms.

1 112" WT.(SOIL'CAN) DRY: 2296.20 gms.

1" 0.0 0.0 100.0 WI. Ol~ WAILI{ JIJ.1U


3/4" 9.2 0.4 99.6 WT.OFCAN 223.20 gms.

3/8" 20.1 1.0 99.0 WT. OF DRY SOIL 2073.00 gms.

#4 40.0 1.9 98.1 WATER CONTENT: 1.89 %


#10 120.6 5.8 94.2 REMARKS: NON·PLASTIC
#20 295.7 14.3 85.7
#40 506.7 24.4 75.6
#60 764.2 36.9 63.1
#100 1159.0 55.9 44.1
#200 1432.6 69.1 30.9
PAN 1435.1
TOTAL SOIL WT. 2073.00 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 IO() 200


100
90
;:;; 80
v 70
E';f-80
~ G50
;: lL>40
ii3 3 30
~ 20
[! 10
o
100 10 GRAIN SIZE IN MII.L1MI"IERS
0,1 0.01 0,001

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: A-Rahman Approved By: Awais Nisar Yasin

RGF· YN(HHY·SOIL -01·04


01.08.2021 Copy Rights Reserved By RGF
Cl:.-L::--U IJJ ~r.# t./ y..) f ~
:'::':":'=::::"'::=::.::!.J~~==l!2=J RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
1'.0. nOl< i'ln~'1~. 'tanhu AI,STh~ly ...h. M'i'AS 51000,Io!:sA Td<:'ph(me: ..!lot) hA) 32'0992 I J2501Htll t'."c -..gG6 (:1.4) ~2~0940 £'m~lt; "'6I.y","I.H... trh::.rg~o!d("'ce!l,(;f)tn
(J(:"at!u(l:AI.N4wl\!O<;If\(1 Stf~i;'t. it.';·\ A!,MJihbn plilrl<:\'. It L-. y.;",buAk~i;lJloI'l,Jh

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
------------------------------------------
Neom desalination plant to gayal transmisssion system.(LD-01) DATE SAMPLED: 29.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 0.60 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.:
ENVT. CONDo TEMP. 23.2 DC HUMIDITY: 36%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

WEIGHT
RETAINED
% RETAINED I % PASSING II WATER CONTENT: (ASTM D 2216-19)
3"
Z 1/Z" CAN NO. JF-3
Z" wr.{SOIL+CAN) WET: 2014.15 gms.
1 112" WT.{SOIL+CAN) DRY: 1934.90 gms.
1" wr. OF WATER 79.25
3/4" 0.0 0.0 100.0 WT.OFCAN 304.30 gms.
3/8" Z4.Z 1.5 98.5 wr. OF DRY SOIL 1630.60 gms.
#4 43.8 2.7 97.3 WATER CONTENT: 4.86 %
#10 147.5 9.0 91.0 REMARKS: NON-PLASTIC
#20 509.9 31.3
#40 950.5 58.3
#60 1243.5 76.3
#100 1395.5 85.6 I 14.4
#200 1506.0 92.4 I 7.6
PAN 1509.2
TOTAL SOIL WT. 1630.60 gms

U.S. STANDARD SIEVE SIZE UNIFI ED SOIL CLASSIFICATION SYSTEM

611 4" J'l 314" 3/8" 4 10 40 100 200


100
90
i;; 80
CJ 70
~ r-60
~G50
~~O
13 :330
~ 20
:s: 10
o
100 10 GRAIN SI%I, IN lIAll.Lli'v1ETERS 0.1 0.01 0.001

Checked By/Reviewed By: SClPPrl Akhtar


------------------
A-Aziz
Tested By: ____:...:.-;.:;:..::.;.:;:..::.____ Approved By: Awais Nisar Yasin

RGF-YNB·PHY ·SOIL·01·04
01.0B.2021 Copy Rights Reserved By RGF
I ~~ ~. -C:-l:.-L-'{jI~~r.:J~,-:?-"I~
f AnERlcompony ~~' .."m
P.O. Uo",",,0273, V",obuAI.5Jo;lyah. MYA'$ 5-:1()()1}. y.'SA
l.(;I(;.IoUuf,:
RIVADH GEOTECHNIOUE & FOUNDATIONS CO.
"'elepl"~ffie; +900 (l.ll) 31:5-0992/ ~1:509!J.3
A'~N..,.'Wa ...;.1I)(f
1<;:.,.: ... 9tJ(i {lol) ::!J2~094U ~m.:.ll; rflr~y&nblla>i:"IKeo~c.it..,<:e,..tom
.$h'«t. Hal AI,M.-:ohIU'I Dlslrld. Ii..'-:., Y.l{',bU A.I-:$II1 ..I)I.lh

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-O 1) DATE SAMPLED: 29.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 1.10 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.: B-2
0
----­
ENVT. CONDo TEMP. 24.3 C HUMIDITY: 36%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. UM
2" WT.(SOIL+CAN) WET: 2237.40 gms.

1 112" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 2198.20 gms.

1" 50.5 2.5 97.5 WT. OF WATER 39.20


3/4" 89.1 4.4 95.6 WT. OF CAN 176.30 gms.

3/8" 103.8 5.1 94.9 WT. OF DRY SOIL 2021.90 gms.

#4 242.5 12.0 88.0 WATER CONTENT: 1.94 %


#10 663.8 32.8 67.2 REMARKS: NON·PLASTIC
#20 1142.8 56.5 43.5
#40 1558.1 77.1 22.9
#60 1763.3 87.2 12.8
#100 1846.9 91.3 8.7
#200 1899.8 94.0 6.0
PAN 1903.1
TOTAL SOIL WT. 2021.90 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
;;:;
80
~ 70
en r-60
~ (§so
:= ~O
;>30
ii:i

~ 20
it 10
o
100 10 GRAIN SIZI: IN Jll.l.ltvll:TFRS
0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-------------------
Tested By: Attiya Approved By: Awais Nisar Yasin

RGF-YNB-PHY -SOIL-01-04
01.08.2021 Copy Rights Reserved l3y RGF
'C.-L-\...:---'U I ~ ~r.tY t../ y.,J I ~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
~.o. 30l<. 3027:1. Y.;mbuAt.$ln~r)'llt" MYAS :110()(),)($.4 'fO!lcph<:il'1«!1 "",~r}6 (14) 3250992 1:)15-0993 fI"lII:; T?66 (1.IJ) 32:~()946 £m"n: tr<I'vtlnb<.l@r:'<l~eOldl:'flt;('".(om
. lQc..lOlI>?f.: AI.N;aw""'~jj{t ~t(,,'t;t. lUi Al.M.ah.. t. Dh;tfl(.t,IU':•• Y.l>'lbu AkSltWly~h

CLIENT: NEOM. PROJECT NO.: 21J4037


-----------------------------------------­
PROJECT: Nearn desalination plant ta gayal transrnisssion systern.(LD-01) DATE SAMPLED: 29.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 2.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt ft gravel. SAMPLE NO.:
ENVT. CONDo TEMP. 24.2 o C HUMIDITY: 36%
DATE STARTED: 01.02.2022 DATE COMPLETED: 03.02.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 112" CAN NO. BB
2" WT.(SOIL+CAN) WET: 1944.42 gillS.
1 1/2" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 1915.60 gms.
1" 125.8 7.6 92.4 WT. OF WATER 28.82
3/4" 125.8 7.6 92.4 WT.OFCAN 249.60 gms.
3/8" 193.0 11.6 88.4 WT. OF DRY SOIL 1666.00 gms.
#4 352.2 21.1 78.9 WATER CONTENT: 1.73 %
#10 734.6 44.1 55.9 REMARKS: NON-PLASTIC
#20 1082.2 65.0 35.0
#40 1329.6 79.8 20.2
#60 1483.7 89.1 10.9
#100 1538.1 92.3 7.7
#200 1569.9 94.2 5.8
PAN 1571.2
TOTAL SOIL WT. 1666.00 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100 "ii'
90
i; 80
co 70
~ r60
~ ~50
c...~0
!-3;
t;j 30
~ 20
E: 10
o
100 10 GRAIN SIZI: IN JII,L1METt:RS 0.1 0,01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------­
Tested By: _____-=-___ Approved By: Awais Nisar Yasin

RGF·YN B·PHY-SOIL·01·04
01.0B.Z021 Copy Rights Reserved By RGF
P,Q. BoX 30:2"11, Yanbu At~Sin;fY~h~ MYAS 5"1.000.. KSA Telephone: -+966 ('111) 3250992/32S0993 f.lx: ,.966 {I") 32509"6 Em::tn~ r8r~yGnbu@t!rlBt!osdenc:e$.tom
lOC.ltl(}m A!MNawammd Street.. Hal AI-Mahan D!stfjct~ R.C... YMtbu AI Slnalyah

PROJECT: Neom desalination plant to !loyal transmisssion system. (LD-01 ) DATE SAMPLED; 24.01.2022
SAMPLE SOURCE: TP­ 01 DEPTH: O.60m DATE RECEIVED; 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.: B-1
ENVT .COND. TEMP.: -=2-=3-:.5:-10rrC=--------:-H-:-:-U-:-M-:-~DI=T:-::Y-:---3-5%-0­

STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

..... LL
t:
.l!l
t:
o
U
.... PL
.l!l
<1:l
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ ----------­
Approved by; Awais Nisar Yasin

RGF-YAN-PHY -SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
GL-l.;../U I, :;: .....:;,;~ ~ '-:?~ ,~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
p,o, Box 30271, Yanbu Al-sJn~IV~h-" MVAS 5:1oo0,,}(SA rclephOlltt: -t965 ('14)32S(}992 J 32:50993 fax;: +966 {14) 3250')46 EmaU! rgf-yanbu@erlgeo5eh!-nt::es.COM
Lo(:O)tlQm AI-Naw.anand St~et, HaJ Ai~Mahan Distri<:t~ R.C... Yanbu At-Slnalyah

PROJECT: Neom desalination plant to gayal transmisssion system. (LO-01) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE: TP­ 01 DEPTH: 1. 20m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 24.1 DC HUMIDITY: 36%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

..... LL
c
.l!l
c
o
U
... PL
.l!l
('\\

5
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
I
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ -------------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved Gy RGF
AnERI
P_O. Box 302"11. Vanbu Al..sln~lyah. MYAS 51000.. KSA lejephollC'~ ",.9G6 (:14) 3250992/3250993 Fa)!! <t9S6 (14) 3:250946 Emal\: rg1..yanbu@cngcosdenC::o"HGm
Locution: Al-N~w~n ....nd Stt-cat. H••I Al·MAhan ot.l>tri.c-rz R.C., Yilnbu I\l-Slnillyah

PROJECT: Neom desalination plant to gayal transmisssion system. (LO-01) DATE SAMPLED:
SAMPLE SOURCE: TP­ 01 DEPTH: 2.50 m DATE RECEIVED:
----­
SAMPLE DESCRIPTION:
--------------------------------­
Brown poorly graded SAND with silt. SAMPLE NO.:
-----­
S-6
ENVT.COND.TEMP.: 23.8 DC HUMIDITY: 35%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....!: LL
....!:
(J)

o
U
... PL
.l!:!
l\:I
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: _ _ _ _ _ __
M.lrfan Checked By/Reviewed By:
- -Saeed
--- Akhtar
--­
Approved by: Awais Nisar Yasin

RGF -YAN-PI-lY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
:---r==r"91 v " I - I - -,...tU I - w • -"j. Ai. ;:, I -, 11::.r:.:-..""/
AnERI ~,[~ ~~H~O~~~NI~~~~N~IO::O.
P.O. Box 30271. Y.1nbu Al..sJ03Iy:t1f\. MVAS 51000. KSA Tet~phon~t -t966 {'14) 3;2S0'.l92/3250-P.l3 32~0946 Etndll: rgf-yaf1butfPc:rI8t!mcl~l"I,<s.r::om
location! At-NaW3t'Hlnd Strcnt, Hai AI-M;,lhan Al-Sina'y.a.h

PROJECT: Neom desalination plant to )layal transmisssion system. (W-01) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE: TP­ 02 DEPTH: O.60m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION:
----------------------------------­
Brown poorly graded SAND with silt. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 23.6 oC HUMIDITY: 36%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022
L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH
NON-PLASTIC
WTWATER

gms
%
NO. OF BLOWS

-c
.2
c
LL

o
U

-
~
~
Q)

t il
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL
.
+ DISH
____
'.~~_r~.~"~.~,.~~~·~_ ~~~~>~ ~"~.~"

WT DRY SOIL + DISH gms


WT WATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------- ---------
Approved by: Awais Nisar Yasin

RGF-YAN-PHY -50IL-02-04
01-08-2021 Copy Rights Reserved By RGF
P.O. so:.t 30271~ Y.lnbU Al.SlnaIYOIh. MYAS SiOOu. KSA Tef~phot'le: -t9G6 (14) 3250"'>92 / 32:509;)3 f:lx: ·.966 (14)3250946 ErnaH! ys'-v.mbu@erlg.etlsdences.com
l{)(:;)tlom Ai-Naw.o)nand Str(l~t:.. H;;I Al-Mah.m Dls.trict,. R.C., Yanbu At·Slnn.y ... h

PROJECT: Neom desalination plant to gaya/ transmisssion system.(LD-01) DATE SAMPLED:


-----
SAMPLE SOURCE: TP- 02 DEPTH: 1.20 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION:
----------------------------
Light Brown poorly graded SAND. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 24.2 DC HUMIDITY: 36%
------
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

NON-PLASTIC

..... LL
c:
Q)
.....
c:
o
U
... PL
J!l(ll
s:
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
CONTENT

NON-PLASTIC

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------ ----------
Approved by: Awais Nisar Yasin

RGF·YAN -PHY -SOIL -02 ·04


01-08,2021 Copy Rights Reserved By RGF
Cl.:-l.;../V J~~~ J'~.) I~
AnERt RIYADH GEOTECHNIQUE & F OUNDATJONS CO.
P.O. 80)1-30271. Vanbu A,~s-lnnly>ll1. MVA.~ 5:1000. KSA lelephoI'H~: ,t9G6 (1.4) 3250992/3250993 ffa)(! ·.966 {14} 3250946 Em.all! t8tFy;1nbu~YJerl8t!Q5dent::(',.c()m
LoOcatiQm AI-Nawilonod Street. Hal AI·M;)".:ln (llstri<t. R.C•• Yanb-U At·,slnillyah

PROJECT: Neom desalination plant to !layal transmisssion system. (LD-O 1) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE: TP­ 02 DEPTH: 2.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt. SAMPLE NO.: 5-5
o
ENVT.COND.TEMP.: 24.2 C HUMIDITY: 36%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022
L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WT WATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....s:::: LL
.l!l
c:
o
U
~ PL
.l!l
rn
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER
NON·PLASTIC
WT DISH
WT DRY SOIL
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: _ _Saeed


___ Akhtar
_ __
-------
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
·CA•.:_l..;./U I, ~~ J:'~.) j ~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O, Box 30'271, Vanhu Al*S!n;:lIYOlh. MVAS 51000. KSA Tej~phone~ ,t9&5 (:14) 325(j<")~2 J 3250993 F.:nt: .966 {liS} 3250946 EmaU: ret>yanbl.l@etIBeosclC"hc~~_com
liJCM'Cf)l Al-Nawammd Sttu4t~ Hal AI-Mahan Dtstrict. R.e... Y.anbu N-5I'n"'vtlh

CLIENT: N£OM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system.(LD-01) DATE SAMPLED: 25.01.2022
SAMPLE SOURCE: TP­ 03 DEPTH: 1.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION:
----------------------------------­
Brown well graded SAND with silt ft gravel. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 23.4 DC HUMIDITY: 34%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....s::: LL
....s:::
Q)

o
U
... PL
....m
Q)

~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 4 CONTENT
No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AYE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------­ -----------­
Approved by: Awais Nisar Yasin

RGF·YAN·PHY·50Il-02-04
01-08·2021 Copy Rights Reserved By RGF
1!IGL:-L;../{JJ~~~if~.)I~
AnERI .vw RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Box :302:'11. Y3nbu At~sln~lvah~ MYAS 51000. KSA Telephone: +!l66 ('14) 3250992 J 3250993 f'BC! ·H)66 (14) :.nSO~:)46 Emalh rgt.y'():nbu(;.'tIcrls(:!o5cknces.com
loc.,Uon: AI-Naw.. n~nd Str~.at. Hal AI-M;)han District. H.C... Y.;.)nbu AHilnnly3h

PROJECT: Neom desalination plant to !layal transmisssion system. (LD-01) DATE SAMPLED: 25.01.2022
SAMPLE SOURCE: TP­ 03 DEPTH: 2.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt a: gravel. SAMPLE NO.: S-5
ENVT.COND.TEMP.: 23.7 DC HUMIDITY: 35%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %

....c: LL
2
c:
o
U
... PL
2III
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------- ---------
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL -02 -04


01-08-2021 Copy Rights Reserved By RGF
-Gl.::..-l;...rUI, ~~ J:'V.)f~
AnERI RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
PD. BoX 311271~ Y;mbu AI...slnaIY"3h. MYAS S1000.. KSA "TeiepttbnC: ·t966 {1.4) 31SCY":)92 / 3250993 4966 (14) 325094& Emall!fs1-y.:mbu@cdscosdenccli.com
locatlO1'lt At~Naw~nand StreQt, H"t AI~M3h<ln R.C.~ Y.mbu At·SlnnlY3h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to ;sayal transm;sss;on system. (LO-01) DATE SAMPLED: 26.01.2022
SAMPLE SOURCE: TP­ 04 DEPTH: O.60m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION:
----------------------------------­
Brown poorly graded SAND with silt. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 23.2
oC HUMIDITY: 34%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

..... LL
r::
.....
Q)

r::
o
U
.... PL
2n:l
S
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ --------­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOIL-02.-04
01-08-2.02.1 Copy Rights Reserved By RGF
Gl:.-l.;../U/~ ~~ t../~.)f~
An ERt Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. sox 30:n 1. vanbu At~sln3fy;ah," MVAS 51000.. KSA feiephone: +!)66 (:14) 3250992 / 3250!J!J3 F\lX: .. 966 (14) 3250946 Emi:llh rs.f.yanbu@NIa.coselel1tcs.com
LOCuUom I\I~N3w3nand Str0et# Hat AI~Mah<lo t}t$tri<::'t:~ R.C., Yanbu Al-SfnOl:iyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 26.01.2022
SAMPLE SOURCE: TP­ 04 DEPTH: 1.60m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION:
---------------------------------­
Brown silty SAND. SAMPLE NO.: B-3
ENVT. COND. TEMP.: --=2-=-3-:.8::ro'-C::------------:-:-H:7 IT=-y:-:------3-40- %­
D"7:
7":":-::1
UM
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WT WATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

,.., LL
t::
.e
t::
o
U
... PL
.ero
s:
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WT WATER gms
NON -PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------­ --------------­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOIL·02-04
01·08·2021 Copy Rights Reserved By RGF
r-"~--r=9'\itl=91·GL:-l;../(j I~ ~~ ~0.)'~
AnERlc.,m~,:,~' I~I RIYADH GEOTEC':NIQUE ~~OUN~ATJONS CO.
f).O. SO);! 302·11. Vanbu At..sln;IY3h~ MYAS 5:1000. KSA Tc.lephoM: -t966 (:14) 3250',)92 / 3250993 32~tJ946 Em:lll: r8f~y.mbuG...'OcrlBC()ldenc~~uom
FOol<': ..-966 (14)
location; A.·N:iwan~nd Street~ Hal AlooMtlhan O!strkt. R.C.,. Y,anlm AI·Sfna\yan

PROJECT: Neom desalination plant to !layal transmisssion system. (LO-01) DATE SAMPLED: 26.01.2022
SAMPLE SOURCE: TP­ 04 DEPTH: 2.S0m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION:
----------------------------------­
Brown well graded SAND with silt. SAMPLE NO.: S-6
ENVT.COND.TEMP.: 23.7 DC HUMIDITY: 36%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
SOIL + DISH

NON-PLASTIC
gms
gms
%

...
t:
LL
.l!lc:
o
(j
... PL
.l!lClI
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %

AVE. PLASTIC LIMIT

M.lrfan
Tested By: _ _ _ _ ___ Checked By/Reviewed By: Saeed Akhtar
---------­
Approved by: Awais Nisar Yasin

RGF-YAN· PHY -SOIL-02 -04


01-08-2021 Copy Rights Reserved By RGF
Gl:-L:,./(jI,~~jV)I~
- -- ....
AnERI RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. SO)( 30211. Vilobu Al.Sln~lyaJt. MYAS 51000.. KSA TefephonC'! ·t9S6 (14) 325009:2/32509'",;)3 f!))(! .966 (1.4) 32SU946 EmOllh rgt,yanbu@erlgcos<:icnces.com
locaHom AI-Nawanand Strt1!t:t, BOll At-Mtlh.al\ Of$ttict. R.C.~ Vanbtt AI-5lnaiyah

27.01.2022
SAMPLE SOURCE: TP­ 05 DEPTH: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND. B-1
ENVT.COND.TEMP.: 23.5 DC HUMIDITY: 34%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH
WT WET SOIL + DISH gms
WfDRY SOIL + DISH gms
NON-PLASTIC
gms
gms
gms
MOISTURE CONTENT %
NO. OF BLOWS

..... LL
c:
~
c:
o
U
... PL
~
III
$:
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
- - - + - - - - - - · · · · 1 - 1- - - - - - 1
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------ -------­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-50IL-02-04
01-08-2021 Copy Rights Reserved By RGF
~~=1Cl::-~{jI,~~~,-:?..JI~
AnERt RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
PD. Box 30271. Yanbu AI~SJnaly3h. MYAS S:1000~ KSA 'Telephone: -t966 (:14) 3250992/3250993 fax: 40!}66 (111) 3250946 Emalh r61~y;,')l1bu@ct!8cosdl!nces.com
locatton: "t-Nawanand Strl(lct. Haj Al-Mahan 01s:trict. R.C.~ Vanbu Al-Sinalyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system_(LO-01) DATE SAMPLED: 27.01.2022
SAMPLE SOURCE: TP­ 05 DEPTH: 1.00 m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION:
---------------------------------­
Brown silty SAND. SAMPLE NO.: B-2
ENVT. COND. TEMP.: -=2-=3""-:.6:-10"-C:----------""-:H:-:":U:-:-:M:-:-:I=-D=IT=-Y=-:------3-5%-0­
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIMIT
RUN NUMBER 1 2 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....t: LL
2t:
o
U
... PL
2<Il
~
Number of Blows N-P
PI

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.1rfan Checked By/Reviewed By: Saeed Akhtar


------ ----------------
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-OZ-04
01-08-2021 Copy Rights Reserved By RGF
P.O. So" 3Q271,. vanbuAt~Sjt'j~IY"h. MVA-"t 5:tOOO~ KSA ·Telcphorw~ -t966 (14) 3250"::}92/32S0!.l93 F;l)O:~ +966 (14) ~2S0946 Eman~ r8t~Y+lnbu@>crI8-cosdetH~::~!li.G:nm
location:: Af-N3wanond Street, H:ll AI-Mah;;ln otstriGt. R.C... YOlnl1U At Srt):)IY3h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
-----------------------------------------­
Neom desalination plant to gayal transmisssion system.(LD-01) DATE SAMPLED: 27.01.2022
SAMPLE SOURCE: TP­ 06 DEPTH: O.60m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 23.2 DC HUMIDITY: 36%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022
L I QUI D LIM I T
RUN NUMBER 2 3 4 5

NON-PLASTIC

....t: LL
....t:
Cll

o
U
... PL
.I!l
III
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER z 3 4 CONTENT
DISH No.
WT WET SOIL + DISH
I WT DRY SOIL + DISH gms
WTWATER
NON-PLASTIC
WT DISH
WT DRY SOIL
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: _ _ _ _ _ __
M.lrfan Checked By/Reviewed By: Saeed Akhtar
---------
Approved by: Awais Nisar Yasin

RGF-YAN-PHY -50IL-02-04
01-03-2021 Copy Rights Reserved By RGF
~~=> Cl.:-l.;../U I" :;::,7r.:J! J"~.) I ~
An ERI RIYADH GEOTECHN laUE & FOUNDATIONS co.
P.O. Sox 30;nl~ VanbuAl..sln~jY:ih. MVAS 51000. kSA "Tclt:ph()t'i{!~ ,t966 (1.4) 32S{Y..)92/3250993 F;,)(: ·.966 {14} 3250946 t;"malh r8t~Y.lt1bu@'erlseo..dp.ncC'!$,cam
lOC:ltibt'it AI-NOlW;.'Jot'iiHUJ Stt"j!.fit. t-I~J AI-Mahan ()tstfict~ R.C.~ Vonbu AI-SrOillyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01 ) DATE SAMPLED: 29.01.2022
SAMPLE SOURCE: Tp· 06 DEPTH : 1.10m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.: B·2
0
ENVT.COND.TEMP.: 24.3 C HUMIDITY: 36%
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIM IT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER
WT DISH
WT DRY SOIL
MOISTURE CONTENT
NO. OF BLOWS

.....s::: LL
.&
s:::
o
(j
... PL
.&
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
I-­ .~,~-~,~-------,-
WT DRY SOIL + DISH gms
WTWATER gms
NON -PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ --------------­
Approved by: Awais Nisar Yasin

RGF -YAN·PHY-SOIL·02-04
01-08'2021 Copy Rights Reserved By RGF
~~"""""'C-L:..-l.:-r(j IJ ~~ ~y~ I~
AnERt RIYADH GEOTECHNlaUE & FOUNDATIONS CO.
P.O. ao)!: 30271 p YanbuAt~Sjn~fyah. MVAS 5jOOO. KSA Tcjtphotlt!'! ,t966 (:14) 32509!J:2 J 3250993 fa)(~ '+966 (14) 3250!)-46 Em.:oll: r8t~y...nbuti'Pc"'lacosd~nC:II!$"com
l,.ee.;)tlQrH f\i~NaWOlnantt StrC".f!t.. Hal At-Mahan Otstrh::t, R.C.~ Yaobu AI·Slntl.'1ah

PROJECT: Neom desaUnation plant to gayal transm;sss;on system. (LD-D1) DATE SAMPLED:
SAMPLE SOURCE: TP­ 06 DEPTH: 2.00m DATE RECEIVED;
-31.01.2022
---­
SAMPLE DESCRIPTION:
-----------------­
Greyish Brown poorly graded SAND with silt 8: gravel. SAMPLE NO.: 5-6
ENVT.COND.TEMP.: 24.2 C
o HUMIDITY: 36%
--- -­
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

LIMIT
RUN NUMBER 2 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....c LL
.....c
(I)

o
()
.... PL
.i!lro
!'!
Number of Blows N-P
PI

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 4 CONTENT
DISH No.
_W_T_W_ET_S_O_IL_+_D_IS_H_ ......... _!'!l: __~_+__.___ .
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: _ _ _ _ _ __
M.lrfan Checked By/Reviewed By: _ _Saeed
___ _ __
Akhtar

Approved by: Awais Nisar Yasin

RGF·YAN·PHY·SOIL·02-04
01·08-2021 Copy Rights Reserved By RGF
P.O. (0)( 3027l., Y:II'"1bU At.Sin;lyah~ MYAS 5:1000.. KS,r., Tclephofl~: .. 966 (l.01) 3250992/3250993 H'I)(: .. 966 (l.4) 3.250946 Email: rBf.~yanbu@~rI8-C0:5C;~tlc.es.-com
I..oc.tltlon. ,r.,t-N",w;)nand Strcct, H;JI AI·MO)h;;ln oJs.trlct, R.C" Yoanbu Al-SlnalYi."Ih

CLIENT: NEOM. PROJECT NO.: 21J4037


---------------------------------------------------­
PROJECT: Neom desalination plant to !Sayal transmisssion system. (LD-01) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE: TP 03 DEPTH: 0.60 m DATE RECEIVING: 31.01.2022
SAMPLE DESCRIPTION:
----------------------------------­
Brown silty SAND. SAMPLE NO.: B-1
ENVT. CONDo TEMP.: -2-3-.2-0rrC------------H-U-M-I-D-IT-Y-:------3-4-0 %--­
STARTED DATE: 01.02.2022 DATE COMPLETED: 03.02.2022

L I QUI D LIMIT
RUN NUMBER 1 2 3 1 4 I 5
DISH No. F-4 F-10 K-10
WT WET SOIL + DISH gms 31.77 34.55 31.90
WT DRY SOIL + DISH gms 29.06 31.55 30.10
WTWATER gms 2.71 3.00 1.80
WT DISH gms 20.35 20.88 22.88
WT DRY SOIL gms 8.71 10.67 7.22
MOISTURE CONTENT % 31.11 28.12 24.93
NO. OF BLOWS 16 24 34

...... 36.00 LL 28
c:
~ 32.00
<3.... 28.00
PL 22
ro
(l)
24.00
5: 20.00
Number of Blows PI 6

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DiSH No. P-4 P-3
WT WET SOIL + DISH gms 29.85 32.56
WT DRY SOIL + DISH gms 27.66 29.75
WTWATER gms 2.19 2.81
WT DISH gms 17.50 17.25
WT DRY SOIL gms 10.16 12.50
MOISTURE CONTENT % 21.56 22.48
PLASTIC LIMIT 22.02
AVE. PLASTIC LIMIT 22

Tested By: M.IRFAN Checked By/Reviewed By: Saeed Akhtar


-----------­ ---------------­
Approved by: Awais Nisar Yasin
RGF -YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
Cl:-l;./Ul~ ~~ j~)!~
An ERI Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Hex 302'11, y;anbtJ At.sr»~Iy;th~ MYM Sl000~ )(SA T('It'phon~ --f966 (14) 3250992/ ,3250993 F:t)I:! .~Hl6 (14' a2:S0946" £rwaH:; tgl",yz,nbu@.t:tl8,co1den«rt.,tbnl
lOCllUoot Al-"N3Wilnand SUt'<tt, Hill Aj-Ml1h~1l Oktd""t, n.c~ vanhou Ai-Sjn-"iy~h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to $layal transm;sss;on system. (LD·01 ) DATE SAMPLED: 2410112022
SOURCE: TP; 01 DEPTH: O.60m DATE RECEIVING: 31.01.2022
SAMPLE DESCRIPTION: Brown Poorly graded SAND. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: HUMIDITY: 33%
DATE STARTED 03.2.2022 DATE COMPLETED: 4.2.2022
MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 1 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 5845 5975 6065 6056 5985
WEIGHT OF WET SOIL gms 1683.0 1813.0 1903.0 1894.0 1823.0
WET DENSITY gm/cc 1.803 1.943 2.039 2.029 1.953

CAN NO. B-6 B-3 0-5 A-6 M-3


WT. SOIL + CAN (WET) gms 422.30 435.70 441.85 440.32 429.54
WT. SOIL + CAN (DRY) gms 414.58 419.78 418.65 409.88 395.20
WI. OF WATER gms 7.72 15.92 23.20 30.44 34.34
WT.OFCAN gms 39.20 40.22 39,85 40.65 41.52
WT. OF DRY SOIL gms 375.4 379.6 378.8 369.2
WATER CONTENT % 2.06 4.19 6.12 8.24
DRY DENSITY gm/cc 1.77 1.86 1.92 1.87

1.94

1.92
MAX. DRY DENSITY gm/cc: 1.92
1.90 / '\
OPT. MOISTURE CONTENT % : 6. 12
1.88
/ I
\
~
0
E 1.86 I \
Remarks: Method "A" is used
Ol


l- 1.84 I \
iii
z
w
0 1.82
/
I
>­DC
0 1.80 \
Tested by: M.IRFAN 1.78
/ \
-----
Checked BylReviewed By: 1.76
I
Saeed Akhtar
1.74
1 3 5 7 9 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
F· YNB·PHY·SOll·03·04
·CA.:_~(JI, ~~ J't;.;)r~
RIYADH G~OTECHN1QUE &. FOUNDATIONS co.
P.O. 80)( 30271J Yilobu AJ"Sfn;lyah# MYA$ S1000.. KBJ-\ Tel&phorw: ·,965 (l.t) .:i2S099'2; /32SM93 ,,~! 49~fi (14) $15.094($ fma,lh '-8f"yahbulkP'.I!r;8~~nces,tt}m
lO{~Uoo~ AJ-N;)w.ammd SticelJ- Hat At-Mahtln D;sbftl~ 11.'('1 Ywnbu A!-$JNI~~h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
-------------------------------------------­
Neom desalination plant to gayal transmisssion system.(LD-Ot) DATE SAMPLED: 24/112022
SOURCE: TP: 02 DEPTH: 0.60 m DATE RECEIVING: 31.01.2022
--­ ----­
SAMPLE DESCRIPTION: Brown Poorly graded SAND with silt . SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.8 O( HUMIDITY: 36%

DATE STARTED 3.02.2022 DATE COMPLETED: 04.02.2022


MOULD NO: CR-63 WEIGHT OF MOULD: 4162
------------------
VOL. OF MOULD: 933.24 ec.

2 3 4 5
R ADDED % 2% 4% 6% 8% 10%
IL + MOULD (WET) gms 5916 5987 6081 6089 6065
T OF WET SOIL gms 1754.0 1825.0 1919.0 1927.0 1903.0
SITY gm/cc 1.879 1.956 2.056 2.065 2.039
CAN NO. A-3 A-10 K-10 5-3 A-6
WT. SOIL + CAN (WET) gms 415.33 429.56 450.36 434.27 437.89
WT. SOIL + CAN (DRY) gms 408.33 416.48 426.85 403.28 401.88
WT.OFWATER g 13.08 23.51 30.99 36.01
WT. OF CAN gms 37.54 40.75 40.55 41.88
gms 378.9 386.1 362.7 360.0
% 1.88 3.45 6.09 8.54 10.00
gm/cc 1.84 1.89 1.94 1.90 1.85

1.97

MAX. DRY DENSITY gm/cc: 1.94 1.95


;'
OPT. MOISTURE CONTENT %: 6.09
1.93
" /' ~
~
u
/ /
\ 1\
§, 1.91

Remarks: Method "A" is used r>­


(j)
z
w 1.89
j \
/ \
0

(t
0
1.87

Tested by:
Checked By/Reviewed By:
M.ARFAN
1.85
<1?
II \
Saeed Akhtar
1.83
o 2 4 6 8 10 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
F· YNB·PHY·SOll·OJ·04
~~- ~ J Ij ••;..J~
·r'" I - ( - "'U" J .. '"
"'"'-'''--''~ ~ "...,"" ~ ~ V ..
,#1'-",.I""
'
r­ '
...
I

RIYADH GEOTECHNIQUE & FOUNDATIONS CO.


P.O. Dt»)( 30211. Y;)nbu N.Sh)~ty~h. MYAS 51000~ ~SA Tt!,~pht'H'Je~ +966 tl<1) <!2S0991/S25099:l FJ)):! -+966 {loll} 3250946 fm~lI! r8.t..y.:mbH@f!t~Mdence!.t:orli
lo<:aUot,,: A)-N\lwammd StJ1ltt... H-al Al..fvhlUln Ohtrfct., A.C•• Volflbu A'~S'n.a'v.ah

CLIENT: NEOM. PROJECT NO.: 21J4037


----------~--------------------
PROJECT: Neom desalination plant to sayal transmisssion system. (LO-01 ) DATE SAMPLED: 2510112022
SOURCE: TP: 03 DEPTH: 1.00 m DATE RECEIVING: 3110112022
SAMPLE DESCRIPTION: Brown well graded SAND with silt 8: gravel. SAMPLE NO.: B-2
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.6·C HUMIDITY: 36%

DATE STARTED 02-03-22 DATE COMPLETED: 02-04-22


MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 1 2 3 4 5
WATER ADDED % Z% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 5978 6054 6150 6155 6125
WEIGHT OF WET SOIL gms 1816.0 189Z.0 1988.0 1993.0 1963.0
WET DENSITY gm/cc 1.946 Z.027 Z.130 2.136 2.103

CAl'-! NO. T-3 F-7 P-3 A-10 P-3


WT _ SOIL + CAN (WET) gms 421.60 434.65 449.36 438.50 442.60
WT. SOIL + CAN (DRY) gms 413.85 421.25 425.90 408.33 406.90
WT.OFWATER gms 7.75 13.40 23.46 30.17 35.70
WT.OFCAN gms 41.25 43.21 39.65 41.78 36.87
WT. OF DRY SOIL gms 372.6 378.0 386.3 366.6 370.0
WATER CONTENT % 2.08 3.54 6.07 8.23 9.65
DRY DENSITY f!m/cc 1.91 1.96 2.01 1.97 1.92

2.04

2.02
MAX. DRY DENSITY gm/cc: 2.01
OPT. MOISTURE CONTENT %: 6.07 2.00 - /~
1!E 1.98
/
/ \
Remarks: Method He is used
(J)

i': 1.96 / \
CM.D.D =2.06'1/cc
U5
z
III
! \
~ 1.94
CO.M.C =5.35 % 0::
0
1.92 / \'I'
Tested by: WISAL
--------
Checked By/Reviewed By: 1.90
I
Saeed Akhtar
1.88
2 3 4 5 6 7 8 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
YNB -PHY·SOIL·03-04
P.O. Rox a02}1, y~l)buAJxSln;tyahl MYA'5. 51000. KSA Td~phc>n.f': ·~966 (14)325.0992./ 315(}<:)9] f.i)x: +966 (14) 3250946 [m~1)! rg'~y:lI)bu@etlg~o.sd~nc~u::om
Loc~tlQn~ AJ~Nawlln~nd Str~et,Hal AI-M<)h;}n Oh1rkt, A.c., Y~nbu Al-S1na!yJh

~rc~~ff~="

CLIENT: NEOM. PROJECT NO.: 21)4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-1 ) DATE SAMPLED: 26.01.2022
SOURCE: TP: 04 DEPTH: 0.60 m DATE RECEIVING: 31.01.2022
------
SAMPLE DESCRIPTION: Brown poorly graded SAND with sil t . SAMPLE NO.: 8-1
SAMPLED BY: RGF
~~~------------

ENVT. CONDo TEMP: 24.4 °C HUMIDITY: 37%


DATE STARTED 02-03-22 DATE COMPLETED: 02-04-22
MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 5920 5995 6070 6085 6066
WEIGHT OF WET SOIL gms 1758.0 1833.0 1908.0 1923.0 1904.0
WET DENSITY gm/cc 1.884 1.964 2.044 2.061 2.040

CAN NO. B-7 B-5 K-10 A-1 A-5


WT. SOIL + CAN (WET) gms 419.60 429.88 448.66 433.88 439.33
WT. SOIL + CAN (DRY) gms 413.25 416.77 425.27 403.85 402.85
WT.OFWATER gms 6.35 13.11 23.39 30.03 36.48
WT. OF CAN gms 38.54 36.57 39.42 41.22 41.15
WT. OF DRY SOIL gms 374.7 380.2 385.9 362.6 361.7
WATER CONTENT % 1.69 3.45 6.06 8.28 10.09
DRY DENSITY gm/cc 1.85 1.90 1.93 1.90 1.85

~'
MAX. DRY DENSITY gm/cc: 1.93 ~~
1.92
OPT. MOISTURE CONTENT % : 6.06
/ \
\
::i
E 1.90
/ ~
Remarks: Method "A" is used
(J)

i'::
UJ
II \
z
~ 1.88
/

Tested by: _ _A.AZIZ


_ _ __
&:o

1.86
II \
Checked By/Reviewed By: / ~
Saeed Akhtar
1.84 '------

2 3 4 5 6 7 8 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
F- YNB-PHY-50IL-03-04
t:.t.;.. l.;../U I" ~~ c/~) I ~
':::':":::=-=..:.:::.:.:!:::2.1~==~ RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. (10)( 302"11. YlU'lbu AJ.Slt~;lyah.; MYA~ 51000~ KSA ·l£!)~ptlone: +966 (.1 It) 3250992-/3250993 f;.lx: +966 (14) 32S0946 Ernllll: r8'~Y.k1nbu@erre:~nS(JeflC.e!",Com
l(K,aOQn~ .N~Na.w;mi}nd -Stf~lIl't. Hvl AI-Milh.m Ohtrkt". R,c•• Yvobu At-S1n.. ly.Jh

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system.(LO-1) DATE SAMPLED: 2711/2022
SOURCE: TP: 05 DEPTH: 1.00 m DATE RECEIVING: 31.01.2022
SAMPLE DESCRIPTION: Light Brown Silty SAND. SAMPLE NO.: 8-2
SAMPLED BY: RGF
~~~-------------------

ENVT. CONDo TEMP: 23.3 °C HUMIDITY: 36%


----------
DATE STARTED 02-03·22 DATE COMPLETED: 02-04-22
MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 6011 6078 6165 6175 6165
WEIGHT OF WET SOIL gms 1849.0 1916.0 2003.0 2013.0 2003.0
WET DENSITY gm/cc 1.981 2.053 2.146 2.157 2.146
CAN NO. A-4 A-5 F-5 A-10 A-5
WT. SOIL + CAN (WET) gms 418.66 422.55 453.20 438.70 438.66
WT. SOIL + CAN (DRY) gms 410.56 408.66 429.66 408.36 401.55
WT. OF WATER gms 8.10 13.89 23.54 30.34 37.11
WT. OF CAN gms 40.32 38.55 39.65 42.15 40.85
WT. OF DRY SOIL gms 370.2 370.1 390.0 366.2 360.7
WATER CONTENT % 2.19 3.75 6.04 8.28 10.29
DRY DENSITY gm/cc 1.94 1.98 2.02 1.99 1.95

2.04

2.03
MAX. DRY DENSITY gm/cc: 2.02 ....
2.02 /' ~
OPT. MOISTURE CONTENT %: 6.04
2.01
/ \
U
u 2.00
/ \
\
E
Ol 1.99 -­ / \ f------­
Remarks: Method UK is used

t::
\
r
if) j
z 1.98
w
0
\
>­ 1.97
0::
0
1.96 1/ 1\
Tested by: JAMSHID ALI 1.95 / \
Checked By/Reviewed By:
1.94 /
10/
\$>

Saeed Akhtar
1.93
2 3 4 5 6 7 8 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
IRr,F- YNR - PHY ·501 L·03·04
~~.CL-~{;.}J~~J.l;-.)I~
::::..::::..:.:..:.::::'~=====~ RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. [lox 302111 Yaobu AJ",Sln;l'1;;}hl MYAS Sl000~ KS).\ T~h:'ph01)t'~ -f966 (14) 32S0992/.325~)93 r~)(! °'"966 {14} 3250946 El'I)"31J: tg,,,,y;::,nbu"@~tI8eOM:~J~n«!s.com
loc.<IUCtfn .A1-NlJw;.Hltlnd S1rC~1.., !-fiJl A}-Mo:Ihan DbMitt f R.C" Y30bu AI-Sln-.."ly.ah
-" '"!i-;".',ifZ~;nq·{,,.}:,-Jh.M';:. ,tiffi:;i:<t.:im'lh"~*l:iI,Qo"'~%~""''''';X'*~''?fi>..{~i<>''''

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to !Sayal transmisssion system.ILD-01) DATE SAMPLED: 29/01/2022
SOURCE: TP: 06 DEPTH: 0.60 m DATE RECEIVING: 31.01.2022
----­
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 23.8 °C HUMIDITY: 38%
DATE STARTED 03.2.2022 DATE COMPLETED: 04.2.2022
MOULD NO: CR-62 WEIGHT OF MOULD:
------------------
4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 5965 6035 6122 6125 6122
WEIGHT OF WET SOIL gms 1803.0 1873.0 1960.0 1963.0 1960.0
WET DENSITY gm/cc 1. 932 2.007 2.100 2.103 2.100
CAN NO. A-10 6-10 P-10 P-10 6-2
WT. SOIL + CAN (WET) gms 421.99 433.62 444.60 435.26 438.99
WT. SOIL + CAN (DRY) gms 410.78 416.57 418.36 402.55 398.90
WT.OFWATER gms 11.21 17.05 26.24 32.71 40.09
WT. OF CAN gms 41.55 41.30 39.55 42.88 43.25
WT. OF DRY SOIL gms 369.2 375.3 378.8 359.7 355.7
WATER CONTENT % 3.04 4.54 6.93 9.09 11.27
DRY DENSITY gm/cc 1.88 1.92 1.96 1.93 1.89

2.00

MAX. DRY DENSITY gm/cc: 1.96 1.98

OPT. MOISTURE CONTENT %: 6.93 .....


1.96 /" ---.....

'"
~
u
u


1.94 / 1\\
Remarks: Method "'A"' is used I-
iii
z
w 1.92
j \
0

0::
0
1.90
I \
~~
Tested by: M.TUFAIL
Checked By/Reviewed By:
1.88
/
Saeed Akhtar
1.86
2 3 4 5 6 7 8 9 10 11 12
MOISTURE CONTENT %
App roved By:
Awais Nisar Yasin
-c...-L..-~(f/.!' i f l.:?...J I ~
RIVADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. noX 30271... V::tnbu .r.I.Sfh;'lyah~ M"'A..~ S1iO()()~ KSA Tele-.phonel ·.966 (:14) a2.s.&<)<)2':.I3;;l'SO"~lc'''3 :~~S()j}"6
f'>3.lr<! d)S6 (14) J:rn:Jll! 'e'~y~l.nb.jl(pe .. lg",o'll:;:~n.!;ot!"1;.~(:>rn
t.oc,.."JOt'lo: AI·Nii_..n.otnd -5lT~t'I~ ttaJ AI.M.,.h<ul t~b~,kt. J:(,C,. y<,r"hu AI·~h~.,ly"h

~:-~:-~-'Ai:~~

21J4037
CLIENT: ~N~E~O~M~.~_ _ _ _ _-:-:--===-:=~~~_ PROJECT NO.:
PROJECT: Neom desalination plant to gayal transmisssion system.{LD-01) DATE SAMPLED: 24.01.2022
SAMPLE SOURCE: TP NO -01 Depth: 0.60m DATE RECEIVED: 31.01.2022
DAMI'Lt. DESCRIPYION: Brown poorly graded SAND.

ENVT. CONDo TEMP: 24.6·C HUMIDITY: _ _ _35%


_ _ __ SAMPLE NO.: 8-1

TEST STARTED DATE: 4.02.2022 TEST COMPLETED DATE: 6.02.2022

DETERMINATION No. 2 3
I
BOTTLE No. A-I B-2

WT. OF BOTTLE + WATER (gm) W1 358.9 360.8

WT. OF BOTTLE+ WATER + SOIL (gm) W2 394.8 394.9

ERATURE (0C) T 25.0 24.0

EVAPORATING DISH No. B-3 A-2

WT. OF DISH + DRY SOIL (gm) A 75.5 73.9

WT. OF DISH (gm) B 18.2 19.5

WT. OF SOIL (gm) A-B Ws 57.30 54.40

SPECIFIC GRAVITY OF WATER AT T GT 0.99705 0.99730

SPECIFIC GRAVITY OF SOIL Gs 2.670 2.673

G.~. =c AVERAGE SPECIFIC GRAVITY (G s) : 2.671


W\. +WI -W2

REMARKS: Method B is Used


- ---- --- ------

TESTED BY: M.IRFAN CHECKED BY I REVIEWED BY : Saeed Akhtar


-----------
Approved By: Awais Nisar Yasin

RGF·Ylm-PHY -SOIL-10-04
01.08.2021 Copy Rights Reserved By RGF
-c:.:..-l.:-~(; I~ :: _~ + ~;.;y t-/ I..:?..,J f ~
RIVADH GEOTECHNIQUE & FOUNDATIONS CO.

Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 25.01.2022
TP NO -03 Depth: 0.60m DATE RECEIVED: 31.01.2022
I:>AMi"'L"'- DESCRIPYION: Brown silty SAND.
• CONDo TEMP: 23.6°C HUMIDITY: _ _ _35%
_ _ __ SAMPLE NO.: 8-1

TEST STARTED DATE: 4.02.2022 TEST COMPLETED DATE: 6.02.2022

DETERMINATION No. 1 2 3

BOTTLE No. A-2 B-3

OF BOTTLE + WATER (gm) W1 358.9 356.7

OF BOTILE+ WATER + SOIL (gm) Wz 393.3 392.2

RATURE (0C) T 25.0 24.0

EVAPORATING DISH No. B-3 A-2

WT. OF DISH + DRY SOIL (gm) A 71.5 73.8

WT. OF DISH (gm) B 16.8 17.3

WT. OF SOIL (gm) A·B Ws 54.70 56.50

SPECIFIC GRAVITY OF WATER AT T GT I 0.99705 I 0.99730

SPECIFIC GRAVITY OF SOIL Gs 2.687 2.683

G T x H'.';
Gs AVERAGE SPECIFIC GRAVITY (G s) : 2.685
w.\.+ W. - W 2

REMARKS: Method B is Used

... -.'---.-.-~.----------

OBY: M.IRFAN CHECKED BY / REVIEWED BY : Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF ·YNB·PHY·SOIL·10·04
01.08.2021 Copy Rights Reserved By RGF
A i f0..) , ~
f·.t.~
f
Do.x:ilOlt7j,,,
An ERICom"""y
Y'.~nbuAhsin.;lyah,. MVA.,"J; S'1{){)c'). f($A
-c.."L-l.;:.--(JI-' ::
RIYADH GEOTECHNIOUE
T('I~phl';ll\('l1 "~9().G {t<'l) :;\:I'509'!):I' I :l'2sorr.':~3
to +.:7
Foltx! ;!)fi6 (14) :l25l)!)'Hi
;'~OUN~ATIONS CO.
r4'Y\~'H: 'tl''''i;1tnt>ul%9-... r~a'''~'(>n£oe'\,(',.".".
lUfflil\lont Al·N,:,.wantll'~d ~U(ltJl., II~\I A~·MliIOh"l) i)!lot.. kt. R.(;" Y3nbu Al·t.'1f'':'~y4h

PROJECT: Neom desalination plant to gayal transmisssion system.(LD-01) DATE SAMPLED: 27.01.2022
SAMPLE SOURCE: TP NO -05 Depth: 0.50m DATE RECEIVED: 31.01.2022
SAMPLE DESCRIPYION: Brown poorly graded SAND.
ENVT. CONDo TEMP: 23.9°C HUMIDITY: _ _ _36%
_ _ __ SAMPLE NO.: 5-2

TEST STARTED DATE: 4.02.2022 TEST COMPLETED DATE: 6.02.2022

NATION No. 1 2 3

No. A-2 B-3

W1 358.9 356.7

· OF BOTILE+ WATER + SOIL (gm) I W2 392.4 390.7

I
T 25.0 24.0

B-3 A-2

· OF DISH + DRY SOIL (gm) A 68.9 70.5

· OF DISH (gm) B 15.3 16.2

W 53.60 54.30

FIC GRAVITY OF WATER AT T GT 0.99705 0.99730

Gs 2.659 2.668

Gs AVERAGE SPECIFIC GRAVITY (Gs) : 2.663


W,+~ f/V2

REMARKS: Method
... ..
~ ..~
B is Used
~- ....-"-.-- ....
~.~~.-- -~.- .... ,,.~-- ..... ~.~--. -~.-~.~ .. ~~.~~. ----..­ ........- .... ~-.

TED BY: JAMSHID ALI CHECKED BY I REVIEWED BY : Saeed Akhtar


--------------------­
Approved By: Awais Nisar Yasin

RGF ·YNB·PHY ·SOIL·10·04


01.08.2021 Copy Rights Reserved By RGF
'f 1:81 "
', -'" ,- I -;;; . -.7 A J -, I, -
"'"''';:''' "'"'' '~'~"" I....--I....::-L,/U ,~r";'C V '--"/ ;:.,J~
..~.I~J RIYADH GEOTECHNIQUE &~OUN';ATION5 CO.
j > ;:. r ."-",
At\'~ @ (1)-",,~~_~_-=~_._
P. Q, Dox.3Q271, YanbU N SfM~oh. H!l.YAS 51000 ~dl AnWI8,. Tel. No. +9(j.f.>-.H-J25Q99:l/J, fax NQ. +9('G-14-:)2S091c;., f.:-1t);')1I: ,gf·~rJb<.j~P.ttg«l~.r;t'-s,rom
.l#~ii: fI.I-Nah<"o'l'm~d Strcct... Hull At·MMOO msrtTli:t. UP Af.CiJ R;C YM•.b u ~.S!.n~".h K~ C&rtme:na tw.r 1<: -S't'J4

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 24101/2022
-------1
SAMPLE SOURCE: TP: 01 DEPTH: 0.60m DATE RECEIVED: 31/01/2022
-------
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.:
SAMPLED BY: RGF
-----------------------
ENVT. CONDo TEMP. 24.5°C HUMIDITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

Mould No: K-1 Weight: 6390 gms Volume: 2110 cc

Soaked CBR 96 Hrs

4S0

Bear~ 400 .....


in value Ratio
~
(lb/inL' (Cor.CBR) I N
.5
:c
3S0
/
300
Ql
2S0 /
.2
ro V
> 200 ~.~~~
/ f----
OJ
c
'i::::
ro
1S0
V
/ AT 0.2"

m
Ql

100 /
SO
;/ AT 0.1"

0
1/
0.0 0.1 0.2 0.3 0.4 O.S
Penetration (in)
0.5000 135 I 410
Remarks: C.MDD = 1.92 g/cc CBR @ 90 % Compaction at 0.1" 13
C.OMC = 6.12 % CBR @ 90 % Compaction at 0.2" 15
TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF· YNI3·PHY· SOIL·05·04


01.08.2021 APPROVED BY: C~fl.sIlliJWlie'lfa?fn;F
. CL.-t..;.--V I., ~--~;;':"
Ai t./V.·-V. I~
~-
RI'VADHGEOTECHNraUE & FOUNDATIONS CO.
~/ .. -
All EOJ:c,;",,,,,ny
• Q; l).})t JJ;)271,-Y~nl\lJ-N SInOI)'ut>.. M~YAS,SlO(}O.~1jI~ 00, NQ, +9G.'(>_~H·)2S0!r921J,l-a.'>( No, __ +~(;G~~:t<)2S~J94G,_ € .. mall: tolJf"'I¥1PIJ~.efYJWI!lt:Ier.«'$.0#J\
Hi'!!
-,",o~fi6n: ~'NiiI}~~ street., At·Mnh:on D~. UP. Area (t,c Yaribu .i*$:lna1ynh K~ (;PrthkotefWo.r YC: .aliJ4

CfJR·2

Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED:


--------------~
TP: 1 DEPTH: O.60m DATE RECEIVED: 31/0112022
DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.: B-1
LED BY: RGF
----------------------------­
24SC HUMIDITY: 35%
04-02-22 DATE COMPLETED: 08-02·22
Mould No: K-2 Weight: 6378 Volume: 2111 cc

Soaked CBR 96 Hrs

700

Penitration Bear~ng I 600


RatIO
(Cor.CBR)
500
/~
Q> 400
V
::l
iii
> 300
V
/
OJ
r:: AT 0.2"
'i:
'"
Q>
CO
200

100 ./ AT 0,1"

o V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR@ 95 % 18
6.12 CBR @ 95 % Compaction at 0.2" 21
TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar
---------------------
RGF· YNB·PHY·SOIL ·05·04
01.08,2021 APPROVED BY: c~~l,(~(1,(je}f1'j,(it6F
f l~m v~~· ~~H~~~~~;NI;;::t:~~~
~~~-

(iD~
~f
Eftl
An Compony .;;.;;;::;;;;.':".;;;'Mb;;;
p~ o. UoQx ]0271. Y.I:mbU NS!ni.\lye-fl..M,A,YAS,SJ,OOO~' NOOI<t. T~. ~. +9~r,.-H-.125Q9'92fJ. Fa=< "l{I, +9"i;-J.4-31SI)'?J-<1~~, s.~~rTl1.'l11: '\:Jf-Ylml:".I-@~IOIXI.I{:I:~-t',fX"J.rorn
.~!Qn: AJ.!'.t~lh~nd S1:r~ l-\nil AI,Milh;:lfl D~trk;t;. UP J\rC'.<1 R,C Yoo.hu Al·~oaly"h K:SA., Ce-rtIDn:te N.o.r jC ~:r.u:4

PROJECT: Neom desalination plant to gayal transmisssion system. (LO-O 1) DATE SAMPLED:
--------1
SAMPLE SOURCE: M-TP: 1 DEPTH: 0.60m DATE RECEIVED: 31/01/2022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.: B-1
SAMPLED BY: RGF
ENVT. CONDo TEMP. 24.5°C HUMIDITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No.: K·3 Weight: 6365 gms. Volume: 2109 ee
--------

Soaked CBR 96Hrs

.,.- ........ 800


Peni Load Bearing Bearing
700
/
value Ratio V
(Ib/in·' (Cor.CBR) '"c 600 /
:a
/"
/
500

>
(j)
.2
co 400
/
OJ
c
·c 300
/ 'T no"
co
(j)
/
/
ro 200

100 / AT n "

0 V I

0.0 0.1 0.2 0.3 0.4 0.5


Penetration (in)

Remarks: C.MDD = 1.92 g/ee CBR @ 100 % Compaction at 0.1" 24


C.OMC = 6.12 % CBR @ 100 % Compaction at 0.2" 28

TESTED BY: M IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF·YNB·PHY·SO""Ir-L·Tn05""'·O""~-----------

01.08.2021 APPROVED BY: c~a/Mi~g(;eh5Wifh


I

.~ .. ',j-r~/
f v" . "I
---"1ft'Il,.,...'l:-VV ~~~~V\.....-'/I;;J.....--
An~~1 ~~:'Y1~JiJJ RIYADH GEOTECHNIQUe '& ~ OUN';AT10NS CO.
_I< 11 '/

P. Q. Dolt-30271. YMbu p.J ~'ah. MAVAS 51000 S&VdJ NW1i:J, Tet. N». ---g&&·14<;t2smUJ, rex 1;.0., +?/,,A;·14·;.tl.50:9>1t;, E·frulInof·y,t>(;'bI),,?e<1o;t?oStl!!t)~«lrll
.. :Li-..pK~")fl; ,~H~.".voo-d $!to:-t. ~ i.H1il~'i bhttt,1ct:. UP A?('£< ~"c V~J AI·~{I!~ !($A. r;e~Ho.:'fC.a1U

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
CLIENT NEOM . .. PROJECT NO: 21J4037
PROJ ECT: Neom desalination plant to gayal transm;sss;on system. (LD-01) DATE SAMPLED: 24/0112022
SAMPLE SOURCE: TP: 1 DEPTH: 0.60m DATE RECEIVED: 31/01/2022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.: 8-1
ENVT. CONDo TEMP. 24.S0C HUMADITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

1.95 MAXIMUM DRY DENSITY: 1.92 glee


.
OPT. MOISTURE CONTENT: 6.12 %

1.90
..
L
1.85
V
/ PENETRATION AT:

CBR at 100% of MDD:


0.1"

24

1.80 / CBR at 95% of MDD: 18

1.75
/
/ CBR at 90% of MDD: 13

TESTED BY: M.IRFAN


1.70
10 14 18 22 26
Axis Title CHECKED BYIREVIEWED BY:
Saeed Akhtar

APPROVED BY; Awa;s Nisar Yasin

RGF-YNB· PHY· SOIL· 05·04


01,08.2021 Copy Rights Reserved fly RGF
f Eftll !"Ill~;;~~~.1!fuN';;;:~~~
~"-cc.cC~~!:!'.~...........• ~.
p,O.I),x)I)-l7-L yU!tnJNS!Jl~lyW,HJ\.YAS:&lOOQt;tt\J(1!~~ lei. til>_ l1ltS·j,4 :;US(.\9!)#}).f'v,'!I'f? <:OC' It )"'5=O~H(... elt'l:!ltt::~~~w@C'n\)cl!~~QmM'm
lOG,'<tlOn; AHWwo'0l}d stn:ef-, HliIi AI Mi?itll)l'l: !)<srtrid. UP' HCO RJ: Y.mhu ,*Sin..W8i ~ C~HIM1C"7t1t

TEST REPORT

..
C.B.R. - DENSITY RELATIONSHIP
CLIENT NEOM . PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gaya{ transmisssion system. (LD-O 1) DATE SAMPLED: 24/0112022
SAMPLE SOURCE: TP: 1 DEPTH: 0.60m DATE RECEIVED: 31/0112022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.5 QC HUMADITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

MAXIMUM DRY DENSITY: 1.92 glee


1.95
OPT. MOISTURE CONTENT: 6.12 %

1.90
PENETRATION AT: 0.2"

1.85 CBR at 100% of MDD: 28

CBR at 95% of MOD: 21


1.80
CBR at 90% of MOD: 15

1.75

1.70 TESTED BY: M.IRFAN


10 15 20 25 30
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar

RGF· YNB-PHY-SOIL-05-04
01.08.2021 Copy Rights Reserved By RGF
Gl::-l.;./(JI, ~~ ify.)l~
An EBI ~J)iuly RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
,.~o. il~ ~;Z,~,Y"l'lw'At~i1;,h~ M'lAS,$1bOO. io;5J\ 1f:~Ph~; t!)tjfj {-14} :j)2~ll a2~~ ,fjJlI: +-;fi!; (loll :nsrnM6 (ID-311: ret<YiMbu€P'e.16c~tMt:;6,OOIl'l
1(){~lk>\'lo1Al,NaW,l"fJlld :SU~i';t~ tfaIAJ<M.lh;Jft
Pf).ukt" iq;..., Y~Hibt.i N~i';~h
C8R·1

Neom desalination transmisssion system. 24/01/2022


SAMPLE SOURCE: TP: 02 DEPTH: 0.60 m DATE RECEIVED:
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.:
--------1
SAMPLED BY: RGF
ENVT. CONDo TEMP.------=23~.3:-o-:::C-------:-H-:-:-U-:-:-M:-:-:ID:-:-ITY=-=-:--3-5%-o-
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

Mould No: M-1 Weight: 6460 gms Volume: 2111 cc

Soaked CBR 96 Hrs

600
tl.IA
Penitration Bearing Bearing
in value Ratio 500 ----'
(lb/in LI ~
(Cor.CBR)
---t ;9 400 /
OJ
:::;
;;;
>
300
V
/
O'l
c:
.;: 200 / liT n 7"
I':l
OJ
CIl /
100 / AT 0.1"

0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 174 528
Remarks:

TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF· YNB·PHY·SOIL·05·04
01.08.2021 APPROVED BY: C~Qshifflalie}fa~ili,F
~~Gl.::rL:/UI,:.~ ·;:;.0'ifl:?)'~
==-=::.:!:=!...!~~~ RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P~o. 80)4" ::W11.1~ YltllUlJ At~SJn;rVj}h~ MYA~ $1000. J<SA tel~n(!o:. -t96O (lit) 3210'-;92 I 32SO<YJJ (;Jl(: ~966 (14) )2$0946 (man: tllr<y~nbuWeTlseMcte-oc:c:\,wm
loc..;lUnn: At.N.1W.lnarul &ltf!@'L HOli hJ-.M::&.h~n [)I-!;Irk-~. R.C. Yanlm .1H.S1n..'lwah

C8R-2

PROJECT: Neom desalination plant to !layal transmisssion system. (LD-01) DATE SAMPLED:
--------1
SAMPLE SOURCE: TP: 2 DEPTH: 0.60 m DATE RECEIVED: 31/01/2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.: B-1
SAMPLED BY: RGF
-------------------
ENVT. CONDo TEMP. 73_3°C HUMIDITY: 35%
-------- ---
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No: M-7 Weight: 6385 gms. Volume: 2108 cc

Soaked CBR 96 Hrs

Penitration Load Bearing Bearing


value Ratio
--r­
(lb/inL) (Cor.CBR)
v----
7
1.,,-/
/
/'
V AT 0.2"

/ AT 0.1"

l/ - -

0.0 0.1 0.2 0.3 0.4 0_5


Penetration (in)

Remarks: C.MDD = 1.94 g/cc CI3R @ 95 % Compaction at 0.1"' = 21


C.OMC = 6.09 % CBR @ 95 % Compaction at 0.2" = 24
TESTED BY: WIr:;AI KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar
-----------­
RGF- YNB-PHY-SOIL-05-04
01.08.2021 APPROVED BY: co&vY&l'tsl)(i~~lje"1J{lyi~F

I ~- " "GL.A..:../VI!J~AJ'(.;.;.)'~
- ...... ...
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P..d. eOl{ 3ol:1.L V-Jn"bl,l AloSln;iy.lh.,. MVM S1tlOO" ~SA. l~ll!tphon~~ :"-%6 {1<1) ll~'»i /3.i$099;i f-,)x: "966 (14) 32~946 (m3lk ,gr'YMbu@mllJ~mt:l(!:f)(-«hwm
lOf'Atfnn! At-..N.aWolruM ~tm~l_ Hid AI-M."th;m Dh.l,kt. R.t: ,Yanhu AI,,~Jn,tl.iv.ah

(ER-J

Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED:


---------1
M-TP: 2 DEPTH: 0.60 m DATE RECEIVED: 31101/2022
LE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.: 8-1
SAMPLED BY: RGF
---------------------------------------
ENVT. CONDo TEMP. 23.3°C HUMIDITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No.: M-B Weight: 6365 gms. Volume: 2111 cc

Soaked CBR 96Hrs

1000
Peni I Load Bearing Bearing 900
value Ratio
800 /
(lb/inL' (Cor.CBR) N
V
c
:a 700 /
600
/
/
<!)
::J
500
>'" ,.-/
0)
400 /' .T 0"
c
.;:

'"
<!) 300
/
[0 V
200 / AT n 1"

100 /
0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: C.MDD = 1.94 g/ cc CBR @ 100 % Compaction at 0.1" 26


C.OMC = 6.09 % CBR @ 100 % Compaction at 0.2" 30

TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF· YNB·PHY ·SOIL·05·0~
01.08.2021 APPROVED BY: ca&YI\~~!ll~~9&ph~1i{l-.F
p..o~ Ilu:c ID2'T1, V;)nw AI.sl~iy~h~ MVA'SS10(x)" ~SA ~~fphQiWt ,*966 (:t~) ;;t;2S0992 /315Q9?3 r,~)l.( !lUll;5 (14) 3:l~0946 (U'lo-a1'1! Jgf~y;)t)h\'~~ll$~oM;ltl\(fl's.tl)rt'
19(~t~fU A'>N~fi~nd .sit,"\. Hili ,M MOit;;)fl ph*fk"" n,(~ Y~flrIlN ~t~$#t-i)tYJh

TEST REPORT
C.B.R. M
DENSITY RELATIONSHIP
CLIENT NEOM . .. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 24/01/2022
SAMPLE SOURCE: TP: 2 DEPTH: 0.60 m DATE RECEIVED: 31/0112022
SAMPLE DESCRIPTION: Brown SAND with silt SAMPLE NO.: B-1
ENVT. CONDo TEMP. 23.3°C HUMADITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

2.00 MAXIMUM DRY DENSITY: 1.94 glee


OPT. MOISTURE CONTENT: 6.09 %

1.95

PENETRATION AT: 0.1"


1.90
CBR at 100% of MOD: 26

1.85
CBR at 95% of MOD: 21

1.80 CBR at 90% of MOD: 15

1.75

TESTED BY: WISAL KHAN


1.70
10 14 18 22 26 30

Axis Title CHECKED BY/REVIEWED BY;


Saeed Akhtar

APPROVED BY: Awais Nisar Yasin

RGF- YNB·PHY-SOll-05-04
01.08.2021 Copy Rights Reserved By RGF
(51) mCl:-~{jI, ~~jl:?/.'~
An EBI Oompan)' ~~~~~ RiyADH GEOTECHNIOUE& FOUNDATIONS CO.

P.O. ~ ~()21'. V.ulbu ~ ..:SJftbtyah~ MYM-S'lOOO. K$A Te-lrrpnGt)¢t ·+9QGl~t.t1) $r2S09',)~ 13(:S<>'<~j y~~~ -....$J6t;l (14) 1)lSrnJ4(j t'irun~ "'f.yi;l.:nbu@ut$~OKIt!'n-c'l:r$;.(om
. ,,«~\kttl~ AI·j.4...W"ft\ilOd _-stf~t,tt.. llaiJ'l ,M,tlh,,·o t)~wi~l.Y N.C,. 't~hbtj .N·$.if~ty,o).h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
PROJECT:
------------------------------------------
Neom desalination plant to !Iayal transmisssion system.(LD-01) DATE SAMPLED: 24/01/2022
SAMPLE SOURCE: TP: 2 DEPTH: 0.60 m DATE RECEIVED: 31/01/2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.: 8-1
ENVT. CONDo TEMP. 23.3°C HUMADIl"Y: 35%
----------------
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
----------------

MAXIMUM DRY DENSITY: 1.94 glee


2.00
OPT. MOISTURE CONTENT: 6.09 %

].95
PENETRATION AT: 0.2"
1.90
CBR at 100% of MDD: 30

1.85
CBR at 95% of MDD: 24

1.80 CBR at 90% of MDD: 18

1.75

1.70 TESTED BY: WISAL KHAN


14 18 22 26 30 34

Axis Title CHECKED BY/REVIEWED BY:


Saeed Akhtar

APPROVED BY: Awais Nisar


------------~------

RGF- YNB-PHY-SOll-OS-04
01.08.2021 Copy Rights Reserved By RGF
I - .• ~IC~l;../UI,~~Lfy~l~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P~O. box ').01.1.1, YMOO AI.$l"';'lyolh. WAS 51000. Yo,SA it'lrphQnt': -1-!l66 (l4) 3~5ro9~ Il~S09$)3 r'))(: ...,66 (14) 31509t.6 tm:,lI: 1·~J<y;;tnbu@'etl6(P1de-o(~,um'
l(){~\lOI'H AJ...tII;)W~Nt1-{I $U\l'trt.. ttillf AI-M~1Ufl OI}.I(k1.1U:;'4 Ytif~l>li
AJ-$ln;)'iy;m
CBR-/

DATE SAMPLED:
--------1
DATE RECEIVED: 31/0112021
I::>AMt'Lt. DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO.:
SAMPLED BY: RGF
----------~~----------------------

ENVT. CONDo TEMP. 23.6°C HUMIDITY: 36%


DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

Mould No: C-4 Weight: 6435 gms Volume: 2105 cc

Soaked CBR 96 Hrs

700

Penitration Load Bearing Bearing .--/


600
value Ratio
in
(lb/inL' (Cor.CBR)

t: ~
V
~ 500
V
Ql 400 /
..:!
>
ra
300 /
V ~.~,~

/
OJ
t:
.;: AT 0.2"
ra 200
Ql

/
CIl
AT 0.1"
100

0 V
0.0 0.2 0.3
0.1 0.4 0.5
Penetration (in)
0.5000 206 626
Remarks: C.MDD= 2.06 g/cc CBR@90%Compactionat 0.1" 19
C.OMC = 5.35 % CBR @ 90 %Compaction at 0.2" 22
TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY: Sneed Akhtar
---------------------- ----------------------
RGF· YNB·PHY·SOIL·05·04
01.08.2021 APPROVED BY: c~jB.sN.iJi,alie'tfa~iw,F
[.~
....... . 1.:.A•.:.,A..:..'/U'-, ~r1' t./0.) I ~
~I V - iN· ...
AnERleompany ~,v.~' RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
til}. bow ~:l1l,,_V~nOO-M~SI~i1a-i\ MtAS .$1000, i\$A 'fe~; '+%6 (i4) '3';l~~ I ~lS0$9J fPll! 4iW (ld) :{j:l1'S094~ tmnli; 1Er,y~mbu@f!TI.6ctntle{}CJt"H()fTl
lfK'Atkm! M.N;wr.UUM ;slr8!cl~ ftii AJ..t.,bh;m Oh.bK:t. R_t:". Vanhu At~Jn.~tv..h

CiJR·2

Neom desalination plant to gaya/ transmisssion system. (LD-01) DATE SAMPLED:


SAMPLE SOURCE: TP: 3 DEPTH: 1.00 m DATE RECEIVED: - - - : : - - - - - - - 1
SAMPLE DESCRIPTION: Brown well graded SAND with silt 8: gravel. SAMPLE NO.:
SAMPLED BY: RGF --------1

ENVT. CONDo TEMP. 23.6°C HUMIDITY: 36%


-------­
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No: C-5 Weight: 6375 gms. Volume: 2109 cc

Soaked CBR 96 Hrs

1000
Penitration I Load Bearing Bearing 900
value Ratio

~
800
(Lbs.) (Ib/in') (Cor.CBR) ;:;­
c: 700
~ 600
/
Q) v
::::J
m 500
/
>
Ol 400
V
c:
.;:
m 300
7 AT 0.2"
Q)
[!)
/
V
200

100 / AT 0.1"

a V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

c.OMe '"
TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF· YNI3·PHY·SOIL·05·04
01.08.2021 APPROVED BY: c~iisl}(i~g(jelfjJyiQ;F
Gl.:-l:..,/{J I, ~r.1 U'l:?.) I~
AnERlc~mpany RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
I>.(j. "0O)j':)'ol1.l~ Yanbu A1.ssn;iv;)~ "N'fAS 51000, ,",S",- If;'~ptwn(!'~ -+966 (14) lJ'l~.J2J3Zs()<J93 F,)'.(: ~goo (14) '1:i{)g';6 (maa: 'gf,y.)nbu@)mts-c-mdeot.(l1,(om
lCK'..::.Hon~ M.N~w.lnaoo Sirettt Hoii iIJ·M,1.h;Hl Ol~l·l~.ct, R.C, Y.anbu AJ-Struivah

(ER-3

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED:
---------/
SAMPLE SOURCE: TP: 3 DEPTH: 1.00 m DATE RECEIVED: 31/01/2021
SAMPLE DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO.: 8-2
SAMPLED BY: RGF
---------------------------­
ENVT. CONDo TEMP. 23.6°C HUMIDITY: 36%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No.: (-6 Weight: 6345 gms. Volume: 2108 cc

Soaked CBR 96Hrs

1100
Bearing 1000
value Ratio 900 ........-'
(Lbs) I (lb/inL' (Cor.CBR) N
c: 800 ~
:0
700 ~
Q)
:J 600
/
>
ro
500
/
en ./,// AT 0.2"
.§ 400
ro
Q)
00 300 /
200
;/ AT 0.1"

100 /
0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: C.MDD= 2.06 g/ee CBR@100%Compactionat 0.1'" 29


C.OMC = 5.35 % CBR @ 100 % Compaction at 0.2'" 34

TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF- YNB-PHY-SOIL-05-0~
01.08.2021 APPROVED BY: cD1i~~/){i~fl&.Ji\l1ifh
,.....-::;:::=-~ Gl;..-l..;..../{JI, : ..... ;D
... if v)
:;;.,4 .. I ~
=-::.:..:.:::...:::.:::.:::!.::.::!~~~d RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. RoJt ]0271. VaflbO AI.Slrs;iy~h. MVA$ 51000• .t<SA, Tch."phone~ -1-~GG {ld)3250991/ :.U50993 (.1)1.: '"*9'66 (14) n!i09.\6 [m~iH 18/·YMlbu6'e(tg:e01f:ir.M~'.((Jm
let:lJ\Jl)tH Al·N~W<1h;'H'KI $U«I, H;)i AI M'}n;;.f) Db.hk1. R.C", Y~flb\l AI-Slna\'r'Jh

TEST REPORT

..
C.B.R. - DENSITY RELATIONSHIP
CLIENT NEOM . PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 25/0112022
SAMPLE SOURCE: TP: 3 DEPTH: 1.00 m DATE RECEIVED: 31/0112021
SAMPLE DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO.: 8-2
ENVT. CONDo TEMP. 23.6 D
( HUMADITY: 36%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

2.12 MAXIMUM DRY DENSITY: 2.06 g/ee


OPT. MOISTURE CONTENT: 5.35 %

2.07

2.02
/
/ PENETRATION AT: 0.1"

CBR at 100% of MDD: 29


1.97 /
1.92
/ CBR at 95% of MDD:

CBR at 90% of MDD:


24

19

1.87 K
/
TESTED BY: WISAL KHAN
1.82
14 18 22 26 30 34
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin

RGF- YN~-PHY·SOIL·05·04
01.08.2021 Copy Rights Reserved By RGF

C~l;;../U Jf) ~d J;'(.?.) f~
AnERI RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
p~o~ BO)( 30271.. Y.at'tOO AI.s~I\;ty~n., MYAS 51000.. KSA T~ph01W't 4~6n ('-') 32;i0992/ 326t)991} F..>J)i,: i-9ti6 {lii~ rll:SOO46 timliili reJ.y..rtb!J(petf~-cM.c~eru::eJr.oot'l'\
l(,)'.)HW'l~ A1·«,)wan~j\d Str{>~t.. Hul At,M~fh"(' Ohtti<t. R.C.~ Y':'nh'U AI,$~ft.;'i1y,ah

TEST REPORT

..
C.B.R. - DENSITY RELATIONSHIP
CLIENT NEOM . PROJECT NO: 21J4037
PROJECT: Neomdesalination plant togayal transmisssion system. (LD-01) DATE SAMPLED: 25/01/2022
SAMPLE SOURCE: TP: 3 DEPTH: 1.00 m DATE RECEIVED: 3110112021
SAMPLE DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 23.6°C HUMADITY: 36%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

MAXIMUM DRY DENSITY: 2.06 glee


2.12 OPT. MOISTURE CONTENT: 5.35 %

2.07
PENETRATION AT: 0.2"
2.02
CBR at 100% of MDD: 34

1.97
CBR at 95% of MDD: 28

1.92 CBR at 90% of MDD: 22

1.87

1.82 TESTED BY: WISAL KHAN


20 24 28 32 36
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar

RGF- YNB-PHY-SOIL-05·04
01.08.2021 Copy Rights Reserveci By RGF
Cl:-l;./VI:J~~J'~~I~
:..::.:..:::=-=-.::.::::.::=:!...!~==~ RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.o.. 8(l)j 302:]1, Y~"bu A1'5.t~i.,~h~ MYM 51000, f<5A It:ltphl,)rrc: ...~6 (14) 3;l5ro9~ I :l:l~J fill(: +?66 (1<'1.) )250946 [m~1t: IBr''f.mhu@t.rrlscmdftDf)I;'<U(ln-l
l.()(itVQfH A!,N.:Jw,;u\l,Ifl41 S\f¢~tj' H.iJ1 A~-M;!h;ifl Oh-lil{1. R(." Y~f\b\.i Al·SlrlAiyah
CBR-I

Neom desalination plant to gayal transmisssion system. (LD-01) 26/01/2022


SAMPLE SOURCE: TP: 04 DEPTH: 0.60 m DATE RECEIVED:
~------ ----------l
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.:
SAMPLED BY: RGF
------------~~----------------------
ENVT. CONDo TEMP. 23.8°( HUMIDITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

Mould No: B-7 Weight: 6435 gms Volume: 2114 cc

Soaked CBR 96 Hrs

600

Penitration Load Bearing Bearing


in value Ratio 500
(Ibs) (Ib/in" (Cor.CBR)
N

B
c:

400
V
..--'

<Il
:J
L
V
<tI 300
>
OJ
~/
c:
.;: 200 / nn ?"

/
<tI
<Il
ro
100
./ AT 0.1"

IlJ
0
/
0.0 0_1 0.2 0.3 0.4 0.5
19 Penetration (in)
0.5000 158 480
Remarks: C.MDD = 1.93
C.OM( = 6.06
TESTED BY: M.IRFAN Saeed Akhtar
RGF- YNB-PHY-SOIL-OS-04
01.08_2021 APPROVED BY: c~/{silifflalie}f(J)iiro;F
-~ I ~ I ~ Ifq .. i.U .~- --y. ~I ~. 'I::r.::'"/'
·

~1t>
c .•.••

~
.........] ' / ' . .

"-"~'-""" tI '--.. • 'r.:;


. 1...1 ~/ ~
An ESI Compnny I'\'.~~. ·"~~.:P, RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
i>:(J. oox It)~1.t!.V4nlru Al:,sln;lyah.. MyAS $1000~ f(.5A te~ ~ (14) :\~:s009~ I al~) f';)lt 'f-9t)b (i4) 3i50946 ('mall: ,g:"<t~l'lbu@ruIB(!tnch!nceLOOm
lrw-..:.\i-nn: .AtvN.<1w;trumd S.1r#tttl'~ Hill AJ·M"h;ul DI1.I)"li't. n.c:" "I.:.tnbu Al,,\1n~tva.»)

CBR·2

PROJECT: Neom desalination plant to gayat transmisssion system. (LD-O 1) DATE SAMPLED:
--------1
SAMPLE SOURCE; TP: 4 DEPTH: 0.60 m DATE RECEIVED: 31/0112022
SAMPLE DESCRIPTION: _B_ro_w_n....:.•. _...::.....:=--____________
SAND with silt SAMPLE NO.: B-1
SAMPLED BY: RGF
------------------­
ENVT. CONDo TEMP. 23.8°C HUMIDITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No: B-8 Weight: 6395 gms. Volume: 2110 cc

Soaked CBR 96 Hrs

900
Penitration
value
(Ib/in') ''Q Ratio
(Cor.CBR) N

~
c:
800

700

600 ~
~

~
::::.
OJ 500
/
::l
(ij
> 400
Ol Ir'/
c: /
'0:: 300
AT 0.2"
/
OJ
OJ
aJ
200

100
/ AT 0.1"

0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR @ 95 % Compaction at 0.1"


CBR @ 95
TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF· YNB·PHY·SOIL·05·0~
01.08.2021 APPROVED BY: com{tl,(~~ve~~JYit6F
Cl::A..;/tJl,:~ ·":;~j4?.)I~
I'\fl"""""" ...omp""y I "''''''' ~RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
f.',O~ $~ )Oi11~ «Mbu Al"Sln;tyah. M-yAS !i.1.QQO. ;';SA f(!l(o~~:'%<I. (i4) il;l~2/3:i~J f:;~: 4-90,.0 (14) ~i509J;,6 £m~lj: 19J'V")rlbU~(le~~~,«lm
L6t'4U()81ALN..1w.U'tallti ~tu'!t1It" hid AI,tJj:lh:m ()[\!rkt, Rr.." Y3j~hiJAt~Sltulvah

CBR·3

PROJECT: Neom desalination plant to gayal transmisssion system.(LD-01) DATE SAMPLED:


-----------t
SAMPLE SOURCE: M-TP: 4 DEPTH: 0.60 m DATE RECEIVED: 31101/2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.:
SAMPLED BY: RGF
ENVT. CONDo TEMP.
---------------------------------------
B.8°( HUMIDITY: 15%
--------
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No.: B-9 Weight: 6372 gms. Volume: 2106 cc

Soaked CBR 96Hrs

1000
Peni Load Bearing
value ~"~ Ratio
900

800
~
(Lbs) (Ib/in" (Cor.CBR)
(in) C
~ 700
::::.
Q)
600 V
~
::J
<ii 500 /
>
en
t:
400 ~-.",
.;;:
/
ro'"
300
Q)
V
../ AT 01"
200

100 /'
0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF· YNB·PHy·soIL·05·04
01.08.2021 APPROVED BY: c_ii/J{i"H1rtehf!1ilGf
~f) ~ ;.A_;,/UJ,~~~l;-')I~
f AnERI Company Il£~'f.!' .....,
t:A•.
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
p..o~ fii)X J0171, Vanbo hi.Sln:.,iy,l!\, M'fA!i-51000. KSA T~~jihOM: -,9{$,6 (1d) 3!l51)992/ )2~3 nJt~ Hl68(14) 325-0946 (mJltH ,gf.y,mbu(pef~eMdeM~5..'t:pM
l1l(O}t19fnA!·NJw,)n;}fl4 :$\rCii.l~ M AI-Milhflfi Ol}.hKt.lt,(", Y4f1W ~t...$ifiltitJh

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT:
-----------------------------­
Neam desalination plant to gayal transmisssion system. (LO·01) DATE SAMPLED:
--------­
26/0112022
SAMPLE SOURCE: TP: 4 DEPTH: 0.60m DATE RECEIVED: 31/0112022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.: 8-'
ENVT. CONDo TEMP. 23.8°C HUMADITY: 35%
------­
DATE STARTED: 04·02·22 DATE COMPLETED: 08-02-22

1.95 MAXIMUM DRY DENSITY: 1.93 glee


OPT. MOISTURE CONTENT: %

1.90
PENETRATION AT; 0.1"

1.85 C8R at 100% of MOD: 25

CBR at 95% of MOD: 20


1.80
CBR at 90% of MOD: 14

1.75 I b"

TESTED BY: M.IRFAN


1.70 + I - - - - ! - - - - - + - - - - + - - - - + - - - - + - - - '
JO 14 18 22 26 30
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin

RGF· YN[l-PHY·SOIL·OS·04
01.08,2021 Copy Rigil ts Reserved By RGF
Cl;..A_::,./V/~;-:~ ·~&J'L.?~f~
A"ERleom.,.... y RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
p~o~ 3i))( ao;rn:~ "f;:$nW .M.$l~i'l;ln., MV)\$: 51.000.. KSA TcJepni)1\«-! ~,960 (14) 3~50992/ 315(')993 f3~1 +f):66{lA) ))250946 E,n;;,H ¥'.et"yM)bU4Pt-tt.s~O\CJt:f'I'~t:~.-c:.om
lo<:.ithmt Ai·NMV,;llY.10d $tt~t.:1,. u..)l AJ,M.;)h~m Pf5.trkt. .fl,¢:"" ¥.anb\t M,Slf\41y.:.h

TEST REPORT

..
C.B.R. - DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (W-01) DATE SAMPLED: 26/0112022
SAMPLE SOURCE: TP: 4 DEPTH: 0.60 m DATE RECEIVED: 31/0112022
SAMPLE DESCRIPTION: Brown poorly graded SAND with silt SAMPLE NO.: B-1
ENVT. CONDo TEMP. 23.8°C HUMADITY: 35%
DATE STARTED: 04·02-22 DATE COMPLETED: 08-02-22

MAXIMUM DRY DENSITY: 1.93


1.95 OPT. MOISTURE CONTENT: 6.06 %

1.90
PENETRATION AT: 0.2"

I.S5 CBR at 100% of MOD: 28

CBR at 95% of MDD: 23


I.SO
CBR at 90% of MOD: 16

1.75

1.70 TESTED BY: M.IRFAN


14 IS 22 26 30 34
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar yasin

RGF· YNB· PHY·SOIL-05·0~


01.08.2021 Copy Rights Reserved By RGF
t::A..::~l;./U I, ~& J'y) I~
An EBI Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
p~o¥ 8()~ )01.11. 'folrYbu ,N.,$!h;l''f;,h. M'lAS,:;'1ooo. KSA t:el~; t~uu (14) ll5~? 1_:n~3 ~(}f~ (i4):ai~Q94G
t;i)(t tmaHl' iBJ"y"u"bu@elt.,,-~t)$deu<af,tIDt
lO(.1)-lJQyr: A!-N4W~tuH1d_SH~(R? H.l?-j~ M~h~ ()iMf~t.Ii:J;... Y~n~~ ~l~$irui'Vl'h
CBR-1

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED:
--------/
E SOURCE; TP: 05 DEPTH: 1.00 m DATE RECEIVED: 31/0112021
::-:-:--=-----­
SAMPLE DESCRIPTION: Light Brown Silty SAND. SAMPLE NO.:
SAMPLED BY: RGF
ENVT. CONDo TEMP.
-----------------------------------
HUMIDITY: 36%
---------=--,:-.,.­
DATE STARTED: 04-02-22 IJATE COMPLETED: 08-02-22

Mould No: (-1 Weight: 6452 gms Volume: 2110 cc

Soaked CBR 96 Hrs

600

Bearing
in value Ratio 500 /"
(Ib/in"' (Cor.CBR)
N'
r: V
:a 400
/'
/
<ll
:::l
ro
>
300
/
/
Cl
r:
<;:: 200 / 'T n?"
C\l
<ll
CO ./
100 / AT 0.1"

0
/
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

TESTED BY; ----....:........:........:....- CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF- YNB-PHY-SOIl-05·0-l
01.08.2021 APPROVED BY: c~jltshl.it;,alie'tf(J~ilIIJF
~~I.:"".;A..;/(JI,:~ ·J&if~)I~
AnERleornpnn!l RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P,O. box )Qi~'-l. Y.l~bu Al.SI,,;TYi.lh. MYAS 5"1000. ",SA 'Tt!~m-~:'966 (14) :i2:s.o9il2 /:ll~) f~x:.~ (~4) ,zS0946 (maU: tgr'Y·imbu€))crigcoscte-nc.('1...wm
tl'll"A_.~Jl: Al.-N.lw~nand 5ir.i!d~ HItl At.M"h:m {)lJ.ITf.c:t~ n.c
4 , Yanhu Al...~tlUivah

Neom desalination plant to gayal transmisssion system. (LD-O 1) DATE SAMPLED:


--------1
TP: 5 DEPTH: 1.00 m DATE RECEIVED: 31/01/2021
DESCRIPTION: Light Brown Silty SAND. SAMPLE NO.:
SAMPLED BY: RGF
--------------------------------------
ENVT. CONDo TEMP. 23.6°C HUMIDITY: 36%
---
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No: C-2 Weight: 6375 gms. Volume: 2109 cc
----------------

Soaked CBR 96 Hrs

800

Penitration Bearing
700

~
value Ratio
L

(Lbs.) (lb/in )
(Cor.CBR) N' 600
.~
:c 500 /
Q)
::J
i; 400
V
/
>
01
c
.;: 300 /
ca
Q)
10 200 / AT 0.2"

100 ./ AT 0.1"

o V I

0.0 0.1 0.2 0.3 0.4 0.5


Penetration (in)

Remarks: C.MDD = 2.02 glee CBR @ 95 % Compaction at 0.1" = 20


C.OMC = 6.04 % CBR @ 95 % Compaction at 0.2" = 24
TESTED BY: JAMSHID ALI CHECKED BY/REVIEWED BY: Saeed Akhtar
---------------------
RGF· YNB·PHY·SOIL·05·04
01.08.2021 APPROVED BY: c~,'il}(~E\lie~!l?t(6F
~~Gl;.,l;./(J/, ~& if~)l~
~::..::.::.~~,,;;;;;;~~ RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P~().I)D)f 30Hl. Yallbu AI~SJnaTYo1h" M'tAS :s 1.OQO,;;$A leltophQnm:'966: (i4) al~»2 J ~:lS.O<:)93 f;lx: *%:6 (14) .)1S09016 (mall! lJ>r<y~nbu@er'6t'!os.df!"fH:(~u:,()m
l(K'..;:.H.ol"1! At,N~w"'lUnti 5tr~",r_ Hoi) hl.M..,h:lIlt l)1"IJ'k1~ R.C•. vanim AI.....;tl"Ukrah

CBR-3

PROJECT: Neom desalination plant to !Sayal transmisssion system. (LD-01)


SAMPLE SOURCE: TP: 5 DEPTH: 1.00 m DATE RECEIVED:
SAMPLE DESCRIPTION: Light Brown Silty SAND. SAMPLE NO.: - - - - - - - - 1
SAMPLED BY: RGF
--------------------------------------­
ENVT. CONDo TEMP. 23.6°C HUMIDITY: 36%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No.: C-3 Weight: 6345 gms. Volume: 2108 cc
----------------­

Soaked CBR 96Hrs

1100

B"~~
1000
value Ratio 900
(in) (Lbs) I (Ib/in·' (Cor.CBR) N
t: 800 ~
;g v
700 ~
Q)
/ V
:::l 600
>
ro
500 /
m
t:
.;: 400 / AT 0.2"

ro
Q)
CO
300 /
200
,/ AT 0.1"

100 /
0 V -

0.0 0.1 0.2 0.3 0.4 0.5


Penetration (in)

Remarks: C.MDD = 2.02 g/ee CBR @ 100 % Compaction at 0.1" 28


C.OMC = 6.04 % CBR @ 100 % Compaction at 0.2" 32

TESTED BY: JAMSHID ALI CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF- YNB -PHY-SOIL-05-0~
01.08.2021 APPROVED BY: cartlll!,-sfM;phWiIh
r@)" ~. Cl;:.A..;.••.--LJI, ~~ ifl;?)'V'
AnERt Company ~~f!' "'A' RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
p,o~ Il/:)J{ il0:211, '(anbo AI.sl~iy.)n. MVAS- 51000~ 1(5A. ~fil~P"j,M! +1)G6 (14) 3?S0991/ )1~3 fl))j;~ *~6;l) (H) .llSQ~M6 fm';:tll: ftl;J,yi)'\bu6'td6(,Mdi':Meid~'l)m
tQC~\;Om Al·Nlwaf)~M Sb'Nt" Hat AlM,.hi.lfi Ohukt", n,(.. 'f#tiUU Af·$bi..iYJh

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037

SAMPLE SOURCE: TP: 5 DEPTH: 1.00 m DATE RECEIVED: 31/01/2021


SAMPLE DESCRIPTION: Light Brown Silty SAND. SAMPLE NO.:
ENVT. CONDo TEMP. HUMADITY:
23.6°C
- -36%
----­
DATE STARTED: 04·02·22 DATE COMPLETED: 08-02-22

2.08 MAXIMUM DRY DENSITY: 2.02 glee


OPT. MOISTURE CONTENT: %

2.03

PENETRATION AT: 0.1"


1.98
CBR at 100% of MOD: 28
1.93
CBR at 95% of MOD: 20

1.88 CBR at 90% of MOD: 15

1.83

TESTED BY: JAMSHID ALI


1.78
12 16 20 24 28 32
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


--------

RGF· YNI3-PHY-SOIL-05-04
01.08,2021 Copy Rights Reserved By RGF
Cl:-~()I,~&ifv~f~
An ERI ComPllny RIYADH GEOT€CHNIQUE &. FOUNDATIONS CO~
p.o. fio:lt aO;rll~ Ya:f:I't)1.;i AMit~t'{~:h" MVAS 510<>0.. K$A 1'~tt!'phonC'! 1'96& (:[4) :;J'2:~21 ~2~3 r~3(; ~~ (14) .!\2S(H;>16 fZm~n! x3tJy..nl:n;~e,.t6e:M.t:Jlrnt~I.()it'
lo(oitton: AJ·NOlw~n"ftd.tfl:'<:\. H~~ J\t~h;')fi O~ttkt# R..e·,# V~tl\:(tt At·iln.dY1Jfl

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
CLIENT NEOM. .. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. {LD-O 1) DATE SAMPLED: 27/0112022
SAMPLE SOURCE: TP: 5 DEPTH: 1.00m DATE RECEIVED: 31/01/2021
SAMPLE DESCRIPTION: Light Brown Silty SAND. SAMPLE NO.:
ENVT. CONDo TEMP. 23.6°C HUMADITY: 36%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

MAXIMUM DRY DENSITY: 2.02 glee


2.08 .... OPT. MOISTURE CONTENT: %

2.03

1.98
/' PENETRA TION AT: 0.2"

1.93
/ CBR at 100% of MDD:

CBR at 95% of MDD:


32

/ ..... 24

l.88 CBR at 90% of MDD: 18


V
1.83 ~
/
1.78 TESTED BY: JAMSHIDALI
12 16 20 24 28 32 36
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar

RGF· YNB·PHY-50IL·OS-04
01.08.2021 Copy Rights Reserveci By RGF
.---:::-:-~t:A.;",l;./U f, ~,0' ifY~ IV'
.:.::.:..::::.::.:.:.~~~==~ RIYADH GEOTECHNIOUE & fOUNDATIONS CO.
P...o . l}Q)f 30111~ Y~olw Al.SJfi~'i'Y;';h.. MYAS 5:l0¢0~ r"SA 1.el!fi:lhon(!o~ :'!k>6 (lfl)3:2!'r099l/1J:~~) fi.'lltt "Sun-(14)3%509.tf) (tO~iJ: IRI·y;aonbtt~~ts:*~dlr~((}nl
t,()(~l~Q1H #-N.J:waNM "$tffti,rt" tim A!'M;.ttt'ft OlMrk:\~ 1(:,(... 'f31ltw Al~S!rt;!i.'tJ'h- CBR-I

PROJECT: Neom desalination plant to !Sayal transmisssion system. (LD-01) DATE SAMPLED: 29/0112022
---------1
SAMPLE SOURCE; TP: 06 DEPTH: 0.60 m DATE RECEIVED: 31/0112021
=---:--:---:-:---­
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.:
SAMPLED BY: RGF
----------~--------------------
ENVT. CONDo TEMP. HUMIDITY: 35%
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

Mould No: M-4 Weight: 6448 gms Volume: 2109 cc

Soaked CBR 96 Hrs

600

Ratio 500

~ 400
V
<I>
::s
iii 300 /
/
>
OJ
c
',: 200 /
V AT n 2"

/
rt!
<I>
OJ
100 / AT 0.1"

0
0.0
/ 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 162 492
Remarks: C.MDD" 1.96
6.93
TESTED BY: JAMSHID ALI CHECKED BY/REVIEWED BY: "aeed Akhtar
------~--~~~------

RGF- YNB-PHY-SOIL-05-04
01.08. Z021 APPROVED BY: C~f{sIlI.ffl,alie}fU~iw,F
CA..:",~(j(, ~~j,-:?~I~
AnERt RIYADH GEOTECHNIQUe & FOUNDATIONS CO.
P.O. OO)f ){)~1t" Y;lnbu At.st";iyilif\ M'(AS $UX1O. kSA ·nu.·phtme! <t~ (14) ~l~~' 1\l~1l f'ilX'! *~ (M) }j~!rt?!f40 t:ffi41l: tgt,V~t1bu@eT1S-(i<m:tlN){J"u'tJm
lnc.Aiktn! At.Nawarumd ghr"t~ Hid ~Miih;m Oktrkt. tt.r.. , vanuh AJ,.5ImwIlh

CBR·2

PROJECT: Neom desalination plant to gayal transmisssion system. (LO-01) DATE SAMPLED:
--------1
SAMPLE SOURCE: TP: 6 DEPTH: 0.60 m DATE RECEIVED: 31/0112021
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.: B-1
SAMPLED BY: RGF
ENVT. CONDo TEMP.
- - - -71.9°C
- - - - - - - HUMIDITY:
- - - - -35%
--
--------
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22
Mould No: M-5 Weight: 6385 Volume: 2104 cc

Soaked CBR 96 Hrs

800

Penitration I Load Bearing Bearing


700
value Ratio
(Ib/in") ~
N 600
I::
V
:a:::::- 500
~
V
CI.>
-=: 400
/
>'" V
OJ ./
I:: 300 ........ ...
~ -.-..
'i:
til
<ll
III 200
/' ATO.2"

100
/ AT 0.1"

o V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR @ 95 % 19
CBR @ 95 % Compaction at 0.2" n
TESTED BY: JAMSHID ALI CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF· YNB·PHY·SOIL·OS·04
01.08.2021 APPROVED BY: C~ftsf)(~~(ieYl~yit?,F
~~ v '1.:,A.;...-l;;.,/(tf, ~& J' ~) J ~
No Eftl 'tt.~~. -
V.A>
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
~jj.l)Qx ll»):f.t, V.'"mw AI,Sln.1ly;)f1, M'IM-!1.000.. lCSA -lclc-phonel.%(S (u)a~~21;,ll500~i3 u:.:: ..~ (iii) ;l:tSOt1116 tm3li~ fgl.yilnbu4l'tflgf;'!-m.d('"ncAM,oom
lnc'~ifnn: A!.N.:JwJlfi1Jrnl-~tr~t~ Hiil A"'M.dun ().kitlri~ n t;" Y:al1hh Ak~tnawJh

CBR-3

Neom desalination plant to gayal transmisssion system. (LO-01) DATE SAMPLED:


--------1
SAMPLE SOURCE: TP: 6 DEPTH: 0.60 m DATE RECEIVED: 31/01/2021
DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.: B-1
BY: RGF
---------------------------------­
23.9°C HUMIDITY: 35%
04-02-22 DATE COMPLETED: 08-02-22
Mould No.: M-6 Weight: 6360 Volume: 2114 cc

Soaked CBR 96Hrs

• "U"'~ _~.,~.
1000
Peni Load Bearing Bearing 900
value Ratio
800
.. .. ./
(Ib/in"' (Cor .CBR) N
c::
700
v--­
<l)
600 ~
::J

>
~ 500 /
/'
V
OJ
c:: 4QO 1'-0-.""
'i:
~
<l) 300 /
CO V
200 / LlTn 1"

100 /
0
/
0.0 0,1 0.2 0.3 0.4 0.5
Penetration (in)

c('
Remarks: ~-~.. ~.. ~~~~~~~-------;,~~~~~~~~~~--~o_---------

TESTED BY: JAMSHfD ALI CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF· YNI3·PHY·SOIL·05·U'1
01.08.2021 APPROVED BY: (QMiL,itlllii~ru;J;Jl!1!IV'-liju,UJ:F'--_
'CA•.:A..;.v'U I, ~~,j' '-2) I~
AnERI RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. tlbJ( 30111, V<lflOO A·I;Q~;y~h. ~~'{A3 501000. KSA ~~'Nlh~! "~6 ("It} a?~21 ;J2~3 r<l)t~ .~6:6 {.U) J.:i5Q<)~G trn"lll rgf~y,;tfibtl~~rtt:tMt;t6t~s.wm
l«~lJwHAJ'N~mO:~M $U~lJ tQl.N·M~h;Jifi f>f-nrktr n,c." n.o.bU: Alv$ltt,),y~h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT . NEOM. PROJECT NO: 21J4037
------------------------------------------ ----­
PROJECT: Neom desalination plant to goyal transmisssion system. (LD-01) DATE SAMPLED: 2910112022
SAMPLE SOURCE: TP: 6 DEPTH: 0.60 m DATE RECEIVED: 31/0112021
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.:
ENVT. CONDo TEMP. 23_9°C HUMADITY: 35%
---------
DATE STARTED: 04-02-22 DATE COMPLETED: 08-02-22

2.04 MAXIMUM DRY DENSITY: 1.96 g/ce


OPT. MOISTURE CONTENT: %
1.99

PENETRATION AT: 0.1"


1.94
CBR at 100% of MDD: 25
1.89
CBR at 95% of MDD: 19

1.84 CBR at 90% of MDD: 13

1.79

TESTED BY: JAMS HID ALI


1.74
10 14 18 22 26
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais N;sar Yas;n

RGF- YNB-PHY-SOIL-05-04
01.08_2021 Copy Rights Reserved By RGF
c~~ ~J CL:..-l.;::../UI!J~~t./V.)I~
~M) V" '.""... ....
EO i!! 00"'1>"11),
I "'A$
An· ~.~~. "'_
..•_ RIYADH GEQTECHNIQUE & FOUNDATIONS CO.
').0. !!QX30:t7.1, ViJl'ibO At>$,ln.;lYillh" MVAS 51D()()# KSA 'T~te-phOM'! 'f9()~ (14) 3il?OO92./-3::l-~93 f3li;1 +M6 (14-l :;U~OO46 t;m~IH ,,,f~y;'tt"'bu@etf.seOKit:'nt~,(om
l.fX.",j-tfpn1 Ai·N..l\V;lf\·"~ Stf'ot.et.= H~I AU";')h;):o .t>h.ttkti 'A.,.('t V.)fibu AI-"Slft~Jy,)h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO; 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-01) DATE SAMPLED: 29/0112022
SAMPLE SOURCE; TP: 6 DEPTH: 0.60m DATE RECEIVED: 31/0112021
SAMPLE DESCRIPTION: Brown well graded SAND with silt. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 23.9"C HUMADITY: 35%
----------------
DATE STARTED: 04·02·22 DATE COMPLETED: 08-02-22
----------------

MAXIMUM DRY DENSITY; 1.96 glee


! 2.04
OPT. MOISTURE CONTENT: %

1.99
PENETRATION AT: 0.2"
1.94
CBR at 100% of MOD: 29
1.89
CBR at 95% of MDD: 22

1.84 CBR at 90% of MDD: 16

1.79

1.74 TESTED BY: JAMSHID AU


12 16 20 24 28 32
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY; Awais Nisar yasin

RGF· YNB·PHY·SOIL·05·04
01.08.2021 Copy Rights Reservecl By RGF
Moisture Content, Particle Size Distribution,
Atterberg Limits, Proctor Test and CBR Test

LAYDOWN No. 3

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


F"'><~ ..9&6 (:t...' rt2SO'll'46 ~3il!c '8'·y;;;:tnbu@,r,,.~¢p~tel)c::e ...'ColYJ!
f>btrict. n.c.• V~nbu N-Sln.<liy~h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 01 Depth: O.60m DATE RECEIVED:


------­ ----------­
SAMPLLE DESCRIPTION : Greyish Brown well graded SAND with silt 8. gravel. Sample NO.:
------------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------------­

SAMPLE NO:

CAN NO: M-14


WT. OF SAMPLE + CAN (WET) (gms) 427.83
WT. OF SAMPLE + CAN (DRY) (gms) 422.35
WT. OF WATER (gms) 5.48
WT. OF CAN (gms) 46.75
WT. OF DRY SAMPLE (gms) 375.60
WATER CONTENT (%) 1.46

Tested By: A.Rahman Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1S-02
01082021 Copy Right Resrved by RGF
RIVADH GEOTECHNIClUE & FOUNDATIONS CO_
P.O. DO)c 30....7:1. Ylllnb-u AI,...sh~;lY::'h. MYAS 5::1.000.. KSA TI:~+e'pho.ne-! +9C>6 (:14) 32".5-0992/3250993 f';:).x~ +95(114) 3250946 Ern,,1;:: r.R'-'YahbtJ@I"i!tlB.<e~i.d:-enc::.e •.com
"(.><:.alk>n~. .l'LS-Na.......~'ni<\f\d Stl-.r.O(~t~ H<.ll At-M<lh<l"o fJh:lr-Ic.t:. R,C.• Vo3Inbu A1-Sfn..;lOlV... h

PROJECT

SOURCE: TP : 01 Depth: 1.20m DATE RECEIVED:


------- -----------
SAMPLLE DESCRIPTION : Greyish Brown well graded SAND with silt & gravel. Sample NO.: B-2
---------------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------------

SAMPLE NO:

CAN NO: B-21


OF SAMPLE + CAN (WET) (gms) 492.51
OF SAMPLE + CAN (DRY) (gms) 487.07
OF WATER (gms) 5.44
OF CAN (gms) 51.47
WT. OF DRY SAMPLE (gms) 435.60
WATER CONTENT (%) 1.25

Tested By: A.Rahman Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
'C..-L:-L::.---U IJ' ~~ if~-' I ~
RIYADH GEOTECHNIClUE & FOUNDATIONS CO.
i">~O. uo~ 30.27:1.~ YtH\'bu At.s'n~lY;;'h~ MYA..."i 51000., tCSA TI;t.:t"'ilht)~;; +-9<66 (:1'1) a;;rS-Q9!):;t /37s.ota93 I"~)(~ +96'& ('5.4) 212509'46 trrf\x.Uc. r-9'..yat1lbu&etig"o~I<ftV)IC:,.t<l:l'.C:()M
l<K1ilItJoo: Al~Nw"",a"i\f'H. St"IW<"t~ U",., Al-Mahlan rJt-lotor-lct. it.C'•• Y>an'b\~ M~Sin.».y.,h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 01 Depth: 2.50m DATE RECEIVED:


----
SAMPLLE DESCRIPTION : Greyish Brown well graded SAND with gravel. Sample NO.: 5-6
---------1

ENVT. COND TEMP HUMIDITY: 39%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------

SAMPLE NO:

CAN NO: C-9


OF SAMPLE + CAN (WET) (gms) 525.58
OF SAMPLE + CAN (DRY) (gms) 519.46
6.12
48.56
OF DRY SAMPLE (gms) 470.90
R CONTENT (%) 1.30

Tested By: A.Rahman Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1 5-02
01.08.2021 Copy Right Resrved by RGF
'::::::"=-==-==~=~~!6d RIVADH GEOTECHNIOUE & FDUNDATIDNS CD.
p~o. nOlo$ ,'lO.2:7:1. Yantx.t AJ",,<;b~;'lYll:fh~ MYAS ,5:1000.. KY.A 'l't:I>JephOl'¥e-: +-!>COG (:t~) 32'5Oi)92/ 32S.o!)93 li'h)(: .. 9Ga. (lA) a2S0UJlG En1I:lI1I:: oI'R'''Yanl.-.u@lt':tf9.(!:c..i.Ci~n€.oe»..C:.olY\
.. tJ()rit. At.N=tI.'V;;)I"IIi.)nd
"'()C~ $'l"'''~':'t~ J-bl,1\~ M ..han f.,lht.1G't. R,(.'~,. V""n"tn.t A1"~fn~~1 .......h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 02 Depth: O.60m DATE RECEIVED:


------­ ----------­
SAMPLLE DESCRIPTION : Greyish Brown well Sample NO.: B-1
-~----~------~-~-- ----------1

ENVT. COND TEMP HUMIDITY: 40%


Test Started Date 2310112022 Test Completed Date: 2410112022
------­

NO:

K-7

OF SAMPLE + CAN (WET) (gms) 508.73


OF SAMPLE + CAN (DRY) (gms) 499.06
OF WATER (gms) 9.67
42.76
OF DRY SAMPLE (gms) 456.30
ER CONTENT (%) 2.12

Tested By: A.Rahman Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
P.O. UO>l.30.2.7:1. Vl:'ldf)bu AJ.SiA';lY:i:ioll. tvJVA...... 5.1000.. KSA T~~~phOr.t!!: +966 (:14) 32s.D"-J92 I 9250"",)93 F;:).x: +9G6 C14) 32$09"6 £n'\nH::.l"d'...y.anbu@efla.<eo:\.Che:r.u::;oe:.... COn'll
Loc..atk>o:. .A)~N.;wWO\I"II~ru. 5u·...,.(I:1". tial A)-" ..",,,h,,,,·n r.)h.I.¥""i:£;"t, R,C. .• ""t.u·.l.,u .A~-Sh ....... l"'iJh

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gayal transmisssion system. (LD·03) DATE SAMPLED: 16-01-2022
SOURCE; TP: 02 Depth: 1.20m DATE RECEIVED: 22-01-2022

LLE DESCRIPTION : Greyish Brown well graded SAND with clay &. gravel. Sample NO.: B-2

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
------­

SAMPLE NO:

CAN NO: B-20

wr. OF SAMPLE + CAN (WET) (gms) 507.18


wr. OF SAMPLE + CAN (DRY) (gms) 497.65
wr. OF WATER (gms) 9.53
wr. OF CAN (gms) 41.75
wr. OF DRY SAMPLE (gms) 455.90
WATER CONTENT (%) 2.09

Tested By: A.Rahman Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB·PHY·SOIL -15·02
01.08.2021 Copy Right Resrved by RGF
't.::-L--~(J/!,~~~~-'f~
RiVADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. UQ>C ~0.27::l.. ~"-&6bu N.Sf",';'ly~h. M¥AS 51000., KSI\ TI::.I.epht:>nel +!9-66 (:14) a:;;l,5U992 I B25Q99:iJ F-'II:l(; ,..966 (14) 9':l;:;':O'O'.II1:\. 'i?~Jt;I,," ·rufyy.",..tH,@I""'tl~~o~h~hC)e ••C:QM
\Q.O;.·OlOljQ";.AlI-N"'\VJiH~iiU·\(f S'lI'~Vt~ .,1; .., 1 At-.-Mllhi>n OtJitri{·.t.. it."";'. "V..-n'bQ A1-!"iln.dv.,h

TP : 02 Depth: 2.00m DATE RECEIVED:


------ --------
DESCRIPTION : Greyish Brown well graded SAND with clay & gravel. Sample NO.: S-5
-------------1

ENVT. COND TEMP HUMIDITY: 40%


Test Started Date 2310112022 Test Completed Date: 2410112022
------------

SAMPLE NO:

CAN NO: K-5


OF SAMPLE + CAN (WET) (gms) 487.09
OF SAMPLE + CAN (DRY) (gms) 475.47
OF WATER (gms) 11.62
WT. OF CAN (gms) 38.67
WT. OF DRY SAMPLE (gms) 436.80
WATER CONTENT (%) 2.66

Tested By: A.Rahman Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-S01L-15-02
01.08,2021 Copy Right Resrved by RGF
"C- L:-l..::.--V I., ,:: :: ~
•...:;.; Lf'-:;-'../ f ~
An lEft. Cornp.~an~y..b::=~ RIVADH GEOTECHNIClUe & FOUNDATIONS <::0.
!if r, u ....·.. ",HI ~ J1', ..,,.rtf\l! O,.·.~n."lvwl', ....1Ym,'{ ~ a no!\)" ~fi."\ TJflrl'l~ll.n1ff' t;;.nit-. ~Jj l a:;,f:rQIUII';;J: I ~I:I1 :f'Vlltlf;;' I·;;'}r.~ 4f>U•• , ~ I .11) ,I~~ 1~(H>Aa, if1h41'~ _·to"y,nj'I.:'I.IlJ:ll.t.t+n.~j~'~"'loI~rtiltl"" ,.,UtTI
lo<:.;t'k;>.o!. p,)-No)'YV.ilInand ~ln;;·lI;I.t. tLaI A __M<Jn;;i-H r)lt",Ui(;I', It>(~y. 'V.:)nJ;l\> N-~l","')~\f:!ll"

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 03 Depth: O.60m DATE RECEIVED:


------­ -----------
SAMPLLE DESCRIPTION : Greyish Brown SAND with silt. Sample NO.: B-1
----------~~~-------------------- ----------------1

ENVT. COND TEMP HUMIDITY: 41%


Test Started Date 2310112022 Test Completed Date: 2410112022
------------

SAMPLE NO:

B-09

493.65
OF SAMPLE + CAN (DRY) (gms) 470.84
OF WATER (gms) 22.81
OF CAN (gms) 41.24
OF DRY SAMPLE (gms) 429.60
CONTENT (%) 5.31

Tested By: A.Rahman Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY·SOIL·15-02
01.08.2021 Copy Right Resrved by RGF
.... o~ tio)c' 302:1:1. Vn"bu N.Sh:~4tYlll<h~ MYA-s 5:1000,. KSA Tf1.I~phopot'>: .<:I>G6 (:14) a'2,!rtH.l9:! I J,J:lSQ!iH,:a VI:tX: +9t).ol> (1.... ' ::J::!M1!!1.tf. t,l't\:!ilf~ ..AI....y.lloh~tg2~t'!3.,:N:>j..:;l-eI'li!.~A.<:o.m
-..'Ilt"""'Ol'll ;Al·N~·Wi;ln"'I'\(I Sj;a'lIt'o(/"t~ fl"'" A' M~hO)n ~... t'xb'h',l. H.-C,. V.anbu ~'f foll1."ly,~h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 03 Depth: 1.20 m DATE RECEIVED:


---­
SAMPLLE DESCRIPTION : Greyish Brown poorly graded SAND with silt. Sample NO.: B-2
--------1

ENVT. COND TEMP HUMIDITY: 41%


Test Started Date 23/0112022 Test Completed Date: 24/0112022
------­

NO:

B-09

OF SAMPLE + CAN (WET) (gms) 510.50


OF SAMPLE + CAN (DRY) (gms) 498.75
. OF WATER (gms) 11.75

41.24
OF DRY SAMPLE (gms) 457.51
CONTENT (%) 2.57

Tested By: A.Rahman Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
~"ID ~ c...l..:::-~U I~ ::: :: ~~~ if ,-::?..-J I ~
An ERI Co",,,,,,,,, 1~..J:!:'.t\!l'.' v.~. RIYADH GEOTECHNIClUE & FOUNDATIONS CO.
v~o. au.. Jl027"~ ~"'l"'1bo At..sIO;lY>1-h. t....r'f~~ :s::.otx>.. K.SA Tejc-phone: +966 ('.l4) 3750'1,)92 I ~~i5Q!)1)3 FA)(! +s,oG6 (14) 32SOD<<'tG iim::.lh f'tf'...y,nnbo4Jtetf{\eos."Ch~:t'}1!:>e!:t..c:on'\
t..ot.w.".',nH~>n!. Al~N.;rw";<ln.;rn('ll5t'r."I'Yt. t<tul A~~M .. h~, ot~il,-t(;.-. n.c., 'V<ilAb\) Af-$lnJ)i'r';p,h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP : 03 Depth: 1.80m DATE RECEIVED:


----­ ------­
SAMPLLE DESCRIPTION : Greyish Brown well graded SAND with silt. Sample NO.: B-3
---------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------­

LE NO:

K-7

OF SAMPLE + CAN (WET) (gms) 471.94


OF SAMPLE + CAN (DRY) (gms) 455.80
WT. OF WATER (gms) 16.14
WT. OF CAN (gms) 37.65
WT. OF DRY SAMPLE (gms) 418.15
WATER CONTENT (%) 3.86

Tested By: ATTIYA Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
P.O. OO)! :10.2:7'~. V6fibti N,$fn;ly~h, "'''VAS 5'!1ooo", KSA Tc.~t<>f$h~t +'966 (14) 325-0992 I :325Q9;9:it F.':W:)(~ +966 (1.,;;1) 32:S09~6 £:rh;;aU! :r(l'''Y;)nbU@f'':tr.e.~o~ten"",e"",ebM
tr,x:",lfoo:. Al-Nit1l'Van:<H'HJ 5't:....:·... t. Hal AJ_M~hiH) f)t\tvk,t. R.<; •• vanhu Al-.$.fl-<lot ... .,h

CLIENT : NEOM. PROJECT NO.: 21J4037


----------1
PROJECT : Neomdesolinotion ptontto goyot tronsmisssion system. (LO·03) DATE SAMPLED: 17-01-2022
----------1
SOURCE: TP: 04 Depth: O.60m DATE RECEIVED: 22-01-2022
------ -------
SAMPLLE DESCRIPTION : Greyish Brown well graded SAND with silt & gravel. Sample NO.: B-1
----------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------

NO:

AB-1

OF SAMPLE + CAN (WET) (gms) 634.84


OF SAMPLE + CAN (DRY) (gms) 627.02

OF WATER (gms) 7.82

47.42
OF DRY SAMPLE (gms) 579.60
CONTENT (%) 1.35

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB-PHY·SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
~An~E~R~I~~~~~~~;;;;J RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
p~o, JloX :90271, vnrttHJ At~5fn;"tY~h. ""'·"VA.-"J. S:lOOO" KSA Tt>JlI.'phon,1!>! +966.(:1.4) 3:;n'..0!'"l92 /325QQ'!);a 1'1300)(: +966 (14) ;'j:'!509~.(i ~,t)1o)';l;1l~ ...... '·.y;u.bu(fi\>..t:tiiJ-tto~nc.oe"':.c_Qln
\<OoI'''''''fnor. "")·N~w"'rJI",nd ::5tn'l'v.'~ H;A& ,A)··M,lh,ll1i I')hi.,.ic,r. " ..!C., Y;.v\bu Af-Sh'>ll'IV:o;JIh

: Neom desalination plant to gayal transmisssion system.(LD-03) 17-01~2022

TP : 04 Depth: 1.20m DATE RECEIVED:


-----­ ------­
SAMPLLE DESCRIPTION : Greyish Brown well graded SAND with silt &: gravel. Sample NO.: B-2
--------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 23/01/2022 Test Completed Date: 24/01/2022
------­

SAMPLE NO:

CAN NO: K-11


WI. OF SAMPLE + CAN (WET) (gms) 743.65
OF SAMPLE + CAN (DRY) (gms) 686.06
OF WATER (gms) 57.59
WI. OF CAN (gms) 50.36
WI. OF DRY SAMPLE (gms) 635.70
WATER CONTENT (%) 9.06

Tested By: A.AZIZ Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB- PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
r---==--_-., c..l.::-~U Ii' ~~ t./'L::?-' I ~
~An~E~R!!!I~~~~~~~;;;) RIVADH GEOTECHNIQUE & FOUNDATIONS CO_
P.O. Uo:>;: 302::7:(. 'Vnnbu AI...sfn;lYiilh. 1\..>IYAS S:::rOOO~ KSA T0hi»phane~ +9-66 (:14) 3:2"SOi!}!'):l1 325(5)9::.,. F~x: *9fi.6. U.4) 3:;t;SC!t4C> 1!i'1"fIo~;1~ #"Rf"YJ.Ulobu®.... tfe.~C>S:<:,,;e~.::eli-,c;bftt'>
"«:w:'•.n fOfH. ,.n.l·Nl);w.... n;1llnd ~-,;,I·'P.~T. H1oIo) AHr.....i:.:r.ho:ln r.lhlr-t<:,t, ftc,CT> \o'er.bu Ai-'Shl.<lly.. h

CLIENT :NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to sayal transmisssion system.(LD·03) DATE SAMPLED: 17-01-2022
SOURCE: TP: 04 Depth: 2.00m DATE RECEIVED: 22-01-2022

SAMPLLE DESCRIPTION SAND with Clay. Sample NO.: B-3

O
ENVT. COND TEMP 23.5 C HUMIDITY: 38%
Test Started Date 2310112022 Test Completed Date: 2410112022

F-5

OF SAMPLE + CAN (WET) (gms) 656.30


OF SAMPLE + CAN (DRY) (gms) 630.21
OF WATER (gms) 26.09
OF CAN (gms) 44.65
OF DRY SAMPLE (gms) 585.56
CONTENT (%) 4.46

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB·PHY·SOIL·15·02
01.082021 Copy Right Resrved by RGF
P.O~ OO~ 3027:1., V:.\hbU At-filn;'tyah.1VtYA.,S S;lC)O()", KSA. .~1C'ph~:: +966 (:14) 32.~2 I 325<)9093 FAli: .9~ (:14) g2S0!J'46 Jrit1"\,dh ""8'...y.."t'lb1..'@~~fg.e-CJo.t..<:";l:encoe:f,.c.ptn
t.O<:?.. lfoo! .AJ-N_,;lo"".~nd :St9·~. *Ml Al~M#hl1J) r...bf.. 1i:'1:.~ R.<.. •• Y"'I'"tbU Ai-~"'n.<)f'i.. h

CLIENT : NEOM. PROJECT NO.: 21J4037


-------1
PROJECT : Neom desalination transmisssion DATE SAMPLED: 18-01-2022
--------1
SOURCE: TP : 05 Depth: O.60m DATE RECEIVED: 22-01-2022
---- ---------- --------1
SAMPLLE DESCRiPTION : Greyish Brown poorly graded SAND with silt ft gravel. Sample NO.: B-1
-------1

ENVT. (OND TEMP HUMIDITY: 36%


Test Started Date 23/0112022 Test Completed Date: 24/01/2022
-------

SAMPLE NO:

(AN NO: K-3

WT. OF SAMPLE + CAN (WET) (gms) 718.90

WT. OF SAMPLE + CAN (DRY) (gms) 707.90

WT. OF WATER (gms) 11.00


WT. OF CAN (gms) 46.35
WT. OF DRY SAMPLE (gms) 661.55
R CONTENT (%) 1.66

Tested By: A.AZIZ Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1S-02
01.08.2021 Copy Right Resrved by RGF
-c:...L:-L::.--U I!, ~~ ~~~, ~
:",,,IERlc<>mP""Y RIVADH GEOTECHN10UE & FOUNDATIONS CO.
P.O. OoJot 3002_7:1. Vu.nbi.! N~JnblytJh. MVAS 5:1000.. KSA Te'~ph~: *,966 (:14' a2.s.0'99:,z / »:ZSO!:H):i) F{Iox~ .966 (14) :;12500<160 IF.,.n>>U.~ "'n'''V.anb~..iI!J>''''tlgttO~.ie,...e''''~A'''f>t'n
lo("·,;:nton~ ,I\,\-N;xW'.\oand S-tn~et'~ d-alAl·Milh.." Ohtrk.t, fc(; ... V ...nbu N-Slru\tV.:.h

CLIENT : NEOM. PROJECT NO.: 21J4037

PROJECT : Neom desalination plant to gayal transmisssion system.(LD·03) DATE SAMPLED: 18-01-2022
SOURCE: TP: 05 Depth: 1. 20m DATE RECEIVED: 22-01-2022

SAMPLLE DESCRIPTION : Greyish Brown poorly graded SAND with silt & gravel. Sample NO.: B-2

ENVT. COND TEMP HUMIDITY: 36%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------

SAMPLE NO:

CAN NO: B-7

WT. OF SAMPLE + CAN (WET) (gms) 569.31


WT. OF SAMPLE + CAN (DRY) (gms) 559.66
WT. OF WATER (gms) 9.65
WT. OF CAN (gms) 42.31
WT. OF DRY SAMPLE (gms) 517.35
WATER CONTENT (%) 1.87

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
P~O. fh:>>( ;;)027:1. 'Y:ln;t;.u N'6fn.:bIY~h. "'''VAS S~H100~ t':SA TeJc-phuJ'l.e: +966 (:1,11.) 21:2:S<W~2 I !?l:::r5(Hi~9:;) 1-':11><: +966 C.14) 32~'!JI46 £'l'n31J;: 1-e:f.yantli.Un>C1rfBoeCo~le"c:.e •• ~OI'n
lQ£.";a,too;. .ni:-Ni'K.......~HUl~tj .5'tnllot>:l:" .MIAi~M .. h~.1'l fJhly'k.l:. \"t.':,. Yl)nu\) ~-:Sh'.;)JIV:oJh

CLIENT :NEOM. PROJECT NO.: 21J4037


--------1
PROJECT : Neom desalination DATE SAMPLED: 18-01-2022
--------1
SOURCE: TP : 05 Depth: 2.00m DATE RECEIVED: 22-01-2022
---­ ------­
SAMPLLE DESCRIPTION : Greyish Brown poorly graded SAND with gravel. Sample NO.: S-6
--------1

ENVT. COND TEMP HUMIDITY: 37%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------­

G-3
OF SAMPLE + CAN (WET) (gms) 5
OF SAMPLE + CAN (DRY) (gms) 600.44
OF WATER (gms) 11.91
38.45
OF DRY SAMPLE (gms) 561.99
CONTENT (%) 2.12

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
AnERlc<>rnp,""y
I'!({;f> ~I c..L:-'_::'----U f~ :.:
t'.m.!\W.l£J RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
w - ...:;;~ ~ '-::?---' I ~
P_D. DQJoC 30.2.7:1. 'Vunbu AI •.sh~;'Y;,:)h. MYI'\S 5:1000.. Y.SA Telephone: +966 (:111) 32S09!>12 /S25-O!)9:;) F~)(! +966 (14) 3250946 F.m:ai1:! l"g'...y.IU,bU@.e.l¥.gc,.:::.:«::I"",nc:oelJ..collf1l
L'O(":alk;.n:. ..rr.1.Na...van.and :5it,n:,lft't. Hal .Al-M""h~n D;~tTil;";t. ~,C .......anbu ~--Sh'M'IV+Jh

TP : 06 Depth: O.60m DATE RECEIVED:


------­ ----------­
E DESCRIPTION : Greyish Brown poorly graded SAND with silt ft gravel. Sample NO.: B-1
--------------1

ENVT. (OND TEMP HUMIDITY: 38%


Test Started Date 23/01/2022 Test Completed Date: 24/01/2022
------------­

SAMPLE NO:

CAN NO: B-1

OF SAMPLE + CAN (WET) (gms) 680.45


OF SAMPLE + CAN (DRY) (gms) 671.25
OF WATER (gms) 9.20
66.58
. OF DRY SAMPLE (gms) 604.67
CONTENT (%) 1.52

Tested By: A.AZIZ Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
'C..--L-~Uf.!' ~~ ~y~l~
An ER! Corr>pany RIVADH GEOTECHNIQUE & FOUNDATIONS CO.
T'.O~ uo~ 3~7'1. Yllnt».< AJ.Si",;IYil)h, .f\"fVAS 5'000", Y.:5A 'l'I;tll2'phono! .06"6 ('101) a:orSCl"J92 /32S099!:;) """'>I:: +96«; (1 .... ) 302:50946 E--":aU"!. rR'VYJu"bU«pIi:I,ff""'II'o...el£!nv:oe'fl.cc:.tn
t<\.K.:Hk.. ,,! AJ.N.a-w-Af'q~n<f :5u~";I't~ H~IA1_'Vh:ilh.:ll-T\ I)hlf'kt;. ft.C., Y.anhn AJ·slo<)tV<Jh

TP : 06 Depth: 1.20m DATE RECEIVED:


------­ ----------­
SAMPLLE DESCRIPTION : Greyish Brown well graded GRAVEL with silt & sand. Sample NO.: B-2
--------------1

ENVT. COND TEMP HUMIDITY: 36%


Test Started Date 23/01/2022 Test Completed Date: 24/0112022
--------­

SAMPLE NO :

CAN NO: P-3

OF SAMPLE + CAN (WET) (gms) 554.80


OF SAMPLE + CAN (DRY) (gms) 547.66
WT. OF WATER (gms) 7.14
WT. OF CAN (gms) 45.66
WT. OF DRY SAMPLE (gms) 502.00
WATER CONTENT (%) 1.42

Tested By: A.AZIZ Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YN8-PHY-SOIL-15-02
01.082021 Copy Right Resrved by RGF
RIYADH GEOTECHNJClUE & FOUNDATIONS CO.
p~o" Qt)o( 30Af71. YntU>Q Ah$ro';;'rY~h • .,."."VI\S ;53.000.. KSA "rC'101!"pho~! +966 {14} 3:.:./',5.Q992 I ».250!i)93 F""X~ ...gt::;.6 (14) 3:2':509... 6 Etnallt 1f'«,..y,.u·.hu@"'1't3~'::'!i;Cjet'J"".e..,.47('>M
'.o.·.~HI'(>n~. M-N"'W"i,H,~nd :5t·,..r,""'t~ tt~l.At-Mii;h;vn 1')t"U-'.ct.. ft ,C.. .... j,. . .,hu Al_S~naly~h

SOURCE: TP : 06 Depth: 2.00m DATE RECEIVED:


------­ ----------­
SAMPLLE DESCRIPTION : Greyish Brown well graded GRAVEL with silt & sand. Sample NO.: B-3
--------1

ENVT. COND TEMP HUMIDITY: 37%


Test Started Date 23/0112022 Test Completed Date: 24/0112022
------­

SAMPLE NO:

CAN NO : E-9

OF SAMPLE + CAN (WET) (gms) 577.90


WT. OF SAMPLE + CAN (DRY) (gms) 569.80
WT. OF WATER (gms) 8.10
WT. OF CAN (gms) 45.66
WT. OF DRY SAMPLE (gms) 524.14
WATER CONTENT (%) 1.55

Tested By: A.AZIZ Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
f1:»<! .. ~G6 (1.4) 11250946 Etn;31J-:. r8'~yanbU@}"Hfg~o~i:ence:s..«:otn
tJb!lrllCt". R,'C•• Y.;!I;1oUtl ,AI-sr,~ly.,h

: Neom desalination DATE SAMPLED: 20-01-2022

TP : 07 Depth: O.60m DATE RECEIVED: 22-01-2022


-----­ ---------­
SAMPLLE DESCRIPTION : Brown SAND. Sample NO.: B-1
--------t

ENVT. COND TEMP HUMIDITY: 39%


Test Started Date 2310112022 Test Completed Date: 2410112022
------­

SAMPLE NO:

CAN NO: M-10


WT. OF SAMPLE + CAN (WET) (gms) 971.62
WT. OF SAMPLE + CAN (DRY) (gms) 947.60
WT. OF WATER (gms) 24.02
WT. OF CAN (gms) 210.70
WT. OF DRY SAMPLE (gms) 736.90
R CONTENT (%) 3.26

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF· YNB·PHY ·SOIL·15·02


01.08.2021 Copy Right Resrved by RGF
I ~~ L1i:J11..:..-L:A_::.---(JI..' -= G. - ...:;;;~ t./ ~-' f ~
An lEft. Co,""any ~;~. ~ RIVADH GEOTECHNIOUE ; . F OUN';ATIONS CO_
P~O. DJ)4. 30.2'7'1, VanbU AJo.oSEr.;;lYi)h. MY""S 53.000~ Y,5A Tch~phoJ\<C": +966 ('1 ... ) a2SO"~g2 I 9250993 f'~X: . 9 6 6 (14' 9.:2:'>090"6 E::rn:nil'!. "n'·'Ya"bu@etlg.e-~h!:,.",::::oe!l.con'1l
"QC::"".foo~ ....}-N.:l"wanand St.n",m~ t-h,,1 AI-rvl~h~n V1.u,.-k..... fL<"_.• V.a-ntn.l M-S(~.YiJh

CLIENT : NEOM. PROJECT NO.: 21J4037


---------1
PROJECT : Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 20-01-2022
---------1
SOURCE: TP : 07 Depth: 1.30m DATE RECEIVED: 22-01-2022
------ -----------
SAMPLLE DESCRIPTION : Brown poorly graded SAND with gravel. Sample NO.: B-3
---------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
--------

SAMPLE NO:

CAN NO: T-6


WT. OF SAMPLE + CAN (WET) (gms) 560.55
WT. OF SAMPLE + CAN (DRY) (gms) 542.65
WT. OF WATER (gms) 17.90

WT. OF CAN (gms) 45.66


WT. OF DRY SAMPLE (gms) 496.99
R CONTENT (%) 3_60

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
c...L::-L::.---V I., ~~ <../ ~~ I ~
RIYADH GEOTECIINlauc & FDUNDATJOl'-lS CO.
P.O, Do,. 30.z'7'J.~ YtH'libu A'~Sln;lyi)ll. J\1YAS 5"000.. KSA TIfi'J4"phfl~: +-1>(i6 ("4) a::ls.o<'J92 I B2-SQl'....'U'3 vax: .9&6 (14) ::.::lSQ'l>46 £fh31J! 19r..y.l'U"lbU@.-:ttg:oIfC>$dt':"l'>E':lt.eon't
\.o('.</I'k:.o: ,IU-NG.W'l\\"IoAfU'f ::':<;""I')"..-t• • ht.l Al ~\"~h!R," DtJitJlic,t. A ,C•• ,.,...~"t'M,1 AI-:5lo!\lV"h

CLIENT : NEOM. PROJECT NO.: 21J4037

PROJECT : Neomdesalination plant to gayal transmisssion system.(LD-03) DATE SAMPLED: 20-01-2022


SOURCE: TP: 07 Depth : 2. SOm DATE RECEIVED: 22-01-2022
LLE DESCRIPTION : Brown poorty graded SAND with gravel. Sample NO.: S-7

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------

E NO:
T-6
OF SAMPLE + CAN (WET) (gms) 548.77
OF SAMPLE + CAN (DRY) (gms) 526.33
. OF WATER (gms) 22.44
OF CAN (gms) 45.66
. OF DRY SAMPLE (gms) 480.67
WATER CONTENT (%) 4.67

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar


-------
Approved By: Awais Nisar Yasin

RGF~ YNB·PHY-SOIL-1S-02
01.08.2021 Copy Right Resrved by RGF
P.o.. ftoJoi 30271~ VanbU AI-Sln;IY~h. ""VAS 5l.000~ KSA TI:l-Je-pho'f\(;O! +~G< (.til' a:;.r,$Q<f")s)2; S::I:!s..o:9'93 V::.X: .9(;.6 (14) 112!'"C941l. J,jI'(u.iJ-1 'i'l\f..ynrd:;uO""Hgc-C'.+~l ....r.c.e:",.cot\')
lO<.aHt)'ol.AATNawa"'ltnd :SU'~(1it~ U,"l Af-M1lh<ln r"h.tJ'h:.t'.fl.<:". V.anbu A:I-"SlOo<lotv~h

CLIENT : NEOM. PROJECT NO.: 21J4037


---------1
PROJECT : Neom desalination plant to gayal transmisssion system.(LD-03) DATE SAMPLED: 20-01-2022
---------1
SOURCE: TP : 08 Depth: O.80m DATE RECEIVED: 22-01-2022
------- -----------
SAMPLLE DESCRIPTION : Brown well SAND with silt & Sample NO.: B-2
---------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
-------

SAMPLE NO:

CAN NO: N-6

OF SAMPLE + CAN (WET) (gms) 1069.04


WT. OF SAMPLE + CAN (DRY) (gms) 1031.50
WT. OF WATER (gms) 37.54
WT. OF CAN (gms) 215.30

WT. OF DRY SAMPLE (gms) 816.20


CONTENT (%) 4.60

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1S-02
01.08.2021 Copy Right Resrved by RGF
~~ v "C...-l.:..-l..;:::.--'U I jJ , - '" • ~~ t./ f~ L;:./-'
An ER. Corropany ,~;7!:J' U.A' RIVADH GEOTECHNIClUE ~ ~OUN';ATIONS CO_
P.O. uo)t 30.27:1., YllInbu A"S'~;'l\1;1h. MVA.S S::U}t>O.. KSA TeJ~pho~! +966 (:I."') a7S09!>2 I 3250993 F:lrx: -+96<> (14) 92$0946 IOm'ail::. "·U'...y.lu'lobu@-.etJg.<ep~;:-enc:oe:B-.col'V)
-'1()(".a-H"t"J~ AJ.NallV",n:and 5u·'~"f."t-. H~I AI-M~h;;;n r .. ht.,-i<;;l. R.C., VOJnbu A1-Sln""tVilh

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT

SOURCE: TP: 08 Depth: 1.20m DATE RECEIVED:


---- -----------
DESCRIPTION : Brown well graded SAND with gravel. Sample NO.: B-2
----------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 2310112022 Test Completed Date: 2410112022
--------

SAMPLE NO:

CAN NO: K-11

OF SAMPLE + CAN (WET) (gms) 847.67


OF SAMPLE + CAN (DRY) (gms) 832.00
OF WATER (gms) 15.67
OF CAN (gms) 135.70
OF DRY SAMPLE (gms) 696.30
ER CONTENT (%) 2.25

Tested By: A.AZIZ Checked By 1 Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB·PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
P~O. ,,0)( :;;tUX.7':t.. Ylu'Ibu Af"5f!'\;;lY\)h~ I\.<1VAS S:lODO... Y.SA T~le-phone-! +.966 (14) a.:;l$Q9~:l1 !i):;l50r,)t)~. f.n)(l +966 (:14) a2$09",,6 E,-n:n.1J-:. I"R'-YJlt.I"\l:)UI!P1t!,lg,coMC;ienc:elli.<oom
\-04.:"UI1',>I')::' M·N;.Kyvan:;Hl,(i $t"....oe:'i. HuIAI·M ... hun r'.J'hu'i.::r. 1'11:,,::,. "".anb~~ Af-Sin..lol'r':o;h

: Neomdesalination plant to gayal transmisssion system.{LO-03) DATE SAMPLED: 20-01-2022


---------1
TP : 08 Depth: 2.00 m DATE RECEIVED: 22-01-2022
----
DI-\,JV\t"_LC DESCRIPTION : Br own well SAI~D with Sample NO.: S-6
-------;

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 23/0112022 Test Completed Date: 24/0112022
-------

SAMPLE NO:
CAN NO: K-11
WT. OF SAMPLE + CAN (WET) (gms) 750.80
WT. OF SAMPLE + CAN (DRY) (gms) 730.25
WT. OF WATER (gms) 20.55
WT. OF CAN (gms) 135.70
WT. OF DRY SAMPLE (gms) 594.55
CONTENT (%) 3.46

Tested By: A.AZIZ Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB-PHY·SOIL·15-02
01,08.2021 Copy Right Resrved by RGF
RIYADH GEOTECHNIClUE & FOUNDATIONS CO_
P.O. Ue»c 3027:1. YrtnUO AI...sh·~;:'lyal_. MYAS .5-1-000,. Y.SA . TeJ~phon.e--~ +'!\)-G.& U,IJ, 3':Z:>09~:l: ; a:;t!.>tvH3 Vax: "!ii~ (14) a.L!=>VY"'f}. 'i';nhdk 'U'~':r'.l~T.l:<4HW.tlr~,jJ.tH';.U>e)i.""-rtil.e.,fJtln'Y\
t..:,\('.·.'.Hk.~I',It. )1\. NI~' ...Mn!ilr'if ':'iiu,..... l. H-II ~~~h'h.h .... 1".. ,,11",', i't,C" "'(...,.nh~~ A¥-::7hlJ.l.t),.. h

PROJECT : Neom desalination plant to goyal transmisssion system. (LD-03) DATE SAMPLED: 22-01- 2022
SOURCE: TP : 09 Depth: O.30m DATE RECEIVED: 03.02.2022
---------­ ------­
SAMPLLE DESCRIPTION : Brown Poorly graded SAND with Silt &gravel. Sample NO.: B-1
------------f

.ENVT. COND TEMP 23. 'flc HUMIDITY: 40%


Test Started Date 04.02.2022 Test Completed Date: 06.02.2022
------------­

SAMPLE NO:
CAN NO: N-06

OF SAMPLE + CAN (WET) (gms) 641.88


WT. OF SAMPLE + CAN (DRY) (gms) 622.90

WT. OF WATER (gms) 18.98


WT. OF CAN (gms) 47.60

WT. OF DRY SAMPLE (qms) 575.30


WATER CONTENT (%) 3.30

Tested By: A.AZIZ Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1S-02
01082021 Copy Righi Resrved by RGF
RIVADH GEOTECHNIQUE & FOUNDATIONS CO_
"AX: +966 (:14> 32::>.0946 1Tt'<";aHo::. 1G'..,yar.bu@.e:dgf!"o!r<.:i1!':1,,(;..e:l$.t:o~
Dht,h::l. it,C•• Y.u"tl"u Af-Sh\.<ll)"OIh

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gayal transmisssion system, (LO-03) DATE SAMPLED: 22 -01-2022
--------1
SOURCE: TP : 09 Depth: 1.20m DATE RECEIVED: 03,02.2022
---­ ------­ --------1
SAMPLLE DESCRIPTION : Brown SAND with Silt Sample NO.: B-3
--------1

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 04,02.2022 Test Completed Date: 06.02.2022
------­

SAMPLE NO:

CAN NO: B-02


OF SAMPLE + CAN (WET) (gms) 765.09
OF SAMPLE + CAN (DRY) (gms) 744.30
. OF WATER (gms) 20.79
153.70
OF DRY SAMPLE (gms) 590.60
R CONTENT (%) 3,52

Tested By: A.AZIZ Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB·PHY·SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
-c:..L:-~U I~ .-:ili ~ ..:;.;~ <./ '-=?~ ,~
An ER. COlnP""''' RIVADH GEOTECHNIQUE & FOUNDATIONS CO.
P.o. no>! 302:7'-. V,:u.,bu N.{5;r.;lynh~ MVA$ $;1000.. KSA TeJ"'phone; +!!>6()' (;Vl) a2S0992 1325(>993 F4:~~ +'9(>6. (1~1') a2~~4'" lirn:;,lh "flf"Y,anl'H.. @""'tllol!:tH..~ll!n-C;>e:"..co"",
Locatfoo:.Ai·NavvAncand :$-tYv.>t't. H~I ""-!Vt:.l'hiW\ Lohulc:.t.. k,C.• Y<lIintlu A1-Sh""""t.,..",h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination plant to gayal transmisssion system.{LD-03) DATE SAMPLED: 22-01-2022
SOURCE: TP: 09 Depth: 2.00m DATE RECEIVED: 03.02.2022
SAMPLLE DESCRIPTION : Brown Poorly graded SAND with Silt &.gravel. Sample NO.: 5-6

ENVT. COND TEMP HUMIDITY: 38%


Test Started Date 04.02.2022 Test Completed Date: 06.02.2022
------­

NO:

M-3
OF SAMPLE + CAN (WET) (gms) 634.53
OF SAMPLE + CAN (DRY) (gms) 613.90
OF WATER (gms) 20.63
WT. OF CAN (gms) 65.30
548.60
CONTENT (%) 3.76

Tested By: A.AIII Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YN8-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
P.O. Ill.»< 30271, V...nbu Al.51"~i1ah. MVA'$ 5'1()OQ~)(SA "to!1<:<phone; -.-966 (14) 325.c;!J!J~ I :!I2S(}!}:l3 ":')1: ,+9G~ (1t1) 3:J.:501:M6 I!m~lI: tll,f.y,lo"l,h.l@C!:I'",eo"l;.lt'm:c,.(.~l.n
ltl1::::..Uuh: Al,Nawal).,lld ~t"l!i:C U4t Al"v;iilla" OHtfl(.t. n.¢.. Y,tHbU AJ.:$I;H.I!l":,th

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 15.01.2022
TP: 01 DEPTH: 0.60 m DATE RECEIVED: 22.01.2022
Greyish Brown well graded SAND with silt 8: gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 23.8 0 C HUMIDITY: 39%
DATE STARTED: 23.01.2022 COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" 0.0 0.0 100.0 CAN NO. L-M
II 2" 201.4 8.2 91.8 WT.(SOIL+CAN) WET:
------
2716.40 gms.
1 112" 300.3 12.3 87.7 WT.(SOIL+CAN) DRY: 2696.40 gms.
------
1" 319.7 13.1 86.9 WT.OFWATER 20.00
3/4" I 423.1 17.3 82.7 WT. OF CAN 252.60

~
720.8 29.5 WT. OF DRY SOIL 2443.80
#4 1006.7 41.2 WATER CONTENT: 0.B2
#10 1540.2 63.0 37.0 REMARKS:
#20 1890.1 77.3 22.7 NON PLASTIC
#40 2094.6 85.7 14.3
#60 2199.9 90.0 10.0
#100
#200 t- 2254.4 ...--..­
~~-;~.

2296. 5
-,--~-
92.2
94.0
7.8
6.0

1~~llm. 2443.80 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
in 80
Q 70
~ ;-60
~ 1§50
~~o
iii 3:30
~ 20
1t: 10
o
100 10 GRAIN SIZE IN ~ILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: Abdurahman Approved By: __A_w~a~i..:.s~t-.t~i_sa_r_Y_a_s_in_ _
----------------

RGF-YNB-PHY-SOIL-Ol-04
01.08.2021 Copy Rights Reserved By RGF
f An ER. Company
1'_0. nOl< ~D271.. Y"'n-t",,, i\'-!Ho;'v..h. MYA.~ 5100Q, t::SA
Cl;;...l.:---'U I, ~~ j',-:?~ r~
RIYADH GEOTECHNIGUE & FOUNDATIONS CO.
"tw:lepll(.)n¢: +9~6 (14) l.:t!HXHi2 I :U!jo;}93 flo ..,.,; ..91$6 (i.1) 'J15()94l1 t"n.:.U: rgf·V3nbu(;j}e.18eos-dC-t>a",.<:on..
lO'(;..tlO(l; Al,N01wa'..... Kf $.ti.;el. H:.l AM..',,\)~., tthWd. ~.<:_ 'I';,~ml;lu Al4Ij,,,,I'I.ah

CLIENT: NEOM. PROJECT NO.: 21J4037


--...,.......,.-::-:-::-::-­
PROJECT: Neam desalination plant to $layal transmisssion system.(LO·03) DATE SAMPLED: 15.01.2022
SAMPLE SOURCE TP: 01 DEPTH: 1.20 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with gravel. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 23.8 DC HUMIDITY: 38%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022
SIEVE SPEC. % PASSING
SIZE LIMIT WATER CONTENT: (ASTM D 2216-19)
3"
21/2" CAN NO. KSA
2" WT.(SOIL+CAN) WET: _ _2318.10
_ _ _ _ gms.
1 1/2" 0.0 100.0 WT.(SOIL+CAN) DRY: 2301.10 gms.
------
1" 222.4 89.1 WT.OFWATER 17.00
3/4" 265.7 86.9 WT.OFCAN 269.90
3/8" 395.5 80.5 WT. OF DRY SOIL 2031.20
#4 568.0 28.0 WATER CONTENT: 0.84 %
------
#10 1098.4 54.1 REMARKS:
#20 1505.9 74.1 NON PLASTIC
#40 1620.6 79.8 20.2
#60 1721.1 84.7 15.3
r-,--~-+----r------~-----r----
#100 1829.2 90.1
#200 1930.6 95.0
PAN 1932.5
TOTAL SOIL WT. 2031.20 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
;:;:; 80
Q 70
~ ;-60
e: [l340
ifj ~30
~ 20
g: 10
o
100 10 GRAIN SIZE IN tJn.LlMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------
Tested By: _ _ _A_'_A_z_iz_ __ Approved By: Awais Nisar Yasin
-----------------
RGF-YNB-PHY·SOIL·01-04
01.08.2021 Copy Rights Reserved By RGF
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. no,< :'10271. Yar>bu At.51,,;TYllh. MYA~ ~1.(H)(). KSA 'roelr'l1hone; ..-~O(j (14) 32~0992 I :<J25-()99:'J 1';:.)0:: +9(>6 (14) 31:~09<'16 I!ln.1l1: rllr.y3nbua>O:IIKeo'd'·... ~,..(;om
Lucatlor,; Al~N"'w;..\:tlld !t'l''''-':l. Hal AI,I'\,'t~Il:;;'1) D:$'..I,,'. 1'1.(:", ... .lII"bU Al.:$fh...IVah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 15.01.2022
SAMPLE SOURCE TP: 01 DEPTH: 2.50 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with gravel. SAMPLE NO.: 5-6
ENVT. CONDo TEMP. 23.9 DC HUMIDITY: 39%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022
SIEVE SPEC. WEIGHT % RETAINED % PASSING
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 112" CAN NO. K-T
2" wr.(SOIL+CAN) WET: 2178.10 grllS.
-----­
1 112" 0.0 0.0 100.0 wr.(SOIL+CAN) DRY: 2165.20 gms.
--...,.-:-----:--:--­
1" 208.4 11.0 89.0 wr. OF WATER 12.90
3/4" 322.5 17.0 83.0 wr.OFCAN 272.70 gms.
-----­
3/8" 461.5 24.4 75.6 wr. OF DRY SOIL 1892.50
#4 652.3 34.5 65.5 WATER CONTENT: 0.68 %
#10 1137.7 60.1 39.9 REMARKS:
#20 1510.7 79.8 20.2 NON PLASTIC
#40 1695.5 89.6 10.4
#60 1778.8 94.0 6.0
#100 1807.6 95.5 4.5
#200 1829.4 96.7 3.3
PAN 1832.6
TOTAL SOIL WT. 1892.50 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
in 80
o 70
i5j ;-60
~~O
Cii 3:30
2;2 20
6: 10
o
100 10 GRAIN SIZE IN rJlLLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


---------------­
Tested By: A-Aziz Approved By: ___A_w_a_is_ N
_ s_ar_ _
Y_as_in___ 1_'
--------------­

RGF·YNB·PHY·SOIL·01-04
01.08.2021 Copy Rights Reserved By RGF
f An ERI Company
P.O. 00... .802":7]:, V.n..t,y.AI."":iln;IYAh, MYAS :>'1000. MM
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
7~I,;.ph<Xl~; ~t) (14) :!-:.t:;~21 ~~~0:!>:93
tue..tfU(~r Al,N';;w.r\:lI~f ~tlo:<t.
'aJI;~ '+9($0 0.4) j'l.50!MO £mlfll: rl;\r.yanbufPt:d8~tn..cle'('!(;e50.t.mh
UbI AI,M.ahllh tJ4ltk,l. A.C., V.",bUAlo$fll.:',toly.ah

CLIENT: NEOM. PROJECT NO.: __2_1J_4_0_3_7_


PROJECT: Neom desalination plant to goyal transmisss;on system. (LD·03) DATE SAMPLED: 15.01.2022
SAMPLE SOURCE TP: 02 DEPTH: 0.60 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with clay ft gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.0 DC HUMIDITY: 40%
------
DATE STARTED: 23.01.2022 COMPLETED: 2501 2022 .
SIEVE SPEC. WEIGHT %R
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)

Ib¥d 0.0 0.0 100.0


CAN NO.
WT.(SOIL+CAN) WET:
PAK
2426.80 gms.

~ 2389.30
1 112" 95.9 4.5 95.5 WT.(SOIL+CAN) DRY: gms.
1" 230.5 10.8 89.2 WT.OFWATER 37.50
3/4" 283.1 13.3 I 86.7 WT.OFCAN 263.10 gms.
3/8" 392.8 18.5 81.5 WT. OF DRY SOIL 2126.20 gms.
#4 497.8 23.4 76.6 WATER CONTENT: 1.76 %

#10 841.4 39.6 60.4 REMARKS:


#20 1219.4 57.4 42.6 LL = 30
#40 1496.6 70.4 29.6 PL =21
1687.2 79.4 20.6
#100
#200
PAN
1804.5
1890.3
1902.0
88q
84.9 15.1
11.1

TOTAL SOIL WT. 2126.2() gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3i4" Jig" 4 10 40 100 200


100
90
~ 80
\.) 70
ei H30
~ gl40
;Z:05:
tIJ 30
~ 20
g: 10
o
100 10 1 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS

Checked By/Reviewed By: _ _....:.S...:...a...:...ee.:..d~A_kh_t_a_r-_


Tested By: _ _ _:...:.;:.;;..;.::..:.~_ _ Approved By: _.. .:A.. ;.w. .:. . ::.:.ai.. ;.s. .;.N.:. .,is.. .:a.:. .,r_Y.. .:a.. .:s.. .:ni__

RGF·YNB-PHY·SOIL-01-04
01.08.2021 Copy Rights Reserved By RGF
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
".0. DOl( ~Ol"11. V;>,>VV fti.st,,;JY/:It., MYA'S, 5:1000. '\I;:l.l\, 'f'ehrvh<:me; .,.966 (l~) ~2S()g9l' /3:t:HJ99i!a flax: +9136 (1",) ~:t5(}94G C.,....!t: f1:lr.ya"b\Ja.r:.IR~tH·dt'O()c~.<mn
lbt:MI<.ofl' Al.N"w';II\;:'1I1(i "~f~d. Hal AH..,.,h..n f>h.hl(,,~. ~.( .• Y,iU1IJU Ak$fll..IY4h

PROJECT NO.:
CLIENT:
PROJECT:
NEOM.
------------------------------~-----
Neom desalination plant to gaya! transmisssion system.(LD-03) DATE SAMPLED:
-21J4037
-16.01.2022
---­
SAMPLE SOURCE TP: 02 DEPTH: 1.20 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with clay & gravel. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 24.2 C
o HUMIDITY: 40%
DATE STARTED: 23.01.2022 COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 JfL I CAN NO. P-4
2" WT.(SOIL+CAN) WET: 2735.90 gms.
1 1/2" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 2698.30 gms.
1" 250.3 10.0 90.0 WT.OFWATER 37.60
3/4" 327.4 13.1 86.9 WT.OFCAN 194.30 gms.

3/8" 461.2 18.4 81.6 WT. OF DRY SOIL 2504.00 gms.


#4 557.3 22.3 77.7 WATER CONTENT: 1.50 %
#10 929.1 37.1 62.9 REMARKS:
#20 1395.4 55.7 44.3 LL := 32
#40 1840.2 73.5 26.5 PL= 22
#60 1958.5 78.2 21.8
#100 2145.2 85.7 14.3
#200 2212.3 88.4 11.6
PAN 2222.2
TOTAL SOIL WT. 2504.00 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
~ 80
o 70
~ r-.60
~ GsO
iil . . .30
~ 20
10
::e
o
100 10 GRAIN SIZE IN MILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


----------------­
Tested By: Approved By: __A_w_a_i_s_N_is_a_r_Y_as_in__
--------~------

RGF·YNB·PHY ·SOIL-Ol·04
01.08.2021 Copy Rights Reserved By RGF
An ERI Company RIYADH GEOTECHNIGUE & FOUNDATIONS CO.
f'_O. )lox M271. Ya!>bu A;.!H.)~lyl>f., M'I'A'S 5"10iXJ, 'I<SA 7'CI'Cphone: t!'){).t'j (1111) 32~2 /l250993 t<:Zl!: -.9(',1) (1"') 32::>0946 1;),..,,11: r"'_yanb..,Qlt:/1neClll-del'l<cc".>tmn
L(>.(; .. lk>r,: J\j.Naw,Mwll,' 'tl'e~t~ H.31.'.l"M;J1I~i. ChUf(:i. A.(:_.....1I'.l.iJ At.-;9,ll1bolyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system.(LD-03) DATE SAMPLED: 16.01.2022
SAMPLE SOURCE TP: 02 DEPTH: 2.00 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt & gravel. SAMPLE NO.: S-5
ENVT. CONDo TEMP. 24.1 0 C HUMIDITY: 39%
DATE STARTED: 23.01.2022 COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"

1~12'
CAN NO. XY
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 2684.90
12" 246.3 10.3 89.7 WT.(SOIL+CAN) DRY: 2639.10

~
" 456.1 80.9 WT.OFWATER 45.80
3/4" 495.2 79.2 WT.OFCAN 253.50 gms.
--~--:-::---

3/8" 639.3 26.8 73.2 WT. 'OF DRY SOIL 2385.60 gms.
----:--­
#4 791.7 33.2 66.8 WATER CONTENT: 1.92 %
#10 1213.4 50.9 49.1 REMARKS:
#20 1612.1 67.6 32.4 NON PLASTIC
#40 1914.3 80.2 19.8
#60 1987.5 83.3 16.7
#100 2121.3 88.9 11. 1
#200 2172.1 91.1 8.9
PAN L 1/ .......

TOTAL SOIL WT. 2385.60 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" J" J/4" 3/8" 4 10 40 100 200


100
90
rn 80
v 70
it l
2::
f/)
r-BO•

~ 650
:: i:L'40
i5 ::<:30
~
1:: 10
20

o
100 10 GRAIN SJZE IN MJLLlMETERS
- - - ---­
"
------­

0.1
- --­ .L

0.01
am 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: Attiya Approved By: _....:;A..:.,;w..;"a..;"i..:.,;s..;"N,;"..is,;"..a..;"r_Y..;"a,;"..s..;"in_ _
--------~------

RGF-YNB-PHY-SOIL-01-04
01.08.2.021 Copy Rights Reserved By RGF
~~ ~ Cl:-~(jI~~~JPl:?..Jf~
f AnERJeomp>nv ....
"_0, Dolt 21,0271, Y'Hl-bu AlxS'n~iY4h. MYA!:l ~1.000.

I<SA
uw RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
1'oeJ~.dU:>fl\!"~"19GO "4) :\2~099"::r I :\1$<W'93 till)!; "i'966 (l-t)tt'l5CJ940 £10,;;11, tRr.yat'>bu@l:!lg<!o)dtt.... o::e!>.'tulT>
1,(O(,uH()(,: Al.N01W..fl:40ll(j $tvt'l!:l. n ..l AI.Mall\,);. DHtfl(.\.l'I_C•• 'fJhl;ou AJ;,$If'J:.tvah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
------------------------------------------
Neom desalination plant to !layal transmisssion system. (LO-03) DATE SAMPLED: -----'1--"'6---:.0---:1---=.2::-::0--=-2-=-2­
SAMPLE SOURCE TP: 03 DEPTH: 0.60 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.1 DC HUMIDITY: 39%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
21/2" CAN NO. J-2
2" WT.(SOIL+CAN) WET: 2240.80 gms.
-----------
1 1/2" WT.(SOll+CAN) DRY: 2145.20 gms.
--------
1" WT.OFWATER 95.60
3/4" 0.0 WT.OFCAN 207.90 gms.
----:-":"':"----­
3/8" 24.2 WT. OF DRY SOIL 1937.30 gms.
------,-",---­
#4 88.3 4.6 WATER CONTENT: 4.93 %
#10 450.2 23.2 REMARKS:
#20 882.3 45.5 NON PLASTIC
#40 1306.1 67.4
#60 1493.2 77.1
#100 1759.4 90.8
#200 1827.3 94.3
PAN 1832.0
TOTAL SOIL WT. 1937.30 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8"" 10 40 100 200


100
90
i;i 80
o 70
5j r60
~ 050

iil 5 30
~ 20
~ 10 -
o
100 10 GRAIN SIZE IN JILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


---------------­
Tested By: A-Aziz Approved By: _...;.A..;.w..;.a;.:.:i..;.s..:...:.:.:..::...-_Y...;.a:.;;.s__
in___
--------------­
RGF-YNB-PHY-SOIL -01·04
01.08.2021 Copy Rights Reserved By RGF
f An ERI Comp.oy

".0. nOM. 80':'-'11, V:I>nb.. AI.S.I.. ~Jy ...h. MVA~ :')JOoO, "SA.
Cl.:-L:-'U l , ~r.tY cYl:?..J I~
RIYADH GEOTECHNIOUE & FOUNDATIONS cO.
1<,h:'.lhoH¢' +9"00 (14) :J':H:~9Z 13%~3 If..,.; ·,.g.66 (14) t\2::>M4tl £>Yo~U; ,."f·Y3nbu~tflg¢o'}<Jton«'AD,"
l(;f('.:.tlo(~~
I\I,N;......"'n:.uHJ !>I1"'¢t!1. it,,1 Al.M,)ll~11 bi,ftld. ".~~ 'I'.:hlN AkSJf}.af1"~h

PROJECT NO.:
CLIENT:
PROJECT:
NEOM.
Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED:
-21J4037
-16.01.2022
----
SAMPLE SOURCE TP: 03 DEPTH: 1.20 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 23.8 a C HUMIDITY: 39%
-----­
DATE STARTED: 23.01.2022 COMPLETED: 25.01.2022

SIEVE SPEC. ~RETAINED % PASSING


SIZE LIMIT WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. R-2
2" WT.(SOIL+CAN) WET: 2235.40
1 112" WT.(SOIL+CAN) DRY: 2147.70
1" WT.OFWATER 87.
3/4" 0.0 0.0 100.0 WT.OFCAN 197.20 gms.

3/8" 25.2
I

1.3 98.7 WT. OF DRY SOIL


- -1950.50
- - - - gms.
------
#4 91.6 4.7 95.3 WATER CONTENT: 4.50 %

#10 418.3 21.4 78.6 REMARKS:


#20 910.2 46.7 53.3 NON
#40 1419.5 72.8 27.2
#60 1596.2 81.8 18.2
#100 1767.3 90.6 9.4
#200 1842.1 94.4 5.6
PAN
TOTAL SOIL WT. 1950.50 grns

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
~ 80
o 70
~ r-60
~G50
e: t:iJ40
~ ;3:30
~ 20
:±: 10
o
100 10 GRAIN SIZE IN MilLIMETERS
0,1 0.01 0,001

Checked By/Reviewed By: Saeed Akhtar


-----------------
Tested By: Approved By: __A_w_ai_s_N_i_sa_r_Y_a_s_in_ _
--------~------

RGF· YNB·PHY -SOIL-01-04


01,08.2021 Copy Rights Reserved By RGF
CL-l.;;./UIJ' ~.d ift...;-'..J f~
RIYADH GEOTECHNIGUE & FOUNDATIONS CO.
P.O. no... 30l71, V:>I'.(HI AI.SJ"~J't'';'h. MYA'$ 51J)OO. kSA hll:'l~hon<!". ~90(,) htl) 31:100992 I 3::1:5-099.) i"..1<; "*966 (14) ".l!io09.o11'l £'m..lI: fQr.y3nbu@e1rg~r:>$-<:-I(:'Ilf;~~.(;Um
l(>(lOUbh; Al·N.h"••>:IIH{1 Stj(~t. Hal Al,M4ht.{. ()!.Uf(.i. It..;:•• V...",bU Al_;fflhty.th

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neomdesalination plant to gayal transmisssion system. (LD-03) DATE SAMPL ED: ----:1-:"6-=.0-1-=.2­ 2 2""'­
0-:C­
SAMPLE SOURCE TP: 03 DEPTH: 1.80 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt. SAMPLE NO.: B-3
ENVf. CONDo TEMP. 23.6 o C HUMIDITY: 38%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216·19)
3"
21/2" CAN NO. H-3
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 2719.90
1 1/2" 86.6 3.6 96.4 WT.(SOIL+CAN) DRY: 2641.60
1" 125.9 5.2 94.8 WT.OFWATER 78.30
3/4" 162.3 6.7 93.3 WT.OFCAN 206.30 gms.
3/8" 244.3 10.0 90.0 WT. OF DRY SOIL 2435.30 gms.
------
------
#4 318.2 13.1 86.9 WATER CONTENT: 3.22 %
#10 703.1 28.9 71.1 REMARKS:
#20 1185.4 48.7 51.3 NON PLASTIC
#40 1738.3 71.4 28.6
#60 1970.1 80.9 19.1
#100 2186.2 89.8 10.2
#200 2262.3 92.9 7. 1
PAN 2270.4
TOTAL SOIL WT. 2435.30 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
i';; 80
" 70
Sl ~O
~ 650

iii 30
~ 20
1t: 10
o
100 10 GRAIN SIZE IN MILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


----------------­
Tested By: Approved By: Awais Nisar Yasin
--------~------ ----------------­
RGF -YNB-PHY-SOIL-01-04
01.08.2021 Copy Rights Reserved By RGF
f An En. Company
~~~
~~M}
,!-~!,
. v... . . .
[ ..-&5'" V
I - I ~ jq .. '"
1.......-'....................... r.t ~ ~:r:"£ V

RIYADH GEOTECHNIGUE & FOUNDATIONS CO.


- -
• ":.;.AI. #0:/'' I::t:A-"",
­
~

p.O. UQ!< ",,0271, Vanbu At<~(';ly ..h. M-'t'AS :,>1,(X)(t, Jo:SA 'l~I~phQoel "i':!iGG U..'I) :J2:$O!i9? / :12~93 YIlJl: ...9156 (14) 3250946 lfm.lll, f~r')'\lnbu.g.I1:.Iu<o~*ntX<!>.{.urtl
ttl(tllltttlo; A!.Nl,h'.rllfi'hl{i St..«t. H",lMt.,l.ah::'h bhttk;:t. It.C.• YAHbti Al'$fm<'yfth

Neom desalination plant to gaya/ transmisssion system. (LD,03) DATE SAMPLED: 17.01.2022
TP: 04 DEPTH: 0.60 m DATE RECEIVED: 22.01.2022
DESCRIPTION: Greyish Brown well graded SAND with silt f:t gravel. SAMPLE NO.: B-1
o
ENVT. CONDo TEMP. 24.2 C HUMIDITY: 39%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 1/2" CAN NO. C-7
2" WL(SOIL+CAN) WET: 2687.30 gillS.

1 1/2" 0.0 0.0 100. WT.(SOIL+CAN) DRY: 2667.00 gms.


1" 136.2 5.6 WT.OFWATER 20.30
3/4" 210.5 8.6 WT.OFCAN 217.40 gms.
3/8" 331.0 13.5 86.5 WT. OF DRY SOIL 2449.60 gms.
#4 497.3 20.3 79.7 WATER CONTENT: 0.83 %

895.5 36.6 63.4 REMARKS:


1412.3 57.7 42.3 NON PLASTIC
1845.2 75.3 24.7
1978.6 80.8 19.2
2194.1 89.6 10.4
2235.3 91.3 8.7
2245.0
2449.60 gms

u.s. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 318" 4 10 40 100 200

100 10 GRAIN SIZE IN JILLlMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: ____A_,_A_z_iz_ __ Approved By: ___A_w_a_i_s_N_is_a_r_Y_a_sl_'n___

RGF-YNB-PHY·SOIL·Ol-04
01.0B.2021 Copy Rights Reserved By RGF
Cl.:-l.;:/(;I, ~r.?Y J'y~f~
RIVADH GEOTECHNIOUE & FOUNDATIONS cO.
".0. i'.k:lll.itlOl'11. Y.wbu A1.$!n;lVl>.h. MYA=> 5'1000, "'SA T.eI<'11h(>n'l').,~!>(it'i Il.!l) :!llSOt..Hll/ :;12:>.<1993 ttOllIl; ,...966 (1"')~'.t~tH~o;o: £m~l1; ,~r.... ~mbu~l:llB(,"Q"~It'tl(:<:lo"(;Clm
l.i>G.tfil(\: Al.NlIVI;)f):;)n(J $tlotttt. ;UI AI~MJ,h"(f ()t~'rI(:_~ ",C., 'r'4{"'l,Iu Al-!$Ijlafyah

Neom desalination plant to gayal transmisss;on system. (LD·03)


TP: 04 DEPTH: 1.20 m DATE RECEIVED:
Greyish Brown well graded SAND with clay ft gravel. SAMPLE NO.:
-----­
24.6 0 C HUMIDITY: 39%
23.01.2022 DATE COMPLETED: 25.01.2022
WEIGHT % RETAINED % PASSING
RETAINED WATER CONTENT: (ASTM D 2216-19)

CAN NO. M-8


2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 3128.30 gms.

1 1/2" 493.7 82.9 WT.(SOIL+CAN) DRY: 3102.90 gms.


1" 669.2 76.8 WT.OFWATER 25.40
3/4" 735.9 74.5 WT.OFCAN 212.40 gms.

3/8" 1038.8 64.1 WT. OF DRY SOIL 2890.50 gms.

#4 1297.1 55.1 WATER CONTENT: 0.88 %


#10 1916.7 66.3 33.7 REMARKS:
#20 2372.1 82.1 17.9 LL 28
#40 2468.6 85.4 14.6 PL= 21
#60 2559.8 88.6 11.4
2612.0 90.4 9.6
2701.2 93.5 6.5
2704.1
TOTAL SOIL WT. 2890.50 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" <I 10 40 100 200


100
90
i;; 80
o 70

~650
~ !!J40
i5 ~30
;;2 20
1l: 10
o
100 0.1 0,01 0,001
10 GRAIN SIZE IN rJILLIMETERS

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: A-Aziz Approved By: __A_w_a_i_s_N_i_sa_r_Y_a_s_in__
-------------­

RGF-YNB-PHY -SOIL-01·04
01.08.2021 Copy Rights Reserved By RGF
~r4
't:::r_
f V
J -_.
..........., ."'" I - I - ~U I .. '" . . aX AJ, ,,:? H./
t:1,.,,*,
~~M}
~
V "-".......--.....-- ft ~·~i
_ . . . V. . :/' ~

An Eft. Cnmpany '\\\i.i;.."l1.!' v •." RIVADH 0f"OT€ ' rHNIOI IF [(. F OIINDATIONS CO.
P.O. UO)o\ <1017:1, Y.uobu A1-$fn~l" ..h. MYA"; :;:1000. 1($1\ 'f(!leph(.loe: ..!)(l.t} ~)~) 325{)9~Z I :;'5099~ h)<: ...9G6 (,<Ii) 3'250941J ~ln311, J"Qr.y~n4\J@ef!3ec>~lcnc..e5"<am
tuC..Hunt I\hN.lw.,I)Jt!.ii $t"vo:t. Htot AI.M..han DHtdd. ;:t(... -r<lif,bu AI':~I.,..fy;m

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 17.01.2022
TP: 04 DEPTH: 2.00 m DATE RECEIVED: 22.01.2022
DESCRIPTION: Greyish Brown well graded SAND with day. SAMPLE NO.:
------
23.7 DC HUMIDITY: 38%
DATE STARTED: 23.01.2022 COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 1/2" CAN NO. N-12
2" WT.(SOIL+CAN) WET: 2237.10
1 112" WT.(SOIL+CAN) DRY: 2163.30
1" 0.0 0.0 100.0 WT.OFWATER
3/4" 17.2 0.9 99.1 WT.OFCAN 220.90
3/8" 65.3 3.4 96.6 WT. OF DRY SOIL 1942.40
#4 138.2 7.1 92.9 WATER CONTENT: 3.80 %
#10 439.5 22.6 77.4 REMARKS:
#20 933.1 48.0 52.0 LL ::
#40 1466.4 75.5 24.5 PL= 22
#60 1508.2 77.6 22.4
#100 1726.3 88.9 11.1
#200 1822.1 93.8 6.2
PAN 1826.4
TOTAL SOIL WT. 1942.40 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOil CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100 .
90
f;; 80
o 70
5i rEO
~G50
::~O
r5 ;:;30
~ 20 .


100 10 GRAIN SIZE IN JILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: ____ ..........iz~_ _
A_-Az Approved By: __A_w_a_i_s_N_i_sa_r_Y_a_s_in__

RGF-YNB-PHY -SOll-01-04
01.08.2021 Copy Rights Reserved By RGF
f (elf) v [---
-~[Jw I t::"A.•::.-I...;:../V I., ;: -'" •....:;,;.,.4
AnERlcompany "i'.~~' __ ~':: RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. 00,,30271, Yanbu AI_Sl'n;ly.:oh. MYA'$ ~1000. KSA
- c../U.) I ~ + -

Telephbne .....!')6t) (1.4) ~2:1oOS'J2/31~0993 f!::.,,; ..-96tS (10") :!!J2~094tS t:m411. rl'r·Yilllbu@l:tlseo!l.-c1.e-llc(:,,"C01T'1
luC",U(Jf,: AI~NAwa"4j)d $tf<:'t!t. ";)1 At.M;)'}:;>" Dhhld. A..c., \'di,I"U Akjlll:bllldh

PROJECT: Neom desalination plant to gayal transmisssion system. (LO-OJ) DATE SAMPLED: 18.01.2022
SAMPLE SOURCE TP: 05 DEPTH: 0.60 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt ft gravel. SAMPLE NO.: B·1
ENVT. CONDo TEMP. 24.6 DC HUMIDITY: 40%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022
SIEVE SPEC. WEIGHT % RETAINED % PASSING
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
21/2" CAN NO. R-8
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 4065.70 gms.

1 1/2" 285.3 7.5 92.5 WT.(SOIL+CAN) DRY: 4034.00 gms.


------
1" 580.8 15.3 84.7 WT.OFWATER 31.70
3/4" 723.0 19.0 81.0 WT. OF CAN 231.40
3/8" 1167.5 30.7 69.3 WT. OF DRY SOIL 3802.60
#4 1604.1 42.2 57.8 WATER CONTENT: 0.83 %
#10 2145.4 56.4 43.6 REMARKS:
#20 2635.8 69.3 30.7 NON PLASTIC
#40 3002.5 79.0 21.0
#60 3242.7 85.3 14.7
#100 3405.8 89.6 10.4
#200 3548.7 93.3 6.7
PAN 3551.3
TOTAL SOIL WT. 3802.60 gms

u.s. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
~ 80
l.J 70
~ r60
:: ~O
~ :;:30
~ 20
g: 10
o
100 10 GRAIN SIZE IN MILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


---------
Tested By: A-Aziz Approved By: Awais Nisar Yasin
------------ -----------------

RGF-YNB-PHY -SOIL-01-04
01.08.2021 Copy Rights Reserved By RGF
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
".0. no~ :J1)~7'. V.$IrIDli Ah!Un~tyah, MYAS, ~1.OOO. -':$A, idephvnc; 't'!'I'66 (l4) )1::S099~ /3:t5099-:' "",1: ... 966 (14) ":tJ;Og46 l!-.n.:tlh '1\f~y3nbuG'9t:d"('o$rk.'1'!c(:'".<om
L0e..U••ft; AI.N;,wii>.~ml t>t~l,tl. H~l Al.M~h~1l bhttk,). ~.( .• 'I'~i.b ... A,i"lhiJJJlah

ENT:
PROJECT: Neom desalination plant to gayal transmisssion system. (W-03) 18.01.2022
lE SOURCE TP: 05 DEPTH: 1.20 m DATE RECEIVED: 22.01.2022
PLE DESCRIPTION: Greyish Brown poorly graded SAND with gravel. SAMPLE NO.:
• CONDo TEMP. 24.3 0 C HUMIDITY: 40%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
21/2" CAN NO. K·9
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 3270.80 gms.
-----­
1 1/2" 223.3 7.4 92.6 WT.(SOIL+CAN) DRY: 3230.50 gms.
------:-­
1" 339.4 11.2 88.8 WT.OFWATER 40.30
3/4" 483.8 16.0 84.0 WT. OF CAN 209.20
3/8" 718.4 23.8 76.2 WT. OF DRY SOIL 3021.30
#4 973.6 32.2 67.8 WATER CONTENT: 1.33 %
#10 1444.8 47.8 52.2 REMARKS:
#20 2027.1 67.1 32.9 NON PLASTIC
#40 2450.7 81.1 18.9
#60 2703.6 89.5 10.5
#100 2815.9 93.2

IBoo
v.v II
2893.6 95.8 4.2
PAN 2895.2
TOTAL SOIL WT. 3021.30 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

3/4" 3/8" 4 10 40 100 200


100
90
~ 80
Q 70
6; r60
::~O
i] 03:30 .
~ 20
g: 10
o
100 10 GRAIN SIZE IN MILLIMETERS 0,1 0,01 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: A-Aziz Approved By: __A_w_a_i_s_N_i_sa_r_Y_a_s_in_ _
---------------­

RGF ·YNB-PHY·50IL-01·Q4
01.08.2021 Copy Rights Reserved By RGF
1'.0. \1(>~ {t02:r'l. YIIM.>I.JAI,5h·";'V..h, MYA'S ~'l()Q(1, ~$~ T<I<;,phooO!-; 't90(\ (til) 3250!:>!J:l! /3250:9!J3 f<;lI:'-: -+-966 (tol)~2~09"4G f!m.tll, t",r~ya"bU@<ltIIRe-O"dC'm:.e ...<:lnn
Lu~M'{J(n /IF N;'w:~lI):~O(t 1I\1'~;II, lul.,\I·M.?hHII'>T~l(I'.\. R 0';. Y"li.. h,1 M.1fllitfrt",h

PROJECT NO.:
CLIENT: NEOM. - -21J4037
----
PROJECT: Neom desalination plant to gaya/ transmisssion system.(LD-03) DATE SAMPLED: 18.01.2022
SAMPLE SOURCE TP: 05 DEPTH: 2.00 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with gravel. SAMPLE NO.: S-6
ENVT. CONDo TEMP. 23.8 DC HUMIDITY: 39%
------
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)

0.0 0.0 100.0 CAN NO. B.B


305.5 10.6 89.4 WT.(SOIL+CAN) WET: 3183.10 gms.

381.5 13.2 86.8 WT.(SOIL+CAN) DRY: 3131.30 gms.

555.1 19.3 80.7 WT.OFWATER 51.80


638.9 22.2 77.8 WT.OFCAN 249.60 gms.

843.0 29.3 70.7 WT. OF DRY SOIL 2881.70 gms.

1064.7 36.9 63.1 WATER CONTENT: 1.80 %


#10 1530.5 53.1 46.9 REMARKS:
72.2 27.8 NON PLASTIC
85.2 14.8
92.6 7.4
95.5 4.5
97.4 2.6

gms

u.s. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90

to 80
0
:z.
70
;;)
t/l
<:
c..

:z.
tl.l
u
0:: 20
g: 10
0
100 10 GRAIN SIZE IN JILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: ___S_ae~e_d_A_k_h_ta_r_ _


Tested By: ____
A_-A_z.....;iz______ Approved By: _....:A..:.;w..:.;a:::.;i.:..s..:.;N.;,:is:.::a::..-r....:Y.::;.as:.,:i::..:.n_

RGF ·YNB·PHY-SOIL-Ol-04
01.08.2021 Copy Rights Reserved By RGF
f An ER. CQm.,.ny L';':~!
rQi)..

P,o. Uoll !:I02},:]., V:I>n.bu AI.:5Jfl~l't'''h. MYA5 5.:1-0(){), loi:$A


RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
"telellhbne; .~!)(}t) (l4~ :1:.t!H>!l9l 13:.t~931 f'''lI.: ,+?I$O (14) ::".509011.(> t'm.llfl, t'8r·v.....bu1@lI:jlj';Jeeo~t"O(;t~.<olT\
\.o,,""U(o(\; AI,N~wa.\:lnd S\"'¢ct. h:o:1 AI,M.$\lllh. ()lst(Jd. I'\.C,_ V~fjbY' A1-:Un&fy;1l1

CLIENT: NEOM. PROJECT NO.: 21J4037


--:-:--:--:--:-:-::-:-:::-­
PROJECT: Neomdesalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 19.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 0.60 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.6 C HUMIDITY: 40%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" 0.0 CAN NO. TV
2" 246.8 WT.(SOIL+CAN) WET: 3158.20 gms.
------
1 112" 365.2 WT.(SOIL+CAN) DRY: 3130.10 gms.
------
1" 426.9 WT.OFWATER 28.10
3/4" 611.3 WT.OFCAN 222.80
3/8" 876.3 WT. OF DRY SOIL 2907.30
#4 1067.4 WATER CONTENT: 0.97 %
#10 1350.2 REMARKS:
#20 1729.3 NON PLASTIC
#40 2106.5 72.5
#60 2421.9 83.3 16.7
#100 2582.1 88.8 11.2
#200 2678.0 92.1 7.9
PAN 2681.0
TOTAL SOIL WT. 2907.30 gms

u.s. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100 .
90 ..
in 80 -
o 70
~r60
~~O
iii ~30 .
~ 20
g: 10
o
100 10 GRAIN SIZE IN I'JILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------
Tested By: Approved By: _....:A...:,w...:..:.:al...:,·s_N_i.sa...:,r_Y a5_in__
.... ..........
--------~------

RGF·YNB·PHY-SOIL-Ol-04
01.08.2021 Copy Rights Reserved By RGF
f An ERI Comp.ny
".0. n(>~ ao.l7~. "bubu At.SJn';ly>l,Jt, MYAS :)'1000. K'SA
CL-l.;../1JJ~ ~~ tfl;?.J'~
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
T¢I¢p'u:.. n¢; '1";66 (14) It:;(i'Jt)?' /l:t:>O"3 r ..X! "'9~ (,).4) "~!W94~ £',r..:.1I; r(lr~'I'aob\Jj§ledR¢o~dCfiCe,._<C.om
I,.tH.:.atlufI; A1_Naw~(;.nd ,tiC<:'t, Hill AI.h1..hil:il !)h,Ufd.I't.(.• V.Hrt.\> Ah$li''''ft''h

CLIENT: NEOM. PROJECT NO.: 21J4037


-----­
PROJECT: Neomdesatination plant to !layal transmisssion system. (LD-03) DATE SAMPLED: 19.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 1.20 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded GRAVEL with silt & sand. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 24.4 DC HUMIDITY: 41%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022
SIEVE SPEC. WEIGHT % RETAINED % PASSING
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216·19)
3"
21/2" CAN NO. XX
2" 0.0 0.0 100.0 WT.(SOIL+CAN} WET: 3311.30 gms.
-----­
1 1/2" 440.0 13.9 86.1 WT.(SOIL+CAN} DRY: 3291.90 gms.
----::---:-­
1" 699.6 WT.OFWATER 19.40
3/4" 930.4 WT. OF CAN 123.10 gms.
3/8" 1403.3 WT. OF DRY SOIL
- -3168.80
- - - ­ gms.
-----­
#4 1826.4 WATER CONTENT: 0.61 %
#10 2327.2 REMARKS:
#20 2704.0 NON PLASTIC
#40 2889.7
#60 2959.7
#100 2987.2
#200 3008.0
PAN 3012.6
TOTAL SOIL WT. 3168.80 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOil CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
;;; 80
" 70
~ ;-60
~ GsO
C3 3 30
i;:! 20
it 10
o
100 10 GRAIN SIZE IN MILLIMETERS 0,1 0,01 0,001

Checked By/Reviewed By: Saeed Akhtar


----------------­
Tested By: Approved By: ___A_w_a_is----'N_is_a_r_Y_i'ls_in__
- - Abdurahman
-----­

RGF ·YNB· PHY·SOll·01·04


01.08.2021 Copy Rights Reserved By RGF
f An ER. Company
P.O, Uoo.. :'102'1:1, Yat>bl.i AI.!Wn~J'fat .. MVA5 5<tUOO. y.$A
Cl:-l.:;../OI!,~~J'Y.)'~
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
'lc!<:-pl ...,..e; +900 (14) !l2:!'U}!)1.Hf / ::.t2:!rn9?:J
tOc.;:.tk>(l; Al~N~wM"U1(1 St<,.;et. BAt
It,)ll,; +961$ (14i13::1:~fJ94(j "m.,,)l~ f.Q'~y.(>n1;lu~P~flReo.df."",~c~.cO>Tl
AI.M,.;h"'l t>H'tl(.t* R..c .... " ..t'it..... Al.:$ln...lyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: -----------------------------------------­
Neomdesalination plant to'Sayal transmisssion system. (LD-03)
----------­
DATE SAMPLED: 19.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 2.00 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Brown poorly graded GRAVEL with sand. SAMPLE NO.: 6-3
ENVT. CONDo TEMP. 23.7°C HUMIDITY: 40%
----------­
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022
SIEVE SPEC. WEIGHT % RETAINED % PASSING
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. SP
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 2636.80 gms.
1 112" 161.1 6.7 93.3 WT.(SOIL+CAN) DRY: 2613.00 gms.
-----------
1" 304.2 12.7 87.3 WT. OF WATER 23.80
3/4" 464.6 19.4 80.6 WT. OF CAN 223.20
3/8" 729.7 30.5 WT. OF DRY SOIL 2389.80
#4 1214.3 50.8 49.2 WATER CONTENT: 1.00 %

#10 1554.6 65.1 34.9 REMARKS:


#20 1814.4 75.9 24.1 NON PLASTIC
#40
#60
#100
#200
2059.6
2190.3
2246.7
2282.7
86.2
91.7
94.0
95.5
EI 6.0
4.5
PAN 2284.3
IOTAL SOIL WT. LJ8Y.8U gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
r;; 80
Ci 70
~r60
;: ~O
rE 30
~ 20
is:! 10
o
100 10 GRAIN SIZE IN ~hLlMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: Abdurahman Approved By: ___A_w_a_i_s_N_i_sa_r_Y_a_s_in___
----------------

RGF-YNB·PHY ·SOIL-01-04
01.08.2021 Copy Rights Reserved By RGF
An fBI Com.,.ny RIYADH GEOTECHNIQUE 8< FOUNDATIONS CO.
P.O. nul'l. fH12'11. 'tanbu A'~~n~ly;>.to. MYAS ~'ooo. I<SA "fel<t•• ht>f,~; .'96~ (14) 32.501l9Z I '32~993 1'1Ilt: "*91$0 114J 3"1:5&911,6 em~lI; rar~Y3tlb>J€'Pe.l8C'o)c!cm::e~.<um
t(>C .. U()i.~ J\I,NlI'Wtu>JIH(t St:f~Cl, fla\ Af>M.'Iht./'i £>!$ltKl..I\.(. .. "'.tht".. Al4hufy..h

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:


---::-=--::-:-=:-=-::-­
TP: 07 DEPTH: 0.60m DATE RECEIVED:
---;;::--:--­
DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.:
ENVT. CONDo TEMP. 23.6 a C HUMIDITY: 38%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)

1C$.=i CAN NO.


WT.(SOIL+CAN) WET:
P-4
1960.30
-----­
gms.

1 1/2" WT.(SOIL+CAN) DRY: 1912.50 gms.


-----­
~
1"

3/8"
0.0
11.5
E i= 0.0
0.7
I 100.0
99.3
WT.OFWATER
WT. OF CAN
WT. OF DRY SOIL
194.20
-----­
1718.30
gms.
gms.
-----:--­
#4 33.2 1.9 98.1 WATER CONTENT: 2.78 %
#10 185.5 10.8 89.2 REMARKS:
#20 590.0 34.3 65.7 NON
#40 1169.1 6U.O ],1.U
#60 1537.1 89.5 10.5
#100 1626.0 94.6 5.4
#200 1663.9 96.8 3.2

~SOILWT.
1668.1
1718.30 glll~

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 314" 318"" 10 40 100 200


100
90
~ 80
Q 70
~ ;-60
~a50
ii3 ->30
i:t! 20
g: 10
o
100 10 1
GRAIN SIZE IN MILLIMETERS
0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


----------------­
Tested By: Abdurahman Approved By: Awais Nisar Yasin
---------------­ ----------------­
RGF-YNB-PHY-SOIL-01·04
01.08.2021 Copy Rights Rc:;crvcd By RGF
CL-L;../Ulft~~i./l:?.)I~
RIYADH GEOTECHNIGUE & FOUNDATIONS CO.
P.o. llo)\ 30~'11. 'V.u.. L.. A1~'Sfn;'fYAh. MYAS ~:1txx),)($A 1'el'!"pf...JI.e: ...-nu ('4) 3~':').M'lI2 I :n:!>tHHU f'a-..; ~966 (,4) 3'Z5094Q £m.aU, fl;\r.yll>"bu#t:.lgeuKlcoc","'"<J;)Il\
(toc;;.Hnh; At~N"w"4i1il(l $'""o:t, ftal Ahfl./Uh::""t Dl,.hf(.\. I'i,(; .. V;:ii,WAI-$lnal"",h

CLIENT: NEOM. PROJECT NO.: 21J4037


-~-:::-:-:::-:::-::::-=--
PROJECT: Heom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 20.01.2022
SAMPLE SOURCE TP: 07 DEPTH: 2.50 m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with gravel. SAMPLE NO.:
ENVT. CONDo TEMP. 23.2 DC HUMIDITY: 38%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPECol WEIGHT % RETAINED % PASSING


SIZt RETAINED WATER CONTENT: (ASTM D 2216-19)
.)

2112" CAN NO. M-8


2" WT.(SOIL+CAN) WET: 1667.00 gms.
1 112" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 1604.60 gms.
1" 42.9 3.1 96.9 WT.OFWATER 62.40
3/4" 87.3 6.3 93.7 WT. OF CAN 212.40 gms.
3/8" 163.1 11.7 88.3 WT. OF DRY SOIL 1392.20 gms.
#4 302.9 21.8 78.2 WATER CONTENT: 4.48 %
#10 508.0 36.5 63.5 REMARKS:
#20 764.7 54.9 45.1 NON PLASTIC

~I
#40 1087.0 78.1
#60 1246.7 89.5
#100 1308.4 94.0
#200 1344.8 96.6
PAN 1346.2
TOTAL SOIL WT. 1392.20 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100 -
90 -
i;:; 80
l? 70
~ r60
:: ~O
Gi 3:30
~ 20
B:: 10
o
100 10 GRAIN SIZE IN I\~ILLIMETERS 0.1 0,01 0.001

Checked By/Reviewed By: Saeed Akhtar


--------­
Tested By: _--.:.A_b.....d.....u_ra.....h.....m.....a_n_ _ Approved By: _...:..A.....w.....a.....is~N.....
is.....
a_r.....
Ya.....s_in_ _

RGF-YNB-PHY -SOIL -01-04


01.08.2021 Copy Rights Reserved By RGF
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O.fio!<. a02'Y1. V"',>bu AI.:s.l'o;'YlI.h. MYAS ":1000, f(SA "'toelol'pliQOe'o .. !)66 {U) :):2~()f#<'.l2: I :l2509g,): f;:;no,: ~'9ti'G (x"l) "?:~U9.U') 1i'rn3lh rRf"y;JnbufPe,18t'C<W<':'fl~)~UTh
f.().;:~U()(I: 1\1,N~wan>mj StJ.::>cl. tI",1 Al.M ....lHT Dt,.tild. R.<:.. V.tfibu AI.'!ln;;.fy;'h

Neom desalination plant to gayal transmisssion system, (LD-03) DATE SAMPLED: 20.01.2022
SAMPLE SOURCE TP: 08 DEPTH: 0.80 m DATE RECEIVED:
SAMPLE DESCRIPTION: Brown well graded SAND with silt 8: gravel. SAMPLE NO.:
---=--=--­
ENVT. CONDo TEMP. 24,2 0 C HUMIDITY: 39%
------
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 1/2" CAN NO, K-9
2" WT.(SOIL+CAN) WET: 2044.00 gms,

I
1 1/2" WT.(SOIL+CAN) DRY: 1965.10 gms,
--~-::-:---

1" 0.0 0.0 100,0 WT,OFWATER 78,90


3/4" 11.7 0.7 99.3 WT. OF CAN 205.70 gms,
3/8" 105.3 6.0 94,0 WT, OF DRY SOIL
- -1759.40
- - - - gms,
#4 270.2 15.4 84.6 WATER CONTENT: 4.48 %
#10 383.5 21.8 78.2 REMARKS:

~
799.7 45.5 54,5 NON PLASTIC
1138.7 64.7 35.3
#60 1377.5 78.3 21.7
#100 1508.5 85.7 14,3
#200 1618.2 92.0 8.0
PAN 1620.6
TOTAL SOIL WT, 1759.40 gms

U.S, STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 314" 3/8" 4 10 40 100 200


100
90
~ 80
l? 70

~ (§so
::~o
i5 330
;;i 20
Ie 10
o
100 10 GRAIN SIZE TN JILLJMETERS 0,1 0,01 0,001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: A·Aziz Approved By: __A_w_a_i_s_N_is_a_r_Y_a_s_in_ _
----------------
RGF-YNB-PHY-SOIL-01-04
01,08,2021 Copy Rights Reserved By RGF
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. (10",302'11, V.. nbu AI.:!.I,,;l,.i1h. MY"~ 5::1000, I<SJ\ '~elephoo<,; ..-'}6t:. h/l) :l;J:5(}9!)) I j25099~ f~lI: ·.9~G (1-\) :.1:1.50911(\ 1::'1110211: q~foV~lIt.o"6Pt=II~<'L,\.dt·nc,f:".cDm
tuc... U(Jtl; AI·Naw,;:U\iWd jt/~i:l. tllli I\1.Mu\lM. I)r~l(jd. It.C_ "'.thl"t II.k~hl<.. Iy~h

Neom desalination plant to gayal transmisssion system. (LD·03) DATE SAMPLED: 20.01.2022
TP: 08 DEPTH: 1.20 m DATE RECEIVED: 22.01.2022
Brown well graded SAND with gravel. SAMPLE NO.: B-3
0
ENVT. CONDo TEMP. 23.6 C HUMIDITY: 39%
DATE STARTED: 23.01.2022 DATE COMPLETED: 25.01.2022
SIEVE SPEC. WEIGHT % RETAINED % PASSING
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. R-2
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 2976.00
1 1/2" 74.9 2.7 97.] WT.(SOIL+CAN) DRY: 2927.90
1" 126.3 4.6 95.4 WT.OFWATER 48.10
3/4" 193.8 7.1 92.9 WT.OFCAN 197.20
3/8" 294.9 10.8 89.2 WT. OF DRY SOIL 2730.70
#4 494.2 18.1 81.9 WATER CONTENT: 1.76 %

#10 991.7 36.3 6].7 REMARKS:


#20 1630.3 59.7 40.] NON PLASTIC
#40 2115.9 77.5 22.5
#60 2221.1 81.3 18.7
#100 2546.9 93.3 6.7
11200 2638.5 96.6 ].4
PAN 2640.1
TOTAL SOIL WT. 2730.70 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" J/8" 4 10 40 100 200


100
90
&; 80
<.J 70
~ r-60
~~O
iij3:30
~ 20
g: 10
o .. ,..... ,.
100 10 GRAIN SIZE IN JILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: Attiya Approved By: __....:A...:..w:......:c.ai_s...:..N....:i_sa_r_Y_a_s_in___
--------~------

RGF-YNB- PHY -SOIL -01-04


01.08.2021 Copy Rights Reserved By RGF
f An

".0.13.0., aOl71. Yaobu


Eft. Company

AI.$lro~Yl:lh, MYAS !i::l006. gSA


CL-l..::,./U/~~~~y.)l~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
"relt!l.hvn~. ",901$ (1.'.!) ):t!5.t)$9~ I ;):2~0993 I'.ll!.: +9<>6 (1~) 32~()9<H~ fj>n411: r~r.yanb ... {gedB~01clC'fi«':>,<uf'n
1.(>~tI(>(I; AI,N~wi;l!\MI{' Stneet. H:.I AJ.Mah-;:,{, O1$,tl(:l. ft. .: .• ",*hbu AI-Slhaty~1l

CLIENT: NEOM. PROJECT NO.: 21J4037


----,-----=-­
PROJECT: Neomdesalination plant to !loyal transmisssion system.(LD-03) DATE SAMPLED: 20.01.2022
SAMPLE SOURCE TP: 09 DEPTH: 0.30 m DATE RECEIVED: 3.02.2022
---=-:--­
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt &gravel. SAMPLE NO.: 8-1
ENVT. CONDo TEMP. 23.7°C HUMIDITY: 40%
DATE STARTED: 4.02.2022 DATE COMPLETED: 06.02.2022

~
SPEC. WEIGHT % RETAINED % PASSING
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)

2112" CAN NO. R-2


2" I 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 1837.90
--,-------­
gms.
1 112" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 1790.60 gms.
----:-:--­
1" 85.3 5.4 94.6 WT. OF WATER 47.30
3/4" 216.3 13.6 86.4 WT.OFCAN 197.20
3/8" 336.9 21.1 78.9 WT. OF DRY SOIL 1593.40
#4 455.3 28.6 71.4 WATER CONTENT: 2.97
#10 623.3 39.1 60.9 REMARKS:
#20 833.2 52.3 47.7 NON PLASTIC
#40 1025.3 64.3 35.7
#60 1145.3 71.9 28.1
#100 1322.2 83.0 17.0
I #200 1465.3 92.0 8.0
PAN 1468.3
TOTAL SOIL WT. 1593.40 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
i;; 80
o 70
~ r-60
;:!ii40 -
iii 5 30
1;2 20
Ie 10
o
100 10 GRAIN SIZE lN M1LLlMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


----------------­
Tested By: Attiya Approved By: __A_w_a_is_N_is_ar_Y_a_s_in_ _
--------~------

RGF ·YNB·PHY·SOIL-01-04
01.08.2021 Copy Rights Reserved By RGF
AnERI RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
".0, Otnt ~o:'t11. Yanbu JII.!.$lO#lylll., MYA:t: 5'1000, XM "1clr-phoo(': ~66 (14) 32$07:)92' /32!SO!1113 t'alO.: +90:$6 {14) 32"09>11(1, ihn'loit; r6f+...... nl;I1,@~.IS('o~cl~m:oe~.(:mh
l<)(4U;:;...: j\!.NAwa..1U'I(' Stf.:i;t. H ..l AJ.·Mdl>"fI Ofc!ttlet. n.e., 'i~;~bu Aj •.,lw);lyah

Neom desalination plant to gaya/ transmisssion system. (LD-03) DATE SAMPLED: 20.01.2022
SOURCE TP: 09 DEPTH: 1.20 m DATE RECEIVED: 03.02.2022
.:'A....... r DESCRIPTION: SAMPLE NO.: B-3
• CONDo TEMP. 38%
STARTED: 04.02.2022 DATE COMPLETED: 06.02.2022
SIEVE SPEC. WEIGHT % RETAINED % PASSING
SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. N-12
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 2375.00 gms.
-----­
1 112" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 2305.60 gms.

1"
-------­
0.0 0.0 10Q.0 WT. OF WATER 69.40
3/4" 210.2 10.1 8 WT.OFCAN 220.90 gms.

3/8" 354.6 17.0 WT. OF DRY SOIL


- -2084.70
---­
#4 575.3 27.6 72.4 WATER CONTENT: 3.33
#10 987.4 47.4 52.6 REMARKS:
#20 1245.3 59.7 40.3 NON PLASTIC
#40 1460.5 70.1
#60
#100
1687.3
1890.2
80.9
90.7
ili=J1
9.3
#200 1920.1 92.1 7.9
PAN 1924.3
TOTAL SOIL WT. 2084.70 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOil CLASSIFICATION SYSTEM

6" 4" 3" 314" 3/8" 4 10 40 100 200

11I~~~~I1I1~~~1
90
in 80
Q 70
100
~;-.60 -

;: ~O
15 3:30
22 20
6: 10
o
100 10 GRAIN SIZE IN MILLIMETERS
0,1 0,01 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: Attiya Approved By: __A_w_a_i_s_N_is_a_r_Y_a_s_in_ _
--------~------

RGF-YNB·PHY .SOll-01-04
01.08,2021 Copy Rights Reserved By RGF
CL-L:---'Ul~ ~~ ~y.)l~
An Eftl Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
,",.0. noxa02'71. Yat.biJ AhSJn~J.,.d" MYA':J; !hOO(). ~SA. 'foe'C'Jlh(ffl«; ...%6 tl.:!}32~099t 13<Z~09!)3 rax: ..-9156 (14) 3'z509ilG I!m.$lI: q~f.v"u.bu~h:·dR:~oWcnt::c~.(L)m
(i)t'.o.Uoo: A'.N>iwiu\.1lHl Stn:.>i!t. ..I ... AM\'''Olh",n 01$\'1(;1. ft.(; •• va,)h,; Al41Hl>tvah

CLIENT: NEOM. PROJECT NO.:21J4037


PROJECT:
-----------------------------------------­
Neom desalination plant to gayal transmisssion system. (LO-03)
----------­
DATE SAMPLED: 20.01.2022
SAMPLE SOURCE TP: 09 DEPTH: 2.00 m DATE RECEIVED: 3.02.2022
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt &gravel. SAMPLE NO.: 5-06
ENVT. CONDo TEMP. 23.4°C HUMIDITY: 38%
----------­
DATE STARTED: 04.02.2022 DATE COMPLETED: 06.02.2022

SIEVE SPEC. WEIGHT % RETAINED


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. M-12
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 1965.30 gms.
0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 1905.10 gms.
---~--=-=---
0.0 0.0 WT. OF WATER 60.20
186.3 11.1 WT.OFCAN 224.
285.3 17.0 WT. OF DRY SOIL 1680.50
654.3 38.9 WATER CONTENT: 3.58
870.1 51.8 REMARKS:
#20 1086.2 64.6 NON
#40 1260.1 75.0
#60 1366.2 81.3
#100 1465.1 87.2
#200 1532.2 9'1.2 8.8
PAN 1534.3
TOTAL SOIL WT. 1680.50 gms

u.s. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
~ 80
" 70
~ r-BO
:= [L40
15 ~30
~ 20
a:: 10
o
100 10 GRAIN SIZE IN MILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


--------------
Tested By: _____A_t_t~iy_a______ Approved By: __A_w_a_i_s_N_is_a_r_Y_a_s_in_ __

RGF·YNB-PHY-SOIL·01·04
01.08.2021 Copy Rights Reserved By RGF
An EAI Company RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P_O. BoX ;30211, Vanbu .Al".sltltllytl.h~ MVAS 51000, KSA 'Telephone: ,t966 (14) 325(»92/3250993 fa)(! +%6 (14) 3250946 Emath rgt"yanbu@t!rlgeo.s:dctH':cs.com
locationt AI·N.3w.3nimd Stfe0.t~ Hal At-M;]h~n otUti(t~ R.C.~ VanbV Al-Slni>\yah

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 15.01.2022
------------~----~------------~------------------
TP­ 01 DEPTH: O.60m DATE RECEIVED: 22.01.2022
DESCRIPTION:
----------------------------------------­
Greyish Brown well graded SAND with silt ft gravel. SAMPLE NO.: B-1
o
ENVT.COND.TEMP.: 23.8 C HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022
L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH
NON-PLASTIC
WTWATER
WT DISH
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON-PLASTIC
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WT WATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------- ----------------
Approved by: Awais Nisar Yasin

RGF·YAN-PHY-SOIL-02·04
01·08-2021 Copy Rights Reserved By RGF
P.O. Bo)( 302"1. Yanbu Al.Sln;lyah. MVAS 51000. KSA Td~phonl!': -+966 (14) 3250992/3250993 F.a)(l ·.966 (14) 3250946 Emall!r8t.ya·nbu@~rI8(!.osclenc~s.com
laeatlom Al-Nawannnd Str-eot, Hal AI-Mahan otstrict. R.C.~ Yanbu At-stnntyah

CLIENT: NEOM. PROJECT NO.: 21J4037


---------------------------------------------------­
PROJECT: Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 15.01.2022
SAMPLE SOURCE: TP­ 01 DEPTH: 1.20m DATE RECEIVED: 22.01.2022
---------------------------------------­
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with gravel. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 23.8 DC HUMIDITY: 38%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

~ == ::=,,-~~

LL
:::::~,,::: ~:~.::

... _-­

~::~::, ,~=: . PL
. :~~.:.: .=:~.~.=.::: ::==~.

.... ~. ~
- - -~~

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------­ ---------------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
Cl:-l.;:../U J~ ~~ Lfy.) 1;.(..::/
An Enl Compllny RIYADH GEOTECHNIQUE & f OUNDATJONS CO.
P~O. 80)( 30211, Vanbu AI •.sln3IYllh~ MVAS 51000~ KSA T~tephone: ·t9&5 (14) 3.250992/32S0!J93 f'.all! "'966 (14) 3250946 fmallt tgt"y ..'t)buGP~"lseosdenccs.co.m
locatl~m; AI-Naw~flimd $ttCl.tt, H.i,1II AleMahan DIstrict.. R.C.. Vanbu I\J-S1nafy.ah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 15.01.2022
SAMPLE SOURCE: TP­ 01 DEPTH: 2.50m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
--------------------------------------­
Greyish Brown well graded SAND with gravel. SAMPLE NO.: 5-6
0
ENVLCOND.TEMP.: 23.9 C HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON-PLASTIC
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER z 3 4 CONTENT
DISH No.
-=-=------------------~------_+--------_+------~~--------4_--------~
gms
gms
gms
NON-PLASTIC
WTDISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------- ---------------­
Approved by: Awais Nisar Yasin

RGF·YAN-PHY-SQIL-02-04
01-08-2021 Copy Rights Reserved By RGF
AnERt
P,Q. DO)( 30:.al. Yllnbu At..sln~lyahi" MYAS 51000. KSA "Telephone, ·.966 (14) 32!H'}!')92/3250!)93 F;,):.:~ .... 9GG {14} 32!<0946 CmIlU, ra"y~u'\bu@t'rIB(!()J:ch:mce:t.com
LocOltion: AI~Naw3nand Str~~t, H~I Ar~M~ft:n1'l ulbrfla~ B.lo;" Y~nbU Al..,s'niJl'f~h

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:


--------------------~----------~----~------------ ------------1
TP­ 02 DEPTH: 2.00m DATE RECEIVED:
---------------------------------------­ ------------1
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt 8: gravel. SAMPLE NO.: 5-5
------------1
ENVT.COND.TEMP.: 24.1 DC HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
gms
NON-PLASTIC
WTWATER
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

. ----.-..... ·--1 '.='==


PL

.... _........-.­ .. _.
Number of Blows PI N'P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gm
NON-PLASTIC
WT DISH gm
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


--------­ ---------------­
Approved by: Awais Nisar Yasin

RGF·YAN·PHY·SOIL·02·04
01-08-2021 Copy Rights Reserved By RG F
P.O. 80)( 30271. Yanbu Al-sln~ly:tih. MYAS 51000~}(sA "Telephone: -t966 (:14) 3250'"~92 /32S0993 f.,'])(! +966 (14) 32S0946 Email! rgt~y.:mbu@erlseo.!:cI~nci!$...com
l.oc:titlon: AI-Nawan"nd Strc-~t, Hal AI-M,3h~n otstri<;t. R.C.~ Yanbu AI-Sln:tilyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 16.01.2022
SAMPLE SOURCE: TP­ 03 DEPTH: O.60m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 24.3 DC HUMIDITY: 41%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM IT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WT WATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

..... LL
t:
OJ
.....
t:
o
U
'­ PL
.2l
C1I
s:
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WT WATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------- ---------
Approved by: Awais Nisar Yasin

RGF -YAN-PHY -SOIL-02-04


01-08-2021 Copy Rights Reserved By RGF
1.::."l;....~UI, ~~jy.)l~
An ER. Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Box 30271. Yanbu A!.s.ln~iy~h~ MVAS 51000. K:SA "Tefephotle! ·.-966 (14) 3250992/3250993 Fd)(~ -t966 {14) 3250946 Emall!rgt.y.anbu@erlsc:osclcru:::t!$.com
lOC.lttoo! Af-Nawao..1nd Stmat, H:.1f A)·Mahan Dl$tflc;:t. R.C,~ Y3nbu AI-Sloa'yah

Neam desalination plant to gaya/ transmisssion system. (LD-03) DATE SAMPLED: 16.01.2022
---------------------------------------------------­
TP­ 03 DEPTH: 1.20m DATE RECEIVED: 22.01.2022
L~"'''Y.r·Lc DESCRIPTION:
---------------------------------------­
Greyish Brown well graded SAND with silt. SAMPLE NO.: B-2
o -----------1
ENVT.COND.TEMP.: 23.8 C HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON· PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH
WTWATER gms
NON·PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------­ ---------------­
Approved by: Awais Nisar Yasin

RGF·YAN·PHY·SOIL·02·04
01-08·2021 Copy Rights Reserved By RGF
P.O. Box 302·'1, Yanbu AI.Sln~IYi1h. MYAS 5:1000. KSA -Tclephon~: -t966 (14) 3250992/3250993 Fa)i! -t966 (14) 32509-46 Email: rs.·yanbu@crIScosc\cnces.com
location: AI-Nawanand Strcat, Hal AI-Mahan Dl&triGt. R.C.~ Ynnou IU-Slnalyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
---------------------------------------------------­
Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 16.01.2022
SAMPLE SOURCE: TP­ 03 DEPTH: 1.BOm DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
---------------------------------------­
Greyish Brown well graded SAND with silt. SAMPLE NO.: B-3
ENVT.COND.TEMP.: 23.6 DC HUMIDITY: 38%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

,=
..::.::. . .:·.i··:··:··: . ._-,__=_c,= :.::" ,.:.:.. =::.1:.:.:..:.:..
...... ;
LL
t:
,.-:.:.;:.­
2t: '-:':L::.: :::.::: ..:::::

U
o
... ~=l NON-PLASTIC I'·:::,:::::=:
Q)
PL
......
<II
, .. _._.
~ . --­ . - .....

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WTDISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------­ ---------------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY -SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
CL:-l;../UI, ~~ ~,-=?.)I~
An En. Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Box 302:7.1. Vl1/ibU A'~S~n~rYllh)' MYAS SlOOO~ KSA TC!'fephOne! ,,966 (14) 3250992/3250993 Fa)(! +966 (14) 32S0!M6 Email! r6t.y..n\bu@erI8e()sd~nce!u:ot1'\
location! A~-Naw.;tnllml Strnat. Hal Al-Mah;m otstrlct~ R.C.~ YanbU i\t·Slhalya'h

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 17.01.2022
SAMPLE SOURCE: TP­ 04 DEPTH: O.60m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
----------------------------------------­
Greyish Brown well graded SAND with silt. SAMPLE NO.: B-1
-----------1
ENVT.COND.TEMP.: 24.2 DC HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022
L I QUI D LIMIT
RUN NUMBER z 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WT WATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON-PLASTIC
PL
.=

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------­ ---------------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02 -04
01-08-2021 Copy Rights Reserved By RGF
P.O. Dox 302"11. Yanbu Al~Sln;lv-ah~ MYAS 51000. KSA ·Telephone: ·t966 (l.4) 3250992/3250993 F;))(! ·t9£6 (1.4) 3250946 Email! rB'~yo1nbu@~rl8~oscl~nt~s.tom
I,..QetJotlon: At-Nawo1nand Streat. Ho1l AI~Mah:m Dlstrict~ R.C.~ Vanbu AI·stnalyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 18.01.2022
SAMPLE SOURCE: TP­ 05 DEPTH: O.60m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
----------------------------------------­
Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 24.6 DC HUMIDITY: 40%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

E~r~,
....c: LL
~
c:
o
U
... PL
~
ra
~ r:~·:-_-::-:::--:: ..._ . _._.... _~:--.:=======--:::::~-==-_-===:i . . .. -.. _..._. ._...­ 1 .

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------- ---------------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-0~
01-08-2021 Copy Rights Reserved By RGF
P.O. Box 30271, Yanbu A1_sln;lyah. MYAS 51000. KSA Tclcphonl!': ,t9G6 (:14) 3250992/3250993 fa,.! "966 (14) 3250946 Em:aU! r8f~yanbu@crls~o~dcnc\!s.com
loeatlon: A'~Nawan .. nd strqet, Hal AI-Mahan Dtstri<;t. R.C.~ Yanbu Ai-Slnalyah

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:
------1
SAMPLE SOURCE: TP­ 05 DEPTH: 1.20m DATE RECEIVED:
------1
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with gravel. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 24.3 DC HUMIDITY: 40%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

..... LL
s:::
2s:::
o
U
... PL
.....ra
OJ

:s:
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------­ -------­
Approved by: Awais Nisar Yasin

RGF·YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
@l
eM
[~] Cl.:.-l.;;...--(JI, ;:::.7A U'L--.) I~ - .. - ..

AnERlcoml"'ny "!1!".M!!' u:~'. RIYADH GEOTECHNIQUE & FOUNDATIONS CO.


P.O. Bo)( S02',l. Y.:lobu AI-sln;IY~h~ MYAS 5:1000. KSA Tdcphotle! -t966 (14) :::J:250'df92/32S0993 fO'l)(: .. 966 (14) :3250946 Em:tU: rst~y.:rnbu@)etI8co.1d~nt:e$.<:om
t.ocMlon: I\!-N3w:u,\a,..d Strc.t~ H;lI AJ-Mahan Dtstri(1'~ fM;:.", VanbU Al-stnalyah

Neom desalination plant to gayal transmisssion system.(LD-03) DATE SAMPLED: 18.01.2022


------------------------------------------~--------
SAMPLE SOURCE: TP­ 05 DEPTH: 2.00m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
----------------------------------­
Greyish Brown poorly graded SAND with gravel. SAMPLE NO.: 5-6
ENVT.COND.TEMP.: 23.8 oC HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022
L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....c LL
....c
Q)

o NON-PLASTIC
U
L. :~~~J.;.... .c. ... ....• ...............•..•.••..... PL
J!lra
?: C.· .......••••.. .•••....".:::c
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER z 3 4 CONTENT
DISH No.
WT WET SOl L + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----------­ ---------------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY -SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
~~I Cl:,..l:;./U I~ ::;....:..7.& ift,?.) I ~
An ERI Company ~,~, U~A5 i RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. SOl( 30271, Yanbu AI.sln~Iy01h~ MVAS s:tooo~ K5A 'Telcphanl!e +9615 (14) 325tY-J92/3250993 F.a\(~ >}966 (14) 3250946 Eman~ t8t~y;anbtl@C:tI6t:!o5denc:~s.com
loc,atl(')lH AI~NaW3nand Stflll$t, Hal AI-Mah~n DI&tti(.t. R,C'A Y.;'mbu AI·Slnnlyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 19.01.2022
SAMPLE SOURCE: TP­ 06 DEPTH: O.60m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
--------------------------------------­
Greyish Brown poorly graded SAND with silt 8: gravel. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 24.2 DC HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 1 2 3 4
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON-PLASTIC
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-------­ --------­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOIL-OZ-04
01-08-2021 Copy Rights Reserved By RGF
P_O. Box 30271. Yanbu AI~SjTl;fV:ah. MVAS 5;'000. KSA 'Telephone: '~966 (14) 32S0992/.3250!J!l3 F.;:.)(! ,.. 966 (14) 32~0946 Em:ali: rgr..ya.1ibu@et1eeo:i:dem::::t':!$.com
loc;)tiom AI~Naw3n .. nd str-cet, H;)t At·Mahan Pt$frr(t~ R.~,.. V.;:.ntru AI.slnaly.ah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
---------------------------------------------------­
Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 19.01 .2022
SAMPLE SOURCE: TP­ 06 DEPTH: 1.20m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
----------------------------------------­
Greyish Brown well graded GRAVEL with silt Ii sand. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 24.4 DC HUMIDITY: 41%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

-::::-~=."
LL

PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER z 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------­ --------------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
AnERI
P.O. SO)!: 302"11, Yanbu A1.S1n~tY~h" MYAS 5:t000.. KSA 'Telephone! ·.966 (:14) 3250992/3250993 F.ax! .. 9-66 (14) l.l250946 Email: rsf,yanbu@erlgcosdences.c:om
location:: AfwNaW~n;)nd Str(l'et, H.al AtwMafUH1 Dtstrl<;t, R.C.~ Vanbu Al-Slonlvah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to transmisssion system.(LD-03) DATE SAMPLED: 19.01.2022
SAMPLE SOURCE: TP­ 06 DEPTH: 2.00m DATE RECEIVED: 22.01.2022
----------------~-------
SAMPLE DESCRIPTION: Brown poorly graded GRAVEL with sand. SAMPLE NO.: 8-3
ENVT.COND.TEMP.: 24.4 DC HUMIDITY: 41%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022
L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON·PLASTIC
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2­ 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan


------­ Checked By/Reviewed By:
- -Saeed
- - Akhtar
---­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01 -08-2021 Copy Rights Reserved By RGF
P.O~ aox 30271. Yanbu AI~Sfn;ly.m. MYA$ S;lOOO. l<SA Tcl~phon~: '19fl~ ('14) 32e309'92 /3250993 FOlX! ..!to6 (14} 3250946 Em;a,U: rRt..y ...mbu~'i>CrIBCO$dt!nct!.!LCOm
lQCatlon: AI~N",wammd $thH.\t. Bal At~Mi)hOln Ulstl'lct. n,c,~ YtlObu A1-S'naJ'i;ih

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination to gayal transmisss;on system. (LD-03) DATE SAMPLED: 20.01.2022
SAMPLE SOURCE: TP­ 07 DEPTH: O.60m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION:
----------------------------------------­
Brown poorly graded SAND. SAMPLE NO.: B-1
ENVT.cOND. TEMP.: -2-3-.6""""o,....:.C---:..-::..-..---H-UM-ID-IT-Y-:---3-8%-0­

STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON·PLASTIC
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH
WTWATER
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------­ ------------­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
GL-l;./(J/~ ~;;y J'V~I~
An EBI Company RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. flox 30Z'} 1~ Yanbu AMiln~tyah. MYAS 51000. KSA Tct~phonl!-: -.966 (1.4) 3250992/ 3250993 faX! ..966 {14) 3250946 Emall! t8t~yolnbuQ)ctJs~osdcnc:e$.com
/.oc:tt(on! A!-Nawanand Street,. H~J AI-M,'lhan otstrld~ R.C,~ Vanhu Aj·S1oill'lah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 20.01.2022
SAMPLE SOURCE: TP­ 07 DEPTH: 2.50m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPTION: Brown poorly graded SAND with gravel. SAMPLE NO.: S-7
ENVT.COND.TEMP.: 23.2 DC HUMIDITY: 38%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER
WT DISH
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....s:: LL
.l!:l
s::
o NON-PLASTIC
U
... PL
.l!:l
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER z 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By:
-----­
M.lrfan Checked By/Reviewed By:
- -Saeed
- - Akhtar
---­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
P.O_ Box 30211, Vanbu AI-stn;IY;)h~ MVAS 51000.}(SA Telephone: ·t966 (14) 3250992 /3250993 Fax! ·~966 (14) 3250946 Email! rgf_yanbu@'crI8co.!:c1~ce.!=-com
lOcation: I\!-Nawanand Street, Hal AI-Mahcln Dt1.trict. R.C., Vanbu AI-SlnalVah

Neom desalination plant to gayal transmisssion system. (LO-D3) DATE SAMPLED:


------------~------~----------~----~--~-------- ------------1
:,...."."-,_r SOURCE: TP­ 08 DEPTH: O.80m DATE RECEIVED:
------------1
SAMPLE DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 24.2 DC HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022
L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER
NON-PLASTIC
gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WT WATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ -----------
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
p.o_ 80)( 3;0271, Yanbu Al-Sln;IY::lh~ MYAS 51000. KSA 'Tclcphone~ ·,966 (:1.4) 32S0992/32S0993 f~)(! ·t966 (14) 3250946 Em~lI! r8t~yanbu@crI8t!0.!:denc;!'s.com
lOColtlon: AI-Nawanand Street, Hal At-Mahan OTstrict. R.C.~ Yanb-u AI-Slnalvah

Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 20.01.2022
---------------------------------------------------­
TP­ 08 DEPTH: 1.20m DATE RECEIVED: 22.01.2022
----------------------------------------­
Brown well graded SAND with gravel. SAMPLE NO.: B-3
ENVT.COND.TEMP.: 23.6 DC HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM IT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER
NON-PLASTIC
gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON-PLASTIC
.....
. . . . ,.tl PL
........... ---­
.._­ -­
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------------- ----------------
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
,eM
,~) ~GL:-l;../(;I,~~t../'U.)f~ - .. + ..

AMERlcompany ~~~, u.~:' RIYADH GEOTECHNIQUe & fOUNDATIONS CO.


P.O. HOI< :30~·11. Yllnbu Al~SlrlllIYlllh. MYAS 5"1000. K.SA "fel&~hor\e! ·t966 (14) 3150992/3250993 F;a~t ""966 (1.11) 325'0946 Emall: r8t~y3nbu@c:rl8cosdc:nc",s.r:om
lat:Mtoot At-NaW,H)<):nd Strcat. Hi11 A.·M;lh:1O Ol$irict~ l\,C' A YanbU AI·SInlllyah

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 20.01.2022
-------------------------------------------------­
SAMPLE SOURCE: TP­ 09 DEPTH: O.30m DATE RECEIVED: 03.02.2022
SAMPLE DESCRIPTION:
-----------------------------------­
Brown Poorly graded SAND with Silt &gravel. SAMPLE NO.: B-1
o
ENVT.COND.TEMP.: 23.6 C HUMIDITY: 39%
STARTED DATE: 04.02.2022 DATE COMPLETED: 06.02.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON-PLASTIC
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-------­ ---------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01·08·2021 Copy Rights Reserved By RGF
:..::.An::.::E::::.:"R:..::.:::..I..::.::.:.::~....J....;;~~~ RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. 00)( 302'11. YanbuAt~sJnalY<lh. MVAS SiOOQ. KSA 'Telephone: ·t966 (14) 3250',)92 / 3250993 fa)!": +966 (14J 3,2S0946 Emall~ rgt.yanbu@Nlg(!Osdenc(}s.com
lOCo"ltlon: At~Nawoiln ..nCf Stro4t~ Hal AI-Mahan otstri<;t.. R.C•• Y.aflbu At·Slnaly;ah

Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 20.01.2022
-------------------------------------------------­
TP­ 09 DEPTH: 1.20m DATE RECEIVED: 03.02.2022
DESCRIPTION:
--------------------------------------­
Brown Poorly graded SAND with Silt ft gravel. SAMPLE NO.: B-3
--------­
ENVT.COND.TEMP.: 23.4 DC HUMIDITY: 38%
STARTED DATE: 04.02.2022 DATE COMPLETED: 06.02.2022

L I QUI D LIMIT
RUN NUMBER 2 3 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON·PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

NON-PLASTIC
PL

Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WT WATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----------­ ----------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
'-=--==Cl:-l.;./U J!} ~r.:1' if~.) I ~
An Eft. Company"" RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. So;': 302'11, Yanbu A1"slnaly;l.h~ MYAS 51000, KSA 'lcleptionf:!'t 'f966 (14) 32SO"';}!)2 /325U993 f!Hd ~966 (14) ft250946 Emall!rl1t.....anbU@.ctlgel)s(lenc~$.com
lo~attom AI-Na.want')nd S1rc<rt, Hal AI-M~";':In ()I£tti(t~ R.C.~ ¥anbu JU-stnalyah

PROJECT: Neom desalination plant to sayal transmisssion system.(LO-03) DATE SAMPLED:


------1
SAMPLE SOURCE: TP­ 09 DEPTH: 2.00m DATE RECEIVED:
----------------------­ ------1
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt 8: gravel. SAMPLE NO.: S-06
------1
ENVT.COND.TEMP.: 23.6 DC HUMIDITY: 39%
STARTED DATE: 04.02.2022 DATE COMPLETED: 06.02.2022
L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
gms
NON-PLASTIC
WTWATER
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

LL

PL

Number of Blows 1'1 N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WT WATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
M.OISTURE CONTENT %
PLASTIC LIMIT
A YE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------ --------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY -SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
r-=-.==r?"91 "GL:.-l..:/U If) ~d j~~ I ~
AnERIc.:<>mp,,"y RIVADI'''' GEOTECI"'NIQUe & fOUNDATIONS CO.
P.O. Box 30271# 't'Anbu J\1~Sinatyldl.< MVAS S:1000~ KSA ·r~lephonel-t966 (:14) 32c!30992/3~.s0993 f'tlxl-t966 (14) 32509116 Er'r"'ii)U~ r8f,y,:u'lbu@CtI8C(.l!I(:lcne~s,cOf'!"
l.n(;;llIQnl Af-N:,w.mi'lod StnH'~t, H<!oJ At·M;lh~n Dh\r!d.. n>c~, Y.;'!ntnl AI-Sln:i\IVilh

Neom desalination plant to gayal transm;sss;on system. (LD-03) DATE SAMPLED:


------~--~~-----~-~-~------- -----------1
TP 02 DEPTH: 0.60 m DATE 22.01.2022
DESCRIPTION:
---------------------------------­
Greyish Brown well graded SAND with clay & gravel. SAMPLE NO.: B-1
o -----------1
ENVT.COND.TEMP.: 24.2 C HUMIDITY: 40%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 3 4 5
DISH No. H-3 F-3
WT WET SOIL + DISH 33.55 37.26
WT DRY SOIL + DISH 30.65 33.85
WTWATER 2.90 3.41
WT DISH 21.55 20.47 21.33
WT DRY SOIL 9.10 11.01 12.52
MOISTURE CONTENT 31.87 29.70 27.24
NO. OF BLOWS 16 23 34

LL 30

PL 21

Numbor of Blow!> PI 9

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No. N-1 N-3
WT WET SOIL + DISH 28.85 29.95
WT DRY SOIL + DISH 26.75 27.45
WTWATER 2.10 2.50
WT DISH 16.52 15.65
WT DRY SOIL gms 10.23 11.80
MOISTURE CONTENT % 20.53 21.19
PLASTIC LIMIT 20.86
AVE. PLASTIC LIMIT 21

Tested By: M.IRFAN Checked By/Reviewed By: Saeed Akhtar


------------ --------------
Approved by: Awais Nisar Yasin
RGF -YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
~--.==y==;l 'Gl::-L:--- (J I~ ~& j t.;.-'..) I ~
:::E:::.:::.R=I~~~",;;;;~~~ RIYADH
::;.A.. GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Box 30:.t;tl j Yanbu I\t~!!):tnaly"h~ MYAS 5:1000.. KSI\. Tclephone~ -+9&& (:14) 3250,)92/l)~.5-091)~
loc.oltion: A'-Naw.mand Strof!'t, Hal Al-Mal1.m

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:


-------------------------------------------------­ -----------1
TP 02 DEPTH: 1.20 m DATE RECEIVING: 22.01.2022
--------------------------------------­
Greyish Brown well graded SAND with clay a: gravel. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 24.2 oC HUMIDITY: 40%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No. A-8 A-10 A-3
WT WET SOIL + DISH gms 34.27 36.55 35.92
WT DRY SOIL + DISH gms 30.52 32.32 32.44
WTWATER gms 3.75 4.23 3.48
WT DISH gms 19.66 18.95 20.70
WT DRY SOIL gms 10.86 13.37 11.74
MOISTURE CONTENT % 34.53 31.64 29.64
NO. OF BLOWS 15 34

.... LL 32
j 36.00
c::
(3 32.00
... PL 22
$ 28.00
III

;:: 24.00
Number of Blows PI 10

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No. T-2 T-3
WT WET SOIL + DISH gms 28.92 30.44
WT DRY SOIL + DISH gms 26.65 27.85
WT WATER gms 2.27
WT DISH gms 15.92
WT DRY SOIL gms 10.73
MOISTURE CONTENT % 21.16 22.48
PLASTIC LIMIT 21.82
AVE. PLASTIC LIMIT 22

Tested By: M.IRFAN Checked By/Reviewed By: Saeed Akhtar


---------- ---------------
Approved by: Awais Nisar Yasin
RGF -YAN·PHY-SOIL-OHJ4
01-08-2021 Copy Rights Reserved By RGF
P.O. oox 30271, Yanbu AI.Si"~IY:l>h.. MYAS 5~OOO~ ~5A TeJcphonL'1 -H)66 (1./1) 3250992 / ':.\250993 F-MH "966 (14) 3250946 En'Jal:J: 'lJt~yanbu®~rl8cn~d(!nces,con-'
I.oC:<'Itiom AJ-N>lwnnaod StHHtt, Hal Al-M;)han Di's\dd, A.,c., VtHlbu A'~::Unalyi)n

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
----------------------------------------------­
Neom desalination plant to !layal transmisssion system. (LD-03) DATE SAMPLED: 17.01.2022
SAMPLE SOURCE: TP 04 DEPTH: 1.20m DATE RECEIVING: 22.01.2022
SAMPLE DESCRIPTION:
--------------------------------------­
Greyish Brown well graded SAND with clay 8: gravel. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 24.6 DC HUMIDITY: 39%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QU ID LIMIT
RUN NUMBER 2 3 4 5
DISH No. C-3 B-8 K-3
WT WET SOIL + DISH gms 31.70 33.80 31.59
WT DRY SOIL' + DISH gms 28.86 30.55 29.36
WTWATER gms 2.84 3.25 2.23
WT DISH gms 19.66 18.95
WT DRY SOIL gms 9.20 11.60
MOISTURE CONTENT % 30.87 28.02
NO. OF BLOWS 16 24

40.00
..... LL 28
I: 36.00
Q)
.....
I:
0 32.00
u

Q) PL 2'1
.....
a:!
28.00
3f: 24.00
Number of Blows PI 7

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No. E-1 F-3
WT WET SOIL + DISH gms 29.68 31.50
WT DRY SOIL + DISH gms 27.33 28.89
WTWATER gms 2.35 2.61
WT DISH gms 16.32 16.50
WT DRY SOIL gms 11.01 12.39
MOISTURE CONTENT % 21.34 21.07
PLASTIC LIMIT 21.20
AVE. PLASTIC LIMIT 21

Tested By: M.IRFAN Checked By/Reviewed By: Saeed Akhtar


--------- ---------
Approved by: Awais Nisar Yasin
RGF-YAN-PHY -SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
, i lVI
~~ i t.:...-L:..-~(j If) ~A
- _. c../V~
­ f~
AnER.comp•.,,, '!'\~~'1l\l' ":~. RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. UQ)( 3Q273., Y.:mbu AI.Sin~tyah.. MYAS 5:1000.. KSA Tl!lephOfiel -i-966 (:14) ~~S099:.1; I a250993 Fonu -0-966 (3..,) 3250946 f!"';;)U~ rot,y.1')nb"H.wlj)tll:JtH"J~Climc.e:J_com
\..o["oiftloo; AI-Nawilnand StfiJiJt, Ual A'~M;Jhan Dlstrld, j:'c,C•• Yanbv Af~Stn<'llv .... tJ

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 17.01.2022
SAMPLE SOURCE: TP 04 DEPTH: 2.00m DATE RECEIVING: 22.01.2022
SAMPLE DESCRIPTION:
--------------------------------------­
Greyish Brown well graded SAND with clay 8: gravel. SAMPLE NO.: B-3
ENVr.COND.TEMP.: 23.7 oC HUMIDITY: 38%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM IT
RUN NUMBER 1 2 3 4 5
DISH No. A-9 F-2 P-5
WT WET SOIL + DISH gms 31.70 33.80 31.59
WT DRY SOIL + DISH· gms 28.86 30.55 29.45
WTWATER gms 2.84 3.25 2.14
WT DISH gms 20.30 19.77 21.56
WT DRY SOIL gms 8.56 10.78 7.89
MOISTURE CONTENT % 33.18 30.15 27.12
NO. OF BLOWS 17 35

.... LL 30
36.00
.sc
t:

8 32.00
.... PL 22
.s 28.00
~ 24.00
Number of Blowl:> PI 8

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No. M-2 M-3
WT WET SOIL + DISH gms 29.70 31.66
WT DRY SOIL + DISH gms 27.33 29.05
WTWATER gms 2.37 2.61
WT DISH gms 16.50 17.25
WT DRY SOIL gms 10.83 11.80
MOISTURE CONTENT % 21.88 22.12
PLASTIC LIMIT 22.00
AVE. PLASTIC LIMIT 22

Tested By: M.lRFAN Checked By/Reviewed By: Saeed Akhtar


------ --------
Approved by: Awais Nisar Yasin
RGF-YAN-PHY-SOIL-02-04
01-08·2021 Copy Rights Reserved By RGF
V:U,OOll' :un'1lj Y1inbti'At.$M'~iytlh. MYII,S 5100'0,"1($1\ ,T~~c~'h?~c: .f9<tJ6 ~~~l3:;>5099~ 1l\·.t~O!¥)t'1 f .'lIl: ..,9(.6 ~1.:n. ;;\?~;.o94f' f.~ruH:'16f,Y..$...bllitb(>l!g<':()ki.em:e.i.f;{Un
l:~~:,H\Jll;. ~f~~~;m·.'t'I~J ~.t~~w(, ~fn9\:l~ ... t~-;m f-'ltdrld. JU:,., ~;mlv.l. ~~"~i'~lY~h

TEST REPORT

UNIT WEIGHT OF SOIL IN-PLACE BY CORE SAMPLE


AASHTO T 233-02
CLIENT : NEOM. PROJECTNO: 21}4037
PROJECT : Neom desalination plant to gayal transmisssion systel't1(I:p-~ DATE SAMPLED: 20/01/2022
...................
-~

SAMPLE SOURCE: TP-08 DEPTH: 0.80m DATE RECEIVED: 22/01/2022


------------­
- --------­

SAMPLE DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO: B-2
SAMPLED BY: RGF
ENVY. CONDo TElVIP. : 23.9 uC HUMIDITY: 37%
TEST STARTED DATE: 25/1/2022 TFST COMPLETED DATE: 27/1/2022
,
A. Mass of Diy Sample in Ail' (gms) = 107.60

B. Mass of Dry Sample + Paraffin Coating in Air (gms) 110.30

C. Mass of Dry Sample + Paraffin Coating in Water (gms) 68.30

D. Density of Paraffin (gm/ C111 3) 0.917

E. Density of Water (gm/cm 3) 1.00

A
(B-O - (B-A}
UNIT wr. (gm/cm 3 ) E D
= 2.755

I WATER CONTENT (ASTM D2216-19) I


F. Wt. of Wet Sample (gms) = 108.30

G. Wt. of DI)' Sample (gms) = 107.60

Moisture Content (%) = (F-G)XlOO


G

= 0.65 %

REMARKS: .................... ----_. -----_......

TESTED BY: WlSALKHAN CHECKED BY / REVIEWED BY: Saeed Akhtar


APPROVED BY: Awais Nisar Yasin

RGF-YNB·PHY-SOIL-17-00
18.08.2021 Copy RighI Reserved By RGF
RGF-YNB-PHY-SOIL-17-00
18_08_2021 Copy Right Reserved By RGF
~7t> .~ f!J ~.··~11v.
(I ~ V.'.':).". J~
" Jc.'.l::.... ,l;;;,7v.
.....:•.. , _- ,.... ,... ff

A!1ERlcoml?'>"'}'~~~_RIYAOH GEOTECHNIOUE & FOlJNDATIONSCO.


P·:o. fhM (UJ27l... YDni.)u Al'51r.~1)'3h. MYA$ 51(JO:(j~-K5A __ T<i~eph~I):::"1-?~p ~14l3~?fY,)Q:~'/ 37.~09!)1l· f.'l,"': _~9()6 (J.4) 32r~(l94(i_ f.1Mit: 18f,'{.,nl~Hilf!'~ri~(in:t<:'n(~:\"«1I"
. _.(~Vtl~~ 4·~;niillJi~I~I~:I~1't:'~". J~!\I)'I:f""~i.lli-,)n nl'h\~'I,. R,( ; t,afl\liJ~,~'~J,~1y'}i,

TEST REPORT
UNIT WEIGHT OF SOIL IN~PLACE BY CORE SAMPLE
AASHTO T 233-02
CLIENT : NEOM. PROJECTNO: 21J4037
PROJECT : !'I~~l1ldesalination pl~ntto gayal transmisssi(Jll:system (LD-03) DATE SAMPLED: - 20/02}2022
SAMPLE SOURCE: TP-08 DEVTH: 1.20m DATE RECEIVED: . 22/~/2!!22_ -

SAMPLE DESCRIPTION: Brown well graded SAND with gravel. SAMPLE NO: 13-2
SAMPLED BY: RGF ......... _­
ENVT. COND. TEMP. : 23.9lJC HUMIDITY: 35%
TEST STARTED DATE: 25/1/2022 TEST COMPLETED DATE: 27/1/2022
A. Mass of Dry Sample in Air (gms) 104.50

B. Mass of Dry Sample + Paraffin Coating in Air (gills) 108.60

C. Mass of Dry Sample + Paraffin Coating in Water (gms) = 65.80

D. Density of Paraffin (gl11/cm 3 ) 0.917

E. Density of Water (gm/cm 3) 1.00

A
(13-C) - (B-A)
UNIT wr. (gmfcm3 ) E D
2.726

I WATER CONTENT (ASTM D2216-19) I


F. Wt. of Wet Sample (gms) = 105.30

G. wt. of DIy Sample (gms) 104.50

Moisture Content (%) (F-G)XlOO


G

= 0.77 %

REMARKS:
...........­

TESTED BY: W1SALKHAN CHECKED BY / REVIEWED BY: Saeed Akhtar


APPROVED BY: Awais NisarYasin

RGF-YNB-PHY-SOIL-17-00
18.08.2021 Copy Righi Reserved By RGF
RGF-YNB-PHY-SOIL-17-00
18.08.2021 Copy Right Reserved By RGF
f An Enl Comp<>ny
~lf)
,\?~,
~
Uk."
., . t --
'--"~........---
t -- ~-'UI ~ ,~- -to .~
RIYADH GEOTECHNIOUE & FOUNDATIONS CO_
•.-1/. ;"0 'r--::.r:."-....--­
-~;~ '-" _:/' ~

J·.o. Do.)( :'10271.. V.1Oobu .l\1.Si.n;;.lya ....~ MVA... . "'loot), KSA ·riE"I~,..hlMl.e~
-.966 (;I.") a:.>.S-oc>'!):? J 3::!SO,!)"~::J Faw.: '~)66 (14) 3:;lS()!)4fi l:m'3.iI! '6'·yaont;,.,ll@~r'al!':oI"~~len("t!'ifo.c:om
lll'C"allon: Al·""il\Ni.HlaIH' StrC'~l~ 1"'\ AI·M",han tlbl,.k;I. H..C" Yat"obu AI-!.lI\:'lly"h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 15.01.2022
SAMPLE SOURCE: TP NO -01 Depth: 0.60m DATE RECEIVED: 22.01.2022
DESCRIPYION: Greyish Brown well graded SAND with silt & gravel.
ENVT. CONDo TEMP: 24.3°C HUMIDITY: 36% SAMPLE NO.: 8-1

TEST STARTED DATE: 26.01.2022 TEST COMPLETED DATE: 28.01.2022

DETERMINATION No. 2 3

BODLE No. F-6 F-3

WT. OF BOTTLE + WATER (gm) W1 356.8 356.9

WT. OF BODLE+ WATER + SOIL (gm) W2 391.9 391.4

TEMPERATURE (DC) T 25.0 24.0

EVAPORATING DISH No. B-3 A-2

· OF DISH + DRY SOIL (gm) A 72.9 73.1

· OF DISH (gm) B 17.2 18.3

· OF SOIL (gm) A-B Ws 55.70 54.80

SPECIFIC GRAVITY OF WATER AT T GT 0.99705 0.99730

SPECIFIC GRA VITY OF SOIL Gs 2.696 2.692

G-r x W~.
G.\. = . AVERAGE SPECIFIC GRAVITY (G s) : 2.694
w,\ + W. - W 2

REMARKS: Method B is Used

TESTED BY: M.IRFAN CHECKED BY / REVIEWED BY : Saeed Akhtar


---------------------
Approved By:

RGF -YNB-PHY -SOIL-1 0-04


01.08.2021 Copy Rights Reserved By RGF
«.0, n~3027i..., v4nbUAt.,si"'~1"'.Rh~ M'f,fl.$, :s.lOOO# KSA T£:l~phf)".e +9f>.6. {.l."'. a::....SO?'9:?' J 3::tSt)9!)3 l'''lo<~ 11)1i,6o (101) ,'12S()!)"'6 £........,3.,11 r6'·Y::'hbu@lI?lr;~I'>'U!ienc~."t>()M
U~(;'.. 'il).ft~ Al·N...W'anand $ttf:'''''t~ II'll AI.Mid!!.>t, I)h~t"::', Fr..C.• Y.t<tn.blf AI·$1,...~IY<llh

PROJECT: Neom desalination plant to gayal transmisssion system.(LD-03) DATE SAMPLED: 16.01.2022
SAMPLE SOURCE: TP NO -02 Depth : 1.20m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPYION: Greyish Brown well graded SAND with clay & gravel.
ENVT. CONDo TEMP: 24.1°C HUMIDITY: 35% SAMPLE NO.: 8-2
-------
TEST STARTED DATE: 26.01.2022 TEST COMPLETED DATE: 28.01.2022

DETERMINATION No. 1 2 3

BODLE No. A-I B-2

· OF BOTTLE + WATER (gm) W1 %0.2 358.3

· OF BODLE+ WATER + SOIL (gm) Wz 395.8 393.6

RATURE (DC) T 25.0 24.0

B-3 A-2

· OF DISH + DRY SOIL (gm) A 74.5 75.1

· OF DISH (gm) B 18.2 19.3

· OF SOIL (gm) A-B Ws 56.30 55.80

GT 0.99705 0.99730

SPECIFIC GRAVITY OF SOIL Gs 2.712 2.715

G,. = AVERAGE SPECIFIC GRAVITY (G s) : 2.713


. w,,,, + TV. W2

REMARKS: Method B is Used

ESTED BY : M.IRFAN CHECKED BY I REVIEWED BY : Saeed Akhtar


-----------
Approved By:

RGF ·YNB-PHY-SOIL-10-04
01.08.2021 Copy Rights Reserved By RGF
f An En. Company

r·.o. nf)'''~()~7J~ V",nhll Ahti;~lyJt,h4 MV",.'\ S:ft,W~O> K'SA


RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
T~I~ph~li ·."l('i#:t:14) azsO'?'?:t./ ,'\2tHHll?::t F"'1<~ .~)&6 (11.1) 32S0!)46 Fxn:;"U: tft,.y,a"'bul.ti>(\rlg.~O'u:ll!"nc,e~.£.Dln
LQC'..dontAl:·Ni/lw.tl'HH~d SUl;Tel" liiJoi Al-M~h:lM} 0,1'$\;1,;:,_ ~.(;,~ ¥3n.tW Al~lnaly.h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
------------------------------------------­
Neom desalination plant to gayal transmisssion system.(LD-03) DATE SAMPLED: 17.01.2022
SAMPLE SOURCE: TP NO -04 Depth: 2.00m DATE RECEIVED: 22.01.2022
PLE DESCRIPYION: Greyish Brown well graded SAND with clay.
ENVT. CONDo TEMP: 23.9"C HUMIDITY: 36% SAMPLE NO.:
-----------­
TEST STARTED DATE: 26.01.2022 TEST COMPLETED DATE: 28.01.2022

DETERMINATION No. 2 3

1<-1 K-2

W1 362.5 363.4

W2 396.1 396.2

RE (0C) T 25.0 24.0

5-1 S-3

. OF DISH + DRY SOIL (gm) A 72.3 72.5

WT. OF DISH (gm) B 18.9 20.2

WT. OF SOIL (gm) A-B Ws 53.40 52.30

SPECIFIC GRAVITY OF WATER AT T GT 0.99705 0.99730

SPEC/FIC GRA VITY OF SOIL Gs 2.689 2.675

AVERAGE SPECIFIC GRAVITY (G s) : 2.682


w<;+w. W:z

REMARKS: Method B is Used

D BY: WISAL KHAN CHECKED BY / REVIEWED BY : Saeed Akhtar


--------------------­
Approved By:

RGF·YNB·PHY ·SOIL·l0·04
01.0B.2021 Copy Rights Reserved By RGF
CL:-L.:.-U/~~~if~..,J'~
RIYADH GEOTECHNICUE 8< FOUNDATIONS CO.
P.D, no;( 30;17.1:" V4r>b\.t,N~S'''~l>jah. MYAS S'1()QO" KSA. ·rfi"ephOlW:~ .966 (1") 37;S-1l"l:l97, I ;1i'7.~t)tn~ FM'~ .~'bti i-S4l :l;)S()\)4in F"'llo0l1h taf,y;1;nhu~~tlat'!o1.Clf.'n,j;'If'$..("OIn
tuc~dotl~ /!ll-N"_"fUUUJ S1.r('-et.. N<l1 AI-Mah.... bt~tri.::". H.C., Y:IIofibU A1' -5In,"I)'4'''

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 17.01.2022
SAMPLE SOURCE: TP NO -06 Depth: 0.60m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPYION: Greyish Brown poorly graded SAND with silt 8: gravel.
ENVT. CONDo TEMP: 23.8·C HUMIDITY: 36% SAMPLE NO.: 8-1

TEST STARTED DATE: 26.01.2022 TEST COMPLETED DATE: 28.01.2022

DETERMINATION No. 1 2 3

BODLE No. e-1 C-3

· OF BODLE + WATER (gm) W1 359.6 360.2

· OF BODLE+ WATER + SOIL (gm) W2 392.3 393.6

T 25.0 24.0

Z-2 Z-4

· OF DISH + DRY SOIL (gm) A 70.2 71.6

B 17.9 18.3

· OF SOIL (gm) A-B Ws 52.30 53.30

IFIC GRAVITY OF WATER AT T GT 0.99705 0.99730

GRAVITY OF SOIL 2.660 2.671

G.), AVERAGE SPECIFIC GRAVITY (G s) : 2.666


W.'i + ~ W2

REMARKS: Method B is Used

TESTED BY: WISAL KHAN CHECKED BY / REVIEWED BY : Saeed Akhtar


---------------------
Approved By:

RGF·YNB·PHY·SOIL·l0·04
01,08.2021 Copy Rights Reserved By RGF
/U.f I •• ,• •~' .Aj. ~U II~"·.-/

f·,O.
f AnERlcompony
OOX3()271~ V"""bu..l\,.~i""'~lya,h.
~~
< -

"i'~J""J' vx:~
MVAS 5:UlC)O. KSh
~

TIF:J~ptlj:'n.e!
.,. • •

~~~
I·· 1·-

RIYADH GEOTECHNIOUE & FOUNDATIONS CO.


·196-& (1.") ;)?.s0'!)~)2.1 ~l25099:'1
~,~-::.. _~~7~

Faloe: ~·)t'.6 (14) 32'fiO!)"6


•• ::;,--' ~

f:1l'l;ail: '8f.yanh.. @£:rlg~e.1.denc~$-.('.orn


LOC""lJon~ AI·No'l\V",n:ollHi su"",,,,t, ,,;~I AI·M.:lhiHl CIlJ,tl"ie;t. R.C., Y::.<In.bu Al-$tn.lly.;,h

CLIENT: NEOM. PROJECT NO.: 21J4037


------------------------------------------­
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 20.01.2022
SAMPLE SOURCE: TP NO -08 Depth: 0.80m DATE RECEIVED: 22.01.2022
SAMPLE DESCRIPYION: Brown well graded SAND with silt ft gravel.
ENVT. CONDo TEMP: 23.7"C HUMIDITY: 35% SAMPLE NO.: 8-2

TEST STARTED DATE: 26/0112022 TEST COMPLETED DATE: 28/0112022

DETERMINATION No. 1 2 3

BODLE No. F-9 F-2

WT. OF BODLE + WATER (gm) W1 358.6 356.8

WT. OF BOTrLE+ WATER + SOIL (gm) W2 393.4 390.6

TEMPERATURE (DC) T 25.0 24.0

EVAPORATING DISH No. A-7 A-2

WT. OF DISH + DRY SOIL (gm) A 73.6 72.9

. OF DISH (gm) B 18.3 19.4

. OF SOIL (gm) A-B Ws 55.30 53.50

PECIFIC GRAVITY OF WATER AT T GT 0.99705 0.99730

SPECIFIC GRAVITY OF SOIL Gs 2.690 2.708

G
.<;
-
­
G T x w,<; AVERAGE SPECIFIC GRAVITY (G s) : 2.699
w,<; +~ -W2

REMARKS: Method B is Used

ED BY: WISAL KHAN Saeed Akhtar


--------------------- CHECKED BY / REVIEWED BY :
Approved By:

RGF-YNB-PHY·SOIL-10·04
01.08.2021 Copy Rights Reserved By RGF
CLA..;./LJI, ~Y1Y j~)f~
All En. Company RIYADH GEOTECHNIOUE & FOUNDATIONS co.
P.O. no:.: 3021l~ V..m bo AhSh)~1'i"h. MVA'S s:t()f)(). ~SA Te-l(ophone: ,..966 (14) :l'SQ9!)'l/ ,3250093 I'rzl<! *966 (14) ~!i09tl6 FrwaiJ! r8t"y:.nhu@NIge(»clen~s.c.nm
l<KaUM: Id~N:;wamU'~d su~t. .~, Al-Mahah O;$bltt. 1\.C., Y",nbv Al-Sinaly,a"

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to !':Iayal transmisssion system.(LD-03) DATE SAMPLED: 1510112022
SOURCE: TP: 01 DEPTH: O.60m DATE RECEIVING: 22.01.2022
---­ ----­
SAMPLE DESCRIPTION; Greyish Brown well graded SAND with silt Et gravel. SAMPLE NO.: 8·1
SAMPLED BY: RGF
ENVT. CONDo TEMP: HUMIDITY: 42%
------ --- ---
DATE STARTED 25.1.2022 DATE COMPLETED: 26.1.2022
MOULD NO: CR-63 WEIGHT OF MOULD:
------------------
4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 3 4 5
WATER ADDED 6% 8% 10%
WT. SOIL + MOULD (WET) 6142 6148 6125
WEIGHT OF WET SOIL 1980.0 1986.0 1963.0
WET DENSITY 2.122 2.128 2.103
CAN NO. A-7 B-4 B-8
WT. SOIL + CAN (WET) 438.90 435.26 440.39
WT. SOIL + CAN (DRY) gms 411.33 415.88 406.35 403.55
WT.OFWATER gms 8.27 15.22 23.02 28.91 36.84
WT. OF CAN gms 38.74 37.65 38.78 41.40
WT. OF DRY SOIL gms 372.6 379.7 377.1 365.0
WATER CONTENT % 2.22 4.01 6.10 7.92
DRY DENSITY gm/cc 1.90 1.95 2.00 1.97

2.02

. ..

MAX. DRY DENSITY gm/cc: 2.00 2.00


~
----
OPT. MOISTURE CONTENT % : 6. 10
---- 1.98
/ .

\
u
J2
E
OJ 1.96 / \
Remarks: Method "8" is used
CM.D.D =2.

l-
Ui
z
w 1.94 I \
I
0
CO.M.C :=:4.95 % >­
0::
0
1.92
\
Tested by: M.IRFAN
J ~
-----­
Checked K\IJ'Il<=>V,,,,.\M&;>t1 1.90

Saeed Akhtar
1.88 ....... ­
3 5 7 9 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
~f)
~
v Cl:..,i.•:../{J/~~AJ'0)f~
- " -
AnERlcomPl'IlY 'l1i1.t~ u•• ~ RIYADH GEOTECHNJOUE & fOUNDATIONS CO.
P.O. nox 3:0271; 'flH.OO AI~5In~ly;i)h.. MYJ\S 51000, J{SA Tt:Jeoph(l1)e~ +966 (14) 3250992/3250993 fj:)x: ~9f:in (14) a:.tS0946 t::rna!l: t81~yanhu!@!!tlgeru.dtm«:,s,oort\
loc~Uoot AJ·W;)w;an~nd SHe!}!, Hal Al·Manan OMrt~ n.(", Yi}nbu A1,Sln.:dyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neomdesalination plant to gayal transmisssion system. (LD·03) DATE SAMPLED: 161112022
SOURCE: TP: 02 DEPTH: 0.60 m DATE RECEIVING: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with clay & gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.3·C HUMIDITY: 37%
DATE STARTED 25.01.2022 DATE COMPLETED: 26.01.2022
--------------~~~-----~-
MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 CC.

TRIAL NO. 1 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 6015 6095 6195 6205 6178
WEIGHT OF WET SOIL gms 1853.0 1933.0 2033.0 2043.0 2016.0
WET DENSITY gmfcc 1.986 2.071 2.178 2.189 2.160
CAN NO. K-1 5-4 F-7 G-5 J-5
WT. SOIL + CAN (WET) gms 415.33 429.56 446.50 434.27 437.89
WT. SOIL + CAN (DRY) gms 408.33 416.48 422.77 403.28 401.88
WT.OFWATER gms 7.00 13.0 30.99 36.01
WT.OFCAN gms 36.32 37.54 40.55 41.88
WT. OF DRY SOIL gms 372.0 378.9 362.7 360.0
TER CONTENT % 1.88 3.45 6.22 8.54 10.00
RY DENSITY gmfcc 1.95 2.00 2.05 2.02 1.96

2.08

MAX. DRY DENSITY gm!cc: 2.05 2.06


/'
.... ,
~
6.22
OPT. MOISTURE CONTENT % :
2.04 /
\
0
.!!
E
0> 2.02
! v \
Remarks: Method "AU is used
e.M.D.D =2. 16g/cc


(jj
z
UJ 2.00 I \
I \
0
e.O.M.e =4.95 % >­
a:
0
1.98

Tested by: M.IRFAN


----------
Checked By/Reviewed By:
1.96 I \
~

(I
Saeed Akhtar
1.94
o 2 4 6 8 10 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
~1f). ~ 'c.,Ll,::./(jI~~~~~)j~
AnER.company ~J'i'')"~' ~ •• ~ RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. HOl( 302:71.. YlU)bti AJ.S!n;'Y-lh, MYI\S 51000, KSI' Tl:!le-phone: -t966 (14) 32S0992/32S(}l)93 FalC: -1-966 (14) 3250946 Em'alJ! '81"'Y"'l'lbU@r!f~.a.e()!.dl!nft!l!i,ct}m
lo(·~\lj)fI; AI·NilW,ijnand Stfccf-l H-iJl.A~-MO:lhan Dj~\,kl. n.(,~ Yanbu A1-S1"aly~h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LO·03) DATE SAMPLED: 1610112022
SOURCE: TP: 03 DEPTH: 1.20m DATE RECEIVING: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt. SAMPLE NO.: 8-2
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.8 °C HUMIDITY: 42%

DATE STARTED 25.1.2022 DATE COMPLETED: 26.1.2022


MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 5932 5995 6095 6098 6075
WEIGHT OF WET SOIL gms 1770.0 1833.0 1933.0 1936.0 1913.0
WET DENSITY gm/cc 1.897 1.964 2.071 2.074 2.050

CAN NO. F-4 H-7 P-1 D-3 A-9


WT. SOIL + CAN (WET) gms 419.60 431.47 441.25 435.26 436.57
WT. SOIL + CAN (DRY) gms 410.33 417.33 417.66 404.88 399.60
WT.OFWATER gms 9.27 14.14 23.59 30.38 36.97
WT.OFCAN gms 37.80 40.12 39.74 41.25 40.22
WT. OF DRY SOIL gms 372.5 377.2 377.9 363.6 359.4
WATER CONTENT % 2.49 3.75 6.24 8.35 10.29
DRY DENSITY gm/cc 1.85 1.89 1.95 1.91 1.86

1.96

MAX. DRY DENSITY gm/cc: 1.95 1.94


/ "" '\.
V
OPT. MOISTURE CONTENT %: 6.24
/
V \
1.92

II
Li

Remarks: Method "A" is used


.!2
E
OJ


t:: 1.90 \
I/
(f)
z
w
0
>­a: 1.88 \
Tested by:
------
M.IRFAN
0

1.86
\ 'W
Checked By/Reviewed By:
Saeed Akhtar
I
1.84
2 3 4 5 6 7 8 9 10 11 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
F· YNB-PHY-SOIL-03·04
~~~C~l;/Ul.:.; :;;;&J-'t;:')I~
:::An:.:::E=R=I:"'::'::::':~~===~;;d RIYADH GEOTECHNIOUe & FOUNDATIONS CO.
P.O. B()~ 30211.0 V,afiW AI,sh,;tY.1lh, MYAS 51000, KSA rt!l~phol'W~ ,,956 (1.,) .3.25099',l /32S0093 fn~! +966 (14) 3250946 k:math t8t"'Y.lHjb-U@~,lgeMt:lt!nc~s,com
lut'aUun; A)·N\Jwilnaod Stn:!ct,. Hill AJ...Mana-n {)h\\'kt~ f\,C"1 YfJnuu At~$JNIy~h

CLIENT: NEOM. PROJECT NO.: 21)4037


PROJECT:
-------------------------------------
Neom desalination plant to gayal transmisssion system.(lO·03) DATE SAMPLED: 1710112022
SOURCE: TP: 04 DEPTH: 1.20 m DATE RECEIVING: 2210112022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with clay & gravel. SAMPLE NO.: B-2
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.3 °C HUMIDITY: 38%

DATE STARTED 25/0112022 DATE COMPLETED: 2610112022


MOULD NO: CR-62 WEIGHT OF MOULD: 6231 VOL. OF MOULD: 2110 cc.

TRIAL NO. 1 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 10455 10657 10855 10862 10785
WEIGHT OF WET SOIL gms 4224.0 4426.0 4624.0 4631.0
WET DENSITY gm/cc 2.002 2.098 2.191 2.195

CAN NO. P-3 F-2 H-6 K-4 A-6


WT. SOIL + CAN (WET) 421.60 435.20 447.30 438.50 442.60
WT. SOIL + CAN (DRY) gms 413.85 420.88 423.57 408.33
WT.OFWATER gms 7.75 14.32 23.73 30.17
WT.OFCAN gms 41.25 42.78 38.95 41.78 3
WT. OF DRY SOIL gms 372.6 378.1 384.6 366.6 370.0
WATER CONTENT % 2.08 3.79 6.17 8.23 9.65
ENSITY gm/cc 1.96 2.02 2.06 2.03 1.97

2.08

MAX. DRY DENSITY gm/cc: 2.06 2.06

OPT. MOISTURE CONTENT % : 6.17


2.04
d
-'2
!5, 2.02

Remarks: Method "C" is used '=
(f)
z
CM.D.D =2. 18g/cc w 2.00
0
CO.M.C =5.15 % >­
[Y
0
1.98

Tested by: WISAL


1.96
Checked By/Reviewed By:
Saeed Akhtar
1.94
2 3 4 5 6 7 8 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
CLA..:../VI, ~r.1 ~y)l~
An IEB. Company
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P"O. BDX 3027:1, Y)'u)bu AJ:",sin;tyOl-hz MYA~ 5tOOO. KSA leh~phOfl4J~ +966 (14) 32S{)9q1 / 32S0993 l'a.: ,+96& (14) 32:S0945 EmllU; rst~Y"'fibu@~fi)lcosdenu~,rorn
J.ru:at~()n~
AI-NliWilnand street. H\lJ AI-Meh;t;1l Olstckt t'U:::'J Vimb« AJ~~n.;Jty.,h

CLIENT: NEoM. PROJECT NO.: 21)4037


PROJECT: Neom desalination plant to gaya/ transmisssion system. (LD-3) DATE SAMPLED: 18.01.2022
SOURCE: TP: 05 DEPTH: 0.60 m DATE RECEIVING: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo ;TEMP: 24.1 ·C HUMIDITY: 37%
DATE STARTED 25/0112022 DATE COMPLETED: 26/0112022
MOULD NO: CR-62 WEIGHT OF MOULD:
---------------------------
6231 VOL. OF MOULD: 2110 cc.

'1 2 3 4 5
D % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) 10S68 10762 10963 10978 10926
WEIGHT OF WET SOIL 4531.0 4732.0 4747.0 4695.0
WET DENSITY 2.147 2.243 2.250 2.225

CAN NO. B-S K-10 A-1 A-S


WT. SOIL + CAN (WET) 429.88 448.66 433.88 439.33
WT. SOIL + CAN (DRY) 41S.33 42S.27 404.77
WT.OFWATER 14.55 23.39 29.11
WT.OFCAN gms 36.S7 39.42 41.22
WT. OF DRY SOIL gms 374.7 378.8 385.9 363.6
WATER CONTENT % 1.69 3.84 6.06 8.01
DRY DENSITY gm/cc 2.02 2.07 2.11 2.08

2.14 ,
...

MAX. DRY DENSITY gmlcc: 2.11 2.12

OPT. MOISTURE CONTENT % : 6.06


2.10
.... ..

V ~

11
g, 2.08 I \
Remarks: Method"C' is used
CM.D.D =2.20glcc

!:::
(f)
z 2.06
w
I \\
Co.M.C =5.10 %
0

tr:
0
2.04
! 1\

Tested by: TUFAIL J '+


------------ 2.02
Checked By/Reviewed By: .

Saeed Akhtar
2.00
2 3 45678 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
F-YNB-PHY-SOIL-03-04
:..::.An:..::.E=R=B::.=::.:.::.:.:!...J=;====~ RIYADH GEOTECHNJQUE & FOUNDATIONS CO.
P.O. Box 302"11, V,anbu AV~ln;ty.)h.. MVA'1 51000# !\~A lehtpttotll!'r -l966 (14) 9250992!32,SO<J9;3 F:u! ·,.966 (14) 3250946 [rnJill: l'a'''yl'lnhu«pet;8eo1d(':J)~J,rom
Loc"Hon.A)·N\lWanand Sb'~e-~ Hill AHI'Jl)nilt'+ OfstfKl.t A.(:,. Y~nbu At-$lfl.>:lty~h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
--------------------------------------
Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: 19/1/2022
SOURCE: TP: 06 DEPTH: 0.60 m DATE RECEIVING: 22.01.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 23.9 °C HUMIDITY: 39%

DATE STARTED 25/0112022 DATE COMPLETED: 26/0112022


------------------~~~~
MOULD NO: CR-62 WEIGHT OF MOULD: 6231 VOL. OF MOULD: 2110 cc.

TRIAL NO. 1 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 10572 10766 10972 10978 10926
WET SOIL gms 4341.0 4535.0 4741.0 4747.0 4695.0
WET DENSITY gm/cc 2.057 2.250 2.2.25
CAN NO. M-10 K-11 K-15
WT. SOIL + CAN (WET) gms 416.58 436.55 437.65
WT. SOIL + CAN (DRY) gms 409.52 406.35 403.28
WT.OFWATER gms 7.06 30.20 4.37
WT.OFCAN gms 39.20 41.22 41.15
WT. OF DRY SOIL gms 370.3 365.1 362.1
TER CONTENT % 1. 91 8.27 9.49
DENSITY gm/cc 2.02 2.08 2.03

2.14 ,---r---r-:--­

MAX. DRY DENSITY gmlcc: 2. 12 2.12 -1---1----+--:0:;:

OPT. MOISTURE CONTENT %: 5.97


2.10 -1---1---+--­

~
!5, 2.08 +---I---+---fl'---f----I---+--t-:E--+---+---j
Remarks: Method HC' is used >­
!:::
if)

CM.D.D r5 2.06 -1----1----+---1---+---1----1---1---1---\-1----+--...,


o
>­a:
o
2.04 +---I-----1I---+---f----I---+---I---+-+--+---j

Tested by: M.ARFAN


----------- 2.02 -I--_I<'---+----+---I---I-~
Checked By/Reviewed By:
Saeed Akhtar
2.00 -1---1----+----+--1---1----1---1----+----+---;
2 3 4 5 6 7 8 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
Gl::.A.;/U I, ~~ t..i't;-') I~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.o. Holt ]0211, '(0'1"'00 AJ~Sln;ly.;Jh# MYA'S; .51000, KSA lrle-,pllOne; "f9n6 (.14) !Z!')09<J2/32:50993 f.:tx: .9bb (14) a2S0946 Effi3lh rgt,yzml:HJtpt!rtgeoscit!nres,c.oft)
loC'.tt't~omA'"N;lw",mmd $t«1G~ Ha'AJ-Mahan ()Jstrf{;:l" tl,C." V~hbu AI·Sirutfy-ah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to guyal transmisssion DATE SAMPLED: 20/01/2022
SOURCE: TP: 07 DEPTH: 0.60 m DATE RECEIVING: 22.01.2022
--:----­
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.: B-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: HUMIDITY: 38%

DATE STARTED 25.1.2022 DATE COMPLETED: 26.1.2022


MOULD NO: CR-62 WEIGHT OF MOULD: 4162
---------­--------------­
VOL. OF MOULD: 933.24 cc.

TRIAL NO. 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 5975 6055 6142 6148 6135
WEIGHT OF WET SOIL gms 1813.0 1893.0 1980.0 1986.0 1973.0
WET DENSITY 1.943 2.028 2.122 2.128 2.114
(AN NO. P-10 P-10 B·2
WT. SOIL + CAN (WET) 444.60 435.26 438.99
WT. SOIL + CAN (DRY) gms 416.57 418.36 402.55 398.90
WT.OFWATER gms 11.21 17.05 26.24 32.71 40.09
WT. OF (AN gms 41.55 41.30 39.55 4 43.25
WT. OF DRY SOIL gms 369.2 375.3 378.8 3 355.7
WATER CONTENT % 3.04 4.54 6.93 9.09 11.27
DRY DENSITY gm/cc 1.89 1.94 1.98 1.95 1.90

2.00

/'
- .... -­ ~ ~
MAX. DRY DENSITY gm/cc: 1.98 1.98 .
OPT. MOISTURE CONTENT % : 6.93
1.96 I "'\
\ ----­

~
0
E 1.94
OJ
j r\
Remarks: Method "A" is used >­

17)
z
w 1.92
! \
0

IY
0
1.90 I \
Tested by:
Checked By/Reviewed By:
M.IRFAN
1.88
V
Saeed Akhtar
1.86
2 3 4 5 6 7 8 9 10 11 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
YNB-PHY -SOIL-03-04
,l.O( Pox 30271. VAJthu AS~Sifl~iY~ih) MYA~ ~:1()OOJ )(SA l~h·phoof.': ·~9GCl (14) "3~'sn<j"')21 ))250903 fMeI HHi6 (:1.4) 3:l!iO!Jt1fj f:.'fY1:i:tih r"f~yi),nhuq;rff.Jlet:u.cl(,1'1cc~.Cortl
Luro!1tlr>lH A!·n~p'l'Y.M'''iH'\d f;t/~d.lIlAI AI MlIhnn Ob\rlelJ n,c;'-I- Yunbu AI iHfli.lIVilh

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to sayal transmisssion DATE SAMPLED: 20.01.2022
SOURCE: TP: 08 DEPTH: 0.80 m DATE RECEIVING: 22.01.2022
----
SAMPLE DESCRIPTION: Brown well graded SAND with silt It gravel. SAMPLE NO.: 8-2
SAMPLED BY: RGF
ENVT. CONDo TEMP: 23.9 O( HUMIDITY: 38%
-----
DATE STARTED 25.1.2022 DATE COMPLETED: 26.1.2022
--~~------~~~~~~
MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 CC.

1 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 5962 6035 6115 6120 6115
WEIGHT OF WET SOIL gms 1800.0 1873.0 1953.0 1958.0 1953.0
WET DENSITY gm/cc 1.929 2.007 2.093 2.098 2.093
CAN NO. P-10 B-10 B-9 K-5 B-8
WT. SOIL + CAN (WET) gms 423.56 433.65 435.68
WT. SOIL + CAN (DRY) gms 411.26 415.68 401.29 395.68
WT.OFWATER gms 12.30 27.57 32.36 40.00
WT.OFCAN gms 40.33 37.85 40.32 43.25
WT. OF DRY SOIL gms 370.9 377.8 361.0 35
WATER CONTENT % 3.32 5.03 7.30 8.96 11.
DRY DENSITY gm!cc 1.87 1.91 1.95 1.93

MAX. DRY DENSITY gm/cc: 1. 95 1.96 -f--'--\-----l---r--t---H--t-----'--f--t--t-_;

OPT. MOISTURE CONTENT % : 7.30


1.94 -f--I-----l---r--IT'---H--f-'.~+--t--t-_;

o
.!2
~ 1.92 -f--t----lc----r+--t---t---t---rr-t-----j-_;
>­f­
Remarks: Method "A" is used U)
CM.D.D t5 1.90 +--1----1--1-+-­
o
C.O.M.C=6.25% >­
0::
o
1.88

Tested by: TUFAIL


------ 1.86 - f - - \ - - - - - l - - - r - - t - - - t - - - j - - + - - t - ­
Checked By/Reviewed By:
Saeed Akhtar
1.84 -I--I----I--+--+--+---l---/--+---I,----I
2 3 4 5 6 7 B 9 10 11 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
RGF· YNB·PHY·SOIL·03·04
C~l;../Ul-, ~~ J'l;?)fV'
RIYADH GEOTECHNIQUE & FOUNDATIONS co.
P.O. nO)( 30211~ YI1:t)biJ At.Sln;ty;lh~ MYAS S1000~){sA Te1€>phone! ·~966 (loll 325.0992/S2SOtJ93 F.nx! +906 (14) 3250946 fl1:)~U~ t1J;l~y:anbu@>t!'18eou:kmc:.e!S,rom
loc...Uoo; Al·N.aw.ammd Stff;eL. H;:,l At-MOl'han Oi$lf1t:l t fU:'1 Vvnbu Al·Sfnal'(~h

CLIENT: NEOM. PROJECT NO.: 21)4037


PROJECT: Neom desalination plant to gayal transm;sss;on system,(LD-03) DATE SAMPLED: 22/0112022
SOURCE: TP: 09 DEPTH: 0.30 m DATE RECEIVING: 03.02.2022
----­
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt 8.gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.3 °C HUMIDITY: 37%
DATE STARTED 06.02.2022 DATE COMPLETED: 07.02.2022
MOULD NO: CR-63 WEIGHT OF MOULD: ---------------~-
4162 VOL OF MOULD: 933.24 cc.

TRIAL NO. 1 2 3 5
WATER ADDED % 4% 6% 10%
WT. SOIL + MOULD (WET) gms 6195 6178
ET SOIL gms 2033.0 2016.0
gmlcc .071 2.178 2.160
CAN NO. K-1 $-4 F-7 J-5
WT. SOIL + CAN (WET) gms 415.33 429.56 446.50 434.27 437.89
WT. SOIL + CAN (DRY) gms 408.33 416.48 422.77 403.28 401.88
WT.OFWATER gms 7.00 13.08 23.73 30.99 36.01
WT.OFCAN gms 36.32 37.54 41.20 40.55 41.88
WT. OF DRY SOIL gms 372.0 381.6 362.7 360.0
WATER CONTENT % 1.88 6.22 8.54 10.00
DRY DENSITY gm/cc 1.95 2.05 2.02 1.96

2.08 . ... , ....

MAX. DRY DENSITY gmkc: 2.05 2,06



6.22 -~
OPT. MOISTURE CONTENT %:
2,04 /'
\
U
.!2
E 2,02
0>
/ It
\
Remarks: Method "A" is used
C.M.D.D =2. 16glcc

f-
iii
z
UJ 2.00
j \
/ \
0
c.O.M.e =4.95 % >­
ex:
0
1,98
\
Tested by: M.IRFAN
------
Checked By/Reviewed By:
1,96 I
Saeed Akhtar 4!
1.94
o 2 4 6 8 10 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
YNB-PHY-SOIL-03-04
Cl;..,l.;./U I, ~d if '-:I) f-:.(::./
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
J".O;UOlC 30271, Y.imbu Al,$Jn~Jy~hr M¥A.'i 51000, XSA" lelrptu:mc: +9tll,j (14) 31.S09"9.l/ll50993 f'ilj(~ .. ~rw (14) )2S090:1{) (mill!: 'lJf..y;:mbul&e11ae"(J.!o(fentC'l.tom
l«-O\tloo~ J\f...N.,WM4Ild S(t"ct't" :iQJ.AI·M~h~fi Ohnkl, ft,C,,, Vl)nbu AI-Sln;H.'Im
CBR·I

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-3) DATE SAMPLED: 15/01/2022
--------1
SAMPLE SOURCE: TP: 01 DEPTH: 0.60 m DATE RECEIVED:
~~~~~--~--- --------1
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.:
SAMPLED BY: RGF
----------~~~--------------------------
ENVT. CONDo TEMP. 24.8°C HUMIDITY: 38%
----------~~~~
DATE STARTED: 26-01-22 DATE COMPLETED: 30/01/2022

Mould No: B-3 Weight: 6458 gms Volume: 2110 cc

Soaked CBR 96 Hrs

900
.:
Penitration Bearing .. .--'
800
.....--' ~
in value Ratio
(in) (Ibs) (lb/inL' (Cor.CBR) N 700
.:: V
~ 600

Ql
:::l 500
/
>
ra
400 / AT 0.2"
OJ
c:
·c
ra
300
/'
Ql
Ol
200
,,/ AT 0.1"

100 /
0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 271 823
2.14 glee CBR @ 90 % Compaction at 0.1" 27
C.OMC = 4.95 % CBR @ 90 % Compaction at 0.2" 32
TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar
----------~~~-------- --------------------­
RGF· YNB·PHY·SOIL·05-04
01.08.2021
Cl;.A.;/(JI,;~ ·;;;~ifL;?~I~

P.O. _
f "'ERI""....
lUDdnn~
.RjYADH GEOTECHNIQUE & FOUNDATIONS CO.
3(j)1>., l'>nbu AI.SIt••ly.h" ",VAS S1000. j(!;N. ltI,\pho",,; c.~ Ii"} l~5®92 / l2sOO;,,· fiOO >1)G.G (14) 31S01l46 em.lI, l1It,y.llbl.I!>..llI"""*imcoHum
t\.l..H.1W;UUrul !1.Jr~i!L UM At.Mab.'m nlli1rkt.. nC.;Votllno A'",~tt;:tlvlih .

CfJn2

transmisssion DATE SAMPLED:


-------1
TP: 1 DEPTH: DATE RECEIVED:
----- --------1
DESCRIPTION: Grayiesh Brown Well graded SAND with silt 8: gravel. SAMPLE NO.:
--------1
LED BY; RGF
---------~------------
ENVT. CONDo TEMP. HUMIDITY: 38%
DATE STARTED: 26-01-22 ----------
DATE COMPLETED: 3010112022
Mould No: B-4
----------
Weight: 6395 Volume: 2106 cc

Soaked CBR 96 Hrs

---
1200
Bearing 11UU
value Ratio 1000
(in) (lb/in L
)
(Cor.CBR) ~
900 ~
'"c ~
g 800
/'
(II
700
:J
;;; 600
V
>
0) 500
./
t::
';:
<tI
400 1/ AT 0.2"

(II /v
aJ 300
200 /" AT 0.1"

100 /
o /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR @ 95 % at 0.1" = 36
CBR @ 95 % at 0.2" =

TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar


------------- -----------
RGF- YNB-PHY·SOIL-05-04
01.08.2021
Cl;,.l;:./V I!J~~ ifl;?.) I ~
RIYADH GeOTECHNIQUE & FOUNDATIONS CO.
I',(i;U6" :IO:l11, Y.m"" Ahsln'!V'" MfA!> !\1iiOO, K!ll\. Tell!pI1'"'''' '._I~~) ~~!iI.lW2 i1256iH1~ f'm -rlM(i4) 12500.6 Em,lI: '8,,...""b""'~f'...""I""".,.<"m
lMAtjml! a"'tbw...:n.:tt\d ~frHl. H~ AJ.MilNn l)hJ:rtrt~ RL;Yanhu A,..; w!\mh

CBR"]

Neom desalination plant to gayal transmisssion system. (LD-3) DATE SAMPLED:


-----:-::-----1
SAMPLE SOURCE: M-TP: 1 DEPTH: 0.60 m DATE RECEIVED:
----------1
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt 8: gravel. SAMPLE NO.:
----------1
SAMPLED BY: RGF
ENVT. CONDo TEMP. HUMIDITY: 43%
DATE STARTED: 26-01-22 DATE COMPLETED: 3010112022
Mould No.: B-5 Weight: 6375
---------­ gms. Volume: 2113 cc

Soaked CBR 96Hrs

1400
.....
Bcaring
..---'
RatIo 1200
~'.
(Cor.CBR) N-
c
~
1000
~
/
Q) 800
/
~

iii
......

V
>
OJ 600 / AT 0,2"

c
.;:
(IS
Q) 400
/
/
OJ AT 0.1"

200

0 V
0.0 0.1 0.2 0,3 0.4 0.5
Penetration (in)

Remarks: C.MDD 2,14 g/ cc CBR @100 %Compaction at 0.1" 43


~C-.O~M-C~--4-.-95-~%~-------:-::-C-B-R~@-10~0-%~o-Co-m~pa-c-t-io-n-a-t-0-,~2-"-----~4~8:-::--------

TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF· YNB-PHY-~""O'!TTIL':T·O"'S:71·0:A4- - - - ' - - - - - - - - ­
01.08.2021 APPROVED BY: Cow g\~~,Jjj,§glsrQ~in
An ERlcompallY RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.o.. fi.6.lt 3-0211, VatlbU Ai..". ii'n;Iy)h., MVA$ 51000, ~5A , T,t.of~P.h~! "9t,iG ('~)~?S0?92 (:u~,. .r-~ni! '1{)1).6 '(Ul3l~~O<;6 t~U: fat,.,,:lObu~e(~M1:ttf;~.t>Am
'JX:.llo)l: A'·I<OW~"'''''S\l''''I. HMAI·M.""" PI>I,kl; Q,C,;V.nbv N,$ln.'~,", .

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT:
------------------------------------------
Neom desalination plant to gayal transmisssion system.(LD-3) DATE SAMPLED: 1 5/01/2022
SAMPLE SOURCE: TP: DEPTH: 0.60m DATE RECEIVED: 22/01/2022
=-:-:-:­
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt 8: gravel. SAMPLE NO.: B·1
ENVT. CONDo TEMP. 24.8°C HUMADITY: 38%
---------------
DATE STARTED: 26-01-22 DATE COMPLETED: 30/0112022

2.15 MAXIMUM DRY DENSITY: 2,14 glee


OPT. MOISTURE CONTENT: 4.95 %

2.10
PENETRATION AT: 0.1"

2.05 CBR at 100% of MDD: 43

CBR at 95% of MOD: 36


2.00
CBR at 90% of MOD: 27

1.95 t-~---+--~"--+----'--,-_+---'---,--+_----_t---'-'--_t

TESTED BY: M.ARFAN


1.90 +-----_t----.:..---I--'------!--'----I------+---'-----I
20 25 30 35 40 45 50
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


------------­

RGF- YNB-PHY-SOIL-05·04
01.08.2021 Copy Rights Reserved By RG F
t::A•.:_l.:....--{1I~ ~~ J' ,-:?.-J I ~
RIYADH EiEOTECHNIQUE& FOUNDATIONS co.
P.O. Dux 3()2"'1~.v<lf\t;ru N'Sll\;tY"~ MY,I\S Sl000~ K~ _1:~~~P!1~~! .. ~~ (11t)·3~~0992:i32Mm93 r-a)t~ WU6 (i4) ;l~5()l.)46 EiMU;: f3f·Y.)'f'lbu~~'t$c~ie-fiCe""~Orn
L<KMk>m AH._Mt)M,$\,,,i;\, Hlil Al'M~"'" Ol>l<kt, 11,(" nhb" ;l.HiIn.lVah

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system.(W-3) DATE SAMPLED: 15/0112022
SAMPLE SOURCE: TP: 1 DEPTH: 0.60m DATE RECEIVED: 22/0112022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.8°( HUMADlTY: 38%
DATE STARTED: 26-01-22 DATE COMPLETED: 3010112022
-----------------­

MAXIMUM DRY DENSITY: 2.14 glee


2.15
OPT. MOISTURE CONTENT: 4.95 %

2.10
PENETRATION AT: 0.2"

2.05 CBR at 100% of MOD: 48

CBR at 95% of MOD: 42


2.00
CBR at 90% of MOD: 32

1.95

1.90 TESTED BY: M.ARFAN


25 30 35 40 45 50 55
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar


------------~-------

RGF· YNB·PHY-SOIL·05·04
01,08,2021 Copy Rights Reserved By RGF
Cl;,l.;../uJ,~:0' J"~.)I~
An ERI Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
p,1'>. no;.< :wnl, Y.II"" Al,1il<~I~.h, MvM ;,;,OO<),,~ l~"'f'!"m'l'~ (14) 8~:k)99' I )~""'9ill' ....,+%(0 .!I.~) )~~OO4« f:mlll: r~'."I';"l>u@>CII~.",<I.M.""H"
\«.;t.f!)iii AH'u:~~~'~t'tc-t, tf~J Ai.:M·~b1irtJJt)V'Rt. ~A ",,,,I\t,1ij N·~.J(\MY~h
C8R,/

Neom desalination plant to gayal transmisssion system.(LD-3) DATE SAMPLED:


--------1
TP: 02 DEPTH: 0.60 m DATE RECEIVED:
Greyish Brown Well graded SAND with clay 11: gravel.
----~~~----~---
SAMPLE NO.: - - - - : : - - : - - - - 1
RGF
HUMIDITY: 36%
26-01-22 DATE COMPLETED: 30/0112022
A-6
------------

Soaked CBR 96 Hrs

1000 .........

in Ratio
900 I~-~ .....
...
.----'
800
N I.·:·.:····.· V
(Cor.CBR) c
:a 700
. I .
~
- 600
'-'/-"
~

~,
Q)
::J
C\i 500 "
>
OJ 400 /
c
.;:
'" 300 /
/ ATO.1"
Q)
III
200

100 /
0
V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks:
~~~-~~-~----~~~~~~---~~----77-------------

TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar


---------------
RG F-YNB·PHY-SOIL-05-04
--------------
01.08.2021 APPROVED BY: cop~iis~ard'6:P!i1W
t:A.:.A..;./U J,::,:: .y~ J,-:?.J 1~
RIYADH GEOTECHNIQUE& FOUNDATIONS CO.
P~Q. i)(»( "Soni l 'v":mbu Al,.-S~n~ly,)h~ MYAS Sl000~ KSA 1i>k-phOfU!t +966 (i4)j2~~ 13~5()991 F'lJx;~)6,G (tAl 3~50!).1.6 tm-lll~ '61.y"'nbu{!jJ~lg~Qj{lffiCI!f..Cbm
"t..nc:";aUoni .A!.Naw;,tnand ":StrPP.J. Hal JU.Mah"3n Ohtrkt_ A..C.• y..anbu hl.Slnalvah

CBR-2

Neom desalination plant to gayal transmisssion system. (LD-3) DATE SAMPLED:


-----:-----:-::----:-----\
SAMPLE SOURCE: TP: 2 DEPTH: 0.60 m DATE RECEIVED:
---------\
SAMPLE DESCRIPTION: Greyish Brown Well graded SAND with clay ft gravel. SAMPLE NO.:
---------\
SAMPLED BY: RGF
----------------------------------------------
ENVT. CONDo TEMP. 24.2°C HUMIDITY: 36%
DATE STARTED: 26-01-22 DATE COMPLETED: 30/01/2022
Mould No: A-7 Weight: 6425 gms. Volume: 2109 cc
-----------

Soaked CBR 96 Hrs

1400
Bearing 1300
value Ratio 1200 ;
.--'
(lb/inL) 1100
(in) (Lbs.) (Cor.CBR) N­
1000 ~
.!:
::a 900
~
Q) 800 ..-'
::l
'itj 700 /
> 600 /'
OJ
t:
.;: 500 / AT 0.2"

'"
Q) 400 /'
!O
300 ./ 'T n ....

200 ./
100
,/
0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: C.MDD = 2.16 g/ee CBR @ 95 % Compaction at 0.1" = 39


----------------~--------------------------~~-------------------------------------
C. OMC = 4.95 % CBR @ 95 % Compaction at 0.2" = 44
TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar
------------------------- --------------
RGF- YNB-PHY-SOIL-05-04
01.08.2021
C~~Ul",:;: ·":;~if'2)I-V
RIYADH GEOTECHNICQE & FOUNDATIONS CO.
1'.0, """ ,021;, ¥nnoo 1II.s1tl'1V'h, MYJIS ~i()()(), ItSil "~""'" +llMl"):j2_l , " ' _ , r..: +llM'(M)l!l50941! emilI!, 'Il,,,/.nlM,>erlg.,,,,lern:.,,,,,,,,
. ·ttK"~IfiJ\! Al44"~IUM Strir1?t, lMt;U,MAhaR fJkttkt. fl.t-,. V~nbu Jt.l.shuiv.lh
GJR·3

DATE SAMPLED:
---------1
0.60 m DATE RECEIVED:
--------------~
SAMPLE NO.:

HUMIDITY: 43%
----­
26-01-22 DATE COMPLETED: 30/0112022
Mould No.: A-8 6363 ----------------­ Volume: 2115 cc

Soaked CBR 96Hrs

1600
Bearing
1400
value Ratio
(in) (Lbs) (Ib/in" (Cor.CBR) 1200

1000
OJ
.aro 800 '
>
0)
c:
.;:: 600
ro
()J
III 400

200

0
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks:

TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: ____


Sa_e_e_d_A_k_h_t_ar_ __
RGF· YNB·PHY·STTOirr[.Tr05""·O"'4r--~~~---------
01.08.2021 APPROVEDBY:_~co~p~~~gl~~Jt.~~~~g~M~k~
f~~i~9___
RIYADH GEOTECHNIQlJ€ & FOUNDATIONS CO.
PyO. r.s(»~ ~t)l71* VMOO AI.sl~ly.Jh, MVA,s .51000.tSA l:t1~p:f).M'ie! i9~611~)31S09j)213251J1jl)'(" r.~~4t66{141.l15{)')4G £m31Hrsf,v;,nbtJ@'~f'i$eo~df:M6.l".Qm
'iX'~Il<>", AI·i<;w.."",,/l<! $IOHI. Hlill\l·M.h....PI>ltkt. 11,('; y.,,,,, A)·Sm.!y>!>

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
------
--------------------------------------------
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-3) DATE SAMPLED: 16/0112022
SAMPLE SOURCE: TP: 2 DEPTH: 0.60m DATE RECEIVED: 22/0112022
-,----,...,--,­
SAMPLE DESCRIPTION: Greyish Brown Well graded SAND with clay a: gravel. SAMPLE NO.:
ENVT. CONDo TEMP. 24.2°C HUMADITY: 36%
------
-------------
DATE STARTED: 26-01·22 DATE COMPLETED: 3010112022

2.20 MAXIMUM DRY DENSITY: 2.16 glee


OPT. MOISTURE CONTENT: 4.95 %

2.15

PENETRATION AT: 0.1"


2.10
CBR at 100% of MDD: 48
2.05
CBR at 95% of MDD: 39

2.00 CBR at 90% of MDD: 29

1.95

TESTED BY: M.IRFAN


1.90
25 30 35 40 45 50
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


-----------

RGF-YNB-PHY·SOIL·05-04
01.08.2021 Copy Rights Reserved By RGF
RIYADH (iiEOTECHNIQUE & FOUNDATIONS CO.
P.O. UO)( 30'l71, VaftbO N:>sll'l~fy~h,.. MYAS 51000, KSA Tc1epOOnC! 4!'~~~ (~<1) 3?~2.i-32~3- f-;!lt-; '*:~ (1~) ::U:'5C!l~6 ftm~U! f'$t·V>lnbuQ)e-tt~MdeMe:~,f:-'0f'1'\
lOUI!!>'" AtN'lW"".nd.1>I....I. H~I A1cM.>n.n 1:>1,,,kt; lI.e" y .... b .. "'~SlMIV.h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LO-3) DATE SAMPLED: 16/01/2022
SAMPLE SOURCE: TP: 2 DEPTH: 0.60m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTION: Greyish Brown Well graded SAND with clay 8: gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.2 QC HUMADITY: 36%
DATE STARTED: 26-01-22 DATE COMPLETED: 30/01/2022
-----------------

MAXIMUM DRY DENSITY: 2.16 glee


2.20
OPT. MOISTURE CONTENT: 4.95 %

2.15
PENETRATION AT: 0.2"
2.10
CBR at 100% of MOD: 55

2.05
CBR at 95% of MOD: 44

2.00 CBR at 90% of MOD: 34

1.95

1.90 TESTED BY: M.IRFAN


30 35 40 45 50 55 60
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar


--------~~~-------

RGF-YNB·PHY-SOIL·05-04
01.08.2021 Copy Rights Reserved By RGF
f An Eft. Compony
. . t:':..1••:--l.;./V I, ~A l/l:?~ I~
RIYADH G€OT€:CHNiaUE & FOUNDATIONS CO.
­ ~ :.

P. Q. (lQx3Q~7L.y.ent>u AI Slnaiy~ M"YN;_S1000_~tArnb~ Td, rw,.-+%-&-14-;)2~992f), FaXNo .. +96G-14-::n:S094G{ fl:In.eU: rQf-ya.nbV@~k.Jw.s:c.~«"S.com


~k'n: AJ'~<'I'r'fil~d .S~r~. ~~'f1'~~~ ~~. ,u.P.~~ k~, y~p~.•. ~~~~.~~ ~

CBR-'

Neom desalination plant to gayal transmisssion system. (LD-03)


TP: 03 DEPTH: 1.20m DATE RECEIVED:
------­ SAMPLE NO.: - - - = - = - - - - 1
DESCRIPTION: Greyish Brown well graded SAND with silt .
SAMPLED BY: RGF
ENVT. CONDo TEMP. 24.8°C HUMIDITY: 38%
------~~~--
DATE STARTED: 26-01-22 DATE COMPLETED: 30-01-22

Mould No: E-2 Weight: 6385 gms Volume: 2108 cc

Soaked CBR 96 Hrs

450
....

Penitration ng 400

~
....c......

in value Ratio
(lb/in L N 350
(in) (Ibs) (Cor.CBR)
/
'
.5
~ 300

Q)
/v
250
.=!
>
co
200
V
Cl
t:
·c 150 / AT 0.2"
co
Q)
OJ
100
V
50
/ AT 0.1"

0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 132 401
Remarks: C.MDD = 1. 96 g/ee on at 12
------~~-~----------~----------------------
C.OMC = 6.24 % CBR @ 90 % Compaction at 0.2" 14
TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhtar
-------------- ---------------
RGF- YNB-PHY-SOIL-05-04
01.08.2021 APPROVED BY: c~shtiJiQ1ie)j'6'fRtF
----~~~------~--------
CI..:-l;;./V l ,=.::
RI'fADHGEOTECHNIQUe & FOUNDATJONS CO.
'A~~4?~I~
-An ERI ComJ>ilhy-
P. 0. t'Qx3Q271. n,...bU N SIMf)'e-h.. HAY.~,SlO~.~'ArtW~ ru. No. -"'%-f;.,-l"'-J~!>09'!):\!I3, r{t.'\{~. +'!1(ithtiH~2SQ$<iI.~~ C",:lnblH tQr",:'$nlJu~,a*'l-oo.~~,mm
~kin: ~'~~~d~r~,.-klld !'l'Mifo~:~~,!~" .UP.~~ ~;<; :tjil):..u~~~~~ f.<:~

CBR-2

Neom desalination plant to gayal transmisssion system.(LD-03) DATE SAMPLED:


----------------~
SOURCE: TP: 3 DEPTH: 1.20m DATE RECEIVED:
--------~-----;
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt. SAMPLE NO.:
---------------;
SAMPLED BY: RGF
--------------------------~~---------
ENVT. CONDo TEMP. 24.8°C HUMIDITY: 38%
DATE STARTED: 26-01-22 DATE COMPLETED: 30-01-22
Mould No: E-3 Weight: 6395 gms. Volume: 2112 cc

Soaked CBR 96 Hrs

700
i i
Penitration Bearing
600
Ratio
(in) (Cor.CBR)
500
.....-' ~
Q) 400
V
>
::l
'iii
Cl
300
/
c:
.;:
III
Q)
OJ
200 / AT 0.2"

100 / AT 0.1"

V 0,4
0.1 0.2 0,3 0.5
Penetration (in)

CBR@ 95% 18
CBR@ 95% 21
TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: Saeed Akhta r
----------~~---------- -----------------------­
RGF- YNB-PHY·SOIL·05·04
01.08.2021
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:
----------------~
SAMPLE SOURCE: M-TP: 3 DEPTH: 1.20m DATE RECEIVED:
----------------~
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt. SAMPLE NO.:
----------\
SAMPLED BY: RGF
ENVT.COND. TEMP.--------24-.-8°-C-----------H~U~M~ID~I=TY-:---3-8%-0--
DATE STARTED: 26-01-22 DATE COMPLETED: 30-01-22
Mould No.: E-4 Weight: 6365 gms. Volume: 2109 ee

Soaked CBR 96Hrs

800
Peni Bearing
700
I·· .. /
value Ratio ~
(lb/in LI (Cor.CBR) ;:;­
c 600
...... ......
/"
'<::
@. .. ........
.....
,/
V
500
Q)
3(1:l
400
...... ...... /'
>
C'I
c
.;:: 300
..

..... .... / 'T n.~"


(1:l
Q) /
OJ 200

100 / AT n 1"

0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: C.MDD = 1.96 glee CBR @ 100 %Compaction at 0.1" 23


~~---------~----------~~~~~--~----~----~~-----------
C.OMC = 6.24 % CBR @ 100 % Compaction at 0.2" 27

TESTED BY: M.IRFAN CHECKED BY/REVIEWED BY: _ _ _. .:S:.,: a:. ; .e. :. ,e. :. ,d. .:A:. ; .k. :. ,ht. .:a. :. ,r_ __
RGF· YNB·PHY·Sut'!1Irr:[·",05""·om4r------------------­
01.08.2021 APPROVED BY: _--,-rJ.ll.l~ljL.111!lW·-'U,*=L~""ru:,-",e=h..u;SiV"",,jn,"-lJF,--_
Cl:-l;../{jl,.~
~ ~t.fU)I~
JZ.. .,.
RlYADHGEOTECHNIOUE & fOUNDATIONS CO.
0.00;< 30271. YMbu N SlnaMlh,~YAS Sl~O?~1 ~~ It'f. Ho. 't~tG-14-,)259992{3, f_&X ~' __f:~-~4>~~(;. E-m~:-f~t~'OO~~~,QYTl
LqaJlbn; IH/aI~~:u.nu Str~ t~_A1'~ Dkrtt{di UP Af~,R~ ~bu AI:'~~~ ~

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT • NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination ptant to gayat transmisssion system.(LD-~TE SAMPLED: 16/0112022
SAMPLE SOURCE: TP: 3 DEPTH: 1.20m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 24.8°( HUMADlTY: 38%
-------­
DATE STARTED: 26-01·22 DATE COMPLETED: 30-01-22

2.00 MAXIMUM DRY DENSITY; 1.96 glee


OPT. MOISTURE CONTENT: %

1.95

PENETRATION AT: 0.1"

1.90 CBR at 100% of MDD: 23

CBR at 95% of MDD: 18


1.85

CBR at 90% of MOD: 12

1.80 +-----+-----+-----+--'---"'---1

TESTED BY: M.IRFAN


1.75 +------+-----+-----+------1
10 14 ]8 22 26
Axis Title CHECKED BYIREVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


---------­

RGF·YNB·PHY·50IL·05·04
01.08.2021 Copy Rights Reserved By RGF
1• •,,:.,.... _CL.l...:;.,/rf/J~~v'i')J~
RIYADH GEOTECHNIQUE & f·QUNOATlONS CO.
P. o. D-»:~0271, y~ N S~iMAYM ~l.QW-$1l'IJ(ll AlWI~t :r~. ~,..4-?(>6"H'32~Q99;Ul. fW(:NQ. +~·U·l2~,~'fl;E·P\aH: m1·~~,<<>m
~~n~.AI"~~.~~~~:I-~ AJ'~~ ~~~,~~'.~Wk,~;~.~,YlVtW~~~·~., ..

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to !layal transmisssion system. (LD-03) DATE SAMPLED: 16/01/2022
SAMPLE SOURCE: TP: 3 DEPTH: 1.20m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with silt • SAMPLE NO.: B-2
ENVT. CONDo TEMP. 24.S0C HUMADITY: 38%
DATE STARTED:
----------------­
26·01·22 DATE COMPLETED: 30-01-22
----------------­

MAXIMUM DRY DENSITY: 1.96 glee


2.00 .,---------..----:--~--r--.........,.~-----.------_.,__,
OPT. MOISTURE CONTENT: 6.24 %

1.95 +---------t---------t----i------\-~---:-
PENETRATION AT: 0.2"

1.90 +---------+------'----I-----.<'----+---'-~--~ CBR at 100% of MOD: 27

CBR at 95% of MOD: 21


1.85 +---------t----------7i'-------.:..-\--------'--l
CBR at 90% of MOD: 14

1.80 +-----t---/----t-----,.-----+------,.---l

1.75 +---------+-----------1f---------+--------~ TESTED BY: M.lRFAN


10 15 20 25 30
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar yasin


--------~~-------

RGF· YNB-PHY-SOIL-05-04
01.08.2021 Copy Rights Reserved By RGF
-c:.,L:-t..;;:./{j I!J ~~ ~i..;?./ J~
An ERlcQm"",ny RIYADH GEOTECHNIOUe& FOUNDATIONS CO.
p,o, ac;..,.; 00271,-y~"bU N-z.lt\i:i1~h. MVA$ ~;\OO()~ KSA 1'¢1c>P:h~o-1.1J66 (1A) a:2~2j32~3 " ..lIe: ... 966 ·~1-'iJ.a-2"!00'9"'6 £~m t$,.y,;!4'11xI~tlM101,dc;I\UllJd:t)m
t.~<.l\l9!'H Al-<N.)Cwpl1",nd ~~n::.. ~ n4i: Ai·M~h~ oo,-t)'k't# 1t.~.. fin~ N~~t'la¥... h CDR.1

Neom desalination plant to gayal transmisssion system.(LD-03)


AMPLE SOURCE; TP: 04 DEPTH: 1.20 m DATE RECEIVED:
------~~----~
LE DESCRIPTION: Greyish Brown well graded SAND with clay & gravel. SAMPLE NO.:
----------------1
ED BY: RGF
----------~---------------------------
ENVT. CONDo TEMP. 1 HUMIDITY: 36%
----------~~~~~
2610112022 DATE COMPLETED: 30-01-22

T-1

Soaked CBR 96 Hrs

900 ......... ..: .. ..


. ..
..... ..
600
in value Ratio
N' 700
...
;..--' V-­
(in) (Ibs) (lb/in LJ
~
(Cor.CBR) 1::

a 600
': .... .

<1l
.= 500
/
>
(1J

400 /
en
1::
.;:
(1J
300
V
/ AT 0.2"

<1l
OJ
200 / .... " ..

100 /"
o /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 268 814
Remarks: C.MDD 2.18 g/cc CBR @90 % Compaction at 0.1 26
~C~.O~M~C~--~5~.~15~-7%~------~C~B~R-@~9~0~%~C~o-m~p-a-c~ti-on--at~O~.2~"~----~3~2-------------------------
TESTED BY: _ _ _ _T_V_F_A_IL_K_H_A_N____ CHECKED BY/REVIEWED BY: _____S_Q_e_ed_Ak_h_t_ar_ _ __
Awais Nisar Yasin
RGf· YNB· PHY·SOIL·05·04
01,08.2021 Copy Rights Reserved By RGF
'c:L:-l.;:./U I~ ~.0.t../ 4?..,J' ~
RIYADH GEQTECHNIOUE& FOUNDATIONS co.
P.Q. BI)It 3O:l:7,i,. YanOO l>J~'$h~lyah. MYAS_SlOOO.. JC$A. l'(;:lC\"phon&~ -J.~6"" (1:4) :;t;U>~2-'3:;,o$C~.1 .f>ttrIJ .. ?W (14) ~1!iM4(i. F.m;:),H~ T8vv,arlbU~lI'tfr~~leJ1.f_~,;.Ulm
• _ _.......:..._ . . . . " .... ~ •• "'M_~-_d .... ~~'"'. ~ .. _.- ... i·... ~ ••• ~M &,",h4~" n "'" ;'h._~.~~'~ ",J_ ••_. __ ~,
CBR-2

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:


---------------;
SOURCE: TP: 4 DEPTH: 1.20 m DATE RECEIVED:
---------------;
DESCRIPTION: Greyish Brown well graded SAND with clay £t gravel. SAMPLE NO.:
---------------;
SAMPLED BY: RGF
ENVT. CONDo TEMP. 24.1°C HUMIDITY: 36%
DATE STARTED: 2610112022 DATE COMPLETED: 30-01-22
-------------­
Mould No: T-2 Weight: 6292 gms. Volume: 2115 cc

Soaked CBR 96 Hrs

1600 , ,

Penitration Bearing Bearing ,


1400 ._-"­
value Ratio
(in) (Lbs.) (Ib/in') (Cor.CBR) -:a
'.::
" 1200
v--­ -'

1000 ~
V
<I>
.aro 800 /
>
Ol
t:: 600 /' V
.;;: ATO.:!"
ro
<I>
III 400 ~
200 / AT 0.1"

o V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR@ 95 %
CBR @ 95 % Compaction at 0.2"
TESTED BY: TUFAIL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar
-----------------------­ ---------­
RGF- YNB·PHY-SOll-05-04
APPROVED BY: _____..:....:...______-:-::-...;,.-,-::--_
01.08.2021
An IEBI Coml>"ny RIYADH GEOTECHNIOOE& FOUNDATIONS CO.

CBR-J

PROJECT: Neom desalination plant to gayal transmisssion system.{LD-03) DATE SAMPLED:


SAMPLE SOURCE: TP: 4 DEPTH: 1.20 m DATE RECEIVED:
---------------4
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with clay 8: gravel. SAMPLE NO.:
---------------4
----------------1
SAMPLED BY: RGF
ENVT. CONDo TEMP. --------------------------------------­
24.1°( HUMIDITY; 43%
DATE STARTED: 2610112022 DATE COMPLETED: 30-01-22
Mould No.: T-3 Weight: 6225 gms. Volume: 2099 cc

Soaked CBR 96Hrs

1800 , .:"':'"
I·······:··
Bearing
'1600
Ratio
(Cor.CBR) N 1400
...
.. ..... ~
.5
£1 1200
......... :.......
...............
~
<ll
::l 1000
.... ;/
V
>'" 800
..
./ ,T n?"
01
r::
'i:: 600
;/
'"
m
<ll
./ ATO.1"
400

200
/
0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

TESTED BY: TUFAIL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar


--------~~~~-------- ----------------------­
RGF·YNB-PHY·SOIL·05-04
01.08.2021 APPROV ED BY: _--"-c",,,oW,In"-""J;'.l..JII'.=bs=ffillJe=ft.wfl1WliRi"",F_ _
;J..U'
,t:..-l:-l.;:;/VI, ~~if4?..JI~
RivADH GEOTeCHNJQUe & FOUNDATIONS CO.
P.O. 1)(>,,, ':f.Ol1l.• 'V"',..", I\J-,.Oj;f"';tyMt. MVAS ::)JQoo~ I(~ Tofl!l~on'O~ ..tm& C'4l a'~ll:l.\!I~!t f,"1;k1)6~{1~~325()94U t:r~fh (IP"YM·.w~i'fJiWtrld~Il4:~t'~m
lmllidMH Al·N.wIo«umd .$~¥It~ U"" At M"han otltfi-et.. tt.(;v Y~!U>lJ ~.~,)h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT PROJECT NO:
NEOM.
- -21J4037
----
PROJECT: Neom desalination plant to PlayaI transmisssion system.(LD-~TE SAMPLED: 17/1/2022
SAMPLE SOURCE: TP: 4 DEPTH: 1.20 m DATE RECEIVED: 22/1/2022
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with clay ft gravel. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 24.1°C HUMADITY: 36%
--------
DATE STARTED: 26/01/2022 DATE COMPLETED: 30-01-22

2.20 MAXIMUM DRY DENSITY: 2.18 glee


OPT. MOISTURE CONTENT: 5.15 %

2.15

PENETRA TlON AT: 0.1"

2.10 CBR at 100% of MDD: 54

CBR at 95% of MDD: 38


2.05
CBR at 90% of MDD: 26

2.00 +----+--;4---+----+--+--+---'---+....,.--:--1

TESTED BY: TUFAIL KHAN


1.95 +----+--+---!----I--+--+---+---,
20 25 30 35 40 45 50 55 60
Axis Title CHECKED BYIREVIEWED BY:
Saeed Akhtar

APPROVED BY: #REF!


--------­

RGf. YNB-PHY-SOIL-05-04
01,08,2021 Copy Rights Reserved By RGF
Cl;...~fJ 1.1 ~r.:1' c/L;?.,) I·~
RIYADH G.EOTECHNIOUE& FOUNDATIONS CO.
PA Oox tJO~7j~ Y.antru AMHn;lyi}-h. MYAs.S1000.~!.A 't.4'tlcph~:~.oj6~ i1.4)3~t.!(l9.~).1 ).l',~3-.. *-,u~ '*~~ (i'" ~:i~M46 ,t~!H J"8'.y,)ubuOCf~JJf:0'1_th~fttf'!u::.om
f.~('.. \~l"tl At.n~~~M St,.~ ~1 AU<.4...Nn Obtfkt. A~ YOtn\>\i AJ,$hl4'Wh

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
------1
PROJECT: Neom desalination plant to !Sayal transmisssion system.(W-03) DATE SAMPLED: 17/1/2022
SAMPLE SOURCE: TP: 4 DEPTH: 1.20 m DATE RECEIVED: 10-10-21
SAMPLE DESCRIPTION: Greyish Brown well graded SAND with clay a: gravel. SAMPLE NO.: -------=B-_2=----f
~--

ENVT. CONDo TEMP. 24.1°C HUMADITY: 36%


DATE STARTED: 26/0112022 DATE COMPLETED:
----------------
30-01-22
-----------------

MAXIMUM DRY DENSITY: 2.18 glee


OPT. MOISTURE CONTENT: 5.15 %

PENETRATION AT: 0.2"

CBR at 100% of MDD: 62

CBR at 95% of MDD: 45


2.05 +--+_---+------b.L--'-}-----jf---~___,4_-+__.,_I

CBR at 90% of MDD: 32

l.UIl +--+_-f--+--'-}----jI---+-_4_--+_-,--.,_I

1.95 +---/----1---+---+-----11----'--1----1----/--'---'-1 TESTED BY: TUFAIL KHAN


25 30 35 40 45 50 55 60 65 70
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar


-----~--~----

RGF· YNB·PHY·SOll·05·04
01.08.2021 Copy Rights Reserved By RGF
CL::-I....;:./V I-,~~ t../'-;?~ I ~
r--=::--'-"""I:l;i"'"

!:;A...~E~R~I~c~o~m~pn~nlf~~~~~.RIVADH GeOTECHNIOUe.& FOUNDATIONS CO"


t·~(). 00-)( "!kJ2""l'.'l.• 'Yl;)nbV At,~ft~IY.l1h, MVAS ~U.OOO. K!!>1lo t.£ok-phr>tUr. ~9b~ (l.o)3-25099:l I t'25O?1Jo:t F:'Jloi~ .1)"
.(lit) :l2SU!)/Uf tlfflaU! ,r8f,.y~b41@t'ctlt.t.em.deni'~'\~CfJm,
loc:.lla-n) At·NaV¥>1l""rnt st:U'y;t'" H.ai Ai~M:a.~r. O~trk't~ ILC." V.. ~b1iAHifl1aty.:ah
caR·'

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 18/1/2022
--------------~
SAMPLE SOURCE: TP: 05 DEPTH: 0.60 m DATE RECEIVED:
------~------~
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.:
--------"'-~----~
SAMPLED BY: RGF
ENVT. CONDo TEMP. HUMIDITY: 36%
-------
DATE STARTED: 26101/2022 DATE COMPLETED: 30-01-22
Mould No: M-1 Weight: 6387 gms Volume: 2110 cc

Soaked CBR 96 Hrs

900 ... ...... ..................


••••••••••
Bearing
..... : .. ................ /
800
..---
in value
(lb/in LI
Ratio
(Cor.CBR) -.::;e
N 700
...
... .. . .. . . .

./"
,,;/
~
600
Q)
500
..... ,"
y
:l
iii
> 400
/
0')
c
.;:
!V
300
....
/.. ATO,Z"

Q)
III
200
,/ AT n "

100 /
0 V
0,0 0.1 0,2 0,3 0.4 0,5
Penetration (in)

Remarks: C.MDD =
~C~.O~M:C==..--~~--~------~~~~~~--~~~~----..·--~----------------------

TESTED BY: TUFAIL KHAN CH ECKED BYfREVI EWED BY: ______-'S_a_e_ed


__A_k______
hta_r____
RGF· YNB·PHY·sOI[·05-04
01.08,2021 coJltf~rs ~~%eh;W~F
Cl::-L::---'V 1~ ~~ j,-:?~,~
An ERI Com!",,,), RIYADH GEOT€CHNIQUE& FOUNDATIONS CO_
(#.0. o~ :)Q.lI-;r:l~ Y.fmbu-Al.M"afyah,. MYh'S $100u. XM T(;O~~(,H'I.$'t .1>00 ~14)a:l.~;( la~~jJ: j;t)tll.:~" (1A) ;)2!KUJ4(i t:m.l)U; ,tAH(,at"*"u.w4;:J'!:t-eo.d"n~'~~I'>'
. - .~l(>nl Ai,ft.u_lt~.:tMl 'S.i,.-r_ Ual At ~~ ob*del~ RJ:.~ V;lnbh-AJ...'SJnahrah

Neam desaUnation plant to gayal transmisssian system. (LO-03) DATE SAMPLED:


--------------~
SAMPLE SOURCE: TP: 5 DEPTH: 0.60 m DATE RECEIVED:
--------------~
DESCRIPTION: Greyish Brown poorly graded SAND with silt 8: gravel. SAMPLE NO.:
--------------~
SAMPLED BY: RGF
----------------------------------------­
ENVT. CONDo TEMP. 24.7°C HUMIDITY: 36%
DATE STARTED: 2610112022 DATE COMPLETED: 30-01-22
Mould No: M-2 Weight: 6295 gms. Volume: 2113 cc

Soaked CBR 96 Hrs

1600
Bearing
1400
value
~
Ratio
(in) (Lbs.) (Ib/in') (Cor.CBR) ;:;­ 1200

~
r::
£1 1000
i

(l)
;:J
iij
>
800 /
OJ
r::
.;:: 600 / AT 0.2"
<II
(l)
CO 400
/
200 / AT 0.1"

0 /
0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR@ 95 % at 0.1" = 43
CBR @ 95 % at 0.2" =
TESTED BY: TUFAIL KHAN CHECKED BYIREVIEWED BY: Saeed Akhtar
------------------------­ --------------~--------
RGF· YNB· PHY·SOIL-05-04
01.08.2021
P.O', f)';:>x W::i;:J. Yll~\tm AI.sl~ijv.ah,. MY-AS. $:U>OQ.. ";$A 'fcM~()M! ~%6 (1-l) ):t~:iI ,f;J2~iJ S~t~" ,(4) ~j:S(f!M6 t:(ru\H: ,~:.v:;(;bu~Nl£~co«hm<~$ ~()m
. 1,<$C'.Mloru AI,N::wx.anand .".t~:t. H.:t5A'-M.::ttloOln Oh.fkl~ f\,t":",~ V::lAhOAh1:tu.-h,.h

PROJECT: Neom desalination plant to gayal transmisssion system. (LO-D3) DATE SAMPLED:
---------\
SAMPLE SOURCE: M-TP: 5 DEPTH: 0.60 m DATE RECEIVED:
---------\
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt 8: gravel. SAMPLE NO.:
---------\
SAMPLED BY: RGF
ENVT. CONDo TEMP. 24.7°e HUMIDITY: 36%
DATE STARTED: 26/0112022 DATE COMPLETED: 30-01-22
Mould No.: M-3 Weight: 6245 gms. Volume: 2106 cc

Soaked CBR 96Hrs

1800
Bearing
1600
value Ratio
(lb/inL' (Cor.CBR) N 1400
.!:
;e 1200
Cl>
::l 1000
til
> 800
OJ
t:
.;::
til
600
Cl>
III
400

200

0
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks:

TESTED BY: TUFAfL KHAN CHECKED BY JREVIEWED BY: Saeed Akhtar


RGF· YNB·PHY·SOIL,u:'·04
APPROVED BY:
------------­
caA~n!l{~{M;eXfl1ifGF
01.08.2021
C-l.:;.A.;:_---(Iljt ::;: • ...:;;& ifv~ I ~
RlVAOH GEOTECHNIOVE&FOUNDATIONS co.
9~O; 11m(3W"?':t.. V;ml~>.IJ\.l.SI·f"f~I'¥ah.-MY')\s. e:n:ooo. h:SA . Tch."ptwne! "t~if,6 C:l4~'!f).:s()<j92/~'2'~:J_ -f;B~~ 'i.!l«i (14') l?~.'509Jlt), a:~,J>IJ: _.iJ.f.y,.mbll"'C'7I£fJ'~N)~(*'U'6m
LOC.:.ttl,'>1\r tt..L>N"'W'H,~nd :$tr~¢t.. B.:t)Af,M:.1tJ<N o~1'tkt~ ft.<=,,,-~ .o\J."$i_~~~

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
PROJECT:
---------------------------------------
Neom desalination plant to sayal transmisssion system.(LD-~TE SAMPLED: 18/112022
SAMPLE SOURCE: TP: 5 DEPTH: 0.60 m DATE RECEIVED: 221112022
SAMPLE DESCRIPTION: Greyish Brown graded SAND with silt & gravel. SAMPLE NO.:
-----------
ENVT. CONDo TEMP. 24.7°C HUMADITY: 36%
-------------
DATE STARTED: 26/0112022 DATE COMPLETED: 30-01-22

2.20 MAXIMUM DRY DENSITY: 2.20 glee


OPT. MOISTURE CONTENT: %

2.15

PENETRATION AT: 0.1"

2.10 CBR at 100% of MDD: 57

CBR at 95% of MDD: 43


2.05
CBR at 90% of MDD: 29

2.00 +-----+-:_--+---~f----___l----__+--,___+----_l

TESTED BY: TUFAIL KHAN


1.95 -1-----+-----+-----1,-------1-----+-----+-----1
25 30 35 40 45 50 55 60
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY; #REF!

RGF- YNB-PHY-SOIL-05-04
01.08.2021 Copy Rights Reserved By RGF
Q1t> V 'CL:-L.;....--tJ/~ ~&ify-"'j.~
AnERlcomvany ~~, v... RIYADH GEOTECHNIOUE & FOUNDATIONS CO_
'>,O.-IMlM 3{)27.1~ Vilnbo At.-!.I~ly':'h. MYAS-:'!;j.OOO, }o;SA 'fe~ephb"(Ol: ~'966 (1t1.}a:7l.50992/<U~9':)3 f'~lo +966 (.1.., 32~~6 Ilm-all: Jfl"y,.,nblJ@'e,.lg(ODKfl."",c:e",I:'O~
l,~Ol'to.r.: AI.N;;aw;;ah:ahd:5h_t. H,3,~ At-MotH;." okVI~1~ R..c;,... Y.anl,l~ Aj·$inzr,ly.Nl

TEST REPORT

.
C.B.R. - DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 18/1/2022
SAMPLE SOURCE: TP: 5 DEPTH: 0.60 m DATE RECEIVED: 10-10-21
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.: B-1
.
,."~ ..-~~.~.~.~.~--,~~,,~-~~.-,,-~",,-~-,--~~~-,~~~.~~-.---~~~

ENVT. CONDo TEMP. 24.rc HUMADITY: 36%


DATE STARTED: 26/0112022 DATE COMPLETED: 30-01-22

MAXIMUM DRY DENSITY: 2.20 glee


2.20 , : , OPT. MOISTURE CONTENT: 5.10 %
'i '
.' '. . ..... .

' / ~ .....
. i I

I
2.15
, ...
/' PENETRATION AT: 0.2"

2.10
...•
./
/ .•.........

CBR at 100% of MDD: 66


V
2.05
...

/ CBR at 95% of MDD: 50

/
.

V CBR at 90% of MDD: 34

2.00
V
/

1.95 . ~- -~---,
- ~- ..­ ~-
---" "-_ .. ~ . ~--. .S.~--T ~~~~~

-- TESTED BY: TUFAIL KHAN


30 35 40 45 50 55 60 65 70
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar yasin

RGF-YNB-PHY-SOIL-05'04
01.08.2021 Copy Rights Reserved By RGF
Gl:A_::./UI,~~c.J'l?)I~
An ERlcompony RIYADH GEOTECHNIQUe & FOUNDATIONS CO.
~.o, n<»< Jon!, YonbIJ ru'51.;ly.i~ MYAS.SlllOO,~SA Tv-I.pllOt,,,, ~ 114) J1"W!1~ 13l~;) f~'" .'t>lI!idI1l1m.6 ,molll 'eI"I'""bIJ~"I~""IC/l<...tO!l\
l<K~lJQ/I'A~N_....n<l $"'"", Hal AIM,b... ()Iud(\, M';Yonoo Al·Slt\.ltm . CBR·/

Neom desalination plant to gayal transmisssion system.(LD-3) DATE SAMPLED:


-------:--1
SOURCE: TP: 06 DEPTH: 0.60 m DATE RECEIVED:
""'ml"'_r: DESCRIPTION: Greyish Brown poorly.. graded SAND with silt & gravel.
--------­ SAMPLE NO.: -----:-::---,----1
>-~~~'~ __ ~~·"'_~~··"' __ __ ..
~~~~'0,,_ ,,=.~~"_.~~IT_~~~.~~~~ ~_ _,~,.

SAMPLED BY: RGF


ENVT. CON D. TEMP. ------::--:-:-:-=------:-H-:-U-:-M-:-ID-'TY-:--:-:--38-%-­
DATE STARTED: 26-01-22 DATE COMPLETED: 3010112022
-------­
Mould No: A-4 Weight: 6366 gms Volume: 2106 cc

Soaked CBR 96 Hrs

1000 ....... .......


: .. ······::::··1··
....

Bearing 900

-
..

----­
in value Ratio .....

800 ........
(lb/in'J
(in) (Ibs) (Cor.CBR) '"'c
~
a 700
V
600
.. ........ /
~
Q)

co 500
/
>
Cl 400 /'
c
·c
co
Q)
300 /' . AT 0:2"

III
200
;/'
100 / '" u.

0
/'
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 286 868
Remarks:

TESTED BY: CHECKED BYIREVIEWED Saeed Akhtar


RGF· YNB·PHY·SOIL·05·04
01.08.2021 APPROVED BY:
l.:A.;A..;...-rU I, ~.0' J' '-:?.) I~
RIYADH G.EOT€CHNIQU€ & FOUNDATIONS co.
P..,;Uox;u,l", V.nWA\.,Jn;ly.h, MYAS ;,coo, j(SA ·td"f>hon.,·.%"(14)3~SOOlil/~~~~ t'K: .~M ("I~z!W9'6 £.... n''1I'.y..nw(ji.. i..'''''lim..''''"'''',
. 1.a4C~\lnn: AL,P*llWlIIiUtUl Stn~i!l: .. u.M At:MlltUSfi OI1.lrkJ. fl.e.. "ianlH~ Al--S~ .

ctJR·2

PROJECT: Neom desalination plant to !Sayal transmisssion system.(LD-3)


SAMPLE SOURCE: TP: 6 DEPTH: 0.60 m DATE RECEIVED:
-------~
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.:
-------~
SAMPLED BY: RGF
ENVT. CONDo TEMP. 24.6°C HUMIDITY: 38%
--------- -----
DATE STARTED: 26-01-22 DATE COMPLETED: 30101/2022
-------­
Mould No: A-5 Weight: __6_4_58_ _ gms. Volume: 2112 cc
--------­

Soaked CBR 96 Hrs

1600
Penitration Bearing Bearing 1500
1400
.
value Ratio ----'
1300
(in) (Lbs.) (lb/inL) (Cor.CBR) ~
'"t: 1200
~
1100
~ 1000 7/~
(]j 900
:::l
"iii 800
> 700 /' AT 0.2"
Cl
t: 600 ?If

<1l 500 / u.
(]j
CO 400 /
300 /'
200 Ji
100 III
a /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR @ 95 % 48
C.OMC = CBR @ 95 %Compaction at 0.2" =

TESTED BY: Saeed Akhtar


- - - - -M.IRFAN
------- CHECKED BY/REVIEWED BY:
--------------
RGF·YNB·PHY·SOIL·05·Q4
01.08.2021 APPROVED BY: _-"-(Q""D",--MM.:.::=!1""~,-"R~,,,,,·
='%"-"""-d=ti'f!'-!.R'IW=·'---_ _
(;1> 'V Cl;A_;./U',::~ ·";;~ify)l~
AIIERlcomp3IlY ~' ::"' RIYADH GEOTECHNIQUE& FOUNDATIONS CO.
P.o. U<>. :lO21~. Y.nbu III-S'o;ly.1;, MY"". ~1IlOO.~!lA ,ti1.p/I""~! ,,_ !1<1) nsoon la~~) f~" .~.G !i4I.n_.6 Em.TI: 'II,.y.M"'\,!,"I&""""'"ht~'.<om
tU<:1itlioorAt"N;;W"tund ghltltt.llitl Al-M..u~.n. bhlrk1.l\,'('",;Y.-.ntM. A•.$~olh

CilR-3

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-3) DATE SAMPLED:
--------------~
SAMPLE SOURCE: M-TP: 6 DEPTH: 0.60 m DATE RECEIVED:
--------------~
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt a: gravel. SAMPLE NO.:
-~---~-~~-----------~------- --------i
SAMPLED BY: RGF
ENVT. CONDo TEMP.
-------------------------------------------
24.6°( HUMIDITY: 38%
DATE STARTED: 26-01-22 DATE COMPLETED: 3010112022
Mould No.: A-6
-----------------
Weight: 6429 Volume: 2114 cc

Soaked CBR 96Hrs

2000 .... ... .


........
Bearing 1800
~
j

Ratio ........ ....


1600 ..

~
(Cor.CBR) N'
c
;a 1400

1200
..
~
Q)
::l
..

V
(1) 1000 /"
> ATO.2" ...
OJ
c 800 /
.;: ,/'
til
Q) 600
/
...

CO AT 0.1"
400
/
..

200

0
V
0,0 0.1 0.2 0,3 0,4 0.5
Penetration (in)

TESTED BY: M.lRFAN CHECKED BY!REVIEWED BY: Saeed Akhtar


RGF· YNB·PHY·~C70mIL-:1·0~5::r·or;r4------------------- -----------------------
01.08,2021 APPROV ED BY: _..wcO.1flp)jU~:uguJfM"'-::sR=t!s=j.w.:LlLt>J[rlUJr.¥_f=If~u:.f}_ _
~*ID .~~ c..i'l.?) j~
f AnERlcompany I~~~J'
P.o. DtX( 30n.1, V~nt»J .!UySln;ly:.h. MYA.-' SlOOO, XSA
\l t:A..:,.l.;./V I,
" .. ~ RIYADH GEOTECHNJOUE & FOUNDATIONS CO.
Te-lt'-ph¢r)C: ... %6 (14) Jl~113250993 ~it: -tJJ5-6 (14' 3250946 (nu1l: "e~..y,)tll~iJ@"(I~?b-~li!'nel'~u-(tM
lo<atfon: AJ.,"'O)w~ffiH·\d $bttl, 1-1,,1 ALMJh~ft, O[j\tl<:t,. itt.... V')obu AI,SIMly~h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
-----------
-------------------------------------------
PROJECT: Neom desalination plant to !layal transmisssion system. (LD-3) DATE SAMPLED: 19/0112022
SAMPLE SOURCE: TP: 6 DEPTH: 0.60 m DATE RECEIVED: 22/0112022
SAMPLE DESCRIPTIOr-. Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.6°( HUMADITY: 38%
DATE STARTED: 26-01-22 DATE COMPLETED: 30/01/2022

2.25 MAXIMUM DRY DENSITY: 2.20 g/ee


OPT. MOISTURE CONTENT: 5.10 %

2.20 -t----+----+----t-----t----I-'----'--f--'----'--t-'-----t-:,4--+'-,-'--,--j

PENETRATION AT: 0.1"


2.15 -t----+----+----t-----t----I-'----f--'--r--t-'----+----+--'-'--,--j

CBR at 100% of MDD: 67


2.10
CBR at 95% of MDD: 48

2.05 CBR at 90% of MDD: 29

2.00

TESTED BY: M.IRFAN


1.95 +---+---+----1----+----+---+---+---+----+----(
25 30 35 40 45 50 55 60 65 70 75
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


----------------

RGF- YNB-PHY-SOIL-05·04
01.08.2021 Copy Rights Reserved By RGF
Cl;..A•.,;;~/U/~ ~~ if~.) I~
RIYADH eEOTECHNIQUe& FOUNDATIONS CO.
P';'Q" (l.())I' 3(')2'1~-".. ,.,bll At~S.Il\i;i'i","h~ MYM StJXID, ':-$1\ T~f~h()fi.jJ! 4-~6 fIJi) 3~rHl9!)21 a:l,~0093. ra~~ ~56 (1~} _'250tMtJ:. E:~th t~(~y,A"'bH(@~'l&~'I'm«$~~)i'n
t.t~K:,3t~j"1 A'J'NMY';M"''»lh11}U't;''.cl.. H~j At"M,»h~.fi ()h.t.ft(,;t~ n~("... vanbu J\j4tJMlY:~h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to $layal transmisssion system. (LD-3) DATE SAMPLED: 19/0112022
SAMPLE SOURCE: TP: 6 DEPTH: 0.60 m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.6"C HUMADITY: 38%
DATE STARTED: 26·01-22 DATE COMPLETED: 30/01/2022
------------------­

MAXIMUM DRY DENSITY: 2.20 glee


OPT. MOISTURE CONTENT: 5.10 %

PENETRATION AT: 0.2"


2.1 5 +----+-'--+----+----+-'---+--'-'--+--'--:>4-.,...
CBR at 100% of MDO: 74

2.1 0 +-'-----+----,-+----!----!--.,...,.7f"----!----!--'--!-.,---!--'-'-'_1
CBR at 95% of MDO: 54

2.05 +---+---f---,-,J,-L,-....--j--,--f-,----l-----l-----+-.,...,.-+-'--'--[ CBR at 90% of MOD: 34

2.00 +----b"'-----!-.,---,-!----!-.,..---!----!----!----!-~-!--,--'_1

1.95 +----+----+----!----+---+---+----!----+--'--+---'--I TESTED BY: M.IRFAN


30 35 40 45 50 55 60 65 70 75 80
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar


----------~-~-------

RGF-YNB-PHY-SOll-05-04
01.08.2021 Copy Rights Reserved By RGF
~~GL-L;./Uf, ~.0',yY)'~
An ERICoI1'lJ)liYlY RIYADH GEOTECHN IQUE & FOUNDATIONS CO.
PA:bc, :ron1, v.1\l)"Al~l"'I~ MYM51(l(l(l, l(,$A 1.I.jlh<>",n.!lfi6{l>1) $1~~ 13l~3 fa" *,,<;6 (14) 31509<6 ("""" 'Sr·y"nbtllJ>ll'Ils• ."tl.,,,,",,,,,,n,
1<><41\""" N·Naw....r><l Sl,m,lnl AIM'~'~ 'P!>I'",l.1\,G... roob~AI.sJ"'ly.h
CBR-l

PROJECT: Neom desalination plant to $loyal transmisssion system.(LD·03) DATE SAMPLED:


----:--::-:-:-::-::-::'-::----\
'LiM' .... ' r SOURCE: TP: 07 DEPTH: 0.60 m DATE RECEIVED:
LE DESCRIPTION: Brown poorly graded SAND.
------­ SAMPLE NO.: --....:...--=--:----\
SAMPLED BY: RGF
ENVT. CONDo TEMP. HUMIDITY: 37%
DATE STARTED: -2-6·-0-1'-22---::::-:-:::=-:::-:::-:­ 30·01-22
Mould No: M-6 Weight: 6455 gms Volume: 2110 cc

Soaked CBR 96 Hrs

Bearing
in value Ratio 500
(Ib/inkl (Cor.CBR)
N
.5
~ 400
Q)

-=>ro 300

Ol
t:
'1: 200
ro
Q)
III
100

0
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks:
~~~~~--~~~~~~r---17------------
TESTED BY: CHECKED BY/REVIEWED BY: _ _ _-=5::. .:Q.:. .:e. . :.e. . :.d. :.A. :.k. . :.h: . .:ta.:. .:r_ __
------------­
RGF· YNS·PHY·SOIL-05-04
01.08.2021
~t> ~.t:A..;A..;:../(JI!J ~&t./~)I~
Ar>EHlcQmPllDY ~. . v ... RIYADH GEOTECHNIQ\.JE& FOUNDATJONSCO.

(;BR·2

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:


--------;
SAMPLE SOURCE: TP: 7 DEPTH: 0.60 m DATE RECEIVED:
---------;
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.:
---------------;
SAMPLED BY: RGF
------- --------------
ENVT. CONDo TEMP. 24.3 D C HUMIDITY: 37%
DATE STARTED: 26-01-22 DATE COMPLETED: 30-01-22
---------
Mould No: M-7 Weight: 6385 gms. Volume: 2108 cc

Soaked CBR 96 Hrs

900
' .
• •
Bearing 800 •

value Ratio
(Ib/in<) (Cor.CBR) 700
~
N'
t: ,
§, 600

(\)
~,
:::l
500
ro
> 400 /
Ol
t:
~
.;:
300 /'
ro AT 0.2"
(\)
III
200
/
100 / AT 0.1"

a V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR @ 95 % fll1nrJ 1(111 at 0.1" = 19


6.93 % CBR @ 95 % Compaction at 0.2" =
TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar
----~~----~--- ------------­
RGF· YNB-PHY -$Oll-05-04
01.08.2021
~,(>; &.. :liJJ1i,Y>noo A!.Sln;Iy.I~ MyA'!, ,,;;oo,,$A lel<Pho".,._ (14) 1~5~~ I a1s(m3 M.: .m lid) nS0946 (m.lI, 'S"y.hbvil!'orls.",cl.n""',.wm
In<,,,,;J()nt M.N41w",narm st'4'I'i'L Hitl AhMahan ()'klrf.tLRr,.,.. Y:mhtt AHi:bI;a.W+l})

CBR-3

Neom desalination plant to !Sayal transmisssion system. (LD-03) DATE SAMPLED:


---------1
M-TP: 7 DEPTH: 0.60 m DATE RECEIVED:
---------1
SAND. SAMPLE NO.:
---------1
HUMIDITY:
24.3°(43%
26-01-22 DATE COMPLETED: 30-01-22
Mould No.: M-8 6365 Volume: 2111 cc

Soaked CBR 96Hrs

1000
Bearing 900
Ratio
800
(Cor.CBR) N
t:
700
f!
(l)
600
.:::ro 500
>
OJ 400
c:
.;:
ro 300
(l)
CO
200

100

0
0,0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks:
rON~~~~-------n~~~~~~--~--------

TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF·YNB·PHY·Su"'Irr:L·7I1
0S""·om4r-----.:.;.--.:.;.--.:.;.---- -----------­
AP PROV ED BY: _---1..(oop~¥_J<l!l1lJ·[5J/I,,""'~""'R&LllJe'""h_"l~i....
jn;ruFl:-..-_
01.08.2021
r~-:::'I~'C~c~.-,..;./.OJ,~,0't/y)l~
,t,O.
f ~nERI CQmPll"Y RIYADH GEOTECHNIQUe & FOUNDATIONS CO.
nml1UI171, V«litHI A:f,!'Itr~~I<ri\ti.i MVA'i ~1fltl€t, fUiJ\, T,~tl-Ph~'i'W'.· t .~[j6 fUlll;l!)f)!Ii)._ JJ. l,"J'2.Gw.»)
f~IIl~6 ~Hl ;~:;H,itW.tG ~f.•n;li'!\·rl)t,y.~ntwt1t4t..'WC'.o1"'J"M"'~ t'fil'l"l
l()(otk>", Al·NiIW~o.1\d ~ilfll. Hoi i\i·M.too c.!.ifkl.l!,\;;, Y.nWJ)l,~I""j¥"h .

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
---------------------------------------- ----------
PROJECT: Neom desalination plant to !Jayal transmisssion system.(LD-~TE SAMPLED: 20/0112022
SAMPLE SOURCE: TP: 7 DEPTH: 0.60 m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.:
ENVT. CONDo TEMP. 24.3°C HUMADITY: 37%
--------------­
DATE STARTED: 26-01-22 DATE COMPLETED: 30-01-22

2.00 MAXIMUM DRY DENSITY: 1.98 glee


OPT. MOISTURE CONTENT: 6.93 %

1.95
PENETRATION AT: 0.1"

1.90 CBR at 100% of MDD: 24

CBR at 95% of MDD: 19


1.85
CBR at 90% of MDD: 13

LBO +-'------f~

TESTED BY: WISAL KHAN


1.75 +------I--------j-----+-----+------/---'
10 14 18 22 26 30
Axis CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


--------------­

RGF· YNB·PHY-SOIL·05·04
01.08.2021 Copy Rjghts Reserved By RGF
~f) , CG~(J/~~~ify.)l~
An ERlcomP""Y ~~:s "..... RIYADH G.EOTeCHNIQUE & FOUNDATIONS CO.
P¥O~ Box 30271, 'f.umu lU4il~~~hi MVAS 51000. KSA 'T~1~ph(jtnc!: ,t-?66 {:101)'3':1'SO<I:j92,(3:l.51)99;) r-¥'i~1.f1)~ tlll} ::J250!;~G l"-'n-aUHgt~YM'!'buOt'fI~t;t:6W:.kol!e"',(,(')m
10<:;:;tft»U ..·~J·Naw;lr\aM $tt~~«Ji ~J. ArM,)h~h b~~1:tkt£ ft.(v:Y.3nbu AIN$thilJy-iloh .

TEST REPORT
C.S.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
PROJECT:
------------------------------------------
Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED: 20/01/2022
SAMPLE SOURCE: TP: 7 DEPTH: 0.60 m DATE RECEIVED: 22/0112022
SAMPLE DESCRIPTION: Brown poorly graded SAND. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.3°( HUMADlTY: 37%
DATE STARTED: 26"01-22 DATE COMPLETED:
-----------------
30-01-22

MAXIMUM DRY DENSITY: 1.98 glee


OPT. MOISTURE CONTENT: 6_93 %

1.95 +--'------t-'----:---i-------+--;£--.---+----:-"--i
PENETRATION AT: 0.2"

1.90 +-__-'--.,.--\-____- j__--,-L-.-+--:--;-__-+__-,--__-; CBR at 100% of MOD: 29

CBR at 95% of MOD: 23


1.85 +-------\---~y-------+-------+-----,--i

CBR at 90% of MOD: 17

1.80 +---___---;1'--___----1-------+-------+--------\

1.75 +-------\------j------­ TESTED BY: WISAL KHAN


14 18 22 26 30 34
Axis Title CHECKED BYIREVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar yasin


------------'--------­

RGF-YNB-PHY-SOIL-OS-04
01.08.2021 Copy Rights Reserved By RGF
Gl.::.-VUi, ~~ di..:?)I~
An ERI Cfl!np.iny RIYADH GEOTECHNIQUE & fOUNDATIONS CO.
P,O. ~•• !mH.$. v."w AI.$li,;'ry'n.MYJ.$ SlOOO. ~ Telo""""", .~ll (14) 315ilil!>2/l25ili1!» , ...., .gllG 1~')"l~Q~'(; tmMI' r~f"f'''bu~'''l(I;i _ _''',t<l1l1
1.()('"tfQ:t'l~ ~.N~V1.f\3ruJ ~ttCt't.lfa1 Al·M_fl~n ~tf~ R'(~I 'f;fnfxl4!·$H~flh .
COR·'

PROJECT: Neom desalination plant to gaya/ transmisssion system.(LD-03) DATE SAMPLED: 2010112022
-------------~
SAMPLE SOURCE; TP: 08 DEPTH: 0.80 m DATE RECEIVED:
---=-----:---- ------------~
SAMPLE DESCRIPTION: Brown well graded SAND with silt & gravel. SAMPLE NO.:
SAMPLED BY: RGF
-----~~~-------------
ENVT. CONDo TEMP. HUMIDITY: 36%
DATE STARTED: 26-01-22 30-01-22
Mould No: Weight: 6441 gms Volume: 2102 cc

Soaked CBR 96 Hrs

700 ...

.........
600 ....

(Cor.CBR)
N
c
......
/
7"
g 500
.....
/
Q) 400
/ ..

:J
<tI
> 300
/'
/
/
OJ
c
·c AT 0.2"
....
<tI
Q) 200
m
100 / AT 0.1"

0 / ..

0.0 0.1 0.2 0.3 0.4 0.5


Penetration (in)
0.5000 206 626
Remarks:

TESTED BY: W/SAL KHAN CHECKED BY/REVIEWED BY: _ _ _.-:..S_Q_ee_d_A_kh_t_a_r_ __


------------
RGF·YN8·PHY·SOIL·05·04
01.08.2021
Gl:-l;../U I, ~-0'J'y) I~
An ERlcomPliny RIYADH GEOTECHNIQUE& FOUNDATIONS CO.
P,O. U<»Ia;;lTl. ""Obu.\l.5'':'I1'"' MYABjOOO. kSA T.~
. .
'>"'' ' (14) a~:>o9!>1 /l2~lI Fa", +?o6(14P2S1.lll4l1 !In.u: 18i.y>nbu~ .. Ii).",.I.~
lnt.l:dnn! At...N1,JW,l.n:;II'Mf ;t,trt!l!t. H:iJ At~Mam.1l [)ldmL R.t:.. 'fanbbAl.sJt~Nah .

CBR-2

Neorn desalination plant to !layal transrnisssion systern.(LD-03) DATE SAMPLED:


---------------1
TP: 8 DEPTH: 0.80 m DATE RECEIVED:
--------------~
DESCRIPTION: Brown well graded SAND with silt Ii gravel. SAMPLE NO.:
--------------~
ED BY: RGF
------------------------~-------------
ENVT. CONDo TEMP. 23.3°C HUMIDITY: 36%
DATE STARTED: 26-01-22 DATE COMPLETED: 30-01-22
Mould No: B-2 Weight: 6367 Volume: 2105 cc

Soaked CBR 96 Hrs

1000 i .
Penitration Bearing 900
value Ratio I /"
800
(Ib/in') ;::;­
c: 700 /
~
600 /
1:1>
.2
<1l 500 /
>
OJ
c:
400
/
'':
<1l
1:1> 300
/ AT 0.2"
aJ
200 /' V
100
/ AT 0.1"

0 /'
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR @ 95 %
CBR @ 95 % at 0.1" =
TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY:
------------------------ ------------------------
RGF-YNB-PHY-SOll-05-04
01.08.2021 APPROVEDBY: __~c~~~~'~s~=~=~~e~~~~t~~~F_____
Cl:.-l.:;../V 1, ~r.:YJ't?~ J~
An ERI Company RIYADH GEOTECHNIQUE & FOUNOATJONSCO.
I',~, ""'. \\O'.n, 'f".""A\.Slnt.ly.li,. MVAS SfOO(" X<A r_Ioj>ht»w' +'>6<)('4) ~,~, I al~j f.x: .~\'i(il!.) ;)lS(J94/i ~m.U, Ig(,y.nbulV"IG<t»tlen"'Hom
. uM Sb~tID Ulil M.-M;ilull ()lstrkt~lt('"" Y:iinl>ltAi..stnalv"h
ttICAUOQt A\..Nltw.u

caR-J

Neom desalination plant to gayal transmisssion system. (LD-03) DATE SAMPLED:


---------------4
SAMPLE SOURCE: TP: 8 DEPTH: 0.80 m DATE RECEIVED:
----------------~
DESCRIPTION: Brown well SAND with silt Ii SAMPLE NO.:
--------=---------------~------------- ----------------~
SAMPLED BY: RGF
--------------------------~--~-------
ENVT. CONDo TEMP. 23.3°( HUMIDITY: 36%
DATE STARTED: 26-01-22
-----------------­
DATE COMPLETED:
------­
30-01-22
------------­
Mould No.: B-3 Weight: 6345 gms. Volume: 2108 cc
-----------------­

Soaked CBR 96Hrs

1100
Bearing 1000
value Ratio 900
(Lbs) (lb/in LI (Cor.CBR) N
c: 800
~
100
(l)
::J 600
to
> 500
OJ
c: 400
';::
to
(l)
aJ
300
200
100
0
0.0 0,1 0.2 0.3 0.4 0.5
Penetration (in)

TESTED BY: WISAL KHAN CHECKED BY/REVIEWED BY; Saeed Akhtar


RGF-YNB·PHY-Su('l1Ir:[-T\105~-OrD4'----------------- -----------------------­
APPROV ED BY: _---.WCQUfl~¥_I~:ugw.·"-'''*=b~=9&=e''_l.h..llll'lv'-''ilt=E'----
01,08.2021
~~t:A*,;.A.:./VJ, ~&J,-:?)I~
AllERlcompany RIYADH GEOTECHNIQUe & FOUNDATIONS co.
J\(). 0/)')1, )0211, Y;lInb;) At.Slll;'t.lh. MVAS 5-1000. kSA jt'fi"PhOI1~i .£166 (14) 3;lS0991Il1~3 Fa:'::>f!166 1-'4) 37!lQlll'46 £tl"i3't: J$f..y,)i\bt*@~rtetMdeM~wm
It>t·Jt~(;m A!·NjwaMrll:J SHvt-l., }I~iAI·MMliitl Obtrkt, R,C., Y(iflbu AJ~;y~h' ..

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-mTE SAMPLED: 20101/2022
SAMPLE SOURCE: TP: 8 DEPTH: 0.80 m DATE RECEIVED: 22/01/2021
SAMPLE DESCRIPTION: Brown well graded SAND with silt £i: gravel. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 23.3°( HUMADITY: 36%
--------
DATE STARTED: 26·01-22 DATE COMPLETED: 30-01-22

2.05 MAXIMUM DRY DENSITY: 2.02 glee


OPT. MOISTURE CONTENT: 6.25 %

2.00

PENETRATlON AT: 0.1"

1.95 CBR at 100% of MOD: 29

CBR at 95% of MOD: 24


1.90
CBR at 90% of MOD: 19

1.85 +_----+------,'~_+---_I----+_---_1

TESTED BY; WISAL KHAN


1.80 + _ - - - - \ - - - - + - - - - + - - - - - + - - - - - \
14 18 22 26 30 34
Axis Title CHECKED BY/REVIEWED BY;
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


----------

RGF· YNB·PHY·SOIL·05·04
01.08.2021 Copy Rights Reserved By RGF
~---"""" Cl::-(..;../V I!J ~& c./~.) f~
.:.2:.-=::"~=:::!:::::!...!=:ii~==~ RIYADH GEOTECHf\UaUE & FOUNDATIONS CO..
p~o~ U~)( 3027.1. V,'u\bU Ai,Slnc-;IV.l-h, MYA$ Sl(:)()O. KSA T¢t-tl<f"h"fi~! ·-.966 (1") 3~S099'?, /3:250993 F;'iIII! +9G.6 (14j :t2:~()!)"6 £~Urfl:l;f·vW\bt'(getf,s~l»C.l~",«lM
lO<ii-Hom AJ.t4a-w~n~j\d Sltec\.- '~~I J\1,M~h'"lfl J)f1-ltkl, A.C•• V.t)f1bti ~-Sjfl~Jv~n

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LO-03) DATE SAMPLED: 2010112022
SAMPLE SOURCE: TP: 8 DEPTH: 0.80 m DATE RECEIVED: 22/0112021
SAMPLE DESCRIPTION: Brown well graded SAND with silt a gravel. SAMPLE NO.: B-2
"_~A~~,~~_~v~~~" •• ~_,~~_~~~"w~<.~._"q~'_'_"'~d""'''_="~V _'''~"_"'_

ENVT. CONDo TEMP. 23.3°C HUMADITY: 36%


DATE STARTED: 26-01-22 DATE COMPLETED:
-----------------
30-01-22
-----------------

MAXIMUM DRY DENSITY: 2.02 glee


2.05 ,--------,--,--,-------,----------,------,---,
OPT. MOISTURE CONTENT: %
----
2.00 +---------j----------f---------+,L-.--...:.---J
PENETRATION AT: 0.2"

1.95 +---'--'----j.---,-----I--.....-rL----I--'-----I CBR at 100% of MOD: 34

CBR at 95% of MOD: 28


1.90 +--------+-----,,.<:.--+---------1------1
CBR at 90% of MOD: 22

1.85+-------:---7"+------11------+---------1

1.80 TESTED BY: WISALKHAN


20 24 28 32 36
Axis Title CHECKED BY/REVIEWED BY:
, Saeed Akhtar

APPROVED BY: Awais Nisar


~----------~--------

RGF·YNB·PHY-SOIL-05-04
01.08.2021 Copy Rights Reserved By RGF
r--=~.~-'''c.,L:-l.;../(jI~~~~~~I~
P~O. Q(>II'
f . _EOlcompony
:"O:t1i f Y,J,hlW iU-Slt..;"Y.lh. MYA5 Sl-.ooQ.. t<SA
RIYADH GEOTECHNIOUE& FOUNDATIONS CO.
.... ~l90f)b(>f.);):i ...9.6"6(1"')32SOW2/:l:l'W993 "~.9" (14,32:50046 cl\,~m fO'-'Y.$ot'\l",,*~fa~~J¥:'H;.~.. ,t«:u·~
s."O<.,~li>lll "'\>.N"'W~T.~'H. ~~n:rio:l .. UiH 1\'·M~h;w, 't»*k1~ «.C'" V;:in~ hf'S¥l~I't,)h CBR-l

Neom desalination plant to gayal transmisssion system.(LD-3) DATE SAMPLED:


--------------~
TP: 09 DEPTH: 0.30 m DATE RECEIVED:
--------~----~
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt ft gravel. SAMPLE NO.:
___ ,~ __ ~_~,.,,>'w~

--.~----------~
SAMPLED BY: RGF
-----------------------------------------­
HUMIDITY: 35%
07-02-22 DATE COMPLETED: 11-02-22
Mould No: B-10

Soaked CBR 96 Hrs

Bearing 800
in value Ratio
(lb/in LI 700
(in) (Ibs) (Cor.CBR) C:
8 600
<l)
::s 500
iii
> 400
O'l
s:::
...
til
300
<l)
m 200

0.0 0.1 0.2 0.3 0.4 0.5


Penetration (in)
0.5000 249 756

Remarks:
~~~-- ..~~--~--------~~~~~~------~~------~-----------------------

TESTED BY: TUFAIL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF· YNB·PHY-SO'"iL""'O""S""I'·Oc;;"4- - - - - - - - - - - - - - - - - - ------------.----------­
01.08.2021 coJl£(~(i ~?.?J;<i'~~i~F
-CL;:...f...:;,../{jI~ ~~ ify~l~
RIVADH GEQTECHNIQUE·& FOUNDATIONS CO.

CBR-2

PROJECT: Neom desalination plant to gaya/ transmisssion system. (LD-3) DATE SAMPLED:
---------------4
SAMPLE SOURCE: TP: 9 DEPTH: 0.30 m DATE RECEIVED:
---------------;
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt & gravel. SAMPLE NO.:
SAMPLED BY: RGF
ENVT. CONDo TEMP. HUMIDITY: 35%
DATE STARTED: -0-7--0-2--2-2--D-A--T=-E-C--O-MPLETED: 11-02-22
Mould No: B-11 Weight: 6320 gms. Volume: 2109 cc

Soaked CBR 96 Hrs

1600

Penitration Bearing Bearing


1400
value Ratio
(in) (Lbs.) (Ib/in') (Cor.CBR) 1200
'".5
g 1000
.~
Q)
:::l
;;; 800
~
>
Cl
c:
.;: 600
/ AT 0.2"
i

C1!
Q)
OJ 400 /
200 / AT 0.1"

o V
0.0 0.1 0.2 0,3 0.4 0.5
Penetration (in)

CBR @ 95 %
4. CBR @ 95 % at 0.2"
TESTED BY: TUFAIL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar
------------------------ -----------------------
RGF- YNB-PHY·SOIL-05-04
01.08,2021
c...l::-l.;./vl~~&ifv~'~
RIVADH GEOTECHNIOUE 8< FOUNDATIONS CO.

CBR';]

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-3) DATE SAMPLED:
----------------~
SOURCE: M-TP: 9 DEPTH: 0.30 m DATE RECEIVED:
-----------1
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt 6: gravel. SAMPLE NO.:
----------1
SAMPLED BY: RGF
------------------------
ENVT. CONDo TEMP. 24. 5°C HUMIDITY: 35%
DATE STARTED: 07-02-22 DATE COMPLETED: 11-02-22
----------
Mould No.: B-12 Weight: 6368 gms. Volume: 2106 cc

Soaked CBR 96Hrs

1800
Peni Bearing Bearing 1600
value Ratio
(in) (Lbs) (Ib/in" 1400
(Cor.CBR) '"c:
:a 1200
(lJ
::l 1000
<ii
> 800
C!
c:
.;:
<tI
600
(lJ
OJ
400

200

0
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: C.MDD = 2.16 glee CBR @ 100 % Compaction at 0.1" 52


C.OMC = 4.95 % CBR @ 100 % Compaction at 0.2" 58

TESTED BY: TUFAIL KHAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF·YNB·PHY·SOIL·OS·04
01.08.2021
APPROVED BY: c~!ii~ru;e)tl!1jo;F
f An ERIOomp"", t~!~;·
~1) VICL:.-l....;../tJl.!t~;;y~~...JI~
v"'!!. RIYAOH GEOTECHNIOUE & FOUNOATIONS co.
P~Q# (\¢X 30111. V~t;lm Al....'S!n;~"'J\. MVAS 510()(). ~"'iA Telf'1>hc.mN "'96(> (lftl '32~21 ::\1,~3 f .. lf: .-966 (U' 29>.'i0946 [I\.ai,. t8.1''1J)Afl~t~~;JIJJ«rtd(':(K,p-.'«:<:>M
t-oc.l\i!ln.~ M·N.:Jw<:mlJnd' $U~¢1~ ubi MM"h,JIn O:ltrkt.. n,c" yi).nl:,Ju Al·$.maI'y3h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. {LD-VATE SAMPLED: 22/112022
SAMPLE SOURCE: TP: 9 DEPTH: 0.30 m DATE RECEIVED: 02-03-22
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt ft gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.5 DC HUMADITY: 35%
------
-------
DATE STARTED: 07·02-22 DATE COMPLETED: 11·02-22

MAXIMUM DRY DENSITY: 2.16 glee


OPT. MOISTURE CONTENT: 4.95 %

PENETRATION AT: 0.1"

CBR at 100% of MDD: 52


2.05 +--4---'--+-'---I""':::"--+--~I---'--l----I--'-----i
CBR at 95% of MDD: 37

2.00 +--4----,,.f----I---+---I----l----I--'-----" CBR at 90% of MDD: 24

1.95 +-----':~--'--I------I---+---I----l--'---I--'-----",

TESTED BY: TUFAIL KHAN


1.90 + - - - - t - - - t - - - - - i r - - - - - + - - - l - - - - I - - - + - - - - I
20 25 30 35 40 45 50 55 60
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: ItREF!

RGF·YNB·PHY· SOIL-05-04
01.08.2021 Copy Rights Reserved By RGF
P.o. tlmt~O~'1i~ Ym\WA],SIrn.IV"-th., MYAS_5:t,()OO~ l(,SA Y~l¢phonez"'9(\.~{14!a'~):l1 !I_~5-I)o&;j. t:'lot,/sX ~.,U (14) :l2SW.l4a (ttU!I~ T6r,Y.l_T'ltru~cr1u-c~ec".(¢m
'- ~...lfQ.l"!i AhN,*~~)fi4 $t,{t~. »:,.i MM,,'~t) Qht,kt,. ~,~~ Vht.b-V AI~St;\4t';''*t;

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
------f
PROJECT: Neom desalination plant to sayal transmisssion system. (LD-3) DATE SAMPLED: 22/112022
SAMPLE SOURCE: TP: 9 DEPTH: 0.30 m DATE RECEIVED: 10-10-21
--::-:---1
SAMPLE DESCRIPTION: Brown Poorly graded SAND with Silt & gravel. SAMPLE NO.: B-1
--~~-'-"-'---'-'~~"-"--"'---~~~" ------I
ENVT. CONDo TEMP. 24.5°C HUMADITY: 35%
DATE STARTED: 07-02-22 DATE COMPLETED:
----------
11-02-22

MAXIMUM DRY DENSITY: 2.16 glee


OPT. MOISTURE CONTENT: 4.95 %

PENETRATION AT: 0.2"


2.1 0 ~"...---+-,--,--+--+-'---,-f-..""".L,--jr-'--+--:-+---I---I

CBR at 100% of MDD: 58

2.05 ~--'-t-"...---+---:Io''-'---,-f----li-----'--+--+---I---I
CBR at 95% of MDD: 42

2.00 ~-+--'--',4--'---+-'---,-f---c------If---+--+---I---I
CBR at 90% of MDD: 28

1.95 ~--Jf-,-t--+--+---,-f----li--+--+---t---I

1.90 -I---+---'---t---\--'---+----1 TESTED BY: TUFAILKHAN


25 30 35 40 45 50 55 60 65 70
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar


---------~----

RGF- YNB-PHY-SOIL-05-04
01,08,2021 Copy Rights Reservecl By RGF
Moisture Content, Particle Size Distribution,
Atterberg Limits, Proctor Test and CBR Test

LAYDOWN No. 5

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


-' .- - ;• .--U •

An _ ......... ",,,.,,,,0.0,,, ; ....u~.


f"~7',,""" c.-L:::.-~U I ~ ;:~~; ~ ~~ I
_:::::[~::::;;} RIYADH GEOTECHNIClUE & F OUNDATION.S
--... ..... ­ co.
no,"" ,",Ol",o-:1. Yr~,.,bu I\f.5;:n.~IY\lk'h. J....'Iyll\.<; l".it'Wm•. I!.SA 'U<h:'I";ha(,.ti!'~ .....66 (:1,,> .3".;rs..o<J'92" ~2S09tlo:., F.'t>.: ·~·"96<> {i4) ;)'~;:'()?<1(, r.Millt: (nf"'Y""r.hu@,l.·I'f>::\~t:>;'j.cl""~"....,.... <t ro""
't;.rl't'.·~n: A)·tJJj\O'lHUld~('Ht f:a.rU'~lr, 'H.} Al·r..l",h!\t'O r.~htd·"·T, n . .(." YHnt." AH\U\.,i~lY'",h

Neom desalination plant to gayal transmisssion system. 30.12.2021


TP: 05 (LO-05) Depth: 0.50 m DATE RECEIVED: 06.01.2022
-----­
'>AMPI I I" DESCRIPTION Sample NO.: S-1
-------1

ENVT. COND TEMP 23.8 0 C HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

SAMPLE NO: S-1


CAN NO: XP-15
OF SAMPLE + CAN (WET) (gms) 840.20
WT. OF SAMPLE + CAN (DRY) (gms) 825.60
WT. OF WATER (gms) 14.60
WT. OF CAN (gms) 180.50
WT. OF DRY SAMPLE (gms) 645.10
WATER CONTENT (%) 2.26

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY·SOIL-15-02
01.082021 Copy Right Resrved by RGF
-c:.-L:-~U I ~ ~~
- -' J:' L::->-'
­ I
RIVADH GEOTECHNIOUE & FOUNDATIONS CO •
....."0. UO)f :JO.;!';7:t., "rUt'.lbH AJ,Sfh;ly:\')h. ""'I'YI\$ .s::u)()O" Y.SA "f"ti"h~'phon~~ .. 9C.6 (:1«\) a"2~\92;1 325099:., I'';:'>:! .. ?6G (:14) :l2!!.0946 L,nall, t6hynnbH(n}<t'r/;S).t:!'<>"dcn~<l~,f:o"",
..... 'I<;..rH A~·:N.uv"'l"1!~r~d
1.~....,,· ~U->r.-~t .. tt~l A}_N'l .. n~)(\ [~'''f1''>t·t. f,L<. .• y.a ... ~"".". AI-$1n~\V~h

CLIENT : NEOM. PROJECT NO.:


-------1
PROJECT • Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 30.12.2021
SOURCE: TP: 05 (LO-05) Depth: 1.00 m DATE RECEIVED: 06.01.2022
-----­
SAMPLLE DESCRIPTION Sample NO.: S-2
-------1

ENVT. COND TEMP 23.8 0 C HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

SAMPLE NO: S-2


CAN NO: P-10
WT. OF SAMPLE + CAN (WET) (gms) 815.42
WT. OF SAMPLE + CAN (DRY) (gms) 798.30
WT. OF WATER (gms) 17.12
WT. OF CAN (gms) 170.45
WT. OF DRY SAMPLE (gms) 627.85
WATER CONTENT (%) 2.73

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01082021 Copy Right Resrved by RGF
'c~)
;;,,~ ---:-~-- or - t .' I --
V ............ "'---- ----
J U-' J
.,
'
'-'
;,:.- ~ I f
_:/'"
;:r::
~
.. ~
"
An Eft. Com.",ny I "f.'W.:cm'[Zj""""""""""""""""""""""" -----------------------­
RIVADH GEOTECHNIOUE & FOUNDATIONS CO.
I"'.O~ no)t .1,0;,.."'. Yrud:rU A¥~Slt'\;.IY .. h. ¥\1YAS 5:'1000" KSA T~flZ-phone: +--9<iG 4:11').} 32S0-t'D2 I 32:s.o-o-9>:a «(l'f-yanbu@>E!'h3.*Q'\-c·Cr.c..:;".con')
,~><a'~nn! .A1-Naw-nnand .$l1"t:f(':t". J-Hd "'l:~tvI:':'I\';'1' AI.'$·ln....ly ..h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desafination plant to gaya{ transmisssion system. DATE SAMPLED: 30.12.2021

SOURCE: TP: 05 (LO-05) Depth: 1.50 m DATE RECEIVED: 06.01.2022


------
SAMPLLE DESCRIPTION Sample NO.: S-3
-------1

ENVT. COND TEMP 23.8 0 C HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
--------

SAMPLE NO: S-3


CAN NO: M-17

WT. OF SAMPLE + CAN (WET) (gms) 800.14


WT. OF SAMPLE + CAN (DRY) (gms) 778.30
WT. OF WATER (gms) 21.84
WT. OF CAN (gms) 180.50
. OF DRY SAMPLE (gms) 597.80
R CONTENT (%) 3.65

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY -SOIL·15,02
01.08.2021 Copy Right Resrved by RGF
.. ~c..-L:.-L.::.---UJ~~;;Y j f~
AnLIi!ll!l1Company l·~·=,?:J~ ~I RIYADH GEOTECHNIClUE & FOUNDATIONS CO.
P.O. nO>l :;)0:;<'7:1. V;:;tobU IM,~'J'\al"''''h. ",1Y.....S S:lVOO", K.l!'A )'''')ocl-,"'OhOnb: .!1)6-06 (::t4} a25Q>:.}92" 326-0990 .....>:: +966 (:t4) ~:'?!~OY'''''' Lr",..1li,·: fUt~Y};H\b'YIK9'''''10!e'O:•.;;:JC:i'. .:::<-'LCOrr;
L ...... ~tfoot AJ·Nd.....,)lO.<1ond S1:£~ ... I. H~\l At_~ .. h.,.t\ Oht.. k,l. ft><:-,~ V"'H~.. q nd.$ln.......... h

CLIENT : NEOM. PROJECT NO.:


--------1
PROJECT Neom desalination plant to gayat transmisssion system. DATE SAMPLED: 30.12.2021

SOURCE: TP: 05 (LO-05) Depth: 2.00 m DATE RECEIVED: 06.01.2022


-----­
SAMPLLE DESCRIPTION Sample NO.: S-4
------;

ENVT. COND TEMP 23.8°C HUMIDITY: 35%

Test Started Date 09.01.2022 Test Completed Date: 11.01.2022


------­

S-4
A-6

• OF SAMPLE + CAN (WET) (gms) 810.10


• OF SAMPLE + CAN (DRY) (gms) 784.30
• OF WATER (gms) 25.80
• OF CAN (gms) 180.50
603.80
CONTENT (%) 4.27

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB·PHY·SOIL·15·02
01.08.2021 Copy Right Resrved by RGF
r-=:~___" 1...::...-L::-~() I.!' :: ,. • .-:;~ t-? l::?-' I ~
AnERD RIVADH GEOTECHNIOUE & FOUNDATIONS CO_
p"Q~ UO)O( :AU27'1.. Y"nbH 1·\J.S'n;'ly~h. MYA:!: S;t.OOO~ )(SA l"4<l"lC'otH)ne: .966 (:14' a~s.o99:t /30?:S<>!>!l'3 '-at_y4)nbu!jJ><bI'J.~~c.:t.eiet'>coe:s_<ol'Vll
"\()'i:'.;o.Hnrnt A'~Nllvv.anand 5U·~tH. 1-~~; A)~M,lh~n AJ.!:.-ln.<H\"ah

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to sayal transmisssion system. DATE SAMPLED: 30.12.2021

SOURCE: TP: 05 (LO-05) Depth: 2.50 m DATE RECEIVED: 06.01.2022


------
SAMPLLE DESCRIPTION Sample NO.: S-5

0
ENVT. COND TEMP 23.8 C HUMIDITY: 35%
Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
--------

NO: S-5
D-8

OF SAMPLE + CAN (WET) (gms) 800.50


OF SAMPLE + CAN (DRY) (gms) 772.60
OF WATER (gms) 27.90

185.45
587.15
R CONTENT (%) 4.75

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY-SOIL-15-02
01082021 Copy Right Resrved by RGF
.......-=~-~"-c::...L:::...-~U I~ ~~ t.../~./
... I - --
~"_wm~~~... .-ny I .~.~~.~.~......~I RIYADH GECYTECHNIClUE & FOUNDATIONS CO.
1".0. lh:;J)o( 30~7;1,. 'V~~t»J N'!Ht\';'lV~h. l'...t'Vh~' S:1(.)()O", y..5A Tcle-phone-: t-l!>G-i& (:14) a2".so,"-~!:):a /325.0993 r:'X; .... 9(;.6 (:14) .<J:Z::'0!.146 l'.'i'V'<ai':: r~'~yahbuWoet'l:€'io¢"o-~!(\lt)C;~$.<::UtV1o
i.()o(',.'Hfon, A]·Nil........-an.;arH1 5u'''''l''t~ "tal A'-~<'lh.-.n Ohhi:ct. it.C.• Y~nbu AI.5t,~"' ....ah

• Neom desalination plant to gayal tmnsmisssion system. DATE SAMPLED:


------;
TP: 05 (LO-05) Depth: 3.00 m DATE RECEIVED: 06.01.2022
-----­
I:'>AMt'LLE DESCRIPTION Sample NO.: S-6
-------f

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

SAMPLE NO: S-6


CAN NO: B-4
WT. OF SAMPLE + CAN (WET) (gms) 780.30
WT. OF SAMPLE + CAN (DRY) (gms) 750.80
WT. OF WATER (gms) 29.50
WT. OF CAN (gms) 180.45
WT. OF DRY SAMPLE (gms) 570.35
WATER CONTENT (%) 5.17

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY·SOIL·15-02
01082021 Copy Right Resrved by RGF
P.O_ no)ol 30~7:1. Y:.robu Al,S;:,...;ly;th. MVAS S3.000~ KSft -reJcphon-e::;. .966 (:1~) 3;;[$0992 /325-0!)93 f.';;a)(; +966 (:14) 32~!»16 ~:.I'n:loi'~ "O'vY.i>r.bU((poC~'ge<!o~'-e_'.<:.-e:~.CO.-n
• 1.~,.""tk>o~ftl-N~l\IV.i.ln.."nd
$.tr.".ot>t. H",I.At-Miih"'1\ I),~);t,k.t. 1~,oC .• v-",ihu 1\1-$.ch.....llV .. h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to Slayal transmisssion system. DATE SAMPLED: 01.01.2022

SOURCE: TP: 06 (LD-05) Depth: 0.50 m DATE RECEIVED: 06.01.2022


------
PLLE DESCRIPTION Sample NO.: S-1
--------1

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%

Test Started Date 09.01.2022 Test Completed Date: 11.01.2022


-------

SAMPLE NO: S-1


CAN NO: M-16
OF SAMPLE + CAN (WET) (gms) 760.55
OF SAMPLE + CAN (DRY) (gms) 750.48
OF WATER (gms) 10.07
OF CAN (gms) 195.85
WT. OF DRY SAMPLE (gms) 554.63
WATER CONTENT (%) 1.82

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
r:~IV'-
V
~ID ~ "'--'-----
I .., I .. ~u-' /a - W -~.
../ .- -11,'-"~L:;/
- ~;~ _::.r"Ij
An Eft. Company ~'. U"." ... RIVADH GEOTECHNIClUE & FOUNDATIONS co.
f'~O, 110>0 ::J.o;r71.. Yllo.'!obu AJ,Sinaly-::.h, r-.>lVAS s.-;1000~ KSA Tcl;;>phonct j ;;l.~~:::J J':l<>I; 4:',).66 (1-1) 37:.09"'6 r,.n~5:lIl1! t'n'..y:<ulbu@«!'}B<V'<>.\Ci~'''<:'I!:'',iCOJ'Vo
ft;·N;\W';;,¥n~",.~(J t""" ,AI-M..h ...n Dhhk.\, ,,,,<:'.. V ...nbu Ai-S,Jn...,l:y."h

: Neom desalination plant to <laval transmisssion sYstem, DATE SAMPLED: 01.01.2022


TP: 06 (LD-05) Depth: 1.00 m DATE RECEIVED: 06.01.2022
Sample NO.: 5-2

• CONDTEMP 23.8 DC HUMIDITY: 35%


09.01.2022 Test Completed Date: 11.01.2022

S-2
CAN NO: B-2
WT. OF SAMPLE + CAN (WET) (gms) 815.35
WT. OF SAMPLE + CAN (DRY) (gms) 797.60
OF WATER (gms) 17.75
180.55
. OF DRY SAMPLE (gms) 617.05
R CONTENT (%) 2.88

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF

[&Jl-c.:.....L.::..-~UJ,!t.:: '" -~~~~-'I


IERI Cc>mpany I ''''~'l!'':' ~'~.
c~~ S?: - .­
An RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
P.O. llQ~ :Jo.:r;1. Y:atd.. )1) A!,StO.\llY"h, '''''JYAS 5-3.000.. KSA I a2'5Q?<,~:;* f":.l<.' ~9C,"6 {:14} 92~946 £-rnaH: ruf-y.. obU®4!#~~i':'t:>$.<.::i""#">(!:N.t>Of1f'!t
"o<:~tfQn:. Al-N" ......~lI''''ZI tl4!l A~·~;!f;.,;;,r~ I,)tl'hkt,. R."-._, .... <3nt'n. At-S'f~fy".h

Neom desalination to gayal transmisssion system. DATE SAMPLED: 01.01.2022

TP: 06 (LD-05) Depth: 1.50 m DATE RECEIVED: 06.01.2022


-----­
DESCRIPTION Sample NO.: S-3
--------1

ENVT. COND TEMP 23.8 oC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
--------

SAMPLE NO: S-3


CAN NO: XP-16

WT. OF SAMPLE + CAN (WET) (gms) 805.56


WT. OF SAMPLE + CAN (DRY) (gms) 782.20
WT. OF WATER (gms) 23.36
WT. OF CAN (gms) 185.65
OF DRY SAMPLE (gms) 596.55
R CONTENT (%) 3.92

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15·02
01.08.2021 Copy Right Resrved by RGF
1"_0. uo~ :',JO~71. Yal!')bti .AJ".sir'\;lY~h. ·r",'JYAS 5:1000", Y.SA T~J.e-f.hone~ .966 (.1 .... ) ::J.2S0992 I ~~2sor~93 I;~)(~ .91:'".61.14) :l.:1'509.'1u £,,rn~iJ: ..n ....yar'\b\J@.!fi.B'I'!'o~c;en"'e".(.·ol'n
l.tH: ..Hfon;..A..I-No:t..,..,HU.<lod $.U·~""f. H;~I Al-M;;Jh.'H rJOi\fl't;.I. f·C("•.• "Y;~nb .. A.1-$:;n..\.V",h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 01.01.2022

SOURCE: TP: 06 (LO-05) Depth: 2.00 m DATE RECEIVED: 06.01.2022


-----­
'>AMI-'LlE DESCRIPTION Sample NO.: S-4
--------1

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

SAMPLE NO: S-4

CAN NO: M-10

WT. OF SAMPLE + CAN (WET) (gms) 775.65

WT. OF SAMPLE + CAN (DRY) (gms) 750.85

WT. OF WATER (gms) 24.80

WT. OF CAN (gms) 202.50

WT. OF DRY SAMPLE (gms) 548.35

WATER CONTENT (%) 4.52

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
An ERB Company
4<"''?>-
~M-J
-r::t.l t.:::...- L:...- ~ U
'l!'.!;o.!'!:J'
"
u'.~' RIVADH GEOTECHNIClUE & F OUNDAT10NS CO •
I!, j L.;:./...,)
••
f~

.... o~ Oo~ ;lO.~7:l.. Y.anb-u At>~Hr.;,y;;oh. f...'YAS :;;;tOOO~ .K5A T«:!o2" •."ho.r.-e; ... -;66 (:ttl} a2.~)U:l 132~.J93 F"'x~ -f-V(>6 (:t4} 3l:::'09<46 f.',,-....,a.t: l'Jat"""ln.. bulYYe.d~~.::.:s,c'.cn<-..,;.eQm
1.. .....c~ •• k;.n:.A.I-N>k ......~n~at~d Sb·~AAi;. Hi,... Al-M<'lh~n ol".ftct:, R.C.~ 'Yllnb\~ AJ~~Ht\AffY' ... I~

Neom desalination DATE SAMPLED: 01.01.2022


TP: 06 (LO-05) Depth: 2.50 m DATE RECEIVED: 06.01.2022
-----­
Sample NO.: S-5

ENVT. COND TEMP 13.B DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
--------

NO: 5-5

M-2

OF SAMPLE + CAN (WET) (gms) 805.82


OF SAMPLE + CAN (DRY) (gms) 778.39
OF WATER (gms) 27.43
185.55
592.84
R CONTENT (%) 4.63

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01,08,2021 Copy Right Resrved by RGF
Ii!1

, -i~·"'-c.....L-L::...-VI~~~J-"l?~I~
AnERlcomp~ny I '''''''''';WJ' ~I RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
P,G. ~1Q.l<I ;';\10;0"7;1" Y"''''h1''I\J~!:;rn.;i')lah. :-'!)Y"""", !.>:l.OOO~ KSA TiH<!ophon~: .. 966 {::1"}3:2'S-O:,-t92 / 32SO~1)a. I'll-X:: 4>966 {:t4} llJ~~)4'4:> l<:w.,.,H: rHf~y#nlb1..uXft"Hh'J*o~lc;~<.:.,,:t,COI'n
L'O<..atioo~ Al-N,;.t"""Hu~nd $l£"I'c,(t. t-...,.1 AJ~I!V1·..h""n 01",1,-1('1", fcc,. Y>lHUU AI· ")1e>-:'l.y","h

Neom desalination plant to gayal transmisssion system. DATE SAMPLED:


-------1
TP: 06 (LD-OS) Depth: 3.00 m DATE RECEJVED: 06.01.2022
-----­
Sample NO.: S-6

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%

Test Started Date 09.01.2022 Test Completed Date: 11.01.2022


------­

LE NO: S·6

M-7
OF SAMPLE + CAN (WET) (gms) 750.45
OF SAMPLE + CAN (DRY) (gms) 722.55
OF WATER (gms) 27.90
. OF CAN (gms) 188.45
WT. OF DRY SAMPLE (gms) 534.10
WATER CONTENT (%) 5.22

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YN B-PHY -SOIL-15-02


01.08.2021 Copy Right Resrved by RGF
';:=-'-~J""-
"d·X;-',
~M-'
:-~ <......--' I
V"
___
.- ____
( " /u J
"
~ _..
~
"
,~ .~
-~..
" .- 'c....--'"""',---,
-
• I
­
,.~. ..~
r-".,.
1-,­
An ER. Company ''f~'!'m' U"," RIYADH GEOTECHNIClUE & FOUNDATIONS CO_
B.:)'>C 30;<"7 '1. Yll;-'b'U AJ'·!>in;IY~h. I\."1YI\:f• .:'>'1000, Y.SA TeJ<!'~hol"'t-C'! +96'6 (:14) a';>S'{)-992 I 3250993 I';:):':! .",)(>6 (1.-1) 32!">OUo"'6 f:l'lF>ai1: "n'vy... "'b"-l@e{;:.B.e,::.~c'ejlCe~ ,C.:)n')
Lt).(".\llonQo:. ,I\.'-N""Io>V'H~~,.nd $t.-"""oI;I:f. l-1;.l) AI_f'V'Iolh .. n l'.Ji.\ty"k.I, R.-c:': .• V03nh,~ A1_:'>lo.:;,~ly"'h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to gayal transmisssion system, DATE SAMPLED: 30.12.2021

SOURCE: TP: 07 (LD-05) Depth: 0.50 m DATE RECEIVED: 06.01.2022


------
SAMPLLE DESCRIPTION Sample NO.: S-1
---------1

0
ENVT. COND TEMP 23.8 C HUMIDITY: 35%
Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------

SAMPLE NO: S-1

CAN NO: N-3

OF SAMPLE + CAN (WET) (gms) 852.52


OF SAMPLE + CAN (DRY) (gms) 838.26
OF WATER (gms) 14.26
OF CAN (gms) 205.55
OF DRY SAMPLE (gms) 632.71
R CONTENT (%) 2.25

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF -YNB·PHY·SOIL·15·02
01.08.2021 Copy Right Resrved by RGF
1..:- L:::-l..:::...--U J" ~~
..... ... -' I ~
_.. t../-" c..:;..,
RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
f.'A':':>. OQ,>f. 30~7:t.. v""..,bu AlA~;n;'Yi:lh. ,VI'VAS 5.1000" Y.;5A F~x! ."356 ~.:l.4' 3:t!,~OY.J\C. l,h'oa'!: l"f..yiU'b'Jtrtt.:t'.:l.>il"(';.'\.,;\e.~i:'¢~.<:o""",
...
r.lh.'~·~t;"l. f-t~<" yit .... h~~ Aj·&~n.<.tv~h

CLIENT : NEOM. PROJECT NO.:


--------4
PROJECT Neom desalination plant to flayal transmisssion system. DATE SAMPLED:
--------4
SOURCE: TP: 07 (LD-05) Depth: 1.00 m DATE RECEIVED: 06.01.2022
------
SAMPLLE DESCRIPTION Sample NO.: S-l
------~

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------

NO: S-l
K-9
OF SAMPLE + CAN (WET) (gms) 827.10
OF SAMPLE + CAN (DRY) (gms) 808.70
OF WATER (gms) 18.40
. OF CAN (gms) 180.50
628.20
R CONTENT (%) 2.93

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF·YNB·PHY·SOIL·15-02
01.08.2021 Copy Right Resrved by RGF
~

AnES. Company
" r~~'"
(,g'ID
,~~~,},
-
v ..........
U","
L:- L:::--- UI ~ ---
RIVADH GEOTECHNIGUE & FOUNDATIONS CO_
Go • ~~~ ~ ~
'-:;;"--y ,. ~ j ::.e..::---­
P.o. 00)01 30.2:7:1, '(.:lnbu M.s,r.;.y.,h. -ll,I)YI\S !'>.l.OOO... YOS"'" TeJe-phon-e: +966 (:l<1) ;)..25-0992 / 32:5-01"",)93 f;-.)(! +9i"~b (:14) ~2:;,-o9.-\b Lr,",,:..il~ "n'vyat'>b'l."(V!Ct'g~c>~i-e,_'• ..:el.cc..;·y.
t. •.x-:.<,tfon:.
A.I'-NiWW"~_n.i\"d 5u-"~oI:"t •.H~i .A)-M ... h .. ~, l)tI;U~~;l. R.C.• V.anbu A-l-Slor""t..... h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 30,12.2021
SOURCE: TP: 07 (LD-05) Depth: 1.50 m DATE RECEIVED: 06.01.2022
-----­
E DESCRIPTION Sample NO.: $-3
--------1

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

SAMPLE NO: S-3

CAN NO : M-18

WT. OF SAMPLE + CAN (WET) (gms) 814.25


WT. OF SAMPLE + CAN (DRY) (gms) 792.58
WT. OF WATER (gms) 21.67
WT. OF CAN (gms) 165.85
WT. OF DRY SAMPLE (gms) 626.73
WATER CONTENT (%) 3.46

Tested By: WI SAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
"c-L::--L::.---U I~ ~~ J:'~~ f ~
An EB! Com.,..ny " ~F-ll RIVADH GEOTECHNIClUE & FOUNDATIONS CO.
P.o.. no).4 :J0;'';'71, .... :.~bo N,-Sr,...,::'I'Y;,h. MYA~; !:>1;::xx::t~tL"iA 'I:'I-.!:-phOf">f!ol to~G.& (.,.4) ;:t;;1,$0092 /32509'93 f'~x: 491SoG (.\4) Sl-=tS0946 E,r.... ;1I.iJ: 'n'-y~t'ob'UI1':t't::t4\~t..$~i~hO(~~.C:O>'1l'.
l..oc.·"H'c.. n!.~~-N>kw""H\J1>~H~ $t:n:;lI.J't. Hi~i ft\~h>1+<h;;on. otlott'k,lt. f(,C•• v..,nbu AI·Si.\..\l>fV~h

Neom desalination DATE SAMPLED: 30.12.2021

TP: 07 (LD-05) Depth: 2.00 m DATE RECEIVED: 06.01.2022


-----­
I:lAMt'LLt:. DESCRIPTION Sample NO.: S-4
--------1

ENVT. COND TEMP 23.8 0 C HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
------­

SAMPLE NO: S-4


CAN NO: F-6
OF SAMPLE + CAN (WET) (gms) 825.25
OF SAMPLE + CAN (DRY) (gms) 797.68
WT. OF WATER (gms) 27.57
WT. OF CAN (gms) 188.50
WT. OF DRY SAMPLE (gms) 609.18
WATER CONTENT (%) 4.53

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF -Y NB-PHY-SOl L-15-02


01.08.2021 Copy Right Resrved by RGF
,
r.;c;..
~CM-J
-~~-~
G:;:l ""--"'"'
~ ----'----
v - ~ J - '" - ~'--y, ~ ~ I I
'-'
.!' --
/ --
-- ~.:'
~
U-'
~ ~
I :.-~
::r-::..--­
::r::.
An IEftl C<>mp~ny ,~.~.!~. u:." RIVADH GEOTECHNIClUE & FOUNDATIONS CO.

,...o~ uo~ 30~.7:1. 'i~~bH AJ'S'r.;lY~h. MYAS ~::lU-OO~ KSA ,.-:-~::I~:}·l~~;-~~~~~~~~~~~~~~:;~~~~~~a~!n iJ~::t.::,:~~,~~:~~,:\~.~t~~!~~.~:.~i~:~~l: "nf·,y:u'bu«P"'~6p'.~c,.~.:.i"'''-,(;.¢"c<:)rf...

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 30.12.2021

SOURCE: TP: 07 (LD-05) Depth: 2.50 m DATE RECEIVED: 06.01.2022


-----~

SAMPLLE DESCRIPTION Sample NO.: S-5


--------1

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

SAMPLE NO: S-5


CAN NO : B-18

WT. OF SAMPLE + CAN (WET) (gms) 800.50


WT. OF SAMPLE + CAN (DRY) (gms) 772.45
WT. OF WATER (gms) 28.05
WT. OF CAN (gms) 195.50
WT. OF DRY SAMPLE (gms) 576.95
WATER CONTENT (%) 4.86

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1S-02
01.08.2021 Copy Right Resrved by RGF
-c.:...- L.:::.-l..:::.--- UI.i' ~ j~~l~
RIVADH GEOTECHNICtUE & FOUNDATIONS CO.
(1."0. n6>t ;:.)02:7:1. YIH"lbu Af'!'iin~l'Y;i'h. ""VA-"> :0.;1.000" $':5;\ -n""ephonc-::: +966> (1'1) 37"""0'992" :'J.25U993 r~t~·ar.bu«t>~~tg~~I~H'i<:'¢=!.f:O.Nl!
t.<r><~.fQn:. Al_N;,k .......\I·},..nd ~U,<,;,,~f .....lnl Al~fYlaha-;n Ai .. ~'n-.'lyah

Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 30.12.2021

TP: 07 (LD-05) Depth: 3.00 m DATE RECEIVED: 06.01.2022


-----­
DESCRIPTION Sample NO.: 5-6
--------/

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
------­

SAMPLE NO : $-6
CAN NO: D-30
WT. OF SAMPLE + CAN (WET) (gms) 785.40
WT. OF SAMPLE + CAN (DRY) (gms) 755.80
WT. OF WATER (gms) 29.60
WT. OF CAN (gms) 175.45
WT. OF DRY SAMPLE (gms) 580.35
WATER CONTENT (%) 5.10

Tested By: WI SAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOI1.-15-02
01.08.2021 Copy Right Resrved by RGF
~~--r_ _-n "'" -
~'---'~.
I.· I -- ~U.f I ..
".;.><. ~-..... ~ L/l2-'I~
An " ­ .... " "",,,,,,,, ...y L.""_w",. =. RIYADH GEOTECHNIOUE & FOUNDATIONS C<:>_
P.(.,). Ho>c ;')001'7;1. V:'l"Ibti AkSit.;'lY~h. MYA:';'; ::'1A:.tOC>, KSA Tel",phon..,.: ~S\66 (;1,0) 3"2SO'<_"92 1325O""'~)<3 '€nt~Y"'l'\l..UllV*">e eo;\.;i,:;~.,>c::-e:s .cort"',o
,(x"Hk>f'l1 ,A).N;k......~'n ..\rHt 51T~o(Io"t~ cHat .AI· M<th;1,H Af--Mt>-..tYdf.

• Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 02.01.2022

SOURCE: TP: 08 (LD-05) Depth: 0.50 m DATE RECEIVED: 06.01.2022


------
SAMPLLE DESCRIPTION Sample NO.: S-1 .~

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%

Test Started Date 09.01.2022 Test Completed Date: 11.01.2022


--------
r;
SAMPLE NO: S-1
CAN NO: XP-02

• OF SAMPLE + CAN (WET) (gms) 835.55


. OF SAMPLE + CAN (DRY) (gms) 824.15
WT. OF WATER (gms) 11.40
WT. OF CAN (gms) 200.55
WT. OF DRY SAMPLE (gms) 623.60
WATER CONTENT (%) 1.83

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01082021 Copy Right Resrved by RGF
~~---""..- I I -- ~u-' I:J _- Go • ~. "~,~~ ~ :/"I j ::r: .~------
>;1'.~""'J' Q',A>
>,"' - ,>
L'>wf!'.
~M) ~
_ "'---' -.......--.-- - - ~~-,;
_ - ~

AnERB Company RIVADH GEOTECHNIClUE & FOUNDATIONS CO.

P.O~ llo>4 30:<'7:1, yn .... bu At,Si~;lY~h. MV .....S !;.;tOOO~ KSA ..


l.~>::~I~::::;~~;::l~\~~~(~~~~~~~::~~::~ ~!n 6~~:r.~~~,~~:1~~~.~t~~!~~h\<!,:::~~I: "n'~ya"b1-lilJ>cf's~o~dern=>e:~.com

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 02.01.2022

SOURCE: TP: 08 (LO-05) Depth: 1.00 m DATE RECEIVED: 06.01.2022


------
SAMPLLE DESCRIPTION Sample NO.: S-2
--------1

0
ENVT. COND TEMP 23.8 C HUMIDITY: 35%
Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------

SAMPLE NO: S-2


CAN NO : M-20

WT. OF SAMPLE + CAN (WET) (gms) 780.45


WT. OF SAMPLE + CAN (DRY) (gms) 768.95
WT. OF WATER (gms) 11.50
OF CAN (gms) 185.45
OF DRY SAMPLE (gms) 583.50
R CONTENT (%) 1.97

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01082021 Copy Right Resrved by RGF
\" :."
~+.
(;if> [:;r'-L-~UI , , _ +~ _+_~~-'I::.r~
" ++ + -.---- +

v ~ -,-»
}!J _" ++

AnERt com""",.'lt'~~~~J·~ RIVADH GEOTECHNIClUE & FOUNDATIONS CO.


llO:" 3027:1.. YunbU At,sfn;.l.... Zloh. rYly.....-S !:.;1000~ K:SA F4X: +~G>& (~4) 3;1:'<1"946 E:-ft\;lil; 'n'·'Y,anb\.urp...•... gol!"C>:lo-<!ie.'\~c:LC;:o""
f'>h.trk.t. (1.,<- .. Viw~bl.i A1_Shully.,h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination ptant to gayat transmisssion system. DATE SAMPLED: 02.01.2022

SOURCE: TP: 08 (W-05) Depth: 1.50 m DATE RECEIVED: 06.01.2022


------
SAMPLLE DESCRIPTION Sample NO.: S-3
-------1

ENVT. COND TEMP 23.8 0 C HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------

NO: S-3

XP-9

OF SAMPLE + CAN (WET) (gms) 850.45


OF SAMPLE + CAN (DRY) (gms) 836.55
OF WATER (gms) 13.90
185.75
WT. OF DRY SAMPLE (gms) 650.80
WATER CONTENT (%) 2.14

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy Right Resrved by RGF
~=~~1 "f - ~l...:::..-I
-- ~
-- ~U-' J..
,., -"'AA
____
~~ ~l:?~I~
ERI RIVADH GEOTECHNIClUE & FOUNDATIONS CO_
1".0.001'1' 30;t7"1.. 'Y:.,."lH" A*~-5Ir>;1')'''h. l\.'lVA.."<;' 5'10<)0. KSA TbJQ~hVfWi>i. +96t> '::11) l1ZSQ'!J9:t I 325-0:993 ... {I'~-yanh'.H!p e~ 'o:Jot.,;:.",.:;'e.~<:-""" ,COt\")
,,",.,<,;),k>n! N-Nn""""..Hl,aod StJ"\'!... t. t'k>l A}.M.. h·...\ A'~Sif\..\~IV ... h

CLIENT : NEOM. PROJECT NO.:


-----~-I

PROJECT : Neorn desolination DATE SAMPLED: 02.01.2022

SOURCE: TP: 08 (LD-05) Depth: 2.00 m DATE RECEIVED: 06.01.2022


-----­
SAMPLLE DESCRIPTION Sample NO.: S-4
-------1

0
ENVT. COND TEMP 23.8 C HUMIDITY: 35%
Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

LE NO: S-4
M-33
OF SAMPLE + CAN (WET) (gms) 805.40
WT. OF SAMPLE + CAN (DRY) (gms) 791.00
WT. OF WATER (gms) 14.40
WT. OF CAN (gms) 210.45
WT. OF DRY SAMPLE (gms) 580.55
WATER CONTENT (%) 2.48

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF -YNB-PHY-SOll-15-02
01082021 Copy Right Resrved by RGF
L~"""D~:I
~M' ~ "c:--L::-l..::----'U J~ ~~
- _- t../" c:-~
­ I~
An Eftl C<.>mF><'ny "f.~~J' u~.~> RIVADH GEOTECHNIGUE & FOUNDATIONS CO_
HO>l 30:,r},:1, Ylllnbi.~ N_S'r-;'1,,>,3h. !\.>'!YAS !:.:1OOO. Y.5A Tt2'Je-phon-e~ +966 (:l"1) 32"::>"09921 ;g,2S-tY~931 "'.3,X~ +966 (:14) :'j~::-;.o9.tl6. E:t'~ .... iI; 'O'vYZll"lb'-I@,o:ntf.to!':'c.~Ctel''';::.~$,(:(>Fr''''
"Ot:~ufo~nA'_Na......-;:>n .. nd $U·...,.~H. H;.,I.I\,J-tvl;:oh<'lH rJi:;I;.t:rk.l. R,.c., Y.:anbu At-S~n.">.v .. h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 02.01.2022

SOURCE: TP: 08 (LO-05) Depth: 2.50 m DATE RECEIVED: 06.01.2022


-----­
I:>AMt'LLt. DESCRIPTION Sample NO.: S-5
------~

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
-------­

SAMPLE NO: S-5


CAN NO: A-17
WT. OF SAMPLE + CAN (WET) (gms) 780.85
WT. OF SAMPLE + CAN (DRY) (gms) 765.20
WT. OF WATER (gms) 15.65
WT. OF CAN (gms) 190.40
WT. OF DRY SAMPLE (gms) 574.80
WATER CONTENT (%) 2.72

Tested By: WISAL Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-1S-02
01.08.2021 Copy Right Resrved by RGF
r-=CT-:7~ c..,l..::-t...:::.-U 1.1' ~~ i f ~-' j - -+ .......

An L!I!liUil Company I "l:'.:;;:'';:"",'' ~ RIYADH GEOTECHNIClUE & FOUNDATIONS CO.


p_o~ nQ:>oI ~O:;<".7". y:t> ....r.\o"L! ru,6In;:'IYli\h, '",'VAS !:..:tooo, KSA T-el<!-f.d,~: P~~ p.tt) ~");"'>O"_lf.):'< t ~:;.t5Q!;)9'a Itax: 4966 (:\4) SlZ!>O!¥46 r;.rnaa: (ftf~y;i)I'lYu;rp.::- ..'~'ltO~;ctO,"-et.,<:o,...".
1.t)~··4*.f,c;.n!.N·N;:"" .......;.n,,,nd S-lj·.,.lttt. }f~(Af~MUh\ll'f'o Dht.yk.t'. R,C:.~ Y,anbu AJ-Sh'~.~VOih

PROJECT Neom desalination DATE SAMPLED: 02.01.2022

SOURCE: TP: 08 (LO·05) Depth: 3.00 m DATE RECEIVED: 06.01.2022


-----­
SAMPLLE DESCRIPTION Sample NO.: S-6
-------1

ENVT. COND TEMP 23.8 DC HUMIDITY: 35%


Test Started Date 09.01.2022 Test Completed Date: 11.01.2022
------­

SAMPLE NO: S-6


CAN NO: F-15
OF SAMPLE + CAN (WET) (gms) 760.25
OF SAMPLE + CAN (DRY) (gms) 744.15
. OF WATER (gms) 16.10
WT. OF CAN (gms) 210.10
WT. OF DRY SAMPLE (gms) 534.05
WATER CONTENT (%) 3.01

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY-SOll-15-02
01_08_2021 Copy Right Resrved by RGF
I ~".•­ ,~~:c;:- "1 ~ L:.- L::.----- UIi' :: G. • .-:.:,,;~ t.../' '-::?-' I ~
An !!COl\! C<>mp."y I '~.!:!I'':'Il'';' l.::;;lj!!E='1 RiYADH GEOTECHNIOUE & F DUNDATIONS CO.
I :;l250!)93 F;t>o:: +966 1.1.4) 32:!>0t7Ac;. Eih\aH,~ w-·(,hy~htJi..l@c'inco~d-c-'-'~'¢:$,.t'<'>f'I')
t.4\1 AI-~ •• h""in t)tliH I.::\,. il.C.• Ylt'u"\bu FU~S-fn.:,~iV:;Jh

Neom desalination plant to gayal transmisssion system. 12.01.2022


TP: 09 (LD-05) Depth: 0.50 m DATE RECEIVED: 22.01.2022
-----­
E DESCRIPTION Sample NO.:
-------1

0
ENVT. COND TEMP 24.3 C HUMIDITY: 40%
Test Started Date 23.01.2022 Test Completed Date: 25.01.2022
-------­

SAMPLE NO:

CAN NO: B-5

WT. OF SAMPLE + CAN (WET) (gms) 377.90


• OF SAMPLE + CAN (DRY) (gms) 373.40
• OF WATER (gms) 4.50
WT. OF CAN (gms) 49.97
WT. OF DRY SAMPLE (gms) 323.43
WATER CONTENT (%) 1.39

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY-SOIL-1S-02
01.082021 Copy Right Resrved by RGF
~if)
'~ ~~
v ....'---""
-
""---".......--
I -' I -' ~u-' I...
" ' ;:,~
_ Y'Ij::r::::""'~
1..../ ~
An ER! company~' UO_A' RIVADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. Oo)t :»0;;'7:1., .... )1,..,bi.~ AI •.!*.n.~lYUh. MYAS .5:1000. KSA TE"J.ephoHt"': ..966 (::t4}a2:>09s);Z / n:ZS0993 fnt~y1>nb>Jtf;><4:l"'~~c.;),~;~<')t..c" .com
L ......··•• t~un~ N_N.a_~u~ .. nd $~r<o';"",~r, .ti>;\1 A\·rvtah..n AI-">fn';'lly,a'.

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to sayal transmisssion system. DATE SAMPLED: 12.01.2022

SOURCE: TP: 09 (LD·05) Depth: 1.00 m DATE RECEIVED: 22.01.2022


-----­
SAMPLLE DESCRIPTION Sample NO.:
---------1

ENVT. COND TEMP 24.3 0 C HUMIDITY: 40%


Test Started Date 23.01.2022 Test Completed Date: 25.01.2022
------­

SAMPLE NO :

CAN NO: B·16

WT. OF SAMPLE + CAN (WET) (gms) 363.60


WT. OF SAMPLE + CAN (DRY) (gms) 360.10
WT. OF WATER (gms) 3.50
WT. OF CAN (gms) 47.68
WT. OF DRY SAMPLE (gms) 312.42
WATER CONTENT (%) 1.12

Tested By: A·Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOl L-1 5-02


01.08.2021 Copy Right Resrved by RGF
r-==---~ t..:::..- L::-L.:::.----U I~ ;: ......G> • ~~-
j - ~~
.""
j~
An ERD Company l '":a'~"~?:~~ RIVADH GEOTECHNIClUE & FOUNDATIONS Cc>_
p~oo:.,.. "0>1 ';"'027'1. Y4lo~t:».I A'~;t'\';ly:j)h. -"''IYA:S ~:1{)OO~ tot:!"V'\. 11\""'Pho~" +-9-66 ."i.~1.a;;;o.~Y;.t2 I 32S,J:;)SIo93 J',.)X; +966 ('14) 11:.1:$0946 E~ail":: f'U'-y;i>nt>t.leJ>et~g«:-ot.':ioC:n!;.<::;;.ot::"oY¥"
t,".W,,-,,norJ:- AJ"N.t ........an~lfuf St'I·'O\'"~t~ tt"A At·""'ooh..x. t':Jh:t.-k.!". R.<;: .• Y»nltu A'-S1n...~}v;;Jh

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT • Neom desalination transmisssion system. DATE SAMPLED: 12.01.2022
SOURCE: TP: 09 (LD-05) Depth: 1.50 m DATE RECEIVED: 22.01.2022
-----­
SAMPLLE DESCRIPTION Sample NO.:
-------1

ENVT. COND TEMP 24.3 DC HUMIDITY: 40%


Test Started Date 23.01.2022 Test Completed Date: 25.01.2022
------­

SAMPLE NO :
CAN NO : B-10
WT. OF SAMPLE + CAN (WET) (gms) 388.40
WT. OF SAMPLE + CAN (DRY) (gms) 382.70
OF WATER (gms) 5.70
46.52
WT. OF DRY SAMPLE (gms) 336.18
CONTENT (%) 1.70

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF -YNB-PHY -SOIL -15-02


0108.2021 Copy Right Resrved by RGF
I ~~~) r5:-11 'C.- L:.-L:::.----'U I ~ :: '" -~~ i f ~-' I ~
An .~RI Co-'tnpany ......
RIYADH GEDTECHNIQUE & FOUNDATIONS CO.
- .....

fi""x~ +96(0 1j,4) 3250'0>4:6 Enn..!>":. il"'nhy.anbU~~";:3oeC>:l--C'eru:.e$_~t;>m.


t).t"J.ri<:l-. tL(";'T vahhu A'f-Sfn.aIY4ih

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT Neom desalination plant to gayal transmisssion DATE SAMPLED: 12.01.2022

SOURCE: TP: 09 (LD-05) Depth: 2.00 m DATE RECEIVED: 22.01.2022


-----­
SAMPLLE DESCRIPTIOH Sample NO.:
--------1

0
ENVT. COND TEMP 24.3 C HUMIDITY: 40%

Test Started Date 23.01.2022 Test Completed Date: 25.01.2022


-------­

SAMPLE NO:

CAN NO : 8-9
Wf. OF SAMPLE + CAN (WET) (gms) 403.50

. OF SAMPLE + CAN (DRY) (gms) 399.10

4.40

58.04

341.06

CONTENT (%) 1.29

Tested By: A-Aziz Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF- YNB-PHY-SOll-15-02
01.08.2021 Copy Right Resrved by RGF
~-~...~
~?~I v "'--' -.....-..-------- ~ .!'J ~
",- I - w • -~-
•.• .,y
I
.; ~~ 1....--'__
_.-- ~Ul 'I:::J_ ••'"
::...-­ ,PI --, ----- ~

An Eftl Cc>mpany ''ll''~*''''=''-=- RIVADH GEOTEC':;NIOUE ~ ~OUN';ATIONS CO.


P.O, Uti>' 302;';11. Y;onbti N'!,~'n;"IY'Olh. MV.....:S :;";1000. Y.LA T~J"'llohot"~l: 1<<\)GC~ (:1"1) 3~S-0'9:,ji2 /32S-01".-\O:;} r:Xl"'~ +966 (.14) 3::t!;"o'!).lt6 F.4'n:ail~ .-r;J~y.:lonbU!l~C!tl{te-o.<!I!tn.~<ell,or:Qtn
Al·N;........ ~~.. nd .$H·'¢'-.{>r~ H~I AI~""'H)h*n rJlho~tk,t. It."'.., Y>JInhu N-Sh......))...""h
"~.)«'41Ilioo:

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neoro desalination DATE SAMPLED: 12.01.2022
SOURCE: TP: 09 (LO-05) Depth: 2.50 m DATE RECEIVED: 22.01.2022

E DESCRIPTION Sample NO.:

ENVT. COND TEMP 24.3 0 C HUMIDITY: 40%


Test Started Date 23.01.2022 Test Completed Date: 25.01.2022
-------­

SAMPLE NO:

CAN NO: B-14


WT. OF SAMPLE + CAN (WET) (gms) 351.00
WT. OF SAMPLE + CAN (DRY) (gms) 347.20
WT. OF WATER (gms) 3.80
WT. OF CAN (gms) 49.35
WT. OF DRY SAMPLE (gms) 297.85
WATER CONTENT (%) 1.28

Tested By: A-Aziz Checked By / Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGF-YNB-PHY-SOIL-15-02
01.08.2021 Copy RighI Resrved by RGF
i~---'.'-~...,.
C:,'0"'-
~~I
~ I......--' I____
-
... I - - -t)
............-
.I
I -' _...
_ .~.
-~...
r ,&"1
_-
- .'
'-" '--'"

­
.',
...,...,
_r-".
'1'::::1_-""-/
::.....--­

AnERl!company ~.!'"''!l'.!' ~. RIVADH GEOTECHNIClUE & FOUNDATIONS CO_


r'~o. Ih:::')4 :>10:<".7:1., 'Vi:\1t1olh.lAI,St..... ;..Yilh. lI.'1y ..... S 5:1000, Y..$.h T~.""phll!;)''Wi'': . 9 6 6 ~:1"') ;{2!:><l1)92 I 3250993 Fn.x: 4''9&6 (:1.4) a.:l~09'''''c. r,-~;n11; rnf~y#n~"..H?ftCt.i(t.,.!Ct"'.:;..~t)(;'¢"'L<nffl
I.O'C';;"!OO:.A)·NAAW'Aln,,;;rut StTO'!ttt. ft""l A}_M ..h..«H t:..... tric,t.
R,C •• 'Y.anhu N.Sln..)i... ~h

CLIENT : NEOM. PROJECT NO.: 21J4037


PROJECT : Neom desalination Diant to qaval transmisssion system. DATE SAMPLED: 12.01.2022
SOURCE: TP: 09 (LO-05) Depth: 3.00 m DATE RECEIVED: 22.01.2022
SAMPLlE DESCRIPTION Sample NO.:

0
ENVT. COt-.1D TEMP 24.3 C HUMIDITY: 40%
Test Sta rted Date 23.01.2022 Test Completed Date: 25.01.2022
-------­

SAMPLE NO:

CAN NO: M-8

OF SAMPLE + CAN (WET) (gms) 401.10

OF SAMPLE + CAN (DRY) (gms) 396.30


OF WATER (gms) 4.80

WT. OF CA.N (gms) 27,71


OF DRY SAMPLE (gms) 368.59
R CONTENT (%) 1.30

Tested By: WISAL Checked By I Reviewed By: Saeed Akhtar

Approved By: Awais Nisar Yasin

RGf- YNB-PHY·SOIL-15·02
01082021 Copy RighI Resrved by RGF
\

rq f ~
EnI
r_'·';;:;""""··""'····"I"',·::;A.;.A_;•._CIIJ' ,";::
I ~:.
, ".,"~_1
C~
~ CR 11l10tM~8(~
I.""""W C"""","y' c..,,,", '.000,000
lim....
CD",~n_~__ !..~~;;;;;;;,.~,o,,~~;:~.e RIYADH GEOTECHNIOUe 8< F OUNOATIONS CO.
"p.. , J'" .r' > i .. P'-- .... ,)-. ....' "
:...:;v~ ~ ,-:?..,),~
s.~ ~", ~"
'"l"'\"".A~ ~~ <J-

P.O. Box 9182. jedd,'h 21413, KSA Telephone: +966 (12) 6715621 / 6176860 fax: +966 (12) 6715426 Em,1il: rgf,wp@erigeosciences.com
Loccltion: Gclrn~lthcl St. nedl' Arbcleen St. intersection, ivlllsilre(clh District, Jeddah

TEST REPORT
PARTICLE SIZE DISTRIBUTION (GRADATION) OF SOILSUSING SlEVEANALYSIS
ASTM -D69131D6913M-17
CLIENT : ~!~0IY!_<;:ompany -----~-
PROJECT NO, :
-~---------------
21J4037
PROJECT : NEOM Desalination Plant to Gayal Transntission System
SAMPLE SOURCE: LD-5( TP-01 REPORT DATE : 29.01.2022
SAMPLING DATE: - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE : 20.11.2022
o
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 C HUMIDITY : 47%
BOREHOLE NO. : LD-S / Tl'- 0] DEPTH (m): 0.60 SAMPLE NO. : B-1
SAMPLE DESCRIPTION: Brown, well-greded SAND with silt & gravel.

WElGIH RETAINED PASSING


SIEVE No. SPEOflCAll0N WATER CONTENT (ASTM 02216-19)
RETAINED (gill.) (%) (%)

3" CanNa. : SM
2112" 00.0 0.0 100 wt. (Soil + Call) Wet (gm.) : 3772.0
2" 00.0 0.0 100 Wt. (Soil + Call) DIy (gm) 3638.7
-----­
I1h" 00.0 0.0 100 Wl. Water (gm.) : 133.3
3/4" 324.2 9.8 90 Wt.Can(gll1.) 314.2
--_._--­ _ .

3/8" 653.0 19.6 80 Wt. (Soil) DIy (gl11.) 3324.5


#4 1123.5 33.8-_._-----­ 66 Water Content (%) : 4.01
---­ ---­
# 10 1805.3 54.3 46 CLASSIFICATION
._.. --_._-_.. _ - ­ - - - - - - _.._. __ .... _ - - ­ _ .. _­

# 20 -_.
2434.3 73.2 27 (ASTM D3282-09fD2487-10)
--. ._-----------­
# 40 2824.2 85.0 15 A-I-a/SW-SM
# 60 2967.7 89.3 11 Dry WI. of soil before washing
----­
# 100 3054.0 91.9 8
--_.._.._------­
= 3324.5
------­

# 200 3081.8 92.7 7 Dry WI. of soil After washing


...
I
PAN 3082.6 _._­ = 3082.6
-----­ -­ ----_._---_.__. • __________________ M _______ •

To(,1l Soil WI. (gl11.) 3324.5

100
90
~. .. .cc' ."., -­

J: .~ .
Ol
'a;
80 .... .• ,' ,.'<".:~':~'. - " .,: --.
" ." . .

~

70 . , :··· ... i,:~ ... . , : : .
.D 60 ~., .
..·C.· ,:
c
Ol -­
50 --.
'iii
Ul

'"
40
..

n.
C 30 ~'"
,~
'"
I! 20
--. ,~
'"
n. 10 -.
o 1 I' F 1 1
100.00 10.00 1,00 0.10 0.01
Grain-size in Millimeters

REMARKS:
----­ .---------------~----- --_._-­ .. " - - - - - ­ -­ -- ­ - -------------­ - - - - - ­ - ------------------.- .... _._­ -.

--- ­ ---­ --­ - ---_._-_._--­ ---._. ---_. __. --_.-- ._- _......... - --_._--­ ... - . --­ .. ----_. __ .._-­ .

TESTED BY: _______l:,<1iy,1/"_ CHECKED BY / REVlEWED BY : . ?y~d~\~~.'~~~b~ilS ._

APPROVED BY:
............... ------­ ---­ ----­ -'­

(I.ab.lncharge)
Cop.\'right of this d(ll'unH'nl is owned by HCr, itlllclY not be reprlltitll"pd e\n'pt with prim writtell 111'rrnissioll from tilt' cOIllIMIlY,

HGI'-jEj)·I'IIY·SOIL·01·03
20.01.2020

\
tq f ~_
ERR
Cnm....ny
r~"~':'-'~'~"""-']
,
A

-(;L'<..
1:;A_:..-L.:---- til" ,::: .-:;.~;~ c./~.",J I ~
o;;f,;;?
.
I§~~ ~1., Lmood.l3abiJilyConl,umyJCnpil.nI6.000.000S.J~
CR)-010160-200

~="~~;:;,f§:::;;.,._ RIYADH GEOTECHNIQUE


... ...
.j.... ,)..,~"\ "!1l.\~.;,;~,/.,- ~..,;,-...u~
& FOUNDATIONS
... ... U'~
'V"\"'I~ ~..::;.._

co.
P.O. Box 9182, Jedd<lh 21413,](sA Telephone: +966 Cl2) 671562'1 / 6'176860 Fax: +966 Cl2) 6715426 E"1<1il: rgf-wp@erigeoS<.-iences.col11
Location: Gr1rnnthrl St. neclT Arbaeell St. intersection, Mushrefah District, Jeddclh

TEST REPORT
PARTI CLE SIZE DISTRI BUTION (GRADATION) OF SOl LSUSING SIEVE ANALYSIS
ASTM -D69131D6913M-17
CLIENT .NEOM Company.. PROJECT N O ' _ .. ~~I~()3!__ .~
PROJECT NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/ TP - 01 REPORT DATE 29.01.2022
SAMPLING DATE: TEST START DATE 18.01.2022
SAMPLE RECEIVING DATE: TEST FINISH DATE 20.11.2022
SAMPLED BY : ENV. CONDITION TEMP. : 24.0 °c HUMIDITY 47%
BOREHOLE NO. : LD-5/ TP - 01 DEPTH (m) : 2.00 SAMPLE NO. S-5
SAMPLE DESCRIPTION: Brown, well-greded GRAVEL with sand .

. I; . . WEIGHT RETAINED PASSING


SIE\ E No. SPE0I1CA11ON RETAINED (gilt) (%) (%) WATER CONTENT (ASTM D2216-191

3" Can No. PAT


2112" Wt. (Soil + Can) Wet (gm.) 2660.0
2" Wt. (Soil + Can) DIy (gm.) 2636.2
1112" 00.0 0.0 100 wt. Water (gm) 23.8
J/4" 471.4 :W.O flO Wt. Con (gm.) 20J.2
3/8" 847.8 36.0 64 Wt. (Soil) DIy (gm.) 2353.0
# 4 1295.0 55.0 45 Water Content (%) 1.01
# 10 1741.1 74.0 26 CLASSIFICATION
---~-~-- - - - - .. ---~------~.

__#3.9...__ 2007.4 85.3 15 (ASTM D3282-09jD2487-10)


# 40
-~-----------.--
2152.8 91.5 9 A-I-a/ GW
# 60 2247.1 95.5 5 Dry WI. of soil before washing
---------... ~-

# 100
---_._--_._-­ ---~------
2281.1 96.9 3 2353.0
# 200 2295.7 97.6 2 DIy WI. of soil Aflerwashing
- - - - - - - --

PAN 2296.6 2296.6


---~-.------- -------~----. -- ---.~-- -----_. ._------------------------_.
Tolal Soil WI. (gl11.) 2353.0

1 ~~.. .."'" .. .... .. •..... _:. •. •.....• . •: : .' .•.


:c 80:: :. ::~ .•.. ::.: ::'..:-' ' ..
.~ ::::: :c' __ c.. _. ,:~-c. c : c : . - . ... . . ...• ­
~ ~~ : . : : :.... ';..~ .. - : > . •..••..••. ...... ••• • .. .... •.• . ~
01: ':­ •...: _ _ .::~.-: ••:._:.... >. :.....::: : : ­ .•
.~~ 5
~
0 . :._""-. -: .: . . . . : .
~. . . ..
.•
~
!
0..
;~---
. .
..-----.-.---- --':"
~ ..... ... . :-.-...

(I)
0.. 10
3=:' ::- ....... .
••..... .- '.. . .•
01" .~.:~ . .- j'"

100.00 10.00 1.00 0.10 0.01


Grain-sizo in Millimotors

REMARKS:
---.- ... --------~-.--- ------------ - - .- .---- .. ---~-- ...---.-------­

- ----_._._.-_---_._--- ---------- ........ _.. ' , - ..........._._"- - - - . - - - - - ' - - _.... _-----­

TESTED BY :._X"iya!:____ CHECKED BY / REVIEWED BY : __ 5~'ed f\sad AblJ~_~

APPROVED BY: .__._-_._-----_..- ­


(L>lb.lncharge)
Cop~Tight of this dOllllllL'llt is oWl1ed h~' I{GF, illll<ly 1101 lx' rpprodun>d (':'>:C('pl with prior writtl'1l pl'rmissioll frolll till' (Olllp(lIlY.

RGF-JED- PI-JY -SOil..!) I-In


20.01.2020
.-
rcq . .
.
f An
ERI
. ...
~~m,~.~..m.m··"~~~···l '--"
.
;;;Q
L.-~Ol,
.

RIYADH GEOTECHNJaUE
,,*" •...,.:;;
"'-:.,:.
s=... L0~JI ~imi"'d.L""''''''C"""",",J'''''fi''''''.00\).''''''5.n
c~''' ~!J~"HH=''~~~;~;;J
; ';'1) CR l01(.1100~M
-<~;:

p.o. Box 9182, jedd,)h 21413, KSA Telephone: +966 (12) 6715621 j 6176860 !"),, +966 (12) 671Sn6 Email: rgf-wp®erigeosciences.com
.A!J'V..,JI~
_
"""'......
a FOUNDATIONS co.
~~-..~_,,-"n .... ;},>':. ..........
-J"....-',u.,... "',J-",,...........

Loc.llion: GMnalha St. near Al"haeen St inlersection,. i\·lushrefah Distrkt~ Jeddi\h

TEST REPORT
PARTICLE SIZE DISTRI BUTION (GRADATION) OF SOILsUSlNG SIEVE ANALYSIS
ASTiVI-D6913/D6913M-J7
CLIENT NEOM Lom.!:"". : PROJECT NO. :
----_. 21}4037 ...• -~

PROJECT : NEOM Desalination Plant to Gayal Transmission System


SAMPLE SOURCE: LD-5/1P 02 REPORT DATE : 29.01.2022
SAMPLING DATE: TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE ; 20.11.2022
o
SAMPLED BY: ENV. CONDITION TEMP. : 24.0 C
................. _­
HUMIDITY : 47%
BOREHOLE NO. : LD-SjTP ·02 DEPTH (m) : 0.60 SAMPLE NO. : B-1
SAMPLE DESCRIPTION: Brown, ,.::lhJI c;uc;u SAND with gravel.

WEIGl-IT RETAINED PASSING


SIEVE No. SI'ECmCATION
RErAINED (gOL) ('Vo) ('II,)
WATIlR CONTENT (ASTM 02216-19)

~
3" Can No. RG
ih" Wt. (Soil + Can) Wet (gm.) : 4216.0
2" 00.0 0.0 100 Wt. (Soil + Can) Diy (gm.) : 4113.8
~
11h" 181.9
.......- .........- ..
4.7 95 Wt. Water (gm.) ; 102.2 --~~

3/4" 631.7 16.2 84 Wt. Can (gm.) : 214.9 ..

3/8" 1131.5 29.0 71 WI. (Soil) DIy (gm.) : 3898.9


----­
._._.­ #4 1791.0 45.9 54 Water Content (%) 2.62
#10 2563.0 65.7 34 CLASSIfICATION
_~
.
_ _ m _•
_---­ -­
# 20 3206.7 82.2 18 (ASTM D3282-09fD2487-10)
# 40 - - -.. 3475.4 89.1 11 A-l-ajSW
-­ ~-- ..- .
# 60 3632.3 93.2 7. _ . ­ Dry WI. of soil before washing
#.. 100 3704.3 95.0 5 3898.9
-~--~ ~---- --.--~-

# 200 3715.9 95.3 5 Dry WI. of soil After washing


.................. .. ,
I····
PAN 3716.8 37]6.8
.--.-­ ,--- ------------- -- ---­ - -_. ~

Tolal Soil WI. (gm.) 3898.9

100
... ~, ... ....:::::: .: ....... "-,. . .. ., .. ; . , .
.... .
. .
90 " 'c ;=,,'.
1" . ,' ~".;; ...; .; ....
·.CC

. ..
;;
0>
80 , •.• ".;~. ":.;,. •••• :;;,:: .•.• : .".:' :"".",:;;;, :
~
.
70 .• ;, ,. ;'." •• :."';:;":::.;:.~:;: ..:,:;:: '.::::;';;.' '.' ,c: :.:.' .... : ,·.c ..... .... C"

........ '
,

'"
.0
0> ~~; : ';:"':'~:':."., .. ..
'

'iii" 40 ..,.~.. c ; , ; .• c.'.


'"
0­ 30 .....•... ;. . . . . . .·.·~c·
C
'" .. ';;.:'.', .. ~ ...

.
'.'

i:!
ID

~~ '. " ..·.c.·· •.•·.··: •..•.•.. C'~: • • • .:
o ' . .

100.00 10.00 1.00 0.10 0.01


Grain-sizo in Millimeters

REMARKS: ~_m .. , . _ . " _. . . ,­ .. - -----~-~.---~--~-.

. _._.
TESTEDIlY; I'aiyaz CHECKED BY / REVIEWED BY : I\sad 1\ bbas

APPROVED BY:
(I.llb. Incharge)
Copyright of this dnt'umi!ll! is nWHP{i hy' RGF, illnllY not h(> rt'f·wodu~\·d ('\n'pl with pI ior wrillcn IWrlllission from tIll' rOI1lI1,\I1~'.

RGF,JED. PIIY-SOIlAI J-()3


20.01.2020
c...L:-~(JI,~~if0...J1~
fAnml
_ ..... 't' _

CR HY'j{noo~ \. "'''1''1'' !,,><lo


L~~ Lmblnty CQmpnt.y/CUnl1»16.00Q,0Q0 fl.,", ,J",.:>,;;,,,.>... "\ .Ju,.~> f ).a;....<#f ~.I.J.--o ..;,;.\~

RrYADH GEOTECHNJOUE & FOUNDATIONS CO.

p.o. Box 9182, Jeddah 21413, KSA TelephQne: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf-lVp@erigeoociellco5.COI11
Location: Garntltha SI. ne.u Arbaeen st. intersection ivlllshrefah District, Jeddah
f

TEST REPORT
PARTICLE SIZE DISTRIBUTION (GRADATION) OF SOl LS U5I NG 51 EVE ANALYSIS
ASTM -D69131D6913M-17
CLIENT : NEOM Company . . PROJECT N o ' : 21J4037
IJROJECI : NEOM Desalin~tio~1-~~~ttoG~-;iT;;;~;~-:;;SsiMSy~t~;;-;--
SAMPLE SOURCE: LD-5/ TP - 02 REPORT DATE : 29.m.2022
SAMPLING DATE: - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE : 20.11.2022
o
SAMPLED BY : - ENV. CONDITION TEMP. : 24.0 C HUMIDITY: 47%
BOREI-IOLENO.: LD-5/TP-02 DEPTH (m): 1.50 SAMPl,ENO.: S '1
SAMPLE DESCRIPTION: Brown, well-graded SAND with gravel. _

SJEVENo. SPEOFICATION lU'l~~~~~~m.) RET;~~ED PA~~;NG WATER CONTENT (ASTM D2216-19)

3" Can No. : B.F


2112' Wt. (Soil + Can) Wet (gm.) 2686.0
2" wt. (Soil + Can) DIy (gl11.): 2606.1
11h' 00.0 0.0 100 wt. Water (gm.) : 79.9
3/4" 371.6 15.6 84 Wt. Can (gm.) 231.1
3/8" 648.7 273--- 73 Wt. (Soil) DIy (gm.) 2375.0

-
#4
..
964.1 40.6 59 WaterContent(%) : 3.36
# 10 1518.9 64.0 36 CLASSIrICATION

# 20 1866.2 78.6_ _2~1~_ (ASTM D3282-09/02487-10)


# 40 2088.3 87.9 12 A-I-a/ SW
# 60 2204.2 92.8 7 DIy WI. of soil before woshing

•.........
# 100 2250.3 94.7 5
---
" 2 3 7 5 . 0 _.... _.. _... . _ -

# 200 .... _ .. _-
2267.9 95.5 5 Dry WI. of soil Aflerwashing
....

PAN 2268.9 ~ 2268.9


1--......----1-········-·······..···········--··--..··--·-------I--·.-,-----I..---..----~-- - - - - . ._.-.
Tol,d Soil WI. (gilL) 2375,0

100
90~--c ;·::::c·c.-~.:::_::ccc ::. c :' .. : ' ... c" ......
:§, 80 "'K .. ;::.::,.;.; - : : ..;, .
'0; 70 .',:";, c.,_. :,---,~.:cc:c:
,'c':' ........: : : : . . . . : :::
:;, 60 .:.; :<-:: .;: """",
· , . : · c c . . . " . : ; ' . : ' : :-: C·c· :c
i 50:' ,. • .: ,··.c:c...::::::::;~:: '.'; . :' · · · ; c ; : : ., .• :c . . - : ...
~ 40 ;c'~ c
':: 30 ... :- .., ., .. , ., ,
&; :: .. :... .. ~ ..
~ 20.. :: .. ," .',: .. ,. = ~ ; •• • ..' :..:
CL 10
o c· ...

100.00 10.00 1.00 0.10 0.01


Grain~sizo in Millimotors

REMARKS:
---- - - -- ~-------- --

TESTED BY : CHECKED BY I REVIEWED BY : ~yed Asad Aoo~~ __

APPROVED BY:
.... ...---­
(L'10. Inchargc)
Copnighl ur I his tlonltn(~nl is o\\,l1t'tl hy }{C F, if ma~' nol Ix~ H.'produn>d (>xc\.'pt with prior wriUt'1l pt'rmis.o;;inn (rom Ihf' ,,'omIMHY.

I{GF-jFD-I'IIY-SOIL·OI·03
20,01.2020
.... • ;;.JA - I~
tq f~ERI~.~~ CA.;;...L:.--(JlfJ ;:."
CR'U'Ul~
_. if0..,.J
lmtoo ~("~y I~j<;w 6.000,00Q fU~
RiYADH GeOTeCHNIOUE 8< FOUNDATIONs CO.
-~,;t ~~ "\ .J1.\.......1~:: ~4~
h\.\"\"1 .. .., ...
a..>..:,r.- ~I'"

p.o. Box 9182-jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 FHX: +966 ( 12) 6715426 Email: rgf-wpfEerigeosciel1fes.col11
Location: Gllrnath.l SL nt2'.af Arlhleen S1. intersection, Mushrefclh District, Jeddclh

TEST REPORT
PARTICLE SIZE DISTRIBUTION (GRADATION) OF 50ILSUSING SIEVE ANALYSIS
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO.
PROJECT : NEOM Desalination Plant to Transmission
SAMPLE SOURCE: LD-5 TP-03 REPORT DATE 29.01.2022
SAMPLING DATE: TEST START DATE 18.01.2022
SAMPLE RECEIVING DATE: TEST FINISH DATE 20.11.2022
o
SAMPLED BY: ENV. CONDTI'ION TEMP. : 24.0 C HUMIDITY 47%
BOREHOLE NO. : LD.5/'I1'·03 DEPTH (m): 0.60 SAMPLE NO. B 1
SAMPLE DESCRIPTION: SAND with silt &

WEIGHr RETAINED PASSING


SIEVE No. SPEO I-1(,A110N WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) ("!oj (%)

3" - -... -~
Can No. CR-12
1
2 h" Wt. (Soil + Can) Wet (gm.) 3946.0
2" wt. (Soil + Can) Diy (gm.) 3798.4
00.0 0.0 100...­
-_ Wt. Water (gl11.) 147.6
288.0 8.1 92 wt. Can (gm) 258.4
614.5 17.4 83 Wt. (Soil) Dly (gll1.) 3540.0
#4 1149.6 32.5 _. - - 68 Water Content (%) 4.17
--­
# 10 2071.9 58,S
41 CLASSIFICATlON
--- ... -~

# 20 2702.5 76.3 24 (ASTM 03282-09/02487-10)


-----­
# 40 3013.5 85.1 15 A-1-a/ SW-SM
----~- . - -.. ~---------

# 60 3151.9 89.0 11
- - -...........
Dry Wt. of soil before waShing
~-

----------~---

# 100 ~~-~----~~---------
3217.6 90.9 9 3540.0
# 200 3240.3 91.5 8 Dry WI. of soil After washing

PAN 3241.6
....­
3241.6
._------------_ ...... _.... _-- . _. '
-~-------
-~ ~-.

TOI"i Soil WI. (gill.) 3540.0

100
90
1:OJ 80
'0;
3: 70
",
.0 60
OJ
<:
'~
50
'"'"

40
30
.,
;:
!: 20
'"
0­ 10
0
100.00 10.00 1.00 010 0.01
Grajn~sizo in Millimeters

REMARKS:

TESTED BY: CHECKED BY / REVIEWED BY : Asad Abbas

APPROVED BY:
(L.ab.
Cop~Tighl of Ihis d()~'unwnl IS OWIWi! by HGE il H1fl)' nol Ill' n.' pnllh,(cd l>);t't'pl wilh prior wrillptl pC'rmission fHim Ihe ,,'omrldnr.

HGF-JED-I'IIY-SOIL-OI-03
20.01.2020
rq f_EftI_" ·c...-4••;:•...I....:--0 J:t :: u
CR lU'U.l1007.oo

Umi1e4tJ.ml11~\y('iQmt>."')Pj.>JC$;{#tfM e.ooo.~ ~U'l

RIYADH GE.OTECHNJQUe 6. f'OUNDATIONS CO.

p.o. !lox 9182, Jedddh 214'13, KSA Telephone: +966 ('12) 6715621/ 617686() Fax: +966 (12) 6715.126 En",il: rgf-wp@erigeoscienccs.com
..:;;~ i f ,-::?..)I~
.)N~ ,",,~ ... ,Jt\.,...J;; 1 u,,~ ~,$>-~

Loc,)tion: GM1Mthn SL near f\rbaeell St. intersection, -ro.. lushre(,lh I:J'istrict, Jeddnh

TEST REPORT
PARTICLE SIZE DISTRIBUTION (GRADATION) OF SOILS USING SlEVEANALYSIS
ASTM -D6913/06913M-17
CLIENT : NEOM I'ROJECT NO.
PROJECT : NEOM Desalination Plant to Transmission -
SAMPLE SOURCE: LD-5 TP REPORT DATE 29.01.2022
SAMPLING DATE: TEST START DATE 18.01.2022
SAMPLE RECEIVING DATE: TEST FINISH DATE 20.11.2022
-E-NV-.-C-'O-N-D-n··'··I··..O
......N
..........T......E....M
.... P.-:­ 24.0 °c HUMIDITY
SAMPLED BY: 47%
----
BOREHOLE NO. : - - - ' - 11'-03
_ .............
DEPTH (m): 2.00 SAMPLE NO. S 5
GRAVEL with silt & sand.

SIEVE No. I SPEGI'ICA110N


WEIGHT
RETAlNED (gm.)
RETAINED
("!o)
PASSING
(%)
I WATER CONTENT (ASTM D2216-19)

CanNa. B.B
Wt. (Soil I- Can) Wet (gm.) 3040.0
00.0 0.0 100 wt. (Soil + Can) DIy (g1l1.) 2979.0
78.2 2.9 97 wt. Watel' (gm) 61.0
316.6 11.9 88 Wt. Can (gm.) 308.0
._.._ - ­ -------
823.3 30.8 69 Wt. (Soil) DIy (gm.) 2671.0
#4 1360.5 50.9 49 Water Content (%) 2.28
# 10 • 1848.2 69.2 31 CLASSIFICATION

# 20 2260.2 84.6 15 (ASTM D3282-09/02487-10)


--_ ....-------- ........_.. _.. _.­ ­
# 40 2380.9 89.1 11 A-l-ajGW-GM
# 60 2461.1 92.1 8 D,y Wt. of soil before washing

# 100 ._..... 2505.6 93.8 6 2671.0


.... -------~"

# 200 2519.3 94.3 6 D,y Wt. of soil After washing


.. ---------------- -... 1--- - ...

PAN 2520.6 2520.6


-_. ,---------""---""---_._------,
'1'01.,1 Soil WI. (gm.) 2671.0

90
1:
.,
.9' 80
s: 70
E 60
0>
c:
'iii
50
i:l
a..
40
C :30
e'" 20
'"
a.. 10
0
100.00 10.00 1.00 0.10 0.01
Grajn~size in MiHimotors

REMARKS:

TESTED BY: I:~1Jx~1!__ CHECKED BY / lUNIEWED BY : i\sad Abbas

APPROVED BY:
(Lj.1b.
Copyright of Ihis donlllwnt is mVlwd In' H.GI'~ il 111,1,\' nollx' 1('prodtlC(ld P:\C('l't with priOi \VI illt'll pPlInission from 1hI.' fOlllpclny.

HGF-JED-PIIY-5011.-01-03
20.01.2020
t:..-l.::-l..:.-'Vl!:f ,:-:, ..
CR.lO:,}U1~:::{)S
':;;.0 if~..) I ~
l..~tJB\)'iJi\y~1:p(I<n>,I.CiUp"~$,OQ(U,}QO$,R ~~.J~~'\ .}ll~.~",i~",,~
fAnERI RIYAD'" GeOTECHNIQUe &. FOUNDATIONS CO.

p.o. !lox 9'182, Jeddah 21413, KSA Telephone; +966 (12) 671562"1 /6'176860 Fax: +966 (12) 6715426 Em,lil: rgf-wl'@erigeosLiell",,,.({)1l1
Locolion: Garnntlm S1. near Arbaeen St. intersectionr j\JushJ'cfah District" Jedd;:lh

TEST REPORT
PART I CLE SIZE 01 ST RI BUTI ON (GRAOATI ON) OF SOl LS USI NG SI EVE ANAL YSI S
ASTM -D6913/D69131\J-17
CLIENT : NEOM rOm"""" PROJECT N O . : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/TP - 04 REPORT DATE : 29.m .2022
SAMPLING DATE: - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE : 20.11.2022
SAMPLED BY: ENV. CONDITION TEMP. : 2"1.0 °c HUMIDITY: -47% . . . . -~
BOREHOLE NO. : LD-5 /11' - 04 DEIYfH (m) : 0.60 SAMPLE NO.: B 1
SAMPLE DESCRIPTION: Brown, weli-greded GRAVEL with sand.

_ WEIGHf HEfAINED PASSING


SlhVENo. SPEOfiCATION RETAlNED(gllL) (%) (%) WATER CONTENT IASTM D2216-19)

3" Can No. : MR


1
2 h 00.0 0.0 1Q9_Wt.(SoilICan}Wcl{gl11.} 4198.0
2" 330.3 8.7 91 Wt. (Soil + Can) DIy (gm.): 4078.7
1112 536.6 14.1 86 Wt. Water (gnt.) : 119.3
3/4" ~ ~~. -----~-------- .......
1227.6 32.2 68 WI. Can (gm.) : 267.0
3/8" 1790.6 47.0 53 Wt. (Soil) DIy (gm.) : 3811.7
# 4________ 2335.2 61.3 39 Water Content (%) 3.13 •
# 10 2937.8 77.1 23 CLASSIFICATION
# 20 3323.9 87.2 13 (ASTM 03282-09/02487-10)
# 40 3523.7 92.4 8 A-l-a/GW
# 60 3620.5 95.0 5 Dry WI. of soil before washing

.._..
# 100 --------------~~-~
3666.7 96.2 4
---- = 3811.7
- - ...•­
# 200 3683.2 96.6 3 Dry WI. of soil After washing
1- . . . ­
PAN 3685.0 = 3685.0
._- ,------------ .... _-----------,
Tol"l Soil WI. (gill.) 3811.7

1~~: ~"-..:: ••. ."~ .~.T:·.:: ,::.:c:-::,,::,: •. ''''. _~ ... ~ ~. c'.: >: • :._~ •. '. :>~~'. ·:-·..c·.: . ..,
~ 80 :.::..~:c .~~c . .·. _.·... ~c.... . c. . -.': .:,....
'iii 70 :.~.. :~:. ~:::::.:::.: ••:.:::..~:•.: : '.' •• : : :.: ., ,'.': :. '.::: :.:. :.:: .:. .' . '.' .
~ 60: ':'. :': : '.: .. :'. ::·~:~:co...~.·: .:.:.:."::~::c~:::: ....-'... :···~::c··:..: .'::... ..: .• :..:::
.1r 50 ....•... • ::::~:::::·::.·::·:L:::·::::·.·::· - :...<.:.:·.::'c:>:::·::': : •
::I 40 .• ~ .••. .=: .:' :.
~ 30 • .• ..•.•• ~ ...•.... =: : ....•.

&i •.. :.~. :


~ 20 .:.:',. •...•• .• ~~ •• : :: ••.••.: . " •
n. 10
o .::
100.00 10.00 1.00 0.10 0.01
Grain·size in Millimeters

REMARKS:
~~~~".,,~" .."-" .. "'-"-.,~.-- .. --~. .............. ------_ .._. -.-.--.. --.---.--------~- ............. -----_.". -- - - ------_.. __ .. - ........ _--­

TESTED BY: Faiyaz CHECKED BY /REVIEWED BY :?yel.I... I\.'iil<11\~~.'l~. __

APPROVED BY:
- ~ ..- ...---,,--,,--------- .... -.~------

(Lab. lncharge)
Copyright of this d()(lImt.~nt is owned by HGF, iilllcl.\' nol Lx' t"l'prodlKed t'xn'pl wUIl prior wrillpf1 lwrmission from the (ompany.

RGF·JED-PIIY-SOIJ.·OI-lH
20.01.2020
f· An ERI
~
Compeol(
1""·'
~) ' ' "'­
i::::~4-
~~~."""''''''--''''
Cl.:-I....:.-'V 1J1 ~~ t-i',-:?..,J I ~
"f'l ~fi1(l'OOli!~
tJmikldlWbil.ly Compn.n,JC«tt~f)j15.000,(;(U) s.n

RIYADH GEOTECHNIOUe & FOUNDATIONS CO.


~>"l''\''''''''',,~.:.:r'
.,$tt)';"~"\ .,.h\t~.,r1"l t ~4~ ~)c>-- . .fA.); U" ~

p,o. !lox 9182., Jedd"h 214 13, !<SA Telephone; +966 (12) 671562'1 / 6176860 Fa" +966 (12) 6715426 En1<1il; rgf,wp@erigeosciences,cOl]l
Locdlion: G)(;).'ull<l. st ned.!' Arbi1een Sf. interSL'CtJon. Mushrefclh District, Jedd,\h
TEST REPORT
PARTICLE SIZE DISTRIBUTION (GRADATION) OF SOl LSUSI NG SIEVE ANALYSIS
ASTM -D69J3fD69J3M-17
CUENf : NEOMr. 'Y PROJECT NO. : 21J4037
- , ..----------­
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/ TP- 04 REPORT DATE : 29.01.2022
SAMl'UNG DATE: ..
TEST START DATE " : 18.01.2022
- _---­

SAMI'LE RECEIVING DATE: TEST FINISH DATE : 20.11.2022


o
SAMPLED BY: ENV. CONDITIONTEMI'.: 24.0 C HUMIDITY : 47%

BOREHOLE NO. : LD·5/1P·04 DEPTH (m): 1.50 SAMPl,ENO. : 5-4
.---~

SAMPLE DESCRIPTION: Brown, well-graded GRAVEL with silt & sand.

WElGlff RETAINED l'ASSING


SI EVE No. SPEOflCATION WATER CONTENT (ASIJVI D2216-19)
RETAINED (gill.) (%) (%)

3" CanNa, : AM
1
2 /z' ~
wt. (Soil + Can) Wet (gm.) : 3481.0

2" Wt. (Soil + Can) Dry (gll1.) : 3377.8
11h' 00.0 0.0 100 Wt. Water (gm) : 103.2
3/4" 683.2 22.3 78 wt. Can (gm) 314.0
-­ 3/8' 1204.8 39.3 61 Wt. (Soil) DIy (gl11.) 3063.8
---._--_..
#4 1828.6 59.7 40 Water Content (%) : 3.37
2059.2 67.2 33 CLASSIFICATION
-_._­ #10
# 20 2318.0 75.7 24 (ASTM D3282-09jD2487-10)
----­
# 40 2476.8 80.8 19 A-2-4/GW-GM
# 60 2546.5 83.1 17 Dry WI. of soil before w<lsbing
~----.--

# 100 2682.2 87.5 12 3063,8


# 200
PAN
2780.0
2781.3
r 90.7 9 Dry WI. of soil Aflerwashing
2781.3
--~.---~ ... ... _-_. -- -------------------.
TO!.l] Soil WI. (gill.) 3063.8

100
...... ~ :'
.. . .. .
';: ~
.... '.' ..
",
.

.. ..... .•.............
.

.
'

90 :
.crn 80 . ' ...

; - . •
;

'w
s
'"rn
.a
70
60 ~ .....
...•.•. ~...
, ........ .... ' , ~...... ' :
i.. : ........
.
••
............ ..
c:
'Vi
50 •••••••
:
.

~
...c

..'
.•....••...

:;; :.' . •

'"
ro
Q..
40
. ~ ." ... ,

c: 30 .~
Q)
~ 20 ; :'.;.. . .. :;; ~ : : .
'"
Q..
10 . .•...... ···i •..•. .
..

0
: •• : :

100.00 10.00 1,00 0,10 0.Q1


Grain·size in Millimoters

REMARKS:
------------­
- --.-------.. -------­

TESTED BY: l'i\iyi1~, CHECKED BY I REVIEWED BY : !\sad Abhas

APPROVED BY:
(Lab. Inch~i:g;;f
Copyright of this do..: ullwnt is oWI1('d h.\' HGE it liMy not l)(' rppmtiun'tll'sn'pl with Iwior wrill{,11 Iwrmissioll fmmille (omp<ll1:'.

RGF-JED- PI IY·SOIl.-OI-03
2001.2020
f"-,,,:,;"~'=="'I 't;:'A•.~_L;.-O'" .: .: ....:;.;-~ i f y..,) ,~
rqf_ERI_, I~
,h,,~)
[us?,]
~ CR '0101~OO
L""''''''.U"",,,,y
;,:,::.:~~~;;~;:;" RIYADH GEOTeCHNIOUE & FOUNDATIONS CO.
Com,,>n,' ".",\," •.000.000 S." .J., or>- , J~' ,.,..', I "'~' "">>-~" U'r'
~,"'.'"\"1.",..It'.;:,....--

P.O. Box 9'182, Jedd.lh 21413,!<SA Telephone: +966 (12) 6715621 / 6176860 FdX: +966 (12) 6715426 Email: rpf-wp@erigeosciences.com
Location: Gafllatha St. near Arbaeen St. intersection, jvlllshrefah District Jeddclh

TEST REPORT
PARTI CLE SIZE DISTRIBUTION (GRADATION) OF SOl LSU5I NG 51 EVE ANALYSIS
ASTM -D69131D6913M-17
CLIENT : NEOM CompanL ____ PROJECT NO. :
.---_..­
21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-S / TP-OS REPORT DATE : 29.01.2022
SAMPLING DATE: - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE : 20.11.2022
o
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 C HUMIDITY : 47%
BOREHOLE NO. : LD-5/TP-05 DEPTH (m): 1.20 SAMPLE NO. : B-2
SAMPLE DESCRIPTION: Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVENo. SPEOIlCAI10N (0/;')
WATER CONTENT (ASTM 02216-19)
RETAINED (gm.) (%)

3" Can No. : TYB


2112" Wt. (Soil + Can) Wet (gm.) : 3469.0
2" Wt. (Soil + Can) Dly (gm.) : 3253.9
----­ ----­
1112" 00.0 0.0 100 Wt. Water (gm.) : 215.1
3/4" 213.2 7.0 93 Wt. Can (gm) : 215.1
~--.--~--

-_._-­
3/8" 599.2 19.7 80 ..
Wt. (Soil) Dly (gm.) : 3038.8
---._-­
#4 1044.3 34.4 66 Water Content (%) : 7.08
--­
# 10 1646.4 54.2 46 CLASSIFICATION
------~---- -----~ ..­ ... _---" - .-.-~-~~ ---­ ----~~-.

# 20 2053.0 67.6 32 (ASTM D3282-09jD2487-10)


--~-- --­ -­
# 40 - - - _ .__. _..
2347.1 77.2 23 A-l-a/SM
# 60 2499.9 82.3 18 DIy WI. of soil before washing
----­ ---~~--------

# 100 .. ~.---- ..
2578.5 84.9 15 =
-------_.­
3038.8
# 200 2637.7 86.8 13 Dry WI. of soil Afler washing
.-----­

PAN 2639.2 = • _____________


2639.2 ~ _______ ~ M M. _,

----------_._. -­
'1'01.11 Soil WI. (gill.) 3038.8

100 :
:-----.:... c,: _:"',.: ,~

E
90
80 :,: . ~':' :...:.":
..
..c­ - ,.. : : , ...': .:
01
.;:; ::~, ..:"".:,... "-,,., , .­
3: 70 ... - .....
.. : ::: .:ec.'.· .-.
~ ..
.-'::
, : ..
'"
.c
01
c: ~~ .... ..' :'~:. ,
~, ....

.. ' ..
cc· .

: ..
.. '
,
'iii
\Jl
ro 40
::: ,
,
"­ , .. ,.
0. : .. . :. ~ :
C' 30
~
'~" 20
'"
0. 10 --_.
o I' I' T I I
100.00 10.00 1.00 0.10 0.01
Grain-sizo in Millimotors

REMARKS:
------­ ----­ -------~. ---------------_.­ -----------------­ - --------- - - - - - - - - - - - - - - - ­ - - .. _------------­
__________ • • _ _ _ _ _ _ _ _ _ . . _. _ _ _ M _ _ . _ . _ •• _ . _ . . . . .•.__ ..._.. _.. _--­ _____.0.____.0_.."_ _ -" .. --_. __ ._.. __.._-­

TESTED BY : ...___.._.. . _ ~~_~.~X~:!~ _________. CHECKED BY / REVIEWED BY : _~t('(1 /2s<'l~~~?_as_

APPROVED BY: - __ - ____ ."• • • • _ •• 0 _ _ _ - _______ ._._

(Lab.lncharge)
Cop~'J"ighl o( Ihis donmwlll is mVIll'd b~' HGr, il 1Il<\~' nol Ix~ rl'plOdlKL'd l'x(l'pl with prior writtl'll pl'rmissioll (rom Iht, (Olllp(lIl~·.

RGr·JEI)-I'IIY-SOII.·O 1-03
21l.01.2020
"C..-l;;;.....(...;...--V I., ~~ i f0..) I
tq f •

An
IERI
,
i~~ ~J L1m'""'l_ll\y~fi'I(_
r"·.w¥··""'.. ··"'·"~··· ..~""··"'
1 ~\'<1' ~ tR.
.
Hl'O'ao.~60

Cn.:"'''''">' '-."~,=~~.;:;::.=@:~~'" RIYADH GEOTECHNJOue &: FOUNDATIONS CO.


_.....

...'''.OOO,''''''''."
.....

""',"..... 'J"',.,..,.,/ ••,_

]'.0. Box 9'182, Jeddah 214'13, 1<5;\ Telephone: +966 (12) 671562'1 /6176860 j',,,: +966 (12) 6715426 Email: rgr·wpfterigeosdences.com
Location: Garnatha St. near Arbaeell St. interSfflion, Mushrefl:lh District~ Jeddah

TEST REPORT
PARTICLE SIZE DISTRIBUTION (GRADATION) OF SOILSUSING SlEVEANALYSIS
ASTl\1-D69131D6913M-17
CUENT NEOM Company ..............................................._---­
PROJECT NO.
PROJECT NEOM Desalination Plant to Transmission
SAMPLE SOURCE: LD-5/ TP-05 REPORT DATE 29.01.2022
SAMPLING DATE: TEST START DATE 18.01.2022
SAMPLE RECEIVING DATE: TEST FINISH DATE 20,11.2022
SAMPLED 13Y : ENV. CONDITION TEMP. : 24.0 °c HUMIDITY 47%
BOREHOLE NO. : DEPTH (m): 2.00 SAMPLE NO. S 5
SAMPLE DESCRIPTION: Brown, well-graded GRAVEL with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPEOFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gilL) (%) ('Vo)

3" Can No. LD


Wt, (Soil + Can) Wpt (em.) 3577,0
2" 00,0 0.0 100 WL (Soil + Can) Dry (gm.) :l507.7
----------­
~-

170.3 5.3 95 Wt. Water (gm.) 69.3


676.2 21.1 79 WL Can (gm.) 297.4
- ---­
1446.0 45.0 55 WL (Soil) DIy (gill) 3210.3
#4 1761.9 54,9 45 Water Content (%) 2,16
# 10 2421.9 75.4 25 CLASSIFICATION
------"-_.
# 20 2792.8 87.0 13
----­
(ASTM D3282-09/D2487-10)
# 40 2941.1 91.6 8 A-l-aJGW
- - ­ ----­
# 60 3017.7 94.0 6 Dry WI. of soil before washing

# 100 3046.6 94.9 5 - - - ­


3210.3
# 200 3056.5 95.2 5 DIy WI. of soil Aner waShing

PAN 3057.4 ._-- ..--.... ­..3057.4


_............ _... _----_ ......,
'1'01,,1 Soil WI. (gm.) 3210.3

100
90
EOl 80
'iii
S; 70
E 60
01
c: 50
'iii
III
40
'"
0..
c: 30
'"~ 20
'"
0.. 10
0
100.00 10.00 1.00 0,10 0.Q1
Grain~size in Millimeters

REMARKS:
_.. ,--_. ~ ",.~-~----~--~-- .. -.­ _... ... ... . ~---

TESTEDHY: CHECKED BY / REVIEWED BY : A~<1d Abbas

APPROVED BY:

Copyrighl of this donmwlll is O\\'llpd by HGE tI rnd~: not bi." feprodu(l'd l'XtT'pl "'illl prtor wrillpil pl'nnls5fon rrlllH Ill(' ,"omp.my.

"GF~JED~I'IIY~SOII.~0I~03
20.01.2020
~~-"Cl:-~O/~ ~~if~~I~
,-,,-,--,-,-,,-,-,-,-.c:.:.::...-'-=---'====~ RIVADH GEOTECHNICUE & FOUNDATIONS CO•
.. .0. D(lx tll'):tIl., V"'nb... Al·5".;ly;:,h. MYA$ ~:tOOO. to:SA ''Telephone; ...')(or} (l.ll~ 32:;'~2/32~-l t'ax: 1"966 (1)\) ~1:!\'O~)II6 £ .... ~lL q~f~yt>l'lt""We.lgeo~cltor5t;<:c~.tQWj
lo(;aUut>: /I.!.Naw<u"L;$nd $tfw.!f:l. H.:)l A)..M .. h:Olil DHt(k•• n.c•. YJohl,l';J AI;_$ijliil:f.;lh

CLIENT: NEOM. PROJECT NO.: 21J4037


------------------------------------------
PROJECT: Neomdesalination plant to gayal transmisssion system. (LD-05) DATE SAMPLED: 01.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 0.60 m DATE RECEIVED: 06.01.2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.6 DC HUMIDITY: 42%
DATE STARTED: 19.01.2022 DATE COMPLETED: 21.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAIt-iED WATER CONTENT: (ASTM D 2216·19)
3"
2112" CAN NO. M-08
2" WT.(SOIL+CAN) WET: 2115.90 gms.
1 1/2" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY; 2026.40 gms.
1" 72.3 4.0 96.0 WT.OFWATER 89.50
3/4" 105.3 5.8 94.2 WT.OFCAN gms.
3/8" 194.2 10.7 89.3 WT. OF DRY SOIL gms.
#4 461.3 25.4 74.6 WATER CONTENT: 4.93 %
#10 837.6 46.2 53.8 REMARKS:
#20 1189.7 65.6 34.4
#40 1434.4 79.1 20.9
#60 1569.6 86.5 13.5
#100 1633.7 90.1 9.9
#200 1679.2 92.6 7.4
PAN 1683.1
TOTAL SOIL WT. 1814.00 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3W 3/8" 4 10 40 100 200


100
90
~ 80
;.; 70
~ ,..60
~ i:§50
;'-~O
·~3

~ 30
~ 20
g: 10
o
100 10 GRAIN SIZE IN MIIJ.IMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF·YNB·PHY -SOIL-Ol·04
01.08.2021 Copy Rights Reserved By RGF
f An flU Compony
'i.:..A•.:..-l;:../LJ/ ~ :: '" ·....:7A ~L;..;..) I ~
RIYADH GEOTEC':;NIOUE ; : OUN~ATIONS CO.
1-'.0. IlQX ::102"71, v ....bu AI.5Jn~l)1 .. h. MYA~ ~.1(}(){), KSA "'·d~phooe; ..-!:H:)t:) (10'1) :t:t~09~2 I :U:.:>tl993 t: ..,,; -..9(,6 (101) :3'1:':>0946 f.!m,3l1; ~~I.y .. nbu@".rReO~dt-nce'.(:D,n
l(1c.. th)(.~ Aj,N;Jwa.\;:iJI(f $h'.;o;[, H"I ,'\I.M.ll):;:.~. Dl$tdo;.i. A,C .• Y,tl,,->u A1.::5II,;)I)I.)h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD·OS) DATE SAMPLED: 01.01.2022
SAMPLE SOURCE TP: 06 DEPTH: 1.50 m DATE RECEIVED: U6.01.2022
SAMPLE DESCRIPTION: Brown Silty SAND with gravel. SAMPLE NO.: S-5
ENVT. CONDo TEMP. 24.2 a C HUMIDITY: 40%
DATE STARTED: 1910112022 DATE COMPLETED: 21/0112022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216'19)
3"
2 112" CAN NO. T-2
2" WT.(SOIL+CAN) WET: 2325.60 gms.
---­
1 1/2" WT.(SOIL+CAN) DRY: 2LYY.JU gms.
1"
----­
0.0 0.0 100.0 WT.OFWATER 26.30
3/4" 62.8 3.1 96.9 WT. OF CAN 295.60
3/8" 149.9 7.5 92.5 WT. OF DRY SOIL 20uJ./u
#4 293.6 14.7 85.3 WATER CONTENT: 1.31 %
#10 428.9 21.4 78.6 REMARKS:
#20 598.6 29.9 70.1 NON PLASTIC
#40 797.7 39.8 60.2
#60 1097.7 54.8 45.2
#100 1386.0 69.2 30.8
#200 1645.2 82.1 17.9
PAN 1647.1
TOTAL SOIL WT. 2003.70 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 314" 3/8" 'I 10 40 100 200


100
90
Z; 80 t+-t·····~·-- !-t---I f-~-~~I++t+ t+-·····t-~··· --~
G 70
~ c-60
~ ~50
:: ~O
C5 30
~ 20
is:: 10
o
100 10 GRAIN SIZE IN J".I.ltvWTERS
0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF-YNB-PHY ·SOIL·01-04
01.08.2021 Copy Rights Reserved By RGF
f An Eftl Comp3ny
f",o. no.. 30Z71. Y.;u>bu- Aj.SI"~:;Y";', MYAS ~'1QO(). K!SA
l¢("'HtJn~
c...-L:-L---'Ul~ ~~ ifl:?.-J f ~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
1'¢1l!phe>n<l': ....1>06 (:1.04) 3250'}92/32~3
Al.Nili!W<'J<Ui)-d Sl~;:t. H:ol At.tlo'ldmt.h
I';u:: ~966 (14) 3"l!l0946
Cl!$\tkt."~ .. Y.iflht!
ewul1: I'6f.'1anbU@r<l.Hco~·d!:",.c..,,.,,,om
Aklh')~.t)l'ah

PROJECT: Ne'om desalination plant to Slaya/ transmisssion system.(LD-05) DATE SAMPLED: 30/1212021
SAMPLE SOURCE TP: 07 DEPTH: 1.20 m DATE RECEIVED: 06.01.2022
SAMPLE DESCRIPTION: Brown well graded SAND with siltft gravel. SAMPLE NO.: B-2
0
ENVT. CONDo TEMP. 23.9 C HUMIDITY: 39%
DATE STARTED: 19/01/2022 DATE COMPLETED: 21/01/2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. R-2
2" wr.(SOIL+CAN) WET: 2135.00 gms.
1 1/2" 0.0 0.0 100.0 wr.(SOIL+CAN) DRY: 2056.30 gms.
105.3 5.7 94.3 wr.OFWATER 78.70
365.5 19.7 80.3 WT.OFCAN 197.20 gms.
3/8" 482.8 26.0 74.0 wr. OF DRY SOIL 1859.10 gms.
#4 873.6 47.0 53.0 WATER CONTENT: 4.23 %
#10 1268.1 68.2 31.8 REMARKS:
#20 1503.5 80.9 19.1 NON PLASTIC
#40 1625.0 87.4 12.6
#60 1695.3 91.2 8.8
100 1732.4 93.2 6.8
1758.1 94.6 5.4
1760.2
TOTAL SOIL wr. gms

u.s. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM


6" 4" 3" 3/4" 3/8" 4 10 40 100 200
100
90
:; 80
'0 70
i/,z rGO
'.1 ::550
e: ~O
1E ""30
2;! 20
E:' 10
o
100 10 GRAIN SIZE IN JILJ,IMI:TJ'RS 0.1 0,01 0,001

Checked By/Reviewed By: SClPPrl Akhtar


------------------
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF·YNB·PHY·SOIL·01·04
01.08.2021 Copy Rlghts Reserved By RGF
1'.0.
f An ERI company

nQ~ tto~11, Yanbv A"~1'~ly ..h. MYAS. 51000. kSA to:-ll!'ph('N)C)


1-(J(.. nil(,;
1.:;'.A••;.A..:;./[JI~ :::: •~::11 J'l:?~ f ~
RIVADH GEOTECHNIOUE & FOUNDATIONS CO.
~~G(. u-=) :l2!H)99Z /3%5099:5
,\I.Naw;!!.l4tHf $1f«t~ U.>!I A~.MilIh:i>'"
t'.ll<; ... 91$0 {1.il) 37:5094l}
[)l:.t..-f<:L R.~.,.
em..)}; 'Rr.y~nbuee"flll!!"oM;.k"««,.<o01)
Y;tfitJu Al-SiHM... ~h

Neom desalination plant to gayal transmisssion system. (LD-05) DATE SAMPLED: 30.12.2022
TP: 07 DEPTH: 2.50 m DATE RECEIVED: 06.01.2022
DESCRIPTION: Greyish Brown poorly graded SAND with silt & gravel. SAMPLE NO.:
ENVT. CONDo TEMP. 23.7 o C HUMIDITY: 38%
DATE STARTED: 19.01.2022 COMPLETED: 21.01.2022

SIEVE SPEC. WEIGHT % RITAINED % PASSING


SIZE LIMIT RITAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 112" CAN NO. AB-1
2" WT.(SOlL+CAN) WET: 2165.30 gms.
1 112" 0.0 0.0 100.0 WT.(SOlL+CAN) DRY: 2123.50 gms.
1" 90.3 4.9 95.1 WT.OFWATER 41.80
3/4" 405.3 22.1 77.9 WT.OFCAN gms.
3/8" 621.3 33.9 66.1 WT. OF DRY SOIL gms.
#4 835.2 45.6 54.4 WATER CONTENT: 2.28 %
#10 1132.3 61.8 38.2 REMARKS:
#20 1285.3 70.1 29.9 PLASTIC
#40 1430.2 78.0 22.0
#60 1520.3 82.9 17.1
#100 1578.3 86.1 13.9
#200 1720.3 93.9 6.1
PAN 1724.1
TOTAL SOIL WT. 1832.90 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 314" 318" 4 10 40 100 200


100
90
;:;; 80
;::; 70
~ ri30
~ i§50
"- 940
~ ;530
LLl
~ 20
1t 10
o
100 10 GR,\IN SIZE IN MILLIMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------­
A-Aziz
Tested By: ____________ Approved By: Awais Nisar Yasin

RGF -YNB·PHY·SOIL-01·04
01.08.2021 Copy Rights Reserved By RGF
Cl:::.-l.;/U/~ ~A.... i./0.,)f~
RIYADH GEDTECHNIQUE & FOUNDATIONS CO.
- ..
P.O. no... 302':'1'1:, 'V.mt;u Ah~";lYi:>h< l!.itYA.S !\lOOO, "SA Tc:l~.dl(.>(\.e~ ">'900 (14) :n:50992: I )l:!KI9!)3 jlj:>)\: ... 9~O (14) ::1:0/::>094/1 tm"J1: ~t-V.;.... bu@l:"jlgeo,d~fl«",.<:om
l,;,e~U(>f': J'\t,NltW':H'\,Uld :$l~et. tt;;ol A"M~IY"'l OI,.ttld. R.<': •• V.H.bu Al.'!ln",flfoSh

NEOM. PROJECT NO.: 21J4037


PROJECT: Neomdesalination plant to gaya/ transmisss;on system.(LO·05) DATE SAMPLED: 02.01.2022
SAMPLE SOURCE TP: 08 DEPTH: 0.60 m DATE RECEIVED: 06.01.2022
SAMPLE DESCRIPTION: Brown Silty SAND with gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 23.9 DC HUMIDITY: 39%
DATE STARTED: 19.01.2022 DATE COMPLETED: 21.01.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. N-12
2" WT.(SOIL+CAN) WET: 2399.90 gms.
1 112" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 2360.40 gms.
1" 164.9 7.7 92.3 WT. OF WATER 39.50
3/4" 269.5 12.6 87.4 WT. OF CAN 220.90 gms.
3/8" 440.2 20.6 79.4 WT.OFDRYSOIL 2139.50 gms.
#4 720.8 33.7 66.3 WATER CONTENT: 1.85 %
#10 1176.3 55.0 45.0 REMARKS:
#2.0 1465.1 68.5 31.5 NON PLASTIC
#40 1620.8 75.8 24.2
#60 1726.4 80.7 19.3
#100 1801.3 84.2 15.8
#200 1862.5 87.1 12.9
PAN 1865.1
TOTAL SOIL WT. 2139.50 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
;; 80
G 70
~ rBO
~ §50
~~O
~ 30
;;2 20
12 10
o
100 10 GI{;\IN SliT IN JIl.I.IMLTERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------------
Tested By: A·Aziz Approved By: Awais Nisar Yasin

RGF ·YNB-PHY·SOIL·01·04
01.08.2021 Copy Rights Reserved By RGF
t:--L-L/V l:t ~r.:f ~,-:?.,J I ~
RIYADH GEOTECHNIGUE & FOUNDATIONS cO.
f.<,Q. nOlO; ao~·r:). V"rU:>u AMI");'l'.oh, M'fA':S :;'].000. t-:5A. Tdcph&ne~ ....~G (34) 3250992 /32'SO!n.) t'.lOll: +!I66("14) "':t.5b940 tm..tlh t$f.y"nuufPcilg<!'Ulr,lC'f<¢(:!> <-um
(6(:;:.Uon: Aj,N..w.'}.<")aH(t $tn~f. H~t AJoM..hM, bliVk.t" A. .c", Y;;t.i:bu Ah$jiH.ly.."

Neom desalination plant to gayal transmisssion system. (LO-05) DATE SAMPLED: 01.01.2022
TP: 08 DEPTH: 1.50 m DATE RECEIVED: 06.01.2022
;)AMI"'Lt:. DESCRIPTION: Brown well graded SAND with Silt ft gravel. SAMPLE NO.: S-4
0
ENVT. CONDo TEMP. 24.9 C HUMIDITY: 41%
DATE STARTED: 1910112022 COMPLETED: 21/01/2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2112" CAN NO. KN-I0
2" WT.(SOIL+CAN) WET: 24'i'i.]n gms.
-----
1 112" 0.0 0.0 100.0 WT.(SOIL+CAN) DRY: 2"'VD.IU gms.
-----
1" 115.3 5.5 94.5 WT.OFWATER 47.20
3/4" 352.2 16.8 83.2 WT.OFCAN J15.r,O gillS.

3/8" 495.3 23.7 76.3 WT. OF DRY SOIL


-----
2092 'in
______ gms.
#4 688.2 32.9 67.1 WATER CONTENT: 2.26 %

#10 1155.3 55.2 44.8 I REMARKS:


#10 1460.3 69.8 30.2 NON PLASTIC
#40 1635.3 78.2 21.8
#60 1745.3 83.4 16.6
#100 1835.2 87.7 12.3
#200 1890.3 90.3 9.7
PAN 1894.1
TOTAL SOIL WT. 2092.50 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIfiCATION SYSTEM

6" 4" 3" 3/4" 318" 4 10 40 100 200


100
90
80
o 70
z
Vi
lfl
<:
0"

~
w
k! 20
it: 10
o
100 10 GRAIN SIZE IN JIIJJMETERS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar

Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF -YN B- PHY-SOIL-01-04


01.08.2021 Copy Rights Reserved By RGF
ft_u_ 00)\ 302·'1, Va,WI.> AI,=>1t-.;1yoah, MYA5 :'):lOOO,!o::SA 'telephone: ... ~a.6 (14) 32!lt>992 13:1'!j.O~9') t';,)\; ....966 U~) 3Z!l()941::1 £rn3J1; ~~f.Yillnb""'@I:~lBeo,.cI~",ce~.c;om
l..(>c~U(J():
Al,HoI ...... :<l.~~j)d $lI-.:c>E:!l. H ..T Ald\.1.,:a\)-ah DB'flc:L A.C.., Y;tl,bu Al_:!Ilfl.ilfy.,:ah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LO·OS) DATE SAMPLED: 22/0112022
SAMPLE SOURCE TP: 09 DEPTH: 0.60 m DATE RECEIVED: 22/0112022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded Gravel with silt ft sand. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.6 0 C 42%
HUMIDITY:
DATE STARTED: 23/01/2022 DATE COMPLETED: 25/01/2022

SIEVE SPEC. WEIGIIT % RElAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 112" 0.0 0.0 100.0 CAN NO. /-1-3
2" 249.6 9.4 90.6 WT.(SOIL+CAN) WET: 2897.70 gms.
-----­
1 1/2" 521.7 19.7 BO.3 WT.(SOIL+CAN) DRY: 2852.90 gms.
---,-,----­
1" 6S0.1 25.7 74.3 WT. OF WATER 44.80
3/4" 753.4 28.5 71.5 WT. OF CAN 206.30 gms.
---­
3/S" 919.5 34.7 65.3 WT. OF DRY SOIL 2646.60 gms.
----­
#4 1246.5 47.1 52.9 WATER CONTENT: 1.6':/ %
#10 1732.7 65.5 34.5 REMARKS:
#20 2060.6 77.9 22.1 NON PLASTIC
#40 2232.2 84.3 15.7
#60 2335.1 88.2 11.B
#100 2402.1 90.S 9.2
#200 2460.5 93.0 7.0
PAN 2463.2
TOTAL SOIL WT. 2646.60 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
in 80 '-I--~"""'" f..'~-
CJ 70
~ r60
':2 i§50
~~O
~ 30
::2 20
~ 10
o
100 10 GRAIN SIZE IN JIl.J.lMETLRS 0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


-----------------­
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF ·YNB·PHY ·SOIL·01·04


01.08.2021 Copy Rights Reserved By RGF
1..:'A.;_~(j I" :: ~ •2~ ifl;?..J f ~
RIYADH GEOTECHNIGUE & FOUNDATIONS CO_
P.O, 1:)0>< .30271. V.. nbu AI.SIn.;'y ..t.. MYA~ ~"1000. "'SA "te-Ie-phOfle~ ...:900 U~) :l2S-OS'92 I :l2~09-9-3 I";i:l:J<: ... 91:S6 h-") 3:;t5OS"~ t"m.:lll. qlr.V3nbu@e.IBeo~d~n<>c~ ...:mn
t(J(:~tl(;ln~ 1I.hN.lIw.:/..);aIHf :s,t:r'«t. H:.I AH\~o).l) ...,1 DBtrl(.i. PI..c., y-,t.bu Al_jfllaly;;!h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LO-5) DATE SAMPLED: 22/01/2022
SAMPLE SOURCE TP: 09 DEPTH: 2.00 m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTION: Greyish Brown well graded GRAVEL with Sand. SAMPLE NO.: S-6
ENVT. CONDo TEMP. 25.0 a C HUMIDITY: 42%
DATE STARTED: 23.1.2022 DATE COMPLETED: 25.1.2022

SIEVE SPEC. WEIGHT % RETAINED % PASSING


SIZE LIMIT RETAINED WATER CONTENT: (ASTM D 2216-19)
3"
2 1/2" CAN NO. C-7
2" 0.0 0.0 100.0 WT.(SOIL+CAN) WET: 1958.60 gms .
.,-:---::--­
1 1/2" 166.3 10.0 90.0 WT.(SOIL+CAN) DRY: 1BlJu.7U gms.
-...,----­
1" 285.6 17.2 B2.B WT.OFWATER 7B.50
3/4" 432.5 26.0 74.0 WT. OF CAN 217.40 gms.
-----
3/8" 571.2 34.4 65.6 WT. OF DRY SOIL 100L./U gms.
-----
#4 889.6 53.5 46.5 WATER CONTENT: 4.72 %
#10 1237.3 74.4 25.6 REMARKS:
#20 1429.8 86.0 14.0 NON PLASTIC
#40 1511.1 90.9 9.1
#60 1550.7 93.3 6.7
#100 1574.8 94.7 5.3
#200 1593.3 95.8 4.2
PAN 1595.1
TOTAL SOIL WT. 1662.70 gms

U.S. STANDARD SIEVE SIZE UNIFIED SOIL CLASSIFICATION SYSTEM

6" 4" 3" 3/4" 3/8" 4 10 40 100 200


100
90
~ 80 ······c······ c········· .. ......
G 70
~ e-60
~ i§50
~~O
~ ~30
i;! 20
~ 10
o I

100 10 GRAIN SIZE IN NlII.l.lrvlETI:RS


0.1 0.01 0.001

Checked By/Reviewed By: Saeed Akhtar


------------
Tested By: A-Aziz Approved By: Awais Nisar Yasin

RGF-YNB-PHY ·SOIL-01·04
01.08.2021 Copy Rights Reserved By RGF
"C.A..:_L::.--V I, :;..~ .~& Jr~..-J I ~
fAn ERIc"",,,. .,,y
Crt 10101GO?b!'J.
U'l~l~ I.~)' ~y I~

RIYADH GEOT'ECHNIo.ue & FOUNDATIONS


6,00fi.(X')() l'!.R .J\i:; ~~~ '\ Jl$.\ ..rl):
'>"~"",\_'f,.:
).:#~ J.,)J~_ ~u u:,~
•..:.....­
(;0..

P.O Box 9182. jedd<1h2H]3, KSA Telephone: +966 fl2) 6715621/6176<%0 Fax: +966(12)6715426 Email: rgf-wp@erigeosciences,coll1

Location: Garrwtha St near Arbfleen St. intersection, tvlushrcft1h Dish'ict, Jeddith

TEST REPORT
AITERBERG LIMIT DETERMINATION
ASTM D 4318-17el
CLIENT : NEOM Company PROJECT NO. : 21JLI037
PROJECT: NEOM DesaE1.1atio~~Plant to Gayal Transmission Syst~
SAMPLE SOURCE: LD-51 TP-01 REPORT DATE: 29.01.2022
SAMPLING DATE: - TEST START DATE: ~---~
18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE: 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 2'1.0 Uc HUMIDITY: ~ _'M'._'_" ~~_
47%
BOREHOLE NO. : LD-51 TP 01 DEPTH (m): 2,00 SAMPLENo.: B 1
Descri ption of sample: Brown, .~. "'..~~~ SAND with silt & gravel. Preparation method: Dry

LIQUID LIMn'
RUN No. 1 2 3 4 5
D1SJ-JNo,
WT. OF WET SOIL + CAN gm5,
WT. or DRY SOIL + CAN gms,
\VT. OF MOISTURE gm5.
WT,OFCAN gUl(),

we OF DRY SOIL gms.


MOISTURE CONTENT IYil
NO. OF BLOWS

. ._=
LL: -
t==
C
2c::
r ­
0
I
I
Plastic limit cannot be PL: NP
u I
2
0.­
I determined/NON PLASTIC
I
s:'" I PI : -

Numberof Blows

PLASTIC LIMIT NKfURAL


RUN No. ] 2 3 'I WATERCONT.
DISH No.
: WI'. 01: WET SOIL + CAN gms.
Wr. 01' DRY SOIL + CAN gms,
wr, OF MOISTURE gil", __
'
W
'
~
"
~
_
'WI:OJ'CAN gll'Lc.;..

W 1'. Of DRY SOIL gillS.


MOISTURE CONTENf ty.,
PLASTIC LIMIT
A VI' PLASTIC I.JMIT

~-.~- ..- - - - - - - - - ._n__ __ ,_.


~ 'T'_'
---------.

TESTEDIlY: Ahmed CI-IECKED BY/REVIEWED BY: _.?X<?~l_i\s<HI


..­..
Abbns
-._------.-. __.----.-.
--.~.-

APPROVED BY:
(Lab,lnchmge)
Cop~-ri~~hl of Ihis dOfunw-llt is OWIl()d hy ItGF, ilIlM~' noll)(~ rf'prodllfcd (,Xff'pt with prior writl!m pl~rmission fl'Otn tii(' (oIllIMny,

RGF·JEI)·PIIY-SOII.-Ol-m
20.012020
t.:.A...;:... c.....::---U ',·~A t.f~J I~
q
(C f . AAERlc_pa,w i~ I./ii/.," I
~_ _'"<_.
1010't6bZb~ r~'~~'7r-·-"·-·';;;;~;::;;;"-j

L....",=.J RIYADH GEOTECHNIQUe.J"~"""" ,-~ ..,">--"'''''''J'>


1
& FOUNDATIONS CO.
eM. .

1....'''''1.''''''',.... ''''''''"'''.'''''.''''' •.000.00081<


- - -

J"• ...,.JJ •• .
\"'\''''!A40':;'<.Jr-'

r.o. Box 9182, jeddah 21<113, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715'l26 Email: rgf,wp@erigeosciences.com

Ux:cltion: Garnatlltl 51. near Arbdeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
ATTERBERG LIMIT DETERMINATION
ASTM D4318-17e1
CUENT : NEOM Company PROJECT NO. : 2lJ4037
PROJECT: NEOM Desalination Plant to Gayal Transm.ission System
SAMPLE SOURCE: LD·5 / TP- 01 REPORT DATE: 29.01.2022
SAMPUNGDATE: - TEST START DATE: 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE: 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 U c HUMIDITY : 47%
BOREHOLE NO. : LD-5/ TP- 01 DEPTH (m): 2.00 SAMPLENo.: 5-5
Description of sample: Brown, well-greded GRAVEL with sand. Preparation method: Dry

LIQUID UMIT
RUN No. I 2 3 'I 5
DISH No. --_. ....... ---.-----.-.--~~-.
-_.. _... _­ -.~- ..-----.-.­ --.~~~------

wr. OF WET SOIL + CAN gU15.

wr. OF DRY SOIL + o\N gms. . _... _ - - - - ­


WI. Of MOISTURE )\1115.

WLOFCAN fllns.
Wf. OF DRY SOIL gms.
MOISTURE CONTENT I'lil

NO. Of BLOWS

I LL:
C I
2<: I ­
- Plastic limit cannot be
u
0 =
=
PL: NP

2
~

=
=
determined/NON PLASTIC
~'" = PI :

Number of Blows

PLASTIC LIMIT NATURAL


RUN No. 1 2 3 <I WA11iR CONT.
DISH No.
WT. OF WET SOIL + CAN gm..'i.
wr. OF DRY SOIL + CAN gnl'i.
WI'. OF MOISTURE !\ll1s.
WLOFCAN gill.,).

WI'. OF DRY SOIL gill,).

MOISTURE CONrENf t'l:l


I'LASTIC LIMIT
AVE PLASTIC LIMIT

-----" ..... _._.-----_ .. _._.­ ---------~ .... -.-.-.~-------- --------------_._­ .. _--­ -­ -- ----­ - - ---- ----­ --------­ - ---- - - - - - - - - - - - - - - - - - - ­ ------- .. -~------------------

TESTED BY: _._...._-­ ..


Ahmed
--~----- --""--------_.. ­
CHECKED BY / REVIEWED BY: _ .__ ____ ~~':.~I.Asnl ~blJ,,:~. .... ___ .___

APPROVED BY:
---------~---.-.----------- .------~

(I.nb.lnchnrge)
Copyright oflhis dorulllPnt is oWlwd hy HCF, it I1My not lv IvproduCl'd PXfPpt with prior wriltl'IlIWflllission from thpcomp,lllY"

RGF·jED-PIIY·SOII.·02·o:l
20.01.2020
·.En'.. . C.A_;;..A_;_/(j'~·~At./0.,J'~
f . An. Co"'''''",,
"-~-:si~--,~::"-:,~,:;z;-1
f§:d. [-~f:r-II U".""'I."""';ly~"tCe,_6.000.<X><>3." .J"~""" ~ ·.r;i]·.)~· "'J_~'''''' r­
Cl't "11:Jl0100ZD\l

L_c .......•=>£d RIYADH G€OTECHNIOUe & FOUN.DATIONS CO.


- -

.j..
- \.,,,",~....:O..!.<....>'"

p.o. !lox 9'182, jeddah 21413, KSA Telephono: +966 (12) 6715621 /6176860 Fax: +966 (12) 6715426 Email: rgf-wp!Yerigeosciences.colll

Location: GiHnatha St. lledT Arhaeell St. intersectioll, rvlushrefclh District, Jedclc1h

TEST REPORT
ATTERBERG LIMIT DETERMINATION
AsTM D 4318-17el
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECf: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/ 1P- 02 REPORT DATE: 29.01.2022
SAMPLING DATE: - TEST START DATE: 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE: 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 Uc HUMIDITY: 47%
BOREHOLE NO. : LD-5/ TP-02 DEPTH (m): 0.60 SAMPLENo.: B-1
Description of sample: Brown, well-greded SAND with gravel. Preparation method: Dry

LIQUID LIMIT
RUN No. 1 2 3 4 5
DIS]-] No.
WI'. 01' WET SOIL + CAN gnls.
WI. OF DRY SOIL + CAN gills.
wr. OF MOISTURE gillS.
WI'.OI'CAN gnLc).
W 1'. OF DRY SOIL gnlS.
MOISTURE CONTENT uII)
NO. OF BLOWS

..... =
=
LL:
c
.....
Cl.I
c
0
=
-,---­
I
Plastic limit cannot be PL: NP
u
....
.2!
I
I determined/NON PLASTIC
I
'" PI :
$: I

Number of Blows

PLASTIC LIMIT NATURAL


RUN No. 1 2 3 4 WATERCONT.
DISI-INo.
W r. 01' WET SOIL + CAN RillS.
W1'. OF DRY SOIL + CAN gills.
WI'. 01' MOISTURE gills. ~ ..... ~

WLOFC,\N gins.
WT. OF DRY SOIL gills.
MOISTURE CONlloNT I~J

PLASTIC I.IMIT
AVE PLASTIC LIMIT

-------------- ...... ~-.... --- ­ -----------------_._----_._._._._----------­ -------------------------­ - -,---._'--. __ .. _-_ ...... _------_ .._ . _ - - - - - - - - - - - - - - - - - _ . _ - _ ..

TESTED BY: Ahmed CI IECKED BY I REVIEWED BY: ________ ~St~~~~~10_b~'lS___. ___


-­ - . _ - , - - - - - - - - - - ----­

APPROVED BY:
-----_._------------------­ __
.. .. .. _----­ -­

(L~b. Inch~rge)

Copyright of this docullH'nl is O\\'Ill'd by HGF, it IJM~' noll1\.' J'l'prOdU(ctll'xCl'pl with prior writtell permission frolll Ih(' romjlclny.

I{CF-jFD-I'IIY-SOII.-02·03
20.01.2020
rq f..ERlc__ __==,~
~] ~
-..,... I
t.::A_:,A.,.;:.-(J,,·~~t../t;?J/~
ct\ HH01002~ . .
U.tt~dt:~.COmpBnylc:::;.up~B,t'Kltl.t$)$.t~
..1 RIYADH GeOTECHNlaUE & FOUNDATtoNS co.
,.,.~~'\~ ...'.~ ........
Jl,t... J,~'~ J~~~,fJ~"~~.J~,,"",.I)I$'r'"

p.o, Box 9182, jeddoh 21413,!<SA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (2) 6715426 Email: rgf-lVliiiJerigeoscienres,corn

Location: Gnrnatha St. near Ari')deen SL intersection, I\'ushreftlh Dishict, Jedd'lh

TEST REPORT
AITERBERG LIMIT DETERMINATION
ASTM D 4318-17el
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/TP- 02 REPORT DATE: 29.01.2022
SAMPLING DATE: - TEST START DATE: 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE: 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 Uc HUMIDITY: 47%
BOREHOLE NO. : LD-5/ TP- 02 DEPTH(m): 1.50 SAMPLENo.: 5-4
Description of sample: Brown, well-graded SAND with grevel. Preparation method: Dry

LIQUID LIMIT
RUN No, 1 2 3 4 5
Dl:'aINo.
WI. OF WET SOIL + CAN gms.
Wf, OF DRY SOIL + CAN gms,
wr. OF MOISTURE gms.
WI. OF CAN gms,
WT. OF DRY SOIL gn,;.
M01STURE CONTENT I'll)
NO, OF BtOWS

....c: I LL: -
I

~
c:
0 =
=
Plastic limit cannot be PL: NP
(.)

~
.... =
= determined/NON PLASTIC
~
n:I
PI :
s:

Number of Blows

PLASTIC LIMIT NATURAL


RUN No, 1 2 3 <] WATERCONJ'.
DlSHNo.
WI'. OF WET SOIL + CAN p,ms,
WT. OF DRY SOIL + CAN gn1s,
\'fl'. OF MOISTURE gnt<1.
W!',OFCAN 1;Il1S.
WI'. OF DRY SOIL gUl'>;.

MOISTURE CONTENT I'll.


PLASTIC LIMIT
AVE PLASTICI.IMIT

-..... -~.-.----~--~.-~------ - -. ----. -----.-----.. -----~---~~---

TESTED BY: Ahmed CHECKED BY / REVIEWED BY: Sycd Asad Abbas

APPROVED BY:
---------------­ -­ ------.---.-~-------

(Lab, Incharge)
Copyright of! 11[5 donrnwnl is oWlwd by HGF, it II"'), not h,' n,'pt olitlty'd pxCtlpt with prior wfiH('n !'xymission from til(' rompllfiy.

I(CF·)F1)'I'IW·5ClIL 02,03
20.0L2020
rq f [__ _ ~
I
'.""~"=__ 'C-L:..-t....;:,..-UIJJ~~v0~'-~
If
Q~) ~-I.It(A'II ~ 1 C"''''016''''''~
/. --. -
-.::.r-::..
"""HA''''~
ERI. . .!041~'" LioJ/lndtWbU"JyCQrrpOl"1y/CaplbdO,(}()O,QO()S.I"t J"'.)~~'" .JU\....r'-.)J~l"~..".1..,.)l~...z...uu:-~
. . ~An..;,.;;,==.:c:.:"::.:"'::""=n\r::....J=.. w=. ._=....=....=....=..,..'-~~~,~J RlVA.DH GEOTECHNIOUe &. FOUNDATIONS CO ..

r.o. Box 9]82, Jeddoh 21413,!<SA Telephone: +966 (12) 6715621 / 6176860 Fox: +966 (12) 6715426 Elllail: rgf-wp@erigeosciences.colll

Loccltion: GarnathC'l St. near Arbaeen St. interseclion, Mushrefclh District, Jecldah

TEST REPORT
ATIERBERG LIMIT DETERMINATION
ASTM D 4318-17e1
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5 / TP- 03 REPORT DATE: 29.01.2022
SAMPLING DATE: - TEST START DATE: 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE: 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 Uc HUMIDITY: 47%
BOREHOLE NO. : LD-5/ TP- 03 DEPTH (m): 0.60 SAMPLENo.: B-1
Description of sample: Brown, well-greded SAND with silt & gravel. Preparation method: Dry

LIQUID LIMIT
RUN No. 1 2 3 4 5
UISHNo.
WI'. OF WET SOIL + CAN gnls.
WI. OF DRY SOIL + CAN gills.
WI'. OF MOISTURE gms.
Wr.OFCAN gUlS.

WI. OF DRY SOIL g1l1s.


MOISTURE CONTENT lYE)

NO. OF BLOWS

..... =
=
LL: -
c:
.2l
c: =
= Plastic limit cannot be
u
0
....
=
= determined/NON PLASTIC
PL: NP

.2l = -
=====
III
PI :
s:

Number of Blows

PLASTIC LIMIT NATURAL


RUN No. 1 2 3 <1 WIITERCONT.
DISH No.
WI'. OF WET SOIL + CIIN gills.
WI'. OF DRY SOIL + CIIN gills.
WI'. or MOISTURE gil).."

WI'. OF CAN gm.s.


WI'. OF DRY SOl L glll.<;.
uAI
MOISTURE CONTENr
PLIISTIC LIMIT
1\VE PLIISTIC LIMIT

------""-_ ... _"-"---_. __..--------------_._-_... _._"--------.--~~----------- ----- .-.. ---------.----------.---~.--. -------------.---~---.--

TESTED BY: Ahmed CHECKED BY/REVIEWED BY: __________ ?yc.:I...~l"_Abb_'lS_________


.--.----------------~-------

APPROVED BY:
-_.--_.._--_.._--_._------------_.._-­
(Lab.lllcharge)
Cop~'righl of this dOl"ullwnt is oWIlPd by HCF, it m.1Y nol bt' l'l'J11 oduced p:'\l"l'pl wilh pJior wrilll'll l1l'rmissioll from IIw rOlllp,lll,\'.

RGF-JED·PIIY-50IL-02-03
20.01.2020
~~-~--~==.'-." 1.::...(..;;•...1.....=.,-0 IjI'.:.~
·2.d ~ 4:?~ I ~
tqf~m,~ f ~'" 1.:'
. :iZ)
1,1<Ji ~ C;\ '\::n.Olae2n~
""""""._"""",=,1""""",&.000.00(>9."
i
.:==;';~:;;,J RIYADH GEOTECHNlaUE & FOUNDATIONS CO.
",......~ ..-'i' h,~ 4,;-~" =,.­
.
J,,> J'"
,.\.~""!'\.,!A.,:,, V"

P.o. Box 9182, Jeddilh 21413, KSA Telephone: +966 (12) 6715621 /6176860 fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Lociltion: Garn(lthil St. near Arbaeen St. intersectioJ1~ ivlushrefah District Jedd<lh

TEST REPORT
ATIERBERG LIMIT DETERMINATION
ASTM D 4318-17el
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5 / lP-03 REPORT DATE: 29.01.2022
SAMPLING DATE: - TEST START DATE: 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE : 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 Uc HUMIDITY: 47%
BOREHOLE NO. : LD-5/ TP- 03 DEPTH (m): 2.00 SAMPLENo.: 5-5
Description of sample: Brown, well-graded SAND with silt & grevel. Preparation method: DIy

LIQUID LIMIT
RUN No. 1 2 3 4 5
DISH No.
VIT. OF WET SOIL + CAN g111S.

VIT. OF DRY SOIL + CAN roms.


Wr. OF MOISTURE gms.
wr. OF CAN p;ms,
Wr. OF DRY SOIL f,111S.

MOISTURE CONTENT [lin


NO. OF BLOWS

....C =
=
LL: -
....c
Q)

0
=
= Plastic limit cannot be PL: NP
u ~
...
....
Q) =
r-­ determined/NON PLASTIC
PI :
5:'"
I -
f--­

Number of Blows

PLASTl C LIMIT NATURAL


RUN No. 1 2 3 4 WATER CONT.
DISI-INo.
WI'. OF WET SOIL + CAN vms.
WI'. OF DRY SOIL + CAN gm.<. i,
Wr. OF MOISTURE ~
vVT.OF O\N gills.
Wr. OF DRY SOIL glll.s. .
MOISTURE CONTENT n;;,
PLASTIC LIMIT
I\vE PLASTIC LIMIT

---_.. -----~----.-.---~-------.-- ~ .... ----------.-.-.-~.-.-------.-.----- ... -- .. --...-- .. __ .. __.... _----_ .... _... _... --------_ ..._---------._.---_.. ,---" .. _.._-----------­ ---­

TESTED BY: ._....._ - - - -I\hmcd


- - _ .... _­ .-----­
CHECKED BY /REVIEWED BY: ___~_~c:d i\sad!lb_bi~_ _~_
APPROVED BY:
- - - - - - - - - - -.. _.- ........-_ .. ­ . _ - - - - - - - ------_.

(Lab. Illcharge)
Copyright of this dOClIlllt'1l1 is oWllPd b.v RCF, illlld~' not lx' I"q1t"()dUn'til'Xl"('pl with prior wriltell Iwnnissioll frolllihe (Olllpllily.

!(GF-JI·D-PIIY-5011.-01-o:l
10.01.2020
V I" ~ -Y if0..) t~ A.../
f ~I;III~"".~ [~
t:.A....: ..-l......::....""(j _.... __ _ -~i,= ~.
tr\ lOllYHlU2tl~ "\<~~"'>;'t"' • .:!..V""
t.i...~tudt.~'ty~;I'l)'/c.upnmG.uoo.oo()~J.I{ Jl,iJ":".w-" jU-~,J! b.~ :Y.1,r-:.< ~U U':~

RIYADH GEO'TECHNIQUE & FOUNDATfON~ CO.

P,O, !lox 9182, Jeddah 2"1413, K5A Telephone: +966 (12) 67156'21 I 6"176860 Fax: +966 (12) 6715126 Email: rgf-Ivp@erigeosciences,COI11
Location; Garniith.:lSt. HPar Arh:lecnSL intersection.. ivlushrefah District Jeddl:lh

TEST REPORT
AITERBERG LIMIT DETERMINATION
AS1M D 4318-17el
CLIENT : NEOM Company PROJECT NO. : 21J'J037
PROJECT: NEOM Desalination Plant to Guyed Transmission System
SAMPLE SOURCE: LD-S./TP - 04 REPORT DATE: 29,01.2022
SAMPUNG DATE: TEST START DATE: 18.01.2022
SAMPLE RECEIVING DATE: _ ..... - TEST FINISH DATE: 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 U c HUMIDITY: 47%
BOREHOLE NO. : LD-5/ TP- 04 DEPTH (m): 0.60
...­.....
SAMPLENo.: B-1
Description of sample: Brown, iVeU-!;!,CuCU GRAVEL with sand. Preparation method: Dry

LIQUID LIMIT
RUN No, 1 2 3 4 5
DISH No,
WI'. OF WET SOIL + CAN gIns,
WI'. OF DRY SOIL + CAN gillS.

Wl'. OF MOISTURE gJ11S.

i wr.OFCAN gms,
I Wr,OFDRYSOIL gIns,
II MOISTURE CONTIO~ 'Vi)
NO. OF BLOWS

...c: I LL: -
I--­
sc: -~ Plastic limit cannot be
0
() =
= PL: NP

s =
=
determined/NON PLASTIC
-
<II
:;: = ..
PI :

Number of Blows

PLASTIC LIMIT NATURAL


HUN No. 1 2 3 'I WATEI, CONT.
DISH No.
WI'. OF WET SOIL + CAN gIllS.
: WI'. OF D1,Y SOIL + O\N gms.
WI'. OF MOISTURE grrl<;.
Wr. OF CAN gms.
WI'. OF DRY SOIL gUts.
MOISTURE CONTENT ' l'1I
PLASTIC l.IMIT
AVE P]./\STICLIMIT

TESTEDny: Ahmed CHECKED BY/ HEVIEWED ny; .._.__ ,~(~d_ Asnd Abbas_ _. __

APl'nOVEDBY:

(Lab.lllcha,w:)
Copyright or this d(KUmrllt is 0\\'11('(1 hy RGL H 11M;' not lx- rt'pmducpd (>xn~p' with prior wriU('1l I'l(>nnis.<;ioll (rom lh('fOmprlIlY.

I,Cl'-jED-1'1IY-SOIlA)2-03
2{),01.2020
tC f ~ .

. An
ERI . ...
. ="'",",,, L=__
r------'"""~"'"~, t.:A..;;-l.;...----U/~·.~~ t./~~I~
; [, 'Cb
I:
l§~~ L\~ UmJ'"dlJa"'I.1yC<>m""ny":"p"",~,?",,,IlOO$." J,,~p.'J"'''"''''~_'hP';'''h'';>
~ Ch'1010~6aWe;

J';t":::.j RIYADH GEOTECHNIOUE 8. FOUNDATIONS CO.


\'\'\"'I"I';,It.~"::'V'"

p,o. Box 9182, jeddah 214]3, KSA Telephone: +966 (12) 67]562] / 6·176860 Fax: +966 (12) 6715426 Email: rgf-IVp@€rigeosciences.com
Location: Garnalha St. near Arbaeen St. intersection, lvlushrefah District, Jeddah

TEST REPORT
ATIERBERG LIMIT DETERMINATION
ASTM D 4318-17el
CLIENT : NEOM Company PRO}ECf NO. : 21J4037
PRO}ECf: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/ TP- 04 REPORT DATE: 29,01.2022
SAMPUNG DATE: - TEST START DATE: 18.01.2022
SAMPLE RECEIVING DATE: - TEST FINISH DATE: 20.12.2021
SAMPLED BY: - ENV. CONDITION TEMP. : 24 Uc HUMIDITY: 47%
_._--_. __ ._...__..-------­ --­ ._-_._--­
BOREHOLE NO. : LD-5/ TP- 04 DEPTH (m): 150 SAMPLENo.: S-4
Description of sample: Brown, well-graded GRAVEL with silt & sand. Preparation method: Dry

UQUID UMIT
RUN No. 1 2 3 4 5
DISI-INo. ULP M,02 LVL
WI'. OF WET SOIL + CAN gnlS. 30,22 30.00 29,97
WT, OF DRY SOIL + CAN gms. 76.90 26.36 26.33
WT, OF MOISTURE gills. 3,32 3.64 3,64
wr,OFCAN gillS. 14,33 13.45 14,20
WT. OF DRY SOIL gills. 12.57 12.91 12,13
MOISTURE CONTENT l'li, 26.41 28.20 30.01
NO. OF BLOWS j4 L4 I::>

31

30 LL: 28
....c:
~ 29
0 PL: 21
u •
... 28

*5: 27
PI : 7

26
10 Number of Blows 100

PLASTI C LIMIT NATURAL


RUN No. 1 2 3 <1 WATERCONT.
DISJ-INo, ELV SRL
WT. OF WET SOIL + CAN gills. 21.51 21.27
wr. OF DRY SOIL + CAN gms. 20.31 20.07
wr. OF MOISTURE gms. 1.20 1.20
~CAN gms. 14.55 14.27
Wr. OF DRY SOIL gills. 5.76 5.80
-- f----------
MOISTURE CONTENT I~I 20.83 20.69
PLASTIC LIMIT 20,76
AVE PLASTIC LIMIT L1

---~~-----.-----~--- .. -~---~---.-- . -----­ ------- ..._------­ -------------~-.--.-

------_._-----------------------­ ---_... ­ .....----_._--_.--.-_._--.. -. -­ .-.-." ----------­ - ...... ------------------_.. _ - - - - - ­

TESTED BY: Ahmed CHECKED BY /HEVIEWED BY: ____ ~)'."~!_0~~d!lbbns ~ _____


-_...._...._-­ .. _---------------­
APPHOVED BY:
------ --------.---"-­ .__ ..... _----_ ... _ - - - ­

(Lnb, Incharge)
Copyright of this dOClIll1l'nt is OWIll'd hy Rcr, illll.l~' not lX' rt'produC{'d (';'\.Cl'pl with prior wriUPIl ppnnission from Ill(' (OlllllclIlY.

r~GF-JI:D-PIW-50fl,-D2-03
20.01.2020
CL:-L:-'(I.'J).~-dif~."JI~
f'qf~."""" 'Cf\ lO1'01aam'a _ __
tJ.mfMdL~~JCiQ:)lU.da.ot.)(j.>ooos"t::t

RIYADH GEOTECHNIOUe & FOUNDATIONS CO.


_ ""'~~"'fA • ..::i<..>*
J\t",~~" Jlll...r4~}'bj~ ~.#J-'';';'~ lS"".:­

P.O. Bo, 9182, jeddah 21413, KSA Telephone: +966 (12) 6715621/6176860 P.lX: +966 (12) 671&126 Email: rgf-wP'ID'rigeoscien.:es.rom

Location: Gam a thil St, n(;'(1r Arbaeen St intersection, rvlushre(ah District, ]eddah

TEST REPORT
ATTERBERC LIMIT DETERMINATION
AS'IM D 4318-17el
CLIENT : NEOM Company ........
PRO]ECI NO. ; 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission Syst~
SAMPLE SOURCE: LD-S/ TP-OS REPORT DATE: 29.01.2022
SAMPLING DATE; TEST 8TART DATE: 18.01.2022
SAMPLE RECEIVING DATE: TESTFINl8H DATE: 20.01.2022
SAMPLED BY: - ENV. CONDITION TEMP. : 24.0 tiC HUMIDITY: 47%
BOREHOLE NO. : LD-S/TP- OS DEPTH (m): 1.20 SAMI'LE No. ; B-2
Description of sample: Brown, silty SAND with gravel. Preparation method: Dry

LIOUID LIMIT
Rill," Nu. 1 2 J 4 G
DISH No.
• WT. OF WET SOIL + CAN gms. -----­ ....... ~

WT. OF DRY SOIL"' CAN gll15.


wr. OF MOISTURE gillS.

wr.OFCAN gUl.4).

WI'. OF DRY SOIL gnlS.


MOISTURE CONTIiNI' n;.,
NO. OF TlI.0WS

LL:
....s:: t======
'======.
J!ls:: =
= Plastic limit cannot be PL: NP
0
0
.... =
= determined/NON PLASTIC
~ r-­ PI : -
s: I

Number of Blows

PLASTIC LIMIT NATUR,\L


RUN No. 1 2 3 'I WIITERCONT.
DISH No.
wr. OF WET SOIL + CIIN gIllS.
WI' OF DRY SOIL + CIIN gnlS.
WI'. OF MOISTURE p,nlS.
Wr. OrCIlN gn'lt;.
WI'. OF DRY SOli. glnS.
MOISruRE CONTENT 'Y;J
PI.IISTIC LlMIT
IIVE PLIIS,]]C LlM]T

TESTED BY: Ahmed CHECKED BY / REVIEWED BY: Syed J\S<ld AblJ<lS


-----~ ." ---- .. ----­

APPROVED BY:
----_._­
(Lab. Jllchmge)
Copyrighl of this donmwnt is owned hy HGF, it Illll;" nol ("l\' frprodtKt'd ('xn'pl with prior written pf'rmis.<;ion from tilt' romp.lIlY.

RGF-JED·PI·IY·S(111.·1)2·I).j
2().OI.2020
" f 1.:..A...; ..,A_;;;...,..... OI,~- --1! ~0,..JI~A---
- -
(C
~ ...... ERI
~
en ~010~(l6Z~\J.
~~ ~-
J~/"""" <h".r',t"'~""'J-.~ ""~"
t...,."""t.."""'yC--,yl ""'"...." •. OOO,OO<.l S.ll
AtYADH GEOTECHNlaUe .& FOUNDATIONS CO.
\""',,\'A"~~-<"y

r.o. Box 9'182, Jeddah 21413, KSA Telephone: +966 fl2) 6715621 / 6176860 Fa" +966 ('12) 6715426 Email: rgf·wpIDerigeoscienccs.com
Locution: Ganmtha SI. near Arb.:leen 51. intersection~ ~vlushrefah District, Jeddah

TEST REPORT
ATTERBERG LIMIT DETERMINATION
ASTM D4318-17el
CLIENT NEOM PROJECl NO. : 21}4037
PROJECT : NEOM Transmission
SAMPLE SOURCE: REPORT DATE: 29.01.2022
SAMPLING DATE: TEST START DATE: 18,01.2022
SAMPLE RECEIVING DATE: TEST FINISH DATE: 20.01.2022
SAMPLED BY: ENV. CONDITION TEMP. : 24.0 Uc HUMIDITY: 47%
BOREHOLE NO. : LD-5 TP - 05 DEPTH (m) : 2.00 SAMPLE No. : 5 -5
Description of sample: Brown, well-graded GRAVEL with sand. Preparation method: Dry

LIQUID LIMIT
2 3 <1 5

WI'. OF DRY SOIL


MOISTURE CONTENT ';It,
ND.DFBLDWS

LL:
1:
~o Plastic limit cannot be PL: NP
u
determined/NON PLASTIC
I PI :

Number of Blows

PLASTIC LIMIT
RUN No. 2 :l
DISH No.
wr. DF WET SOIL .. CAN :1111.<;.

gIll,).

gms.
gm.'. i.
gnl<).
{lA,

TESTEDUY: Ahmed CHECKED BY/REVIEWED BY: .S)'ed!,~~~Abb~.

AI'I'HOVED BY:
(Lab. Incharge)
CopYfi~~ht of this donll1lt'lll is oWlwd hy HGF, H may nollx" ff·prothKf·tI (·x.((·pt with prior wriHt'n Ix-"nnission from tlll-'(omp(m~.'_

RGF·)ElH'IIY·50IlA)2·03
20012020
AnERt
P.O. Box 302"11r Y~nbu AlwSlnalY;'Jt'i. MY,AS 51.000. KSA Ttl:lt:phone! ,t966 t:t4) 32SO£.l92 J 3250993 fax:- -t966 {14} 3250946 Email: rgf.yanbu<iPct!gcoKlenccs.com
LOCidtlotU J\I-Naw.:lmmd Stt~e~ Hai A'-M~han ()lstrid~ R.C.~ Yanbu At-Slnatyah

Neom desalination plant to !Sayal transmisssion system. (LD-5) DATE SAMPLED:


------1
SAMPLE SOURCE: TP­ 06 DEPTH: O.60m DATE RECEIVED: 06.01.2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt 8: gravel. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 24.6 DC HUMIDITY: 42% ----­
STARTED DATE: 19.01.2022 DATE COMPLETED: 21.01.2022
L I QUI D LIMIT
RUN NUMBER 2 3 4 5

NON-PLASTIC
WT DISH
gms
%

..... LL
r::
.er::
o
U
.... PL
.e
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

M.lrfan
Tested By: _ _ _ _ _ __ Checked By/Reviewed By: Saeed Akhtar
-------­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY -SOIL-02-04


01-08-2021 Copy Rights Reserved By RGF
GL:-l.;../UI,~~}!J'V.)'~
- ... .....
AnERI RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O. Box 30271, Y.:)tlhu AI-Sin:,+ytlh, M'IAS 5:1000,. KSA Tet(!photl~! -.9'66 (2.4) 3250992/3250993 fAl(: -"966 (lA) 3250946 £mali! rgt",Y.3nbu«De-r1eeosc}f!"tlces.totT\
lQCuUOn! AI-N<lwarH'lf\d Stroe~ Hat AI-Mahz.n OistrictA R<C., Y<tnbU At-Sltudyah

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gaya/ transmisssion system. (LD-5) DATE SAMPLED: 01.01.2022
SAMPLE SOURCE: TP­ 06 DEPTH: 1.50m DATE RECEIVED: 06.01.2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: 5-5
o
ENVT.COND.TEMP.: 24.6 C HUMIDITY: 42%
STARTED DATE: 19/0112022 DATE COMPLETED: 21/01/2022

L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WIT SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %

....I:: LL
.lBI::
o
U
... PL
.lBtil
~
Number of Blows
PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER z 3 CONTENT
DISH No.
WT WIT SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
A VE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------ -------------
Approved by: Awais Nisar Yasin

RGF-YAN-PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
·CA•.;_l..;../U I~ =;: ~& t/ V.) I ~
An Eftl Company RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Box :302-11. ¥anhu AJ_slnaiY3h. MVAS 5:1000~ KSA "Tcl~phone~ ·t956 (14) 325099-2/3250993 Email! tBt~yahbu@~tl6(:'osdenc:e!i:.(OJTl
l(>CJt1on; "'t-NaWtli:und st:r-'Get~ H",; Al·M;,h:an Olstrlct~ AI-SlnoJ'Iah

PROJECT: Neom desalination plant to sayal transmisssion system.(LD-5) DATE SAMPLED: 30/12/2022
SAMPLE SOURCE: TP­ 07 DEPTH: 1.20m DATE RECEIVED: 01.06.2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt ft gravel. SAMPLE NO.: B-2
ENVT.COND.TEMP.: 23.9 DC HUMIDITY: 42% ----­
STARTED DATE: 19/0112022 DATE COMPLETED: 21/0112022

L I QUI D LIMIT
RUN NUMBER 1 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
gms
SOIL gms
%
NO. OF BLOWS

..... LL
c:
.e
c:
o
<.J
... PL
.e
I'll
~
Number of Blows
PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ -----
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-SOll-OZ-04
01-08-2021 Copy Rights Reserved By RGF
CL:-L;../ul,~Ajv.)l~
.. .,... ..
An
----~
EAI Company
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Hox 30211, Y:lntn; Ak<;lnaly,:Ifl. MYAS 51000~ KSA Tclcphone~ ,.. 966 {l4} 3250'J92 J 3250993 r.<:lX! "t966 (14) 3.2!:.O9.46 Ern:tl~: rSf~ynnbu@crlscosdencc:s.com
loc.<:Itforu ",t-N3W3nimd Str~t. H:li AI-Mnh~n 01strlct.. H.C... Y.<:Iobu A.I·.sfnalyah

PROJECT: Neoro desalination plant to gayal transroisssion system. (LD-5) DATE SAMPLED:
-----1
SAMPLE SOURCE: TP­ 07 DEPTH: 2.50m DATE RECEIVED: 01.06.2022
SAMPLE DESCRIPTION: Greyish Brown poorly graded SAND with silt a gravel. SAMPLE NO.: S-6
0
ENYT.COND.TEMP.: 23.9 C HUMIDITY: 42%
STARTED DATE: 19/01/2022 DATE COMPLETED: 21/01/2022

L I QUID LIM I T
RUN NUMBER 2 3 4 5
DISH
WT WET SOil + DISH gms
WT DRY SOIL + DISH gms
gms
NON-PLASTIC
WT WATER
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

..... Ll
!:
.f!:!
c
o
u
... PL
.....
<ll
ro
:l:
Number of Blows N-P
PI

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WT WATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ ----------------­
Approved by: Awais Nisar Yasin

RGF-YAN -PHY-SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
P.O. flox 30271, Yanbu AI.SlnaIY~h.. MYAS 51000~ KSA T~I~phot1~= ·t966 (14) 32~tYJo92/32509!}3 fax: ·.9&6 (14J 325091\6 EmOlU! rB"r-yat1bu@~rlB"~o5d~nces.coM
location: AI-Nawanand Strcot, Hai At-Mahan District. H.C.• Y.mbu AI·Slndlyah

PROJECT: Neom desalination plant to gayal transmisssion system.(LD-5) DATE SAMPLED: 02.01.2022
SAMPLE SOURCE: TP­ 08 DEPTH: O.60m DATE RECEIVED: 06.01.2022
SAMPLE DESCRIPTION: Brown Silty SAND with gravel. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 24.6 DC HUMIDITY: 42%
STARTED DATE: 19.01.2022 DATE COMPLETED: 21.01.2022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WT WATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

....c LL
.l!l
c
o
U
"­ PL
....OJC1I
5:
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOl L gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

M.lrfan
Tested By: _ _ _ _ _ __ Checked By/Reviewed By: Saeed Akhtar
----------
Approved by: Awais Nisar Yasin

RGF·YAN·PHY ·SOIL·02-0~
01·08·2021 Copy Rights Reserved By RGF
l.:,L:-l.:,./U I!J ~~ if L:?~ I~
AnERI RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Box 302'1l~ Y.;mbu Al~stn..ly:ih,. M'IAS 51000, KSA Telephone: ·t966 (.1.4) 3250'''>92/32!)09~3 fa:l«:: '~9S6 (14) 3250946 Email! r6t~y.3t'lbu@etlBcosdeJ:H;4"!!f..r;()",
loc.l.tlon: AI-Nawanand Strcat, Hai AI~Mahan OJstrlct~ B,CA Yanbu At·Slo;)'I'Iah

Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED:


----­
SOURCE: TP­ 08 DEPTH: 1.S0m DATE RECEIVED: 06.01.2022
DESCRIPTION: Brown well graded SAND with Silt ft gravel. SAMPLE NO.: S-4
ENVT.COND.TEMP.: 24.6 DC HUMIDITY: 42% ----­
STARTED DATE: 19/0112022 DATE COMPLETED: 21/0112022

L I QUI D LIMIT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH
NON-PLASTIC
WTWATER

gms
%
NO. OF BLOWS

.....I: LL
$
I:
o
U
... PL
J!l
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


------- ---------
Approved by: Awais Nisar Yasin

RGF -YAN-PHY-50IL-OZ-04
01-08-2021 Copy Rights Reserved By RGF
GL:A...:../LJI,:.;: ..A7~ ~~.) I ~
An ERI Company RIYADH GEOTECHNIQUE & FOUNDATIONS CD.
p.o. Box 302·,1. Y.1obu At-stnalyah. MVAS &1000, KSA Telephoru:~~ ,t966 (l.4) 3250"):92/3:250993 Fa)l~ '.%6 (14) 325.09.0.16 Em.. n! tgf-y.1Xtbu@erlgco!ic}ences.com
loeatlOrl\ Ar~Nd.w~mmd Stteat~ Hal AI~Mahan Dlstri<l. R.C•• Yanbu AI-Slnaly,:ah

PROJECT: Neom desalination plant to gayal transmisssion system.{LD-5) DATE SAMPLED:


SAMPLE SOURCE: TP­ 09 DEPTH: O.60m DATE RECEIVED:
-22.01.2022
----­
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt ft gravel. SAMPLE NO.: B-1
ENVT.COND.TEMP.: 24.6 C
o HUMIDITY: 42%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM I T
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
MO. OF BLOWS

..., LL
c
.ac
o
U
.... PL
.a
~
Number of Blows PI N-P

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH
WT DRY SOIL + DISH gms
WTWAT£R gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----­ ----------­
Approved by: Awais Nisar Yasin

RGF -YAN-PHY·SOIL-OZ-04
01-08-2021 Copy Rights Reserved By RGF
"""--"---==Cl:.-L;../ UI, ~~ J:' '-:?.) I ~
AnEIU RIYADH GEOTECHNIQUE & fOUNDATIONS CO.
P.O. Box 302', I, Vanbu AI~S!n~Il';.'Ih~ MYAS 5.1000. KSA relephon.e: -t!)&6 {-'iil) 3250992 /3250993 fd"'! l-9S6 (14) 3250946 Emalll rgt~y ..mbtJ@ede~05dent:t'~_com
I,,('tc()tiom AI·N~wannnd Str-e~t~ H~l )\1~Milhtm DT£ttict~ R.C.~ )'anbu AI-Sioalyah

PROJECT: Neom desalination plant to gayal transmisssion system.(LD-5) DATE SAMPLED:


----­
SAMPLE SOURCE: TP­ 09 DEPTH: 2.00m DATE RECEIVED:
SAMPLE DESCRIPTION: Greyish Brown well graded GRAVEL with Sand. SAMPLE NO.: S-6
ENVT.COND.TEMP.: 24.6°C HUMIDITY: 42%
STARTED DATE: 23.01.2022 DATE COMPLETED: 25.01.2022

L I QUI D LIM IT
RUN NUMBER 2 3 4 5
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
NON-PLASTIC
WTWATER gms
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
NO. OF BLOWS

..... LL
t:
.....Q)
t:
o
U
!o­ PL
.....
Q)

I'll
~
Number of Blows N-P
PI

NATURAL
PLASTIC LIMIT
WATER
RUN NUMBER 2 3 4 CONTENT
DISH No.
WT WET SOIL + DISH gms
WT DRY SOIL + DISH gms
WTWATER gms
NON-PLASTIC
WT DISH gms
WT DRY SOIL gms
MOISTURE CONTENT %
PLASTIC LIMIT
AVE. PLASTIC LIMIT

Tested By: M.lrfan Checked By/Reviewed By: Saeed Akhtar


-----~ -------­
Approved by: Awais Nisar Yasin

RGF-YAN-PHY -SOIL-02-04
01-08-2021 Copy Rights Reserved By RGF
rqf~~ CR 'O_1£n("~
~ rJ" 0..) r::J::'.,.~
t.:...-l.:.A..,.;....... (J I, ;:,:it •;:;;
Um\'!Xl&i(>I)J!.ily_CQf·fl;~JC~~!~H>W.OOi)SJt
- -
.)\f,;;;~" ,)\1.."...,.",)J 4.1)# lJ:J,....,....~J
~
l'\'\"''\.''A~~ .....__
lS'" ~
RiYADH GEOTecHNIQUe &. FOUNDATIONS CO.

p.o. \lox 9182, jeddah 21413, KSA Telephone: +966 (12) 6715621/6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garnatha 51. near ArbaeenSt. intersection, Mushrefah District, jetltlah

TEST REPORT
MODIFIED PROCTOR TEST
ASTM 0 1557-12 (METHOD-C)
CLIENT : NEOM Company PROJECT NO. :
-21J4037
-....- ­
PROJECT: NEOM Desaii~ation pi;;;:~t to Gayal Transmission System
SAMPLE SOURCE: LD-5 / TP - 01 REPORT DATE : 29.01.2022
SAMPLING DATE: ..................-
-
-....
TEST START DATE: 20.01.2022
SAMPLED BY : R.G.F TEST FINISH DATE: _.. ~~·V··.
21.01.2022
BH/TPNo. : LD-5 I T1' - 01 SAMPLE No. : B 1 DEPTH(m): 0.60

MOULD No. : IH-03 Wt. of Mould (gIll) : 5112 Voluille of Mould (ee) : 2123

TRIAL No. 1 2 3 4 5 ~

WATER ADDED % 2 4 6 8 10
'NT WET SOIL + MOULD (WET) gms 9666 9863 10101 10076 10069
'NT WET SOIL gms 4554 4751......
-_ 4989 4964 4957
WETDENSIlY g/cm' 2.145 2.238 2.350 2.338 2.335

CAN No. GPK KBG PBK KDP BDP


WT. SOIL + CAN (WEI) gms 2940.0 2970.0 2955.0 ...." .. _.­ 2996.0 3010.0
I·..·---··-~-
WT. SOIL + CAN (DRY) gms 2884.0 2862.9 2797.1 2788.0 2758.7
--'~

WT.OrWATER gms 56.0 107.1 '157,9


-_............._ ­ 208.0 251.3
-------­
WT. OF CAN gll1S 249.0 250.0 263.0 269.0 275.0
WT. OF DRY SOIL gms 2635,0 ... 2612.9 2534.1 2519.0 2483,7
WATER CONTENT
..- -..
-~---.--~~----

DRY DENSITY
----~-~ ............. _­ %
J
2.13
2.10
4.10
2.15
6.23
2,21
8.26
2:16
10.12
......•... _._-----­ - - _......_......
2.'12
!l;/cm

SOIL DESCRIPTION: 2.22 ;.­ .... .... ...


.... I'·'

~ lil;;

BroW'}Ll.Ne1t9@9':9 SAf\J!?\f\Iith:;i!t & gravel. ._-­ ~~----""'----~ 2.20
! " ::: .. I .....

V N
:

MAXIMUM DI~Y DENSIlY (glC1ll3) : 2,21


_ _·m·. __ ____._____
~ ._.~.~ ••.n. ... .. . 1:.­
2.18 :--.­ :::
\
J

...
OPTIMUM MOISTURE CONTENT: 62% ... ... .... .. :.'

t . I" ~: .
2.16 .. ... .
REMAR1<S: ~
rJ')
iii 2.14
...
.... 1\ I·······
l····
::.

......

TESrEDBY: Faiy<lz/Narejo
0
2.12 ..
! . ..
1\
CHECKED BY / HEVIEWED BY : Syed Asa:~!~~I:'a.<;_.__. 2.10 /:
. .
. ..

APPROVED BY : 2.08
.... ~-~-~--.-.----------------

(LAB.INCHARGE) 1 2 3 4 5 6 7 8 9 10 11
Moisture Content (%)

Cop~Tight of this document is OVVJ1l'd b~' RGP, it l1ldY not btl n>proLhKl.)d l'XH'pt will! I,rinr wri!tpn pennission (rom tht, fompany.

RGF-Jl:D-H1Y-SOIIA1Hl·1
20.01.2020
-..--~ ./ -:; --AI"
~
if c;.....) I ::f
"t.::'A...;..-f...::--rfJ J-' ::-v. :-.:!"',...,....;
f An
ERI
~pnny
I·~
..•._.. h-h ....

-=_.G~~.11
-;;J

..
W'
""""'~ ~i'bl"ty G€OTECHN,QUE
. ·;':L_ RIYADH C.""'•. ..I',~"",
m_Uu.'~".:;::,=''':...

OR
J~'
'~1-o1r;f\29-!;,

&. FOUNDATIONS CO.


~,> ....
c-Nny I
_

OO<l.OOO S.R
_

,
..,..
~_\.\\'\ .... .3~_.....
",', J ••, .... ··h)-- P<

P.O. !lox 9182, jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf,wp@erigeosciences.com

Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, jeddClh

TEST REPORT
MODIFIED PROCTOR TEST
ASTM D 1557-12 (METHOD-C)
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LO-S / TP - 02 REPORT DATE: 29.01.2022
SAMPLING DATE: - TEST START DATE : 20.01.2022
SAMPLED BY : - -"-­ .--"-.. --~
R.G.F
..---.----------.--.-----.-- ..­ ------­
TEST FINISH DATE: 21.01.2022
-_._--­
BH/TP No.: LD-5 / TP - 02 SAMPLE No. : B-1 DEPTH (m) : 0.60

MOULD No. : IH-03 Wt. of Mould (gm) : 5112 Volume of Mould (cc) : 2123

1RIALNo. 1 2 3 4 5
WATER ADDED % 3 5 7 9 11
WT WET SOIL + MOULD (WID) gills 9615 9812 10020 10018 10010
WTWETSOIL gills 4503 4700 4908 4906 4898
WET DENSITY g/cm3 2.121 2.214 2.312 2.311 2.307

CAN No. LVN JBL FN BKD PAl


WT. SOIL + CAN. (WET)._____. gms 2944.0 2960.0 3015.0 3000.0 2981.0
WT. SOIL + CAN (DRY) gms 2865.5 2834.0 2833.8 2774.0 2715.0
WT.OFWATER gms 78.5 126.0 181.2 226.0 266.0
_._-_WT.OFCAN
.. _­ .
gms 205.0 273.0 ...­
256.0 260.0 280.0
WT. OF DRY SOIL .. ,
gills 2660.5 2561.0 2577.8 2514.0 2435.0
-.--~

WATER CONTENT % 2.95 4.92 7.03


----_.
8.99 _. 10.92
----­ ---­
3
DRY DENSITY !" / cm 2.06 2.11 2.16 2.12 2.08

SOl L DESCRIPTION: 2.18 ., .. ;;


Br0\;\lrl.1. we~.:-_9!~~~~~~~I:)_\<Vi~~_~~~ _______ 2.16
....
,
I';;
I
.- ..... T"
...
'C' •
j;

, ..
'C'
:i J
f: ."\
.... ..
.. ..
MAXIMUM DRY DENSITY (glcm3) : 2.16
iO 2.14 ..

II 1\
..
7.0% E ...
...
OPTIMUM MOISTURE CONfENT : ~ . ..... . ....
.9 2.12 ..... . ....
II
HEMARKS: ~
'iii
e 2.10
.... . . ..

1/
._ ...
r\
.....
.. '
'

.
. . .....

I'

0
Q)
V \
TESTED BY: FaiyazjNarejo '5 2 .08 I

CHECKED BY / REVIEWED BY : Syed Asad Abbas


------~---.------
---­

2.06
/ ...
.. .

APPROVED BY : - ---- .... _. ­ ._ .__. __ ._... _---.. .----­


.. _... - ..__ . --.-.~.- ------­
2.04
(LAB. INCI-IARGE) 2 3 4 5 6 7 8 9 10 11 12
Moisture Content (%j

Cop~Tighl of Ihis d(Kllllll'1l1 is mVlll'd h~' RGF, il nM~' I1nllw rt'prodllCl'd l'xcl'pl \vilh prIor \\'nllpll )lL'rmissioll from IllP compall~·.

I~GF· /l:U·PHY·SOll.·O-Hll
20.01.2020
./ -7.AJ· ,I-"-~
l.:.A_;__ ~t)',::_tio ~Jl""""..'" if0./1::J~
~.
f ~_••••
Eftl I~-, [,~-ll "'h,":::'~)h"""'~~='"

_~p"ny I=- _. , ; :. _
eR l0101('.n?-Br.. -

Un'lqdV.",'ilyC"""""."IC",,•• 'C.\)O(>.OOOS.H
RIYADH G<EoreCHNIQUe & FOUNDATIONS CO.
..l'J~yJ..'.J"·jJi»''''''·h_'''''''''''
_. ~ ~.\.\''''l''''''''';:;' ........

P.o. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf,wp@erigeosciences.colll

Location: Garnatha S1. near Arbaeen St. intersection, Mushrefah Distrkt, Jeddah

TEST REPORT
MODIFIED PROCTOR TEST
ASTM D 1557-12 (METHOD-C)
CLIENT NEOM Company
: PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5 / TP - 03 REPORT DATE: 29.01.2022
SAMPLING DATE: - TEST START DATE: 20.01.2022
SAMPLED BY : R.G.F
-~-----------.---.----.-----.-----
TEST FINISH DATE: _. ----­
21.01.2022..__... _"_ .. __..
BH ITP No.: LD-51 TP - 03 SAMPLE No. : B-1 DEPTH(m) : 0.60

MOULD No. : IH-03 wt. of Mould (gm) : 5112 Volume of Mould (cc) : 2123

TRIAL No. 1 2 3 4 5
WATER ADDED % 2 4 6 8 10
WT WET SOIL + MOULD (WET) gms 9681 9899 10131 10116 10095
WTWETSOIL gms 4569 4787 5019 5004 4983
3
WET DENSITY f'/cm 2.152 2.255 2.364 2.357 2.347

CAN No. .
ZPL CR-I0 VLV MNS ZAL

WT. SOIL + CAN (WET) gms 2948.0 2971.0 2980.0 3000.0 2986.8
WT. SOIL + CAN (DRY) gills 2894.2 2867.0 2825.0 2792.5 2733.0
WT.OFWATER gms 53.8 104.0 155.0 207.5 253.8
-----­
WT.OFCAN gms 205.0 230.0 255.0 240.0 248.0
WT. OF DRY SOIL gms 2689.2 2637.0 2570.0 2552.5 2485.0
WATER CONTENT % 2.00 3.94 6.03 8.13 10.21
----­ ------­ ------­
3 2.13
DRY DENSITY g/C111 2.11 2.17 2.23 2.18

SOIL DESCRIPTION: 2.24 i'.


';'.' -_ .. .. .. :'
E:lr~\I\I.I}_well-greded SAND with silt & gravel.
... i ...

I ~: .:'
2.22
MAXIMUM DRY DENSITY (glcm 3
2.23 I
) :
- .. ~--.------- .. ----­
;::;­ 2.20 ...
.... j ...•
.. -.. . .. ....
\ ..

OPTIMUM MOISTURE CONTENT: - - - - - - ­


6.0% ~
E
.9 2.18 II -_ ..
\ ....
..

»1/
...
REMARKS: -----_.. ---~----.------ .. ~-.----.-----.--.-
.e­
~ 2.16 ...
\ ....

......

TESTED BY: .__ ..._..F~i yazl I'Ji11~~__. ____ .. ___ . __ . ___


0
<1l

&' 2.14 I \
CHECKED BY 1 REVIEWED BY : Sycd Asad Abbas
-_._---_._--------_._-­ 2.12
I
/.. ~
. ~ .

APPROVED BY : 2.10
----------.-----------~----------

(LAB. INCHARGE) 1 2 3 4 5 6 7 8 9 10 11
Moisture Content (%)

Copyright of this lhKlIllll'nl is o\vncd b~' RGE ilml1Y not bt, J'l'proLiuced pxcl'pl ,,,,,ilh prior wrilll'1l pprmission fromllw company.

EGF·1E])·I'IIY·SOIIA1Hl'i
20.01.2020
rq f Eftl
. 1.:.
[~ Lv~! un"t<~·k'."'fi!yC<)m, "!\ylC
"V'::;-'~'.---

'*'
....-.-.---.--'---C"<-1
t,;,h- _ I

I.
_
en 10Hl100~~
./
.A...::•.A...::.../t) J-' ; ..Gi _ -

••,..IO.OOO.OOll$J'l
_
-;-..A.J.,
~,.-.;'" V u/I f::l~
_I""' ...

..>",,,~, ~'\l,',.r',I»J.v ''''>-'"'''


_....
,

. .':!!__....~~pany _.--.... -;;ii· _ RIYADH GEOTECHNIQUE &. FOUNDATIONS CO.

P.O. Box 9182, jeddah 21413, KSA Tel0phone: +966 (12} 6715621 / 6176860 Fax: +966 (12) 6715426 Email: rgf,wp@erigeosciences.com

Location: Garnatha 51. near Al'baeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
MODIFIED PROCTOR TEST
ASTM D 1557-12 (METHOD-C)
CLIENT : NEOM
---~---~--~--~--
............. -~-~--~------
PROJECT NO.: 21J4037
PROJECT: Transmission
SAMPLE SOURCE:
SAMPLING DATE:
REPORT DATE:
TEST START DATE:
29.01.2022 ......
21.01.2022

SAMPLED BY : R.G.F TEST FINISH DATE: 22.01.2022
BH/TP No.: LD-5/ 1P - 04 SAMPLE No. : B-1 DEPTH (m) : 0.60
-------­

MOULD No. : I1-I-03 Wt. of Mould (gm): 5112 Volume of Mould (cc): 2123
---------­ -----­

1RIALNo. 1 2 3 4 5
WATHRAUUED % 2.5 4.5 6.5 8.5 10.5
WT WET SOIL + MOULD (WEI) gIllS 9621 9842 10073 10056 10050
WTWETSOIL gm..'> 4509
.-......
4730 4961 4944 4938
WETDENSTIY r;/cnl' 2.124 2.228 2.337 2.329 2.326

CANNa. REW ...­


HAR YAN PCI PSL
- - - - -.......- . - -......
WT. SOIL + CAN (WEI) gms 3018.0 2920.0 2948.0 3025.0
WT. SOIL + CAN (DRY) gn1s 2947.0 2802.3 2781.0 2804.2
........
I
~

WT. OF WATER gms 71.0 117,7 167.0 220.8 263.2


-~-~--

WT.OFCAN gms 218.0 233.0 290.0 301.0


..- ­
308.0
WT. OF DRY SOIL 2729.0 2569.3 2491.0 2503.2 2443.8
--­ -.~--

~:6~---1---~:~:"I---~i.~~ ~-.
WATER CONTENT % 8.82
DRY DENSITY glen? 2.14 2.10

SOIL DESCRIPTION: 2.20

IBrown, well-qreded GRAVEL with sand. 2.18


MAXIMUM DRY DENSITY (g!cm~) : 2.19
;::;- 2.16
6.7% E
OPTIMUM MOISTURE CONTENT : ~
E.! 2.14
HEMARKS: €
--.---~-----.~--~--- ....
:g 2.12

··'····I········I······I·······~·I
~ ................

I.::: .......1'....
TI~STED BY: c5 2.10
.... ...... . ---­ . -.­ -_._.
CHECKED BY / REVIEWED BY : Asad Abbas
2.08 1--,1----/­

APPROVED BY : 206
(LAB. INCI-IARGE) 2 3 4 5 6 7 8 9 10 11 12
Moisture Content ("!o)

Cop~Tighl of this docUlnenl is oWf\(·d by RGE it mny not be n,"producl'd l'X(Ppl \\'ith prior \-\'littei1 Jwnnission from till,' company.

RG1·JED·PIIY-50IL-O·I-OI
2ll.O1,2020
rg f
. An
ED I
1.::.A.;__ ~(J/~=';: ~~V'l?.)t~
!,.1~~MJ!"~W'jtyConWfiY/CUp~eJ)'JO,OO~$,R. ~J.J~''\ ~*..rl.jl"'.l~ 4J~;'-~.'}U'";rJt
Cn. lOHUN.l2'65

RIYADH GEOTecHNIOUE &. FOUNDATIONS CO.


t,\.\'>'.'\.,,,,",,!-~,,,,,:,,

P.o. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.colll

Location: Gamatha St neal' Arbaeen St interseclion, Mushl'efah District, Jeddah

TEST REPORT
MODIFIED PROCTOR TEST
ASTM D 1557-12 (METHOD-C)
CLIENT : NEOMn PROJECT NO. : ------~~
21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5 /TP - 05 REPORT DATE: -_. 29.01.2022
SAMPLING DATE: - TEST START DATE: 21.01.2022
SAMPLED BY : R.G.F TEST FINISH DATE: 22.01.2022
BH/TPNo. : LD-5 / TP 05 SAMPLE No. : B 2 DEPTH(m): 1.20

MOULD No. : IH-03 wt. of Mould (gl11) : 5112 Volume of Mould (ee) : 2123

TRIAL No. -­
1 2 3 4 5
WATER ADDED %
.,,-"~~--
:1 .'i 7 9 n
\NT WET SOIL + Moui:i5 J~IrI) gms 9640 9838 10069 10048 10039
WT WEr SOIL gms 4528 4726 4957 4936 4927
.--~--"-".-
~-.-~-

WET DENSITY g/cl1\' 2.133 2.226 2.33[; 2.325 2.321

CAN No. RLS


..-­ ~-
JRK
...............
STL TSK APH
VVT. SOIL + CAN (WET) gills 2966.0 2977.0 3011.0 2980.0 3060.0
---wr.-SOIL + CAN (DRY) gms 2886.0 2849.0 2830.9 2747.6 2786.0
\vr. OF WATER gms 80.0 128.0 180.1 232.4 274.0
WT.OFCAN gms 275.0 290.0 301.0 201.0 315.0
WT. OF DRY SOIL gms 2611.0 2559.0 2529.9 2546.6 2471.0
WATER CONTENT
..__....._-_.- ....................._---_ ...­ ­ - -...... % 3.06 5.00 7.12 9.13 11.09
---_ ..... .... - -­
DRY DENSITY g/en, 2.07 2.12 2.18 2.13 2.09

SOIL DESCRIPTION: 2.20 I;' ,1,;,1:;,:;;, T:: .


11'1;:: ;;;'L 1;.1 .1,1
IBrown, silty SAND with . . " ...... ' .. I

MAXIMUM DRY DENSITY (g/cm3 )


:1.

: 2.18 2.18 .... 1 .1/"\. ... .


OPTIMUM MOISTUHE CONTENT : 7.1%
2.16 ..
. ·r '1\
.: I . j ..... : ... ::.' ....
2.14 . . .. 1
REMARKS: --_ ..._. __...... ...... ..­ ~ :'.:.:~.. . ....
-.~-- --~,~-.~ ~~~~-.-

<J) ... ... 1

~
~.
212 . 1 / 'K
Faiyaz/Narejo
..~~'
TESrEDUY:
o 2.10 ) .
CHECKED BY / REVIEWED BY : Syed Asad Abbas
-------~-------------~--

208 . iJ .
. I··
APPROVED BY : 206
(LAB. lNG-lARGE) 2 3 4 5 6 7 8 9 10 11 12
Moisture Content (%)

~
Cop~Tighl of Ihis d(KUllwnt is ()'~vn('d by RGF, it B)HY nOIl'w n'produl'l'd pxcl'pl with pri(1r\~TiHen pt'n1lissjQIl from Ow company,

RGF-JICl)·P1IY-SOIL-OI-O,1
2{Ull.20211
~~ t:.A..:.A...:../U I,:;: :;;;~ J ,-:?) I~
AnERlcompany RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. !lox 30271... Vanbu AI~SI~ly;'th. M'IAS 51000; KSA Te1~phon~! ·~9fi6 (111) 3250992 /3250993 hl)(~ .,.966 (14) 32.!.0946 ErnOllJ! r8l.Y~I~bu@Nrg.eos.denc.e!l.com
L<KiJlIon; A1-Nawanand St.r~C't~ Bu) AI·Mtloh.m Dbtrkl, R.C,# ';'ianbu Af~Slnaly.ah

pz~• •~'~.

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: 01.01.2022
SOURCE: TP: 06 DEPTH: 0.60 m DATE RECEIVING: 06.01.2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.8 °C 42%_ __
HUMIDITY: _ _ _

DATE STARTED 2210112022 DATE COMPLETED: 23.1.2022



MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 1 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 6021 6095 6195 6208 6170
WEIGHT OF WET SOIL gms 1859.0 1933.0 2033.0 2046.0 2008.0
WET DENSITY gm/cc 1.992 2.071 2.178 2.192 2.152

CAN NO. A-2 A-8 P-9 F-4 K-10


WT. SOIL + CAN (WET) gms 421.58 418.95 448.36 420.78 429.36
WT. SOIL + CAN (DRY) gms 412.58 405.36 423.58 391.56 393.65
WT. OF WATER gms 9.00 13.59 24.78 29.22 35.71
WT. OF CAN gms 40.22 41.30 40.55 42.88 43.25
WT. OF DRY SOIL gms 372.4 364.1 383.0 348.7 350.4
WATER CONTENT % 2.42 3.73 6.47 8.38 10.19
DRY DENSITY gm/cc 1.94 2.00 2.05 2.02 1.95

2.08

2.06
MAX. DRY DENSITY gm/cc: 2.05
OPT. MOISTURE CONTENT % : 6.4 7 2.04 ./ "-

0
-!2 2.02 /
/
'" ~
E
en
>­f-
/ \
Remarks: Method "A" is used 2.00

I \
U)
Z
e.M.D.D =2. 16glcc W
0
1.98
e.O.M.e =5.25 % >­ /
cc:
0

1.96
1
\
I~
Tested by:
Checked By/Reviewed By:
Tufail Khan
1.94
I
Saeed Akhtar
1.92
2 3 4 5 6 7 8 9 10 11 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
RGF- YNB- PHY -SOIL -03-04
·Cl;...l.;./UJ,:.. '" :;;AJ'L;,t,)1;;:4/
.....,. ~

RIYADH GEOTECHNIOUE & FOUNDATIONS CO.


P.O. !:tox 302Jl. Y;.\l'1bu AM;tn~hJah,MYAS 51000# 1<S;A l'e'ephorW': 'i9E6 (14)3250992/325&)93 fa)!! ",966 (1413-:l509t\6 .frJ):;)U: rgf"ya»buttPt!r;geosc!:ences.t:om
l<K:.atlO1\Z AJ~Naw,\1naod Stn:ttl,. Hat AI-M.,han [);'Strt~l R.,C", Yanbu At.siNlyilh

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT: Neom desalination plant to gaya/ transmisssion system. (LD-5) DATE SAMPLED: 3011212021
SOURCE: TP: 07 DEPTH: 1.20 m DATE RECEIVING: 06.01.2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: 8-2
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.3 °C HUMIDITY: 41%

DATE STARTED 22/01/2022 DATE COMPLETED: 2310112022


MOULD NO: CR-62 WEIGHT OF MOULD: 6231 VOL. OF MOULD: 2110 CC.

1 2 3 4 5
% 2% 4% 6% 8% 10%
OIL + MOULD (WET) gms 10589 10785 10978 10970 10945
WEIGHT OF WET SOIL gms 4358.0 4554.0 4747.0 4739.0 4714.0
WET DENSITY gm/cc 2.065 2.158 2.250 2.246 2.234
T-2 S-4 A-9 K-3 F-3
gms 419.60 432.58 446.35 435.26 440.39
gms 413.25 419.35 425.36 406.58 406.35
WT. OF WATER gms 6.35 13.23 20.99 28.68 34.04
WT. OF CAN gms 40.22 41.30 40.55 42.88 43.25
WT. OF DRY SOIL gms 373.0 378.1 384.8 363.7 363.1
WATER CONTENT % 1.70 3.50 9.37
DRY DENSITY gm/cc 2.03 2.09 2.04

2.16

MAX. DRY DENSITY gm/cc: 2. 13 2.14


,/'
OPT. MOISTURE CONTENT % : 5.45
2.12 / '\\
~
~ 2.10
II \
Remarks: Method HC' is used
CM.D.D =2. 17glcc

o
Uj
iE 2.08
/
I \
CO.M.e =5.40 % >­
0::
o 2.06 \
\
Tested by:
-----
Checked By/Reviewed By:
M.IRFAN
2.04
¥
/ I~

Saeed Akhtar
2.02
2 3 4 567 8 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
·~1J. mC~~Ul'~~~l?)I~
AnEIUcompany I~J'I'J'f,;t ~ RIYADH GEOTECHNIQUE & FOUNDATIONS co.
P.O~ 80x a011J.I 'fO\lllH;,AhSrt)~iyah. MYAS 51000~ KSA 'rr1cphomt +966 (14) 31S09t)2/.!f:2'SOO9:3 f-lll(! ~9b6 (14) 3250946 E:tna;1Jr tQt"y~nhu@~tlSt!~ti!~'$.t.t>m
lo~tjOfi: AJ-N~w.;m.md StN:cL H>fi A~Mli\hafJ Ob-h-Jr,;t_, n.c" Vvnbu Al-5in3ty..h

CLIENT: NEOM. PROJECT NO.: 21J4037


PROJECT:
-------------------------------------­
Neom desalination plant to gayal transmisssion system. DATE SAMPLED: 01.02.2022
SOURCE: TP: 08 DEPTH: 0.60 m DATE RECEIVING: 06.01.2022
---:--------:-­
SAMPLE DESCRIPTION: Brown Silty SAND with gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.3 °C HUMIDITY: 40%
--------­
DATE STARTED 22/0112022 DATE COMPLETED: 2310112022
MOULD NO: CR-63 WEIGHT OF MOULD: 4162 VOL. OF MOULD: 933.24 cc.

TRIAL NO. 1 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 6055 6135 6215 6228 6210
WEIGHT OF WET SOIL gms 1893.0 1973.0 2053.0 2066.0 2048.0
WET DENSrry gm/cc 2.028 2.114 2.200 1.214 2.195
Z-1 6-8 K-4 M-8
gms 425.30 421.58 422.50 437.56
gms 416.57 40 •. 398.25 392.70 401.32
WT. OF WATER gms 8.73 14.56 23.33 29.80 36.24
WT. OF CAN gms 39.60 38.25 37.55 41.28 41.90
WT. OF DRY SOIL gms 377.0 362.9 360.7 351.4 359.4
WATER CONTENT % 2.32 4.01 6.47 8.48 10.08
DRY DENSITY gm/cc 1.98 2.03 2.07 2.04 1.99

2.08 . ...

2.07
MAX. DRY DENSITY gmlcc: 2.07 /'
OPT. MOISTURE CONTENT % : 6.47
2.06

2.05
1/ "\
~ 2.04
/ 1\
E
OJ 2.03
F \
Remarks: Method "An is used

I-
Ui 2.02
z
/ \
C.M.D.D =2.
c.O.M.e =5.55 %
w
0
>­ 2.01 II
/ \
DC
0
2.00 \
Tested by: M.IRFAN 1.99 ! ~

Checked By/Reviewed By: 1.98


J
Saeed Akhtar
1.97
:1 3 4 5 6 ., 8 9 10 11 12
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
YNB·PHY·SOIL·03·04
P.O. no)!: 302"11. Vanbu AhSln;"lyn-hJ MVAS 51000,.. KSA Jelt!'phOft.oe! +966 (14) 3'2S0992 J 3250993 fa:.!:: -+966 (14) 3250946 f.mll1J: t8,.y.mbu@~ll.tl(>ou:lenc"t's..lC.orn
"{'Iea,lon: A.t--Nawamrnd S1(ect~ t"tal AI-Mahan Oh;t"rkl, R.C.• Yanbu Al~Slnalyah

CLIENT: NEOM. PROJECT NO.: 21)4037


PROJECT: Neom desalination plant to gayal transmisssion system. (LD-05) DATE SAMPLED: 2210112022
SOURCE: TP: 09 DEPTH: 0.60 m DATE RECEIVING: 2210112022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
ENVT. CONDo TEMP: 24.7·C HUMIDITY: 41%
----­
DATE STARTED 25/0112022 DATE COMPLETED: 2610112022
MOULD NO: CR-62 WEIGHT OF MOULD: 6231 VOL. OF MOULD: 2110 cc.

TRIAL NO. 2 3 4 5
WATER ADDED % 2% 4% 6% 8% 10%
WT. SOIL + MOULD (WET) gms 10589 10785 10978 10970 10945
WEIGHT OF WET SOIL gms 4358.0 4554.0 4747.0 4739.0 4714.0
WET DENSITY gm/cc 2.065 2.158 2.250 2.246 2.234

CAN NO. T-2 5-4 A-9 K-3 F-3


WT. SOIL + CAN (WET) gms 419.60 432.58 446.35 435.26 440.39
WT. SOIL + CAN (DRY) gms 413.25 419.35 425.36 406.58 406.35
WT. OF WATER gms 6.35 13.23 20.99 28.68 34.04
WT. OF CAN gms 40.22 41.30 40.55 42.88 43.25
WT. OF DRY SOIL gms 373.0 378.1 384.8 363.7 363.1
WATER CONTENT % 1.70 3.50 5.45 7.89 9.37
DRY DENSITY gm/cc 2.03 2.09 2.13 2.08 2.04

2.16

MAX. DRY DENSITY gm/cc: 2. 13 2.14

OPT. MOISTURE CONTENT % : 5.45


2.12 I 1\\
~
~ 2.10
/ \
Remarks: Method "(" is used
e.M.D.D =2.22g/cc
>-
I-
iii
zw 2.08 I '\
e.O.M.C =5.35 %
0
>-
n:
II 1\
o 2.06

\
Tested by:
------
Checked By/Reviewed By:
M.IRFAN
2.04
¢If
/ bt.
Saeed Akhtar
2.02
2 3 4 5 6 7 8 9 10 11
MOISTURE CONTENT %
Approved By:
Awais Nisar Yasin
F- YNB-PHY-SOIL·03-04
rg f ,,-~RI __,
l..:..-L:-t...::.-u 1]1 ~.& d y..),~
CR HnOH:m2~
lJm!bH:iL~ily (;.omPfl.«yli;ll~bii~.jJ#)Q,fJOOncn.

RIYADH GeOTECHNIOUE 8. FOUNDATIONS CO.


";;\f;J~~ '\ YI.P~,> j b~ V)J-~-~"\j, W:T>
"10~\'\'~A"';;;,-"",

P.o. 130x 9182, jedd,1l121413, KSl\ Telephone: +%6 (12) 6715621 /6"176860 Fax: +966 (12) 67"15426 EIM;I: rgf-wP'i~rigrosciena:s.com

U:>i.:ation: Gan101th.lSl. near Arlmeen SL intersfftion.. 'Mushref<lh Districtr Jedda.h

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM D 1883-16
ICONSUl,TANT NEOM Company PROJECT NO. : 21J4037
ipROJECT NEOM Desalination Plant to G IT system ~------

SAMPLE SOURCE: LD-S ITP-Ol REPORT DATE: 29.01.2022


SAMPLlNG DATE: .............- - - - - - - - - - - - - - - - ­
TEST START DATE: ........................... _-_ __
21.01.2022
.. ._----­
SAMPLE REC. DATE: TEST FINISH DATE: 25.01.2022
SAMPLED BY: KGF. ENV.CON: T: 2tl.1 "c H: 46%
BH/TPNo.: LD-5/ TP-Ol DEPTH (m): 0.60 SAMPLENo.: B-1

Mould No.: M-30 Weight: 6035 gms. Volume: 2126 cnf

Density determination Moisture content after soaking SweHdata


Wt. of smnple +mold. giH 10521 Can No. REL Molding dale 21.01.2022
Wl.ofsample gm 4486 WetSoil+Can gm 540.0 Initial dial reading 3.67
Wet density gll1/<.c 2.11 Dry Soil+G,n gnl 494.3 1st day reading 3.67
Wl.olWater gUI '15.7 2nd day reading :Hit
Initial mQisture content Wl.ofCan gm 28.0 3rt! (lay reading 3.67
CfmNo. IINL Wl. of Diy Soil g111 '166.3 4th day reading 3.67
Wt. ofWetSoil+Can gm 611.0 Moislure COJ1teni % 9.80 Settlement diff.(mm) 0.00
Wt. of Diy Soil + Can 8m 577.0 fRo! specimen (mm) 116
wt. of moisture gm 3,1.0 Compaction data Selllement % 0.00
WI. of Can gill 27.0 No. of blows ILayer 10
WI. of dry Soil gill 550.0 No of Jayer 5
Moisture Content 'y., 6.18 Max.dry proctor density (gm/ ee) 2.21
Dry density gnVc.c 1.987 Cmnpaction IYAI 90

DEARING RATIO DATA 400


Jlclli Load Bearing Bearing
in Lbs value Halio ....... .... ..- ..­ ..
I'~ ~

Inch Ib/ill' Cor.OlR V~

0.0000 300 /
0.0125 V
;/
0.0250 101 34 f£ I·· i .....
g
0.0375 ~

'l 200
238 79
0.0500
/
1\l
>
0.0750 362 121 .§ ........ ... ....

0.1000
0.1500
486
652
162
217
16 ~ '"
100 I
/
0.2000 818
................ ...... 27:" 18 .........
O.25DO 899 :"00
0.3000 967 322
0
(J.3500 1017 :n9
0.0 0.1 0.2 0.3 0.4 05
OAOOO 1041 347 Penetration in (ins)

0.5000

REMARKS: COl11pnct~d ilt OMC 6.2 %

TESTEDBY: Faiya/. /\hmed/Usmnn CIIECKED BY / REVIEWED BY: Syed AS,It! l\bb~lS

APPROVED BY:
(Lab.lncharge)
Copyright of this document is owned by RGF, it I1lny not be reproduced except with prior written permis.';iol1 from the compnl1Y.

RGF·jF.Il·I'IIY·SOIl.·OR·03
2().OI.202()
CL.-t...:---v I~ ,:.;: *2.d J',-:?..) f~
tqf_ER'.~' en t010'lOi):l~
l.~l~y".€Jtnpai'l:Y/~p1ht1l;,~,~n.. n
RIYAOH GEOJ'ECHNIOue & FOUNDATIONS CO.
~~,f~J¥)"."" ~"U.i~~

P.O. Box 9182, jeddah 21413,!<SA Telephone: +966 (12) 6715621 /6176860 F,1X: +966 02) 67 J5426 Email: rgf·wp@:'€rigeosciences,colll

Loc~ltion: G.1rnatha St. near AJIA1('E'J1 S1. inlers(."Ction.. tvlushrefah District, Jccl(!i:lh

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM D1883-16
ICONSULTANT : NEOM Company 1'1( IF(TNO.: 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/ TP 01 REPORT DATE: 29.01.2022
SAMPLING DATE: TEST START DATE: 21.01.2022
SAMPLE REe. DATE: TEST FINISH DATE: 25.01.2022
SAMPLED BY _ .....
RG.F. ENV.CON: T: 24.1oC H: 46%
-
BH/TPNo.: LD·5/ TP-01 DEPTH (m): 0,6 SAMPLE No.: B 1
Mould No.: M-2 Weight: 6238 gms. Volume: 2143 em

Density determination Moisture content after soaking Swell data


WI. of sample + mold 8m 11017 CanNa. GLV Molding date 21.01.2022
WL of sample gIn 4779 WetSoi1+Can Rill 535.0 lnilial dial readlng 3.'15
Wet density gm/c.c 2.23 Dry Soil+C1l1 gm 491.4 1st day reading 3.45
WI. of Water ~ ____ W'.'_ 4,/\ Inri clay fParlil1R 345
Initial moisture content WI. of Ca;,-~~"""'-'---'~ gnl 24.1 13rd day reading' 3.45
Can No. NTU WL of Dry Soil gill 467.3 4th day reading 3.45
WI. of Wet Soil +Can nt'll 488.0 Moislure Content % 9.33 Settlement diff.(nun) 0.00
WI. of Dry Suil + 0111 Rl11 461.2 HLofspecimen (mm) 116
WI. of moisture gm 26,8 Compaction data Settlement % 0.00
Wt. ofean glll 23,0 No. of blows /L.1)'01' 25
WI. of dry Soil gUl 438.2 No oi la)'er 5
Moisture Content iYiI 6.12 Max,dry proctor density (gm/ ee) 2,21
Dry densny gllVc.c 2.102 Compaction i!tl, 95

BEARING RATIO DATA 900


Peni Load Bearing Bearing -.~-. --..--... ----~--
~.----- -~---"~--

in Lvs value Ratio 800


Inch lv/ill' Cor,CHR :. "
1--" -~ ---~------,--- ..

0.0000 700
... V -­ --------- ..--". ~ ...
0.0125
600
/
0.0250
0.0375
270 90 2
g
c: 500
I -" ··,,1· .....

00500
0.0750
589
901
196
300
'!l
~
'"c: 400
II " I·· . .. , , "

0:1000 1203 401 40


.~
m / 1-­ ..... .... ,"" .. ....

OJ500 1638 cyI6 300 I ' / I·· ..·"


I' ,,~

0,2000 2095 698 47 200 /


0.2500
0.3000
2215
2347
738
782 100 II I····
0.3500 2441 814 0

0.4000 2462 821 0.0 0.1 0,2 0,3 0.4 0,5


Penetrahon in (ins)
0.5000

REMARKS: COll1pucled al OMC 6.2 %

TESTED BY: Faiyaz Ahmed/Usman CHECKED BY /REVIE\>VEDBY: Syed Asad Abbas


. ----.-..............
--.-~--

APPHOVED BY:
(L'lb. Inch<ll'ge)
'''­

Copyright of Ihis doclllllent is owned by RGF, it mey not be reproduced excepl with prior wl'itlcn permission fJ'Ol11lhc company.

RGF~JED'PI·IY,SOJI."[)g·05
7OJ)L2020
CL:-~tJl,~~~~..)I~
tq f _ERI-=" ,
eft ' O l Q 1 Q ; f . 1 2 J : m .
\"~U;oohilityComplm)"Ct:tp1tru{\,o(x'}"OOQi~U\,

RIYADH GEOTECHNloiJe & FOUNDATIoNS CO.


JI,o>:)~-_'\-.,..'1lI_""'~J? *"")'.NI*
'·~"l"1"'"~~f> .....;
:tJ"..;--";"')~ is",,,

1'.0. !lox 9182, jcddi1h 214]3, KSA Telephone: +966 (12) 6715621/6]76860 Fax: +966 (12) 6715426 Email: rgf-wplilerigeosciences.com

Locc)tion: G,)rnatlm SL neM Arbaeen St. intersection, tvlushl'c(,lh Dish-jet, Jedd{)h

TEST REPORT
CALIFORNIA BEARING RATIO
ASlM D 1883-16
CONSULTANT : NEOM Company l'J{U)I:lCt' NO, : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/ TP - 01 REPORT DATE: 29.01.2022
SAMPUNG DATE: -_ .....
TEST START DATE: 21.01.2022
SAMPLEREC. DATE: TEST FINISH DATE: 25.01.2022
SAMPLED BY R.G.F. ENV.CON: T: 24.1oC H: 46%
BH/TPNo.: LD-5/IT-01 DEPTH (m): 0.6 SAMPLE No.: B-1
Mould No.: C-7 Weight: 7763 gtllS. Volume: 2083 em'

Density determination Moisture content after soaking Swell data


WI. of sample +mold. gm I 12658 Can No. LR-l Molding date 21.01.2022
Wt.ofsample gill I 4895 WetSoil+Can gm 515.0 Initial dial reading 3.83
Wetdensily I 1'1111/<.< I 2.35 Dry Soil+Can 1'1111 474.7 1st day reading 3.83
Wt. ofWaler gtn 40.3 2nd day reading 3.83
Initial moisture content WI. of Can gm 22.2 31'd day reading 3.83
Cm1No. C-91 WI. of lJry Soil gm 452.5 4th day reading 3.83
wt. of Wet Soil ., Can glll 501.0 Moisture Content % 8.91 Settlement diff.(l1un) 0.00
WI. of Dry Soil + Gl11 flBl 473.0 HI.of specimen (nun) 116
wt. of 1110isture 8m 28.0 Compaction data Settlement % 0.00
WI. of Can !;11l 21.0 No. of blows fLayer 56
WI. of dry Soil gJll 452.0 No of layer 5
Moisture Content i~1 6.19 Max.dry proclor d(,llSily (gm/cc) 2.21
Dry density gnVc.c 2.21 Compaction tYtJ 100

BEARING Il.i\TIO DATA


Peni Loa<l Bearing Bearing
1600
in l.bs value Hatio
.- . -- ----- - - - -- ----~,--~-

Inch Ib/i..• ~or.CBR .


1400 ~--~
0.0000 ... ... ......
~ --~----------------

,./
0.0125
0.0250
0.0375
528 176

i
1200

1000
.... _.
v-­ ------- - ._. __..

O.OSOO 990 330 .£


3 800
;/ 1-­

0.0750 1475 492 ~ / ................ --~. .- ...

OJ 000 1975 6Fi8 66 .[ V


600
0.1500
O.2(J()0
2570
3175
857
1058 71
&l
400 f ..

O.2S00 3485 n62


200
/
0.3000
O.350()
3685
3845
1228
1282 0
! .... ...... . ..

OAOOO 3935 "13"12 0.0 0.1 0.2 0.3 0.4 0.5


Penetration in (ins)
O.50()() !

REMi\RKS: Compacted <It OlvlC 6.2 %

TESTEDIlY: CHECKED BY /REVIEWED BY: Asad Abbas


APPROVED BY :
(Lab.lncharge)
ron"\!I'lnht- of thic (1f'\rln\1()n~ i~ ()'lAJn(ld hv nf:r. it n);.)v not hr~ rpl1lni!l1('C'd ("I)(('f~nt "vi~h 11l'inl' t,,-n'iHpn nrll'n)ll..;.l..;.inn fnllYl lhn rnnn'l:ll"i\!

RGF-)ED-PIIY-SOII.-OS·1l5
20.01.2020
rg
I '-
f
No
EAI CoMpany
---··~-------n 1..:..rL:,...,t....:;...;(Ji;!t:~ y~iff..:?...J/~
i
f 1.li~JI.i'u~""''''
,9ili) .~
- RIYADH GEOTECHNIOUe &. FOUNDATIONS. CO.
.J<l,..-',: ........ ~~;::;~;.;;

P.o. Box 9182. Jedd.11121413, KSA Telephone: ~%6 (12) 671562J /6176860 Fax: +%6 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Cilrnilttm5l near :\rbaeenSt inrersectio!1 Mushrefclh District, Jeddah


f

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASThl D 1883-16
CLIENT : NEOM PROJEcr NO. : 21J4037
PROJEcr: NEOM Desalination Plant to Transmissi REPORT DATE : 29.01.2022
SAMPLE SOURCE: LD-S I TP 01 TEST START DATE: 21.01.2022
SAMPLING DATE: _ _ _ _ _ _ _ _ _ TEST FINISH DATE: 25.01.2022
SAMPLE REC. DATE: H: 46%
------------------------------ ENv.cm- - - -
24.1oC
BH/TPNo.: LD-3 / TP - 01 DEPTH 1m) : 0.6 SAMPLE No.: B-1

2.22 MAXIMUM DRY DDJ"SITY: 2.21 glee


OPT. MOISTURE CONTENT: ~ 'y"

2.18 +1----+----f----f-----+---I

PENETRATION AT: 0.1"

() 2.14 1 CBR at 100'Y<, of MDD: §Q


.!2
E CBR at 95'% of MDD: 40
OJ
>- 2.10
t:: CBR at 90% of MDD: 16
en
z
~ 2.06

~
0 TESTED BY:
2.02 I I / I
CHECKED BYjREVIEWED BY: AsadAbbas

1.98 +1 --+--+---1--+--+--+--+-__1----1--+--1 APPROVED BY:


15 20 25 30 35 40 45 50 55 60 65 70
C.B.R. % (Lab Incharge)

Copyright of this document is ovmed by RGF, if may not be reproduced except with prior written permission from the company.

RCf-jED.PHY·SO'I.·Og·05
20.01.2020
C(";.A...:...---V t, ~~..l"',-:?..Jf~
,,;
I q =~=~/~"~"~' .,J~.ir~.'~~\~;.!"'~.~~~:~~;':
.:..=:..=~=:=~==~~J RIYADH GEOTECHNIQUE & FOUNDATiONS, CO.

p,o. Box 9'1 82. Jeddah 2I,<1:'.,!<SA Telephone: +966 (12) 6715621/6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences,com

Location: Gunatila SL near Arbaeen Sl intersection, Mushrefah Dislric~ je{Jdah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Transmissio REPORT DATE: 29,01.2022
SAMPLE SOURCE: LD-5/ TP - 01 TEST START DAT 21.01.2022
SAMPLING DATE: _ _ _ _ _ _ _ _ _ _ TEST FINISH DAl 25,01.2022
SAMPLE REC DATE: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ENV. cm 24.1oC H: 46%
BH/TPNo.: LD-;; / TP- 01 DEPTH (rn): 0.6 SAMPLE No. : B-1

2.22 MAXIMUM DRY DENSITY: 221 glee


OPT. MOISTURE CONTENT: 6.20 %l

2.18 1 1 /1
PENETRATION AT: 0.2"

J2.14 t--+--I-~
CBR at 100%, of MDD: Z1
.!=2 CBR at 95'X, of MDD:
E 12:
T-I-:-t-:--t-+-~-1L+--l-J~
OJ
t::
>-2.10 be 1 CBR at 90% of MDD: 18
en
z
w
e2.06 1/ 1
0:: TESTED BY: Paiyazi\luned{Usma
Cl
2.02 1 1/ 1 ,I
CHECKED BYjREVIEWED BY : S)'e<if,s~~!,bbas

APPROVED BY:
1.98
15 20 25 30 35
~.8~~. ~ 55
60 65 70 75

Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PI-lY-SOIL-OS-OS
20,01.1020
'C-L::-~(jl" ~~t/b;)l~
tq.f_m,--, Il CR IOltfHlfH?M
L~todt~)'~yl-C;.<:1-pftt~:Hl:~,QO()~,R,

RIYADH GEOTEC:HNIOUE:&FOUNDATiONSCO.
- -- -
.Jv~,~~\.o·~ ,J\lI~J' ~!,>~1.;lJj-~~
\~r.'t'1'V".,;:"""""
u"p

P.O. Box 9182, Jeddah 21413,](sA Telephone: +966 (12) 671562'1 I 6176860 Fax: +966 (12) 67J5426 El11ail: rgf-wp@erigeosciellces.com

Location: Gmf1l1th'l St. near Arbaeen SL intersection, Mushref.lh District Jeddah

TEST REPORT
CAUFORNIA BEARING RATIO
ASTM D 1883-16
CONSULTANT : NEOM Company .... ._-­
PROJECT NO. : 21J4037
PROJECT: NEOM Desalinatio!1 Plant to Gayal TraJ1Smissj()~.System
SAMPLE SOURCE: LD-5/ TP- 02 REPORTDATE: 29.01.2022
SAMPLING DATE: - TEST START DATE: 21.01.2022
SAMPLE REC. DATE: TFST FINISH DATE: 25.01.2022 i

SAMPLED BY: RG.F. ENV.CON: T: 24.1 <lC H: 46% !

BH/TPNo.: LD-5/lP-02 DEPTII (m): 0.60 SAMPLENo.: B-1

Mould No.: M-6 Weight: 6320 Volume: 2143 em'


. ­ gms .
Density determination Moisture content after soaking Swell data
wt. of sample +mold. gm 10799 Can No. DMK Molding date 21.01.2022
WI.of sample gm 4'179 WetSoil+Can gUl 470.0 Initial dial reading 2.98
Wet density gllVC.C 2.09 DrySoil+Can gm 426.1 1st day reading 2.98
Wt. at Water glll 43.9 2nd day reacling :loY!)
Initial moisture content WI. of Can gm 22.2 3rd day reading 2.98
Can No. ELN WI. of Dry Soil gill '103.9 4th day reading 2.98
WI. of Wet Soil +Can 8111 467.0 Moisture Content % lO.87 Setllement cliff.(null) 0.00
Wt. of Ury Soil + Om gm 438.0 Ill.of specimen (111m) 1'16
WI. of moistme p,UI 29.0 Compaction data Settlement % 0.00
Wt.ofCan nUl 20.0 No. of blows ILayer 10
WI. of dry Soil gIll. 418.0 No 01 layer 5
Moisture Content ';;1) 6.94 Max.cu·y proctor density (gm(cc) 2.16
Drydel1sily gl1Vc.c 1.954 Compaction ;y,j 90

BEARING RATIO DATA 350


Peni Load Dearing Bearing _._". . ....

-
!
in Lbs value Ratio
300
./' r--­
Inch Ib/iJ'> Cor.CBR
, .. .... [ .... ". __ .
0.0000 ;7
250
0.0125
,....
V
~
0.0250
0.0375
90 30
~ 200
7
0.0500
0.0750
207
315
69
105
~
·e
~

OJ 150

/ .... I .... "

!
:ll ... - ." ... ..­ _.-,­

0.1000 420 140 14 I1l I


100
566

I
0.1500 189
.... ' .... " . ... "

0.2000 710 237 16


50

I
0.2500 810 270
I····· .....

0.3000 854 285


0
0.3500 899 300
0.0 0.1 0.2 0.3 0.4 0.5
O.40()() 926 309 Penetralion in (ins)

0.5000

REMARKS: Compacted at OMC 7.0 %

TESTED BY: Fail'az Ahmed/Usman CHECKED BY/REVIEWED BY: Syed /\sad Abbas
APPROVED BY :
(Lab. Incha!'g")

RGF-]ED-PHY·SOII.·08·05
20.01.2020
~L-~tJl,=_" +2A~v..)l~
tq f AAERL.___ . ' ..
on 10'tiJ't~~%..
~~>"~'fJ~l$.(;Qtl,~;:tUl

RIYADH GEO"TECHNiQUE & FOUNDATIONS


... :**... -+4<

.)l(~':'#~'"', ...~~,;rJ.lt

p,o. llox 9182, )ectdah 21413, KSA Telephone: +966 (12)6715621/6176860 Fax: +966 (12) 6715426 Email: rgf'lVv~rigeo5CiellCes,com

Location: Garnatha St. l1e.lr Arhaeen St. intersection. :rvfushrcfah District} Jeddah

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM 0 1883-16
CONSULTANT NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to
SAMPLESOURCE: LD-5! TP -02 REPORT DATE: 29,01.2022
SAMPLING DATE: TE..ST START DATE: 21,01,2022
SAMPLEREC DATE: TEST FINISH DATE: 25.01,2022
SAMPLED BY R.G.F, ENV.CON: T: 24,loC H: 46%
BH!TPNo.: LO·5!TP-02 DEPTH (m): 0,6 SAMPLENo,: B 1

MottldNo.: M·7 Weigbt: 6350 gtns, Volume: 2161> em

Density determination Moisture content after soaking Swell data


WL of sample + mold gm 11133 Can No. FNB Molding date 21,01,2022
Wt. ofs"mpie gnl 47&"> Wei Soil+Can 8m 580,0 Initial dial reading 3,15
Wei density gm/c.c 2,21 Dry Soil+Can gIll 528,6 lSi day reading 3.15
WLofWater gm 51.4 2nd day reading 3.15
Initiaimoistttre content WI. OfOUl gm 25,0 3rd day reading 3.15
Can No, JNK WI. of Dry Soil 15m 503,6 4th day reading 3.15
WI, 01 Wet Soil "Can gtn 537,0 Moisture Content % 10,:11 tiettlemenl diff.(mm) 0,00
Wl. of Dr)' Soil " Gm glll 503,1 HLof specimen (mm) 116
WI. of moisture gtll 33,9 Compaction data Setllement % 0,00
WI,ofG'Ul g111 26.1 No, 01 blows jLayer 2::>
WI. ofclr)'Soil gIn 477,0 No of layer 5
Moisture Content CYu 7,11 Max,dry proctor density (gm/ee) 2.16
Dry density gnV(,c 2.060 Compaction ''Ii, 95

BEARING RATIO DATA 900


Peni Load Bearing Bearing .~.~ ............. --.-.--,--­ ~--~--

in Lbs value Ratio


Inch Ib/ill' Cor,CBR
800
--- .... _-_.­ -----­ ---­ ----------­ ~~ ... -;7 ......
. •

0,0000 700
0,0125
I .. ---------­ ~ ..... ...... ...
~ . .., . ,

0,0250
0,0375
259 86 N
c
lic
,S
600

500
.7­ I~ .. I·······~~~ ....

(J,0500
0,0750
562
854
187
285
~
~
0>
c
'C
400 I ...
... ~

... j .
..

.
~

...
. . . . . . . . . . ..
~ ~

~ /
~ ~

0.1000 1146 382 38 300


0,1500
0,2000
1533
1922
511
641 43 200 / '"

(),2500 2079 693


100
/
0.3000
0.3500
2212
2275
737
758 0 I " ..

0.4000 2282 761 0.0 0.1 0,2 0,3 0.4 0,5


Penetration in (ins)
0,5000

REMARKS: Compacted at OMC 7,() %

TESTED BY: . . l:ai}'ilz~~ll~l(=',J /Ufil~J~ ... CI-IKKED BY /REVlEWEO BY: Syed Asad Abbas

APPROVED BY:
(l.ab,lncharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company,

RGI··)E1.J..PI'IY·SOII.·Og·05
20,01.2020
\;:"A.~..A•••.;:.../U I~ :;:: .;-dJul::?.) t~
tqf_ERI~f~T
=
OR tOH)H~~:/'1lh . . ' "~""",;,,,,,,,,,,;:,-, ...Wi
Wrntt.ud l.~lty~)' ICn:pLMt'&.()qO.OOO 6U't,. .J~,} ...~ .,,' ....<ul..V'"\1 {h?4.;tt~JJ-- ..tI>,.\-.lS' J>A

RIYADH GEOTECHf,lIaUE & FOUNDATIONS CO.

P.O. Box 9182, jeddnh 214B, KSA Telephone: +966 (12) 6715621 /6]76860 Fax: +966 (12) 6715'l26 Email: rgf-wp®>rigeosdences.com

Location: Garnatha St near Arbdeen St. intersE'Ction, Mushrefdh District, Jedclah

TEST REPORT
CALIFORNIA BEARING RATIO
ASTMD1883-16
CONSULTANT: NEOM Company PRO]ECTNO.: 21J4037
PROJECT ; NEOM Desalinatio~J=lI~nt to Gayal!ransmission System
SAMPLE SOURCE: LO-5/TP 02 REPORT DATE: 29.01.2022
SAMPLING DATE: - TESTSTARTDATE: 21.01.2022
SAMPLE REe. DATE; TE'IT FINISH DATE: 25.01.2022
SAMPLED BY R.G.F. ENV. CON: T: 2tU DC H: 46%
BH/TPNo.; LD-5/TP-02 DEPTH (m): 0.6 SAMPLE No.: 13-1
Mould No.: M-10 Weight: 6073 gInS. Volume: 2115 en1

Density determination Moistul'e content after soaking Swen data


WI. of sample +ntold. I gm I 10959 Can No. BDL Molding date 21.01.2022
Wt.of sample I gm I 4886 Wet Soij+Can gm 501.0 Initial diaj reading 3.26
Wet density I gm/c.c I 2.31 Dry Soil+Can gm 459.0 1st day readinp; ;j.Lb
WI. of Water p;m 420 2nd day reading 3.26
Initial moisture content WI. of Can gm 25.0 3Id day reading 3.26
Can No. FFN WI. of Dry Soil gill 434.0 4th day reading 3.26
Wt. of Wet Soil +Can gm 478.0 Moisture Content % 9.68 Settlement diff.(mm) 0.00
WI. of D.y Soil + Can gm 448.7 Bt.of specimen (mm) 116
WI. of moist1l1'e gm 29.3 Compaction data Settlement % 0.00
WI. of Can gm 24,0 No. of blows fLawr 56
WI. of dry Soil gm 424.7 Nooflayer 5
ivloisture Content 'y" 6.90 Max.dry proctor denSity (gm/cc) 2,16
Dry density gill/r.c 2.16 Compaction % 100

BEARING RATIO DATA


Peni Load Ileal'iug Bea"iug 1300 .,----,----,--:-,-----.-;--;-----,r---~_,
in Lbs value Ratio
Inch Ib/iu' Cor.CIlR 1200 ,

0.0000 1100 / .
0.0125 1000 /'
0.0250 472 157 ,,," 900 +----+---/--:7+----+----+-----1
o0375 .§ 800 /
0:0500 855 285 ; 700 r----+--,~--t----+---_+-----I
0.0750 1290 430 ~ 600 r----+Vr/'-----I-----+----I-----I
0.1000 1720 573 57 .~ 500 /
0.1500 2248 749 &l 400 I-----;r-+----j----+----~---__I
0.2000 2788 929 62 300 1 - - - / , f - - / - t - - - - t - - - - t - - - - t - - - - - I
0.2500 3057 1019 200 ---..--,-+---+----1
0.3000 3273 1091 100 I-cf-I---+----+----+----+----I
0.3500 3345 1115 0 I-V___-'-__-.J_ _ _- L_ _ _- ' -_ _-.J
OAOOO 3395 1132 0,0 0.1 0.2 0.3 0.4 0.5
0.5000 Penetration In (ins)

REMARKS: Co,,,,,,,, at OMC 7.0 %

TESTED BY: Faiyaz Ahmed/Usmal1 CHECKED BY/REVIEWED I3Y: Syed A5<1<1 Abbas
APPROVED BY:
I
(Lab.lncharge)
Copyright of this doclIment is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-jEIH'IIY-SOll.OS·05
2(),OL20lO
rcq f An,EftI
cl..=.-~6t!J~:dtY42..)f~
~A;""Cf'l¢l~
('~~~"YI_~d,.OI.1O.voo
':"':':"':==-=-=:::!"-'===,~~ RIYADH GEOTECHNIQUe' 8.
_,
.. ,5:~
. ' . ",' '_"'~';\!":\.Y,;';;..;:':::'-.;-w
_..J~~"'."';"'~';Q.t.~J.t~~-~,;I~_~':I$"~,
FOuNDATIoNs CO.

1'.0. Box 9182. Jedd,\h 21413, KSA Telephone: +966 (12) 6715621/6176860 Fax: +966 (12) 6715426 Email: rgf.wp@erigeosdences.com

Location: Cilrnalh" St. near Arb"".n St. intersection, Mushrefah District, Jeddah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASlM 0 1883-16
CLIENT : NEOM PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Transrnissi REPORT DATE : 29.01.20??
SAMPLE SOURCE: LO-5 TP 02 TEST START DATE: 21.01.2022
SAMPLING DATE: TEST FINISH DATE: 25.01.2022
------------------------------
SAMPLE REC DATE: ________________________________ El'·N. COl' 24.1 oC H: 46%
BH/TPNo.: LD·S TP - 02 DEPTII (m) : 0.6 SAMPLE No. : B-1

2.18 :MAXIMUM DRY DENSITY: 2.16 glee


OPT. MOISTURE CONTENT: zo:o- 'I'"

2.14
PENETRATION AT: 0.1"

U 2.10 CBR at 100'/'ll of MOD: 9Z


~
E CBR at 95''1" of MOD: ~
Ol
~ 2.06
CBR at 90')'" of MOD: 11
Ci5
Z
w 2.02
o
~
o TESTED BY: .:aiyaz Ahmed/Usma
1.98
CHEO<ED BY/REVIEWED BY: Asad Abbas

1.94
APPROVED BY:
10 15 20 25 30 35 40 45 50 55 60
C. B. R. % (Lab Incharge)

Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-Pl-lY·SOlL·OS-05
20.0'1.2020
C--L:A....::...,(jI,:;: :"::;;~if:l:?..)f~
rqf_ERl~' c..R 1(.l1Q"tGG;z6fi.
t,.~~y~lC.u)*l'aHi,~COOS,~,

RIYADH GEOTECHNIOUE &; FOUNOATtONSCO.


. ...I"", .;):~.:'I: ,...~l:....-i'.t~j
'1~V.\',"t.Y~"~.,;..o
l.>,.....,.,. :U,;;j......oo-_;.;:..f.i U:,r--

r.o. Box 9182. Jedd"i1 21413, KSA Telephone: +966 (12) 6715621/6176860 Fax: +966 (12) 6715426 Email: rgf-wp11)erigeosciences.com

Loc<ltion: Garn<ltha St. near Arbaeen Sl intersection. Mushrefah District, Jeddah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIENT : NEOM PROJECT NO. : 21J4037
PROJECT: Transmissio REPORT DATE; 29.01.2022
SAMPLE SOURCE: TEST START DAT 21.01.2022
SAMPLING DATE: TEST FINISH DAl 25.01.2022
SAMPLE REC. DATE: ENV.cm 24.1oC H: 46%
BH/TPNo. : LD-5 11"- 02 DEPTH(m): 0.6 SAMPLE No.: B-1

2.18 --­
MAXIMUM DRY DENSITY: 2.16 glee
OPT. MOISTURE CONTENT: 7.00 tVtl
/'
/.
2.14
/ PENETRATION AT: 0.2"

-2.10
(,)
/ CBR at 100'Yi, of MOD: 62
.!:2
E
OJ
/
/ , CBR at 95'Y" of MOD:

CBR at 90% of MOD:


:iQ

f:2.06
/ .... .. -16
//
(J') ,
z ,
~2.02 ..
/ ., ;
f20 /"/ TESTED BY:
1.98 /"
/" . '. CHECKED BYjREVIEWED AsadAbbas
-------­

/ • ••
APPROVED BY:
1.94 • ••• •

(Lab Inerer e)
10 15 20 25 30 213. It.O % 45 50 55 60 65

Copylight of this document is owned by RGF, it may not be reproduced except with prior written perm.ission from the company.

RGF-JED-PHY-SOIL-OS·05
20.01.2020
'CL:-L;.../VJ,~~r../y..)l~
. nERI~
tqf= CR"'Q10'~'\')
t.~l~li'~/~G,OQO,~(l:.,R:.

RIYADH GEOTECHNIOlJe 8. FOUNDA'TIoNSCO.


')l(J ,;,.,.,.I.t'"
,,~.,·.,.,,·"\'tA;"'~~
...,~l..,..t;>/~", ...~.~J"""~ U".,rJ>

p.o. Box 9182, Jeddah 21413, KSA Telephone; +966 (12) 6715621/6176860 F"x: +966 (12) 671';126 Email: rgf-w,,®erigeosdences.com

Location: Gclrnatha st. nefU Arb.leen Sl. intersection, iVlushrefah Di5lrict~ Jeddl1h

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM D1883-16
CONSULTANT NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5 TP-03 REPORT DATE: 29.01.2022
SAMPLING DATE: TEST START DATE: 22.01.2022
SAMPLE REC. DATE: TEST FINISH DATE: 26.01.2022
SAMPLED BY: R.G.F. ENV.CON: T: 24.1 "c H: 46%
......................... ~

BHjTPNo.: LD-5/ TP-03 DEPTH(m): 0.60 SAMPLENo.: B-1

Mould No.: M-32 Weight: 6086 Volume: 2129 cm'

Density determination Moisture content after soaking Swell data


WI. of sample +mold. gnt 10621 Can No. RML Molding dale 22.01.2022
Wt.ofsample gm 4535 WrtSoil+Can gm 523.0 Initial dilll reading 3.58
Wet density gnv'c.c 2.13 Dry Soil+Om gm 477.8 1st day reading 3.58
WLofWa\er gm 45.2 2nd day reading j.!::>1l
Initial moisture content WLofCan flll) 23.0 3rd day reading 3.58
Can No. LVK WLofDrySoil gm 454.8 4th day reading 3.58
WI. of Wet Soil +Call gnl 510.0 Moisture Content % 9.94 Settlement diIf.(111ll1) 0.00
WI. of Dry Soil + C'Jl gm '182.2 Ht.of specimen (111m) 116
WI. of moisture gm 27.8 Compaction data Settlement % 0.00
WI. of Can gn1 26.0 No. of blows /Layer 10
WI. of dry Soil g111 '156.2 No of layer 5
Moisture Content IYtI 6.09 Max.dry proctor density (gmjcc) 2.23
Dry density gnVc.c 2.008 Conlpactioll IY.} 90

BEARING RATIO DATA 500


Peni Load Be.u·jug Bearing
in Lbs value Ralio , ~~ ~~~~ .~~ ~ ~~~~-~~~ ~~~~~~~~
-~.~ . ~~- ~~~.~
.-".~~---~-

Inch Ib/inz Cor,CBR


400
().O()OO
......
().0125
,;7 ' ~~
~~-

0.0250 112 37 'I.;


g 300

/
0.0375
'l ~~ ~ . .~ ~~ ..
0.0500 270 90 ~
0.0750 405 135 !l' 200
0.1000 537 179 18 til'" V
-­ --­ ------­
1
0.1500 725 2'12
100 ' /
0.2000 913 304 20
D.2500
0.3000
0.3500
990
1074
1112
1124
330
358
371
375
0110.0 0.1 0.2 0.3 0.4 0.5
0.4000 Penetration in (ins)

0.5000

REMARKS: Compacted al orvlc 6.0 %

TESTED BY: Fai)'a~. i\hlJlcd/Usl11an CHECKED BY / REVIEWED BY: Syed i\sild i\bbas
AI'I'HOYED BY :
---"-------­
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

I<GF-jED-PIIY·SOIL-08·05
20.0'1.2020
t::..A••;_~tJl~ ;: ..'" .,2 -11 ifv~ f..:r:.
tq fM_Eft,o",=, CA j(»)(l'1M~.
i.~t!.~y CoJT)~/a.apu.il;:16:.OQ(I,~$.R.

RJVADH GeOTECHNIOLJE & FOONDATIONS CO.


_ ~: A../
:,r--'
\"",,,\"u",o.;:oV'l'
.)\o::.I'<?-~"t'Jdt..rlj I.~~r'<..lt '~/J:-" ..;;n) J<,8'p.

1'.0. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 I 6176860 Fax: +966 (12) 671&126 Email: rgf-wp@erigeosciel1ces.com

Location: Garnatl1a St. ne(lf Arb<leen SL intersection, fvlushrefah Dislrict, Jeddah

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM D 1883-16
CONSULTANT: NEOM '"'''"",''''y ~: 21J4037
PRO}; NEOM Desalination Plant to Gayal I [ClII::iHII:;!SIUIi System
·SAMPLF SOURCE; LD-5/ TP - 03 REPORT DATE: 29.01.2022
SAMPLING DATE: TEST START DATE: 22.01.2022
SAMPLEREC. DATE: TEST FINISH DATE: 26.01.2022
SAMPLED BY R.G.F. ENV. CON: T: 24.1oC H: 46%
BH/TPNo.: LD-5/TP-03 DEPTH (m): 0.6 SAMPLENo.: B 1
Mould No.: M-1 Weight: 6466 gms. Volume: 2126 em

Density determination Moisture content after soaking Swell data


WI. of sample + mold gm 11250 Can No. KVL Mokting dale 22.01.2022
WI. of sample gm 4784 Wet Soil+Om gill 498.0 Initial dialreadinst 4.15
Wet density gm/c.c 2.25 Dry Soi1+0m gm 458.2 1st day reading 4.15
WI. of Water gm 39.8 2nd day reading 4.15
Initial moisture content WI. of Can gm 25.0 3rd day reading 4.15
Can No. BNL wt. of Dr\, Soil gm 433.2 4th da\' r('adu,!! 4.15
WI. of Wet Soil+Can gm 550.0 Moisture Content % 9.19 Settlelllentdiff.(nun) 0.00
WI. of Dry Soil + G1n am 519.6 BLol specimen (111m) 116
Wt. of moisture gill 30.4 Compaction data Settlement % 0.00
Wt. of Can gill 23.0 No. of blows ILay"r 25
wt. of dry Soil gm 496.6 No of layer 5
Moisture Content 'X, 6.12 Max.elry proctor density (!im/ec) 2.23
Dry denSity guy,., 2.120 Compaction·y., 95

BEARING RATIO DATA 1100


Peni Load Bearing Bearing •
in Lbs valne Ratio 1000 +----+---,..-\----+-~--+--~_1
Inch )"/in" Cor. CDR ..... •
900 .~------4-------4-----~~~~--_+------~
0.0000 "/
0.0125 800
0.0250 365 122 i 700 +-----I--/--,~/+------I----+---
0.0375 ";:" 600
0.0500 697 232 ~ /
> 500 f--------+F------+-------4-------+-----~
0.0750 1052 351 .~ J
0.1000 1407 469 47 .!I 400 f---;---++----I------+----I-------"
0.1500 1895 632 300
0.2000 2383 794 53
200 r
1
, __1--_+___ + ______ 1_ _ _ _ _ +-___
0.2500
0.3000
2618
2753
873
9111
/
V
100 f - - F - - - - I - - - - - I - - - - - - I - - - - - I - - - _

0.3500 2773 924 0


!l.4000 2812 937 0.0 0.1 0.2 0.3 0.4 0.5
0.5000 Penetration in (Ins)

REMARKS: Compacted at OMC 6.0 %

TESTED BY: FaiY(lz Ahmed/Usmill1 CHECKED BY/REVIEWED BY: Sycd Asad Abb"s
APPROVED BY:
(Lab.lllchargc)
Copyright of this document is owned by RGf, it may not be reproduced except with prior written penni~sion from the company.

ECf-JED-Pl"lY-SOll.-OS-05
20.01.2020
rq
. f -=-_
_IJ:HIII c""'""'''Y
~,,,,.,~._*,~=,,,,C..l•..:-~(J/~:::: ·~~Jy~l~
..=r
\~ .,.-,.fJ.
. ;b,
[j?J. .Jl!~.
.d:J

";;" ,
,. "~.-ity~.nYJCIWIItri.",OO6,OOQ~f\ -Ji.o";'~'\·':I1!
ell 101t)1c:a)~~_

RJYADH GEOTeCHNIOUe & FOUNDATIONS


_~>>a~;h. '--~\.n"YA\II~...,..,
.....A.I!h)A4.'IItJ..f)..
CO.

P.o. Box 9182, Jeddah 214'13.!<SA Telephone: +966 (12) 6715621/6176860 Fax: +966 (12) 671:Yl26 Email: rgf-wp@;erigeosciences.colll
Location: Garnatha Sl. near Arbat,"'en SL intersectiofl~ i\lushrerah District, Jedd!i.h

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM D 1883-16
CONSULTANT: NEOM \"UII'IJ''''Y PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gaya Transmission System
SAMPl£ SOURCE: LO-S/ TP - 03 REPORT DATE: 29.01.2022
SAMPl.ING DATE: - TESTSTARTDATE: 22.01.2022
SAMPLE REe. DATE : - TEST FINISH DATE: 26.01.2022
--- -
SAMPLEDBY _ _ _ _ _ _ ..._~R~.G_:F. ENV.CON: T: 24.1oC H: 46%
BH/TPNo.: LD-5/1P-03 DEPTH(m): 0.6 SAMPLE No.: B 1
Mould No.: C-8 Weight: 7644 gms. Volume: 2137 em'

Density determination Moisture content after soaking Swell data


Wt. oi sample +mold. g111 127lJ9 Can No. OK Molding date 22.0'1.2022
Wt.ol S<llllple 1\111 5065 Wei Soil'·Can g111 477.0 Initial dial reading 3.93
Wet density gm/c.c 2.37 Dry SoiJ+Can gm 440.6 1st day readi1lg 3.93
Wt, of Water gm 36.4 2nd day reading 3.93
Initial moisture contcnt WI. of Can gm 26.0 31'<1 day reading 3.93
Can No. RUN WI. of Ury ~llli gm 414.b 4th day readmg 3.93
Wl. of Wet Soil +Cml gl11 480.0 Moisture Content % 8.78 Settlement diff.(mm} 0.00
WI. of Dry Soil + Can gill 453.5 HI.of specimen (llllll) 116
Wt. of moisture gm 26.5 Compaction data Setllement % 0.00
Wt. of Can gm 22.0 No. of blows /Lay!?r 56
Wt.ofclrySoil gm 431.5 Nooila)'!?r 5
Moisture Content 'v., 6.14 lvlax.dry proclor dens!t)' (gIll/ee) 2.23
Dry density guY,.c 2.2.1 Compaction % 100

BEARING RATIO DATA


Peni Load Bearing Bearing 1600 .,-_ _ _- ._ _ _ _,--_ _ _-,-_ _ _ _,--,_ _ _-,
in tbs value Ratio
Inch Ib/in" Cor.CBR -_. ....~ I·--~·· .~-
1400 ..... ~--+---+::~p;;.;;;,;;j~~~ I
(J.OooO /
1--_0_.0_125 1200 f----1f-----+V-7~---+---+---,--l
0.0250 501 167 ~ I···~ / ........... -­

~)~75 i 1000 /
0.0500 1055 352 .£
" 800 I----+I--r­
/--+----jL....-.--.f---­
lJ.U:I!.llJ 1595 5.U ~ ~/ ..... ....._J .....
0.1000
0.1500
2130
2755
710
918
71
! / .....~. ~ -~ -~~ .-~-
.§ 600
I ~ ..
0.2000 3390 1130 75 400 /
0.2500 3694 1Lj 1
0.3000
0.3500
3943
4078
13"14
1359
200

0
V
f-~--4----+----+----4f---_
.. 1 - ·....

OAOOO 4125 1375 00 0.1 0,2 0.3 0.4 0.5


0.50()O Penel,a'ion in (ins)

REMARKS : ~ at OivlC 6.0 %

TESTED BY: Faiya;; Ahmed/Usman CHECKED BY / REVIEWED BY: Sycd Asad Abbas
APPROVED BY:
~~~.~.----~~~.-~~~ ........... ..
~ ~--~.-~ .....
(I.nb. 111rhmg<')
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF·JED·I'IIY~S()II.~08·03
20,01.2020
(('q f An
Enl ~!.
.
~----- -c..-L:-l:;./{JI,::~ -.....:;;~t/'-:?..)f~
!~ Iv~l RIYADH
~
> '~~'/
~~"'/ea.-1M'OO."""sll'<
~

~~:
OR;

ti"'.... ..l,<>"""" ,."'.:c'>/"_'Yi;.'-~ ...


1()'C1~:; ,

GEOTECHNIOUE &.f'OUNOATlONS CO.


'," , . ~.• "".\~~.,...~.•..;:.."""..
"';,.>

P.O. Box 9182. J",ld.,h 2'1413. KSA Telephone: +966 (12) 6715621 /6176860 Fax: +966 (12) 6715426 Email: rgf-wp@?rigrosciences.com

Location; Q1rnlltha St neaf ArbaE'en SL intersection.. Mushrefah District. Jeddah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIEI\'T : NEOM PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Transmissi REPORT DATE : 29.01.2022
SAMPLE SOURCE: LD-5/ TP - 03 TEST START DATE: 22.01.2022
SAMPLING DATE: TEST FINISH DATE: 26.01.2022
-----------------------------
SAMPLE REC DATE: ENV. CO~ 24.1oC H: 46%
---------------------------
BH/TPNo.: LD-5/TP-03 DEPTH(m): 0'; SAMPLE No.: 8-1
-----------

2.24 ...--,..--,.---,-----,-~ MAXIMUM DRY DENSITY: 223 glee


OPT. MOISTURE CONTENT: ~ 'Y<,

2.20 I 7'
PENETRATION AT: 0.1"

U CBR at 100')!" of MDD: Zl


..s:2
E CBR at 95'}';, of MDD: ~
>­OJ 2.12 I
I­ CBR at 90% of MDD: III
U5
~gs 1(!>~/~I---r~i---~~--··
Z
2.08

TESTED BY:
2.04 I i/ I
CHECKED BY/REVIEWED BY: Asad Abbas
,j{
2.00 +1--+--+--+--+---1--+---:'-1 APPROVED BY:
15 20 25 30 35 40 45 50 55 60 65 70 75
C. B. R. % (Lab Incharge)

Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY·SOIL·08-OS
20.Q1.2020
rg f
I '- An
fR.1
r?si)-r<.bl~ ~~;-:--iJf-,.-.: ·":;;-~r./,-?..-Jf,~
I~-"- _¥~. Lwr~ft.~.y~/~6.000,OQQ~,.~. ~\(:}~~'~''''~l.~JJ~~.~.tj-O.~~ ~
ComPM'Y L ...-:-:::::........ ~;~;-=,,_ RIYADH GEOTECHNIOUe & FOUNDATlONSCO.
..

P.o. Box 9182, J,,,ldah 21413, KSA Telephone: +966 (12) 6715621 ! 6176S60 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com

Location: Garn(1thil St. near Arbaeen St. intersection, Mushrefah District Jeddah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmissio REPORT DATE: 29.01.2022
SAMPLE SOURCE: LD-5 TP- 03 •••• ­ < ~ • • • • • •- - ­ - - - - - - _ . _ ••••
TEST START DA1 22.01.2022
SAMPLING DATE: - TEST FINISH DAl 26,01.2022
SAMPLE REC. DATE: - ENV.Cm 24.1oC H: 46%
BH/TPNo, : LD-5/ TP- 03 DEPTH (m): 0.6 SAMPLE No.: 8-1
---­

2.24 MAXIMUM DRY DENSITY: 2.23 gfcc


OPT. MOISWRE CONTENT: 6.00 (Xl

2.20
V
/ PENETRATION AT: 0.2"

u
·2.16 / CBR at 100'}-(, of MDD: .Q

~
E
OJ
>-2.12 /
/ CBR at 95'1., of MDD: ~

CBR at 90'1., of MDD: -20


!:: /
en
z
w /
/
02.08

0::
0
/ TESTED BY: Faiyaz Aluned/Usma
2.04 /
/ CHECKED BY/REVIEWED BY: Syed Asad Abbas

2.00
/ APPROVED BY:
(Lab Incharge)
15 20 25 30 35
40 C~B. R~ 010 5 60 65 70 75 80

Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF- JED- PHY-SOlT_-DS-OS


20.01.2020
:::~ .~~ dy.,Jf~
tqf"ER'~~ 9.1 I t:,.,L-t..::.--'U l
" __ "M"'<=,=, l'
0~/h [ CR IOlO"1Il2(\~_ \',-~~"'·n'-,}\.",~ .......
[ ~~~ ..~~_~ [l,..imitGdt.JJ;thmly('"..ornf.<f.lflYl~Plt41fi'()QO,QOO~,R, .,.l":...t~~ .... "to.lt"r4)!b.},~l.,J)J-.""'~).lS';J-
...................,_.........! RIYADH GEOTECHNIClUE & FOUNDATIONS CO.

P.o. Box 9182, Jeddah 21413, KS;\ Telephone: +966 (12) 6715621 /6F6S60 Fax: +966 (12) 6715426 Email: rgf-wp<illerigeosciences.com
LOCiltion: Garnatha st. near Arb<leen St. illtersection~ fVlushrefah District, Jeddah

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM D 1883-16
CONSULTANT NEOM Company PROJECT NO. : 21J4037
-----------i
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5 / TP - 04 REPORT DATE: 29.01.2022
SAMPLING DATE: TEST START DATE: 22.01.2022
SAMPLE REC. DATE: TEST FINISH DATE: 26.01.2022
SAMPLED BY: R.G.F. ENV. CON: T: 24.1 "C H: 46%
BH/TPNo.: LD-5/ TP - 04 DEPTH (m) : 0.60 SAMPLE No.: B-1

Mould No.: M-12 Weight: 6396 gms. Volume: 2130 cm"'

Density determination Moishue content after soaking Swell data


WI. of sample +mold. gm 10869 Can No. HLN Molding date 22.01.2022
Wl.of sample gm 4473 WetSoiI+Can gm 556.0 Initial dial reading 3.33
Wet density gnVc.c 2.10 Dry Soil+Call gnl 505.6 1st day reading 3.33
WI. of Water gIll 50.4 2nd day reading 3.33
Initial moisture content WI. of Can gm 25.0 3rd day reading 3.33
Can No. GMR WI. of Dry Soil gm 480.6 14th day reading 3.33
WI. of Wet Soil +Can gill 527.0 Moisture Content % 10.49 ISettlement diff.(nUll} 0.00
WI. of Dry Soil + Gln gnl 495.6 Ht.of specimen (mm) 116
Wt. of moisture gIll 31.4 Compaction data Settlelnent % 0.00
WI. 01 Can gill 22.6 No. of blows /Layer 10
WI. of dry Soil gIll 473.0 No of layer 5
Moislure Content c~1 6.64 Max.dry proctor density (gm/cc) 2.19
Dry density gnVc.c 1.969 Compaction c~) 90

BEARING RATIO DATA


350
Peni Load Bearing Bearing .~ .. ----­

in Lbs value Ratio

.~--,
'"'.,--20itij~
Inch Ib/in' Cor.CBR -----_.__.. _. .. -.- ..--.---
.... _.­
_.­ -~- - - - - - - - - - _.

0.0000

0.0125
wei I
fj;
0.0250 104 I 35 g I

0.0375
0.0500 204 68
c

~
~
200

/1
0.0750
0.1000
310
414
103
138 14
rn

~
m
150

100
If:
!
0.1500 569 190
.­ ,...
0.2000 719 240 I
16
0.2500 809 270 50 ~
0.3000 865 288
o
0.3500 899 300
0.0 0.1 0.2 0.3 OA 0.5
0.4000 933 311 Penetration in (ins)

0.5000

REMARKS: Comp'lCted at OMC 6.7 %

TESTED BY :_~ Faiyaz Alllll['~l1l}...:~I~~~ ______ CHECKED BY / REVIEWED BY: Syed Asad Abbas
APPROVED BY :
(Lab. Jncharge)
Copyright of this document is owned by RGf, it may not be reproduced except with prior written permission from the company.

I,GF-JED-PI·IY-SOII.-OS-[)"
20.01.2020
c.,..L--~{jI;J ~~·~l.:?..)I~
tqf_ER'o_~ '<OR. "Q'I-o:t(l{i2B~.
~1..~nyCOf~lYj~6.'OQQ1~)f),.n .,,'!:,.,q~ ... "''U.w4)!.~~.r~.l.,l.;~~~...JI'"

RIVADH GEdt"ecHNIOue& FOUNDATIONS CO.


-\.l.'''\"I ..... i> ~"......

P.O. Eox 9184 )eddah 214J3,!<SA Telephone: +966 (12) 671562J /6176860 Fax: +966 (12) 67J5426 Email: rgJ·'VJ1i"erigeosciences.com

Locallon: GarnallM S1. neilr ArDtleen St intersection,. ~\'Jushrefdh Distrkt~ Jeddilh

TEST REPORT
CALIfORNIA BEARING RATIO
ASTM D 1883-16
ICONSULTANT: NEOM Company I'ROJELT NO.; 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5ITP - 04 REPORT DATE: 29.01.2022
SAMPUNGDATE: TEST START DATE: 22.01.2022
SAMPLE REC. DATE: TEST FINISH DATE: 26.01.2022
SAMPLED BY RG.F. ENV. CON: T: 24.1 oC H: 46%
BH jTP No. : LD-5/ TP - 04 DEPTH (m) : 0.6 SAMPLE No. : 13 - 1

Mould No.: M-14 Weight: 6115 gms. Volume: 2143 ems

Density determination Moisture content after soaking Swell data


WI. of sample + mold gm 10872 CanNa. VKL Molding date 22.01.2022
WI. of snmplc gill 4757 Wei Soil+Can gm 511.0 I"ilial diall'ending 3.'12
Wet ilen,lty em/ c,( 2.22 Dry Soil+Can gm 466.5 lsi day reading 3.42
WI. of Water gm 4,1.5 2nd day rcading 3.'12
Initi~1 mois(lIl't' content WI. of Can gm 27.0 3rt! clay reading 3.42
Can No. ClF WL of Dry Soil gm '139.5 4th day reading 3.42
WI. of Wet Soil +Cnn gm 473.0 Moisture Content % 10.13 Settlement diff.(mm) 0.00
WI. of Dry Soil + Can gm 445.2 Ht:of specii'leD(jiilli)'- 116
WI. of moisture gm 27.S Compaction data Settlement % 0.00
WI. of C'm gm 23.0 No. of blows /La)'cr 25
WI. of dry Soil gm 422.2 No of layer 5
Moist"re Content I\I" 6.58 Max.dry proctor dcnsily (gm/ cc) 2.19
Dry density guYc.c 2.083 Compactiml 'Y,I 95

llEARlNGRATIODATA 900
IJeni Load Dearing Dearing ~"""_ .. ~~~". .... ___ ~. _____.._... _ ._._._________ ~ _____ ....

in Lbs value Ratio 800


Inch Ib/in" Cor.CIlR ........_ ...._ . ___.._.......~... ...........
0.0000
0.0125
700
V ./
I· ....---- 1-·-..--·-· ..--1

0.0250 24 3 81 ~- 600 / ._ I ...

0.0375 ;;- 500 f----I----)!:.---I----+-----+---.....j


0.0500 548 183 ~ / --­
0.0750 839 280 .~ 400
~

V
0.1000 1144 381 38 300 / --1-.. ...... . .....

n.1500 1547 516 / - - . -1-­


0.2000 1887 629 42 200
02500 2045 682 100----.-+----1---.......,1-----1----1
0.3000 2195 732 I
0.3500 2243 748 0 II-_ _ _"--_ _---'L-_ _---I_ _ _--.l._ _ _--l

OAOOO 2299 766 0.0 0.1 0.2 0.3 0.4 0.5


0.5000 Penetration in (ins)

HEMARKS: LOInp"'-":" at OMC 6.7 %


1---" ..-........

i TESTED BY: Fail'a;>; A/uncd/Uslllill1 CHECKED BY / REV1EWED BY: Syed Asatl Abbas
I API'ROVED BY: .. ~.~.."......."."..........

I (Lilb.lnch<1rg0)··-·-·­
Copyril~ht of this document is owned by RGF, it nMy not be reproduc<'d except with prior written permission from the C0111I'«l1y.

RGF·JED-PHY·SOII.·U~·05
20.01.2020
~f
rc
.. A1iERI
__~_..-:.--'~
com~-,,~
m""'''':'_....
c:':~~~o
~~~'II\CL:-l.;...--'UI!t~~jl:?Ji~
:-J
..
Cfl H)1Q'":tB!1I
[ ~:.. -v~L Umiimji.1nW.Il)'_~.,.:n~/C~llnI~900~OO)$,~
H'''''~
- _ .
j\o;;,~, ~ru.' .......i)!a_~,1'-':U:J;"-':'>.u.
RIYADH GEOTeCHN10lJE & FOUNDA"TlONS CO.

p,O, Box 9J82, Jeddah 21413, KSA Telephone: +966 (12) 6715621 /6'176860 E,,: +966 (12) 6715'126 Email: rgr,wp<rerigeosciences,com

Location: Gtlrl1flth,l SI. neill' Arbacen St. inrerscction, Mushrefah District, Jeddah

TEST REPORT
CALIFORNIA BEARING RATIO
AS1M D1883-16
CONSULTANT: NEOM vOflltJ"UlY PROJECfNO.: 21J4037
PROJECT: NEOM U",::.aIlIlCH,u,1 Plant to Gayal Transmission System .
SAMPLE SOURCE: LO-S/ TP 04 REPORT DATE: 29,01,2022
SAMPLING DATE: .. TEST START DATE: 22.01,2022
----------------
SAMPLEREC. DATE:_____________ ....._ _..... TEST FINISH DATE: 26.01,202~ __
SAMPLED BY KG,F, ENV. CON: T: 24.1oC H: 46%
BH/TP No. : LD-5/ TP - 04 DEPTH (m): 0.6 SAMPLE No. : B-1
Mould No.: M-16 Weight: 6213 gms. Volume: 2141 em

Density determination Moisture contellt after soaldng Swell data


WI.. of smnple +mold. gm I 11223 Can No. RBI Molding date 22.01.2022
Wt.of sample I gm 5010 Wet Soil+Cun gm 483.0 Initial dial reading 4.06
Wet density I gm/c.c I 2.34 Dry Soil+Can gm 442.8 1st day reading 4.DD
WI. 01 Water gm 40.2 2nd day reading 4.06
Initial moisttlIe content Wt. of Can gm 21.0 3rd day reading 4.06
Can No. AFB Wt. of Dry Soil gm '121.8 4th day reading 4,06
Wl. of Wet Soil +Can gm 540.0 Moisture Content % 9.53 Seulement diff.(mm) 0,00
Wt. 01 Dry Soil + Can gm 508.1 BLof specimen (mm) 116
WI. of moisture gm 31,9 Compaction data Seulement % 0.00
WI. of Can gm 27.0 No, of blows flav"r 56
Wt. of dry Soil gm 481.1 No olln),e!' 5
Moisture COlllent 'Ii, 6.63 Max.dry proctor ,knsity (gm/ee) 2.19
Dry dellsity gnv'c.( 2.19 Compaction 'y., 100

BEARING RATIO DATA


Pelli Load Bearing Bearing 1400 .~_ _ _~_ _ _ _~_____
in Lbs value Ratio
Inch lb/in< Cor.Clm , - - - - - - ... ___ H _______ ----------- ----­

~::: 1200 l/ . . . ._ . _. .
0,0250 478 159 1000 /
'E 1 .... 1 - 1..- ... -.- ...

Q.0375
0,0500
0,0750
944
1401
315"
467
!lj

'"

~
800
II
I-----+-+----+----l------l----~

/-¥-----+----l-------l----~
600 \--____
1-..­

0.1000 1893 631 63 .§ '" ._ .. _ H_

0.1500 2473 824 &l


400-----l-----.+-----....j
0.2000 3064 1021 68 /
0.2500
0.3000
(l.3500
3305
3523
3642
llUl
1174
1214
V
200 I---I------+-------I--------l---------------I~---__I

0 l -_ _ _J......_ _ _J......_ _ _ _ _..l..-_ _ _ _..l..-_ _---l


(lAnDO 3708 1236 0.0 0.1 0.2 0.3 0.4 0,5
0.5000 Penetration in (ins)

REMARKS : Lompacwd at OMC 6.7 %

TESTED IlY: Faiyilz Ahnwd/Usman CHECKED BY I REVIEWED BY:


-- ----_.. _-------...... _.....- ..- - -------------_..Syed
_...
Asml Abbas
..... _­
APPROVED BY: ----_...... ... .._-- .. _... _....
_ _ _---­
(Lab.lncharge)
Copyri!~ht of this document is owned by RGF, iI may 110t be reproduced except with prior written permission from 111(' company.

RGI:·)ED-PIIY·SOII.·08·03
20.01.2020
l.::;A•.:.--,_:/l! I, ::~ •.;:;v~ iff..:?..,J I ~
fqf_BU__ ~. eft 1i>10'J~
U".,.'IE.~~oy'~MQU.O\J(>~~
RIYADH GEOTECHNlOUe&.f'OUNOATIONS CO~
.i'<l"'........
" .• 'I:;:"......."Y.;..~.."..-
w"'"' .....': .._ViJ-.""" ...'"

P.O. Box 9182. Jed,idh 21413, KSA Telephone: +966 (12) 6715621/6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeosciences.rom

Location: Gflrnclth<l St. near .AJbaeen St. intersection. i'vlushrefah Distrid,leddah


TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIENT : NEOM PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Transmissi REPORT DATE: 29,01,2022
SAMPLE SOURCE: LD-5/ TP - 04 TEST START DATE: 22.01,2022
SAMPLING DATE: TEST FINISH DATE: 26.01.2022
------------------------------
SAMPLE REC. DATE: ______________________________ ENV. cm 24_1oC H: 46%
BH /TP No.: LD-5 TP - 04 DEPTH (m): 0_0
______...:....:_____ SAMPLE No.: B 1

2.20 MAXIMUM DRY DENSITY: 2.19 f!lcc


OPT. MOISTURE CONTENT: ~ ')I"

2.16
PENETRATION AT: 0.1"

U 2.12 CBR at 100'1., of MDD: §2

-
<.>
E
O'l
CBR at 95'}j, of MDD: ~

~ 2.08
CBR at 90'lIc, of MDD: II
enZ
~ 2.04

~
Cl TESTED BY: ~aiyaz Ahmed/Usma
2.00 I Y -I
CHECKED BYjREVIEWED BY: Asad Abbas

1.96 +I---+---I----+----l---I--+--+--t----'---jl---'-I-­
APPROVED BY:
10 15 20 25 30 35 40 45 50 55 60 65
C.B.R. % (Lab lncharge)

Copyright of tl-us document is owned by RGF, it may not be reproduced except "ith prior written pen:nission from the company.

RGF-]El).PHY·SClHAlS-DS
20,01.2020
Cl:.A....:.,.-,fll,:-:: ·2~t./!..:?~'~
rgf_ER,_ ; CR10\01;CKi:2N
, ~l.ilIl)ility~ICmm!6,QOO;llOOS,,!,J"J';'''''''
Rl'YADH GEOTECHNJOUE! 8<
',,:~"~"'''Il' .... #-...:.:...,..
"'''"·"hl .>:t,...)I.1J..... -,.:;,l'''
FOUNOATlONSC:O~

roO Box 9182 jetldah 21413, KSA Telephone: +966 (12) 6715621 /6176860 Fax: +966 (12) 6715426 Email: rgf-wp@I?rlgeosdences.com

I.ocation: Glrnatha St. near Arbaeen St. intersection. Mushrefah District Jeddah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIENT : NEOM PROJECT NO. : 21J4037
PROJECT; Transmissio REPORT DATE : 29.01.2022
SAMPLE SOURCE: TESTSTARTDAl 22.01.2022
SAMPLING DATE: TEST FINISH DAl 26.01.2022
SAMPLE REC DATE: ENV.Cm 24.1oC H: 46%
BH/TPNo.: LD-5/ TP-04 DEPTH (m): 0.6 SAMPLE No.; 5-1

2.20 MAXIMUM: DRY DENSITY: 2.19 glee


· 7 OPT. MOISTURE CONTENT: 6.70 {Xl

2.16 1/
/ ..
PENETRATION AT: 0.2"

0 2.12
/ ·
CBR at IOO')!" of MDD: .@

..!2
E / · CBR at 95% of MDD: :g
01
>-2.08
/ CBR at 90'\\, of :MDD: :ill
!:: ·
(f)
z
W /
/ ·
02.04

/ ..
ex:
0
2.00
// TESTED BY: Faiyaz Aluned/Us

/ ... CHECKED BY/REVIEWED BY:


,

1.96
/ ; . .
APPROVED BY:
·
15 20 (Lab Incharcre)
25 30 35
c~'B. 11.5 % 50 55 60 65 70

Copyright of this document is owned by RGF. it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIlAS.Q5
20.0'1.2020
-~. -;J:.A
'W""=~~" t.:..-L..-~U/~ :::: .~_; r..,/y.,.)f-~
J

f An Enl Compony [
r~t"'') I ~ 1i 'ow,.,,,,,,,..
................................._•........!
CR
~.~ .-,,.~~~ f t~t~rCc"n~'C~plt"il'lI3.,OQO<OQO_RR. .,J~_
,.,-""""" '"
.:\J.........1Jf"~.p.V!1.,))~.:.,..~J>U"'~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
... .;,."...... "

P.O llox 9"182, jeddah 214"13, KSA Telephone: +966 (12) 6715621 /6176860 Fax: +966 (12) 6715426 Email: rgf-wp@.'erigeosciences.com

Localion: Gal'natha St. near Arhaeen St. intersection, tvlushrefah District, Jeddah

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM 01883-16
CONSULTANT NEOM Company PROJECT NO. : 21J4037
------­
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE: LD-5/ TP - 05 REPORT DATE: 29.01.2022
SAMPLING DATE: TEST START DATE: 24.01.2022
SAMPLE REC. DATE: TEST FINISH DATE: 28.01.2022
SAMPLED BY: RG.F. ENV. CON: T: 24.1 "c H: 46%
BH/TPNo.: LD-5/ TP - 05 DEPTH (m) : 1.20 SAMPLENo.: 13-2

Mould No.: M-3 Weight: 6629 gms. Volume: 2140 em

Density determination Moisture content after soaking Swell data


WI. of sample +mold. g111 11144 CanNa. KMP Molding date 24.01.2022
Wl.ofsample gm 4515 WetSoil+Can gIll 493.0 Initial dial reading 3.65
Wet density gnYc.c 2.11 Dry Soil+Can gJ.l1 446.7 1st day reading 3.65
WI. of Water g111 46.3 2nd day reading J.b!>
Initial moisture content WI. of Can ?,111 26.0 3rd day reading 3.65
CanNa. 13KD WI. of Dry Soil gn1 420.7 4th day reading 3.65
WI. of Wet Soil +Can gm 522.0 Moisture Content % 11.01 Settlement diff.(mm) 0.00
WI. of Dry Soil + Cln gtn 488.8 Ht.of specimen (mm) 116
WI. of moisture gUl 33.2 Compaction data SeUlement % 0.00
WI. of Can gm 23.0 No. of blows /Laycr 10
Wt. of dry Soil gnl 465.8 No of layer 5
Moisture Content 1% 7.13 Max.dry proclor density (gm/cc) 2.18
Dl)' density gnYc.c 1.969 Compaction IX, 90

BEARING RATIO DATA 400


Peni Load Bearing Bearing I
in Lbs value Ratio - ___ I _
.
~
.
]uch Ib/in" Cor.CBR
350
-"-1'
... -_.
.-.~
--: ..---.-..._.--.-----­
---~---- -­
. --.--.--..--­ ----.- ....... _--_.
- - ._------_. = ~~------.-- -==---=--===.=: ~-=:.=~.~.~==-:=-=-
_...­ _·_--··_·.. 1·_· ·. . . _·---1--··_..· ·
0.0000 300

I
-···················~·
... -. . . .. .. - .........
, '" ...._-""-_._-------_._-­ - - - - - - - - ­ - ------.
0.0125
~.-.-"

-.-= --""-"'0.'- " _ ' __ ' _ 0 ' ____ •• _ •• ___ ••• _ •••••• _ • • • • _._". _ _ _ _ _ .~ _ _ • _ _ _ _ _ _ _ _ •• ~ __ ••
'i; 250

b
./1 ··T········I··r-r­
0.0250 123 41
'g - - - - -. - ,--­ -­ - .­ - ._-.-. . - .. - - -­ _
0.0375 s ,. . -..... ~. - _.­ --- ­ -­ - - ­ -­ - --­ - _.
- - ---­ -­ - -­ -­ --­ - - -­ - -----­ -­ --­ ~-- -­ ----.-­ - ... _---_.
........._--._----­ ----­ -­
~

"l 200
0.0500 225 75 ~
0.0750 337 112 ,~ 150 - - .-­ . . . . "::.1:
Jl
0.1000 456 152 I 15
I I
0.1500 629 210 100
0.2000 814 271 I 18
! I

0.2500
0.3000
0.3500
900
960
991
1018
300
320
330
339
50

0
v
0.0 0.1 0.2 0.3 0.4
I
0.5
OAOOO Penetration in (ins)

0.5000

REMARKS: Compacted at OlvlC 7.1 %

TESTED 13Y: ____ Faiya".l\hl2.1ed/Us.'.1~".~~ ___ CHECKED BY/REVIEWED 13Y: Syed I\sad Abb".s
APPROVED 13Y :
(Lab. Incharge)
Copyright of this document is owned by RGF, it m<ly not be reproduced except with prior written permission from the company.

I(GF-JED- PlIY-SOIL-OS-03
20.01.2020
t::..-l.;....l....::,./u I, ~~ ~y..) f~
f AllIERI Compony
~m:H}l-Q'1ti;i~_.

l..~U;~1-~1 c:~nyl~~6}4Qni)(lQj) R

RIYADH GEOT'ECHNIOue 8. FOUNDATlONS CO.


.;..~ .:;,.".'-"

1'.0. Box 9182, Jeddah 2'14"13, KSA Telephone: +966 (12) 6715621/6"176860 Fax: +966 (12) 6715"126 Email: rgf-wp@erigeoscienl-es.com

Loc{)tion: Garnatha St. n(>cu Arbaeen St. intersectlon, 1vlushrefah District, ]eddah

TEST REPORT
CALIFORNIA BEARING RATIO
AS1M D 1883-16
CONSULTANT: NEOM Company PRO}Ecr NO.: 21J4037
PRO}ECr: NEOM Desalination Plant to Gayal Transmission System
SAMPI.E SOURCE: LD-5 I TP - 05 REPORT DATE: 29.01.2022
SAMPLING DATE: TEST START DATE: 24.01.2022
SAMPLEREC. DATE: TEST FINISH DATE: 28.01.2022
SAMI'LED BY R.G.F. ENV. CON: T: 24.1oC H: - - -46%
·--1
BH!TPNo.: LD-5/ "IP - 05 DEPTH (m) : 1.2 SAMPLENo.: B 2
Mould No.: M-4 Weight: 6354 gms. Volume: 2153 em

Density determination Moisture content after soaking Swell data


WI. of sample + mold gnl 11134 CanNa. RAM IMolding date I 24.01.2022
Wt.ofsample gill '1780 WetSoj]+Can gm 481.0 Initial dial reading 3.60
Wet density gm/c.c 2.22 Dry Soil+Can gm 437.8 1st day reading 3.60
WI. of Water ~;m 43.2 2nd day reading 3.60
Initial moisture content Wt.ofCan ~m 23.3 3rd day reading 3.60
Can No. SNK WI. of D1')' Soil I gIll I 414.5
WI. of Wet Soil +Can g111 456.0 Moisture Content I % t 10.42
Wt. of Dry Soil + Can gm 427.7
WI. of moisture g111 28.3 Compaction data
WI. of Can gIll 24.0 No. of blows ILayer '5
;:
WI. of dry Soil gm 403.7 No of Jayer ,j
IYloistul"C COlltent 'Yo, 7.01 Max.dry proclor density (!~n/ ee) 4.1S
n

Dry densily gm/c.c I 2.075 ICompaction 'Vo, 95


BEARING RATIO DATA 900
Pen; Load Bearing Bearing ······1·· ~
in Lbs value Ratio 800
Inch lb/in' Cor.CRR
0.0000 700
0.0125
600
265
!"
0.0250 88
0.0375 .5 500
~
0.0500 585 195 ]:
0.0750 880 293 g>

OJOOO 1200 400 40


j I
300
0.l500 1619 540
0.2000 2030 677 '15
200E
0.2500 2280 760
0.3000 2382 794 100 i
0.3500 2450 817 o '
OAOOO 2500 833 00 0.1 0.2 0.3 0.4 0.5
Penelral ion in (ins)
0.5000

REMARKS: Compacted at OlvlC 7.1 %


---­ ---­ --~~-------

TESTED BY: . ..-.2'~iy'l~.l\l~l11".d/.!:lsmi1n_ OIECKEDJ3Y /REVIEWEDBY:


APPROVED BY:
(Lab. lncharge)
Copyright of this document is owned by RGF, it may not be reproduced ('X«'pt with prior written permission fronl the company.

EGF·jED·PllY·SOHAi8·03
20.01.2020
_~~~==~ t'::'..l_;-~tJ J, ~~jI t../'l::?~ I~
tqf_ERI_ Cl'l10'Q'tf)Un~
~1.u.:mtl4i\ly~:n)'.te1l$14Ma.¢(l(J,()O()Sll.
RIYADH GEOTECHNlaue &. FDUNOAIlONS CO.
l,-.Y.""'l"A"'';;!>~
J';'.>v.~'-~·1U ......V. ?,".).'y4~-,/~~}~lS~

P.o. Box 9182, Jeddah 21413, KS/\ Telephone: +966 (12) 67"1562] /6176860 Fax: +966 (12) 671!Y126 Email: rgf-wp<1J.'e'igeosciences.com
l...oc.1tion: Garnath,) St. 1lE'(\f Arbaeen St intersection, l'vlushrefi\h Dislrict, Jeddah

TEST REPORT
CALIFORNIA BEARING RATIO
ASTM D 1883-16
CONSULTANT NEOM Company PROJECTNO,: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmis~i(m System
SAMPLE SOURCE: LD-5/ TP - 05 REPORT DATE: 29.01.2022
SAMPLING DATE: -----~... --~.--~
TEST START DATE: 24.01.2022
SAMPLEREC DATE: TEST FINISH DATE: 28.01.2022
-------.­
SAMPLED BY R.GF ENV. CON: T: _24.1oC
...... _ - ­
H: 46%
! BHjTP No.: LD-5 j TP - 05 DEJYfH (Ill) : 1.2 SAMPLE No.: B 2
Mould No.: C-9 Weight: 7747 gms. Volume: 2050 em

Density determination Moisture content after soal<ing Swell data


WI. of sample +mold. gm I 12544 Can No. 13KM Molding date 24.01.2022
Wt.of sample I gm 4797 Wet SOil+C'111 gm 530,0 Initial dial reading 3.44
Wet density I gnVc.c I 2.34 Dry Soil+Can gm ']84.9 1st day reading 37!4
WI. of Water gm 45.1 2nd day reading 3.44
Initial moisture content WI. of Can gm 27.0 3rd day reading 3.44
c;;;N;;. NF WI. of Dry Soil gm '157.9 4th day reading 3.44
WI. of Wei Soil +Can gm 520.0 MoislllreContent % 9.85 Selllement diil,(mtn) 0.00
WI. of Dry Soil + Can gm 487.0 HI. of specimen (mm) 116
WI. of moist11re gm 33.0 Compaction data Selliement % 0.00
Wl. of Cnn gill 25.0 No. of blows fLayer 56
WI. of dry Soil gm 462,0 No of layer 5
Moishll"e Content % 7.14 Max.dry proctor densily (gm/ccY··· 2.18
Dry density gnVc.c 2.18 Compaction 'Yo, 100

DEARING RATIO DATA


Peni 1.oad Bearing Bearing 1400
in Lbs value Ratio
Inch Ib/iIl' COI'.CBR ...... !.. .-~-~~. i-·~·--·-······--~

~ 1~ ~p.
0.0125 .--7---------~---

0.0250 412 137 1000 ! :/


~ ~ 1 - ­
g 800 ~------+---~--~-------+------~~------
0.0500 900 300 c
<D
/
• • •.

~ 600 + - - - 4 f - - - - 1 - - - - - 1 - - - - - + - - - - - - i
0.0750
0.1000
1350
1794
450
598 60.~ I ..... ~....._I__
0.1500
0.2000
2347
2911
782
970 65
&l 400
I ..
O.2S00
0.3000
0.3500
3192
3406
3540
1064
1135
1180
II.
200 I--+---t----~-·-I-----I-----+-----

0 I -_ _ _l...-_ _ _l...-_ _ _l...-_ _ _.l-_ _---.J

0.'1000 3653 1218 0.0 0.1 0.2 0.3 04 0.5


0.5000 Penetration in (ins)

R E M A R K S : ' ( at OMC 7.1 %


....-.---:--.-.-.-~... - ..- --~--

TESTED BY :1~:iXaz_A~:11('d/lJsl~1<l11_ CHECKED BY jREVIEWED BY: Asad Abbas


Al'PROVED BY :

RCF-JED-I'IIY-SOIL-OS-05
20.01.202()
-c.,L::...(_:./(jI~ .:;' •..:;;~ ifL:?~ I~
tqf~ERI~~~ CR10101~
tinlfib$fj~Con-tp.uny(~".OOO.()(,J(}$;.~

RIYADH GEOTECHNIOUE & FOUNDATIONS CO~


'.\~'\''''I:''AO~""""
,J~,:J~,,\ .;'V...,..J~;~*,,~V.iJ--oo.;:.oU'U"'~

P.o. Box 9182, j('dddil 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fox: +966 (12) 6715426 Email: rgf-wp@erigeosciences.com
Loc,1tion: Garnati'M St near Arbaeen St. intersection, Mushrefah District;. Jeddah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIENT : NEOM PROJECT NO. : 21J4037
PROJECT: NEOM Desalination Plant to Gayal Transmissi REPORT DATE: 29.01.2022
SAMPLE SOURCE: LD-S IF-OS
---~--.
TEST START DATE: 24.01.2022
SA MPLING DATE: - TEST FINISH DATE: 28.01.2022
SA MPLE REC DATE: - ENV.COl' 24.1oC H: 46%
BH/TPNo.: LD-51 TP-05 DEPTH (m): 1.2 SAMPLE No.: B-2

2.20 MAXlMUM DRY DENSITY: 2.18 glee


OPT. MOISTURE CONTENT: 710 '%
--­
2.16 /
o 2.12
/ PENETRATION AT:

CBR at 100'Yt, of MOD:


0.1"

QQ
~
E I
i / CBR at 950ft, of MDD:
Cl I / :ill
>­ 2.08 . CBR at 90'Y<, of MDD: 12
!::
(J)
Z
;/
/ .

~ 2.04 ,/ :
~ // i
Cl
,/ TESTED BY: .'aiyaz Aluned/Usrna
2.00
;/

1.96
/ ...
CHECKED BYjREVIEWED BY: Sl~ci!'SadAbbas

• •
APPROVED BY:
10 15 20 25 30 35 40 45 50 55 60 65
C. B. R. % (Lab Incharge)

Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RCF-JED-PHY-SOIL-QS.05
20.01.2020
t:.-l:A..:./Uf}1 -:: ·A~ V',-:?..J I~
rqf_ER'~' CR 10'tO"lGG265
L__ ~_y~!~",_SA . ,' ..."""':u,;-.""" ...""
RI'VADH GEOTE2CHNIOue & FOUNOA-noNSCO_
,J,,",....~,,"',.,..,
'1 ... \~\"t."lTA1iI'''::'-"",

P.o. Box 9'182, J,,,ili,1i1 2'1413, KSA Telepl10ne: +966 (12) 6715621 /6176860 Fax: +966 (12) 6715426 Email: rgf-wp@erigeoscienC€s,com

Location: G£lrm1t1'k1 St. near Arbaeen SL intersectjo~ Mushre((1h District Jeddah

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
ASTM D 1883-16
CLIENT : NEOM PROJECT NO, : 21J4037
PROJECT: Transmissio REPORT DATE: 29.01.2022
SAMPLE SOURCE: TEST START DA1 24,01.2022
SAMPLING DATE: TEST FINISH DAl 28.01.2022
SAMPLE REC. DATE: ENV.Cm 24.1oC H: 46%
BH/TPNo.: LD-5 JP-05 DEPTH(m) : 1,2 SAMPLE No.: B-2

2.20 MAXIMUM DRY DENSITY: 218 gfee


OPT. MOISTURE CONTENT: 7.10 tyo

2.16 / ,

/ .,
. ;
PENETRATION AT:

CBR at 100'% of MDD:


0.2"

~
<.,)2.12

E
17 CBR at 95'1<, of MDD: i!2
.
Cl
>-2.08
/ CBR at 90"J., of MDD: -18
!::
(f)
z
w /
/ , .. . ,
02.04
,
~ /// TESTED BY: Ahmed/Usma
0
/'
2.00
: .. CHECKED BY/REVIEWED BY: Syed Asad Abbas

./
/' .. :

1.96
' . 'I: APPROVED BY:
(Lab Incharg.e)
15 20 25 30 35 <1.%. Ft.5 % 50 55 60 65 70

Copyright of this document is owned by RGF, not be reDroduced except with permission from the company.

RGF·jED-PHY-501L·OS·05
20.01.2020
C~~(II, ~J:!f J:',-:?)l~
"",~" .. ,,"ml"'nl w:::'­ ~ RIYADHGEOTECHNIQUE & FOUNDA'TIONSCO.
r'..o. IJpX ;m211~ YanbU Al.Sln~lyj}·h4· MYAS 51000. K:5A tcl'CphQt~t 4f)66 (l~.)J~~l j ;S"fS¢!$3 f.a'~ +sl}.6 {14} 31S(.t9~O tflvl); r$t·~)bu.tt~{tac~kii1(.~i:~(.t)m
l,«:~.\l~l Al'Nl)jN;ml!)~ $(f~~t. Ui;!Il.I'J-M.;ihM'i ~i(t~ ,R,C,,. 'faflbV -N...$1n~Jy;m
aJR-1

PROJECT: Neom desalination plant to )Jayal transmisssion system. (LD-5) DATE SAMPLED: 1/112022
SAMPLE SOURCE: TP: 06 DEPTH: 0.60 m DATE RECEIVED: --6-/1-12--0--2--2---1
SAMPLE DESCRIPTION:
------------------
Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.:
SAMPLED BY: RGF
ENVT. CONDo TEMP.
-------------------------------------------
HUMIDITY: 39%
DATE STARTED: -2-3-/0-1--/2-2-~~~~
DATE COMPLETED: 27/0112022
Mould No: A·4 Weight: 6455 gms Volume: 2113 cc

Soaked CBR 96 Hrs

900 ....
. .
Bearing 800
in value Ratio
. ~ ~
(Ib/in" (Cor.CBR)
N 700
(Ibs) c:
(in)
.~
:0 600

<1l
::; 500
I :/
ro /,/
> 400
0)
c:
....
C1I
300 V
/ ATII ?"

<1l
en 200 /
100 / AT 0.1"

0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: 27
,... ..... ,... ~ ......... n.~ __

TESTED BY: ............ . CHECKED BY/REVIEWED BY: .'>need Akhtar


-------------------
RGF· YNB-PHY·50IL·05·04
01.08.2021 APPROVED BY: copyAl{lfaiS(J./JD.Q:(J BY<l'9J. __
~--- t:A.;.,l;;../{JI-' ;: ..w .
.,,;; A.. .... ) I~
j v
':'::::::::"::'::::..:.::.:.:'~~~dll"d RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P".o, e.b.x '31..)"111, ytmbu N-SlnlJV.:Ih. #VIYAS 51000, KSA, lcleph()iW! 4-966 (11')) :3).SOO:91 13"2~)9j f,\l~! ~aiS6 tId) ji~OO.·:n'j. (rrnlU: fgf.y.mbu(pmfS,V!McJ""n£~J"t:om
loe.~\-lol1j AU:i3w<:tn:1nd ~trl'~t. H,:iI.hu·..hl.h~t"I OkttkL 1LC:,~ "t',mhu Al·,:~tnMvilh

Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED:


--------1
TP: 6 DEPTH: 0.60 m DATE RECEIVED: 6/112022
I~AMt'Lt. DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: 8-1
SAMPLED BY: RGF
--------------------------------------------
ENVT. CONDo TEMP. 24AOC HUMIDITY: 39%
-------:-c-=-::::--::-::-:-
DATE STARTED: 23101/22 DATE COMPLETED: 2710112022

Mould No: A-5 Weight: 6452 gms. Volume: 2109 cc


--------

Soaked CBR 96 Hrs

1400
Penitration I Load Bearing Bearing 1300

(in)
value
(lb/inL)
Ratio
(Cor.CBR) N
c
:0
a;
1200
1100
1000
900
800
.--/
~
~
v
---
::J
rn 700 /
> 600 ./
01
c:
.;: 500 /' AT 0.2"

rn
a; 400 V
OJ
300 ./" AT 0.1"

200 /
100 /
0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: C.MDD = 2.16 g/cc CBR @ 95 % Compaction at 0.1" = 40


C.OMC= 5.25% CBR@95%Compactionat 0.2"= 46
TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF· YNI3·PHY·SOIL·OS·04
01.08.2021 APPROVED BY: copy1\I~.mi*,NJm1i r):{cw,in
Cl:-l;./VJ-,:~~ .;;;& J'l:?~f~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
p,.{), iK>x :w:.tH, "(;',,00 Al.sl";fv~h! M;vA5 Sj~ K'~ 'lit~~J}hM~! ""!,;G6 (1~)3l_~,t ~ l).:')009~ ~;oX! ~1it\6 (14) $l~O'j46 tlfl..lli: fuf,.yMtbU~l1i'iltwoot.f#Jlt:(!t.l;om
tru;,,-l:lL:UH AUil)w~t\:2n.d!\tt'~~ Hi'I:\ Al.M;lh;m rnu(kl.l\.C,~ Y;m.,.l M.•:~ltuiv.m '

alR,1

Neom desalination plant to gayaf transmisssion system. (LD-5) DATE SAMPLED:


---------1
SAMPLE SOURCE: M-TP: 6 DEPTH: 0.60 m DA TE RECEIVED:
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt ft gravel. SAMPLE NO.:
ISAMPLED BY: RGF
ENVT. CONDo TEMP.
------------------------------------------­
24.4°C HUMIDITY: 43%
23/01122 DATE COMPLETED: 2710112022
Mould No.: A-6 Weif~ht: 6385 Volume: 2110 cc

Soaked CBR 96Hrs

1800
. ,"
Bearing
1600 •

~---"
value Ratio ' ,

(lb/in LI (Cor.CBR) 1400

1200
~, , :"

Q)
::l 1000 / ..

>
iii
800 / AT 0.2"
01
c:
.;:
600
,/
'"
Q)
CD ;/ AT 0.1"
400

200 /
0
V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

56

TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF·YNB·PHY·~
01.08.2021 APPROVED BY; (oPl'~ta!fli1J.N.iMl"'j rfi;....."W.l.l.tP'--_
AnERI
p~o~ I}QiIt, 00271 t VallI»! AJ<$l~iy~h~ MYA'S S1000~ K5A l¢"4-pMnC!'t9t& Jl4~ :aa~" /37:,50.993. F....! t~ (t4) .3~Sb94ti E:rnJ.!J: 'f$~"ImlnJ~tlgeM(IH'I(t'Lt(m';
L<x.\ioruA!-H<1W:~m.,ftd_SUe:It'_. H31 M.M;;)li.;'ttiOlsVkl.I\,(" Y~flb\J A'·SJN«i~ .

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT :~N=EO=M~.____________________________ PROJECT NO: 21J4037
PROJ ECT: Neom desalination plant to sayal transmisssion system. (W-S) DATE SAMPLED: 1/112022
SAMPLE SOURCE: TP: 6 DEPTH: 0.60m DATE RECEIVED: 6/112022
SAMPLE DESCRIPTIOI\ Grayiesh Brown Well graded SAND with silt 6: gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.4°C HUMADITY: 39%
---------------­
DATE STARTED: 23/01122 DATE COMPLETED: 2710112022

2.20 MAXIMUM DRY DENSITY: 2.16 glee


OPT. MOISTURE CONTENT: 5.25 %

2.15 I I. /'1

PENETRATION AT: 0.1"


2.10 +I--:-:--t-~--l

CBR at 100% of MOD: 56


2.05 I :/1'
CBR at 95% of MOD: 40

2.00 I /' CBR at 90% of MDD: 27

1.95 I ;/

TESTED BY; M.ARFAN


1.90 +I--+---I---I-------cl----+---+---+-----l
20 25 J() J5 40 45 50 55 60
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin

RGF· YNB·PHY·SOIL·05·04
01.08.2021 Copy Rights Reserved By RGF
'Cl.::..A...;;...,..(j1-' ~~ J'Y...J I ~
An ERI Company RIYADH GEOTECHNIQUe & FOUNDATIONS CO•
.P,,()~ Do)( 302:7:t... Vanbo I\hSlt~ty~h.. MYJ\'S 51000, K-'>,A 'Tt"l~phoM! 4~6a t~4) 3?Sf:W92/ a2S0!>93 Fa,,""! ~9uo (14) ;125(1"'>46 ~m.1IH l~f-'tanbu~cf:S~jtm(:~~,~
t~Vt)nl MN~ooand St(>J:'iCl"," H~a N~Mt1h;tn O$\tkt.. ft.,., Y~flW N~'h~iy~n .

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT NEOM. PROJECT NO: 21J4037
--------------------------------------------
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: 1/1/2022
SAMPLE SOURCE: TP: 6 DEPTH: 0.60m DATE RECEIVED: 6/1/2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt a gravel. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.4°C HUMADITY: 39%
DATE STARTED: 23/01/22 DATE COMPLETED: 27/01/2022
------------------­
------------------­

MAXIMUM DRY DENSITY: 2.16 glee


2.20
OPT. MOISTURE CONTENT: %

2.15 1 'I I/,: I


PENETRATION AT: 0.2"
2.10 I I" ; / 1
CBR at 100% of MOD: 64
2.05 +I---t--:-­
CBR at 95% of MDD: 46

2.00 ! /
CBR at 90% of MDD: 31

1.95

1.90 J-I----+-~_+_--l--_1_-+--+_-!__-I_____j TESTED BY: M.ARFAN


25 30 35 40 45 50 55 60 65 70
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar

RGF: YNB-PHY:$OIL:05-04
01:08:2021 Copy Rights Reserved By RGF
Cl;.,l.:/V l, ~~.~y)l~
An ERI Comp,;,rl! RIYADH GEOTECI-INIQUE & FOUNDATIONS CO.
P~O. no. )()~11" Yanbo-Al~SWlf"'h~ MYA5 !'.1:1OOO. k$A ft:l~~ --1'%6 (Id) tll~09P21 ,):(~:) ';');1 +9()G (Iii) 3250946 t:tnAU; Tgf"Y~buO'er~~tIMKei,{(Hn
tQ(~)Jqm #'k-iJ:W~t\3n(i SHetrt~ Hal JU M;}h$tll 04i.rlt;(. H.(,,,. Y~hi;n.j Al~smal)'.lh

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) 30/1212021


SAMPLE SOURCE: TP: 07 DEPTH: 1.20 m DATE RECEIVED:
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt ft gravel. SAMPLE NO.: ----::B::---::-2-~--/
SAMPLED BY: RGF
ENVT. CONDo TEMP. HUMIDITY: 39%
------::--:-=::=-=-:::-:­
DATE STARTED: 23101122 LJAI t:: COMPLETED: 2710112022

Mould No: F-1

Soaked CBR 96 Hrs

1000 ... ..... -


... ..
Penitration Load Bearing Bearing 900
in value
(lb/in L !
Ratio
800
Iv'
-~
(Cor.CBR) .~
700
/
V ..

600
<1>
.2
500
/'
>'"
Cl 400 / -
c:
.;::
300
/' AT 0.2"
'"
Ql
CO
e/
200
7
Po U.·I

100

0
V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 286 868

TESTED BY: M.ARFAN CHECKED BYIREVIEWED BY: Saeed Akhtar

RGF· YNB·PHY·SOIL·05·04
01.08.2021 APPROVED BY: cop/lR\Wlli!ifNi5Il1lid'&;lf~irr
Cl;.,l;../(II, ~~ jl:?)I~
AnERICQl'I'l))llI'lY RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P,o. Bow J.Dl1;i~ YoH\W At..sm;yt;;h. M'lAS S1,j;')Oi). J($A -fell?phtme! ~96() (14) ~a~!ll a~~3 fax! +tJ6fi (lfi):32!tQ';l46 J;ffi~tI~ .t$f<v,:mbufY'ert~<»dern:¢$,(.qm
to('.a\Ion~AU;laWArumtl ~'1?£>L H:.31 A.t.MaJufl bidrkt.- R.t!... VanhuAMtnaivah - .

CBR-2

PROJECT: Neom desalination plant to gayal transmisssion system.(LD-5) DATE SAMPLED:


----------1
SAMPLE SOURCE: TP: 7 DEPTH: 1.20 m DATE RECEIVED: 6/112022
SAMPLE DESCRIPTION: Brown Well SAND with silt & SAMPLE NO.: B-2
--~--------~--------------~---------
SAMPLED BY; RGF
ENVT. CONDo TEMP.
--------------------------------------­
24.4"( HUMIDITY: 39%
DATE STARTED: 23/01122 DATE COMPLETED: 27/0112022
Mould No: F-2 Weight: 6432 gms. Volume: 2106 cc

Soaked CBR 96 Hrs

1400
1300

.--­
Bearing
1200 ...-'
Ratio
1100
(Cor.CBR) N
~
.:: 1000
---,V
;§ 900
Q) 800 /
:::l
ro 700 V
>
en 600 /
.§ 500 /'" AT 0.2"

ro
Q) 400
V
r::o
300 / AT 0.1"

200
]I'
100
,/
o V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR @ 95 % Compaction at 0.1" = 43


CBR @ 95 % Compaction at O. 2" ~ 48
TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF- YNB·PHY-SOIL·05·04
01.08.2021 APPROVED BY: copfl<l'gp,i§dlIl~A&dYJ9R&
'C~L;./ul!J~difl:?.)'~
An EBI Company RIYADH GEOTECHNIQUE& FOUNDATIONS CO.
p...o. BOlt 30:1'1" v';,mbtrA'.$I~lY,)l\. M\"AS ~1i:)()O~ x5.A lttk1!pr;toM!'! ~ij (lA) 'l~$099~1 )1~3 Ji.a)!~ .966 ('1,iJ) 3flS()~46 (man! fEi.y~but11ef(gC\)t:tl~t)(@'1..(fim
i.OOIlk¥l:: AhN~w;"'JH'td Stt.t't't. *iM .M.M;i.h:n~ O'l).lfict. R (;" vanhll AI.~~h

caR·3

Neom desalination plant to gayaf transmisssion system. (LD-5) DATE SAMPLED:


--------;
M-TP: 7 DEPTH: 1.20 m DATE RECEIVED: 6/112022
I::>AMt'L.t:. DESCRIPTION: Grayiesh Brown Well graded SAND with silt ft gravel. SAMPLE NO.: 8-2
BY: RGF
------------~~~~------
Z4.4°C HUMIDITY: 43%
-----­
23/01/22 DATE COMPLETED: 27/0112022
F-3 Weight: 6415 Volume: 2114 cc

Soaked CBR 96Hrs

1800 ..
. ... . ......
:

'''~D
.....

Peni Load Bearing ~


1600

(Lbs)
value
(lb/in L'
Ratio
(Cor.CBR) N 1400 ~ t-'.---­
oS V
:c 1200 /
Q)
:::l 1000
/' .....

iii
> 800 / AT 0.2"
01
t:
.;::
ns 600
/
ro
<IJ

400 / AT 0.1"

200 /
0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks:

TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar


RGF· YNB·PHY·SOI[·05·0~
01.08.2021 APPROVED BY: cor#/{f.g,i?rl'tig~&rI¥;9Ek/:
.~ Cl;.,(.;./VJ,~&J'4?)I~
AnEIU "... RIYADH GEOTECHNIOUE& FOUNDATIONS CO.
p~o, Of))j;30271. ~W ,.t<Si~ty"h~ MYA'i Sl~X.s.A Telet'hMC!';,*9{)6Jll\~J.15O':»2/3"~SM9J. fa;.:: ",,%6 {1<1)-U2509-4'6 JiflUlil J~y'.$rtb\'@ttl'~¢$Cte(\t~l.t6m
lO<'3tlOO1} Al·N~W",;ff\')fld.Sttctt'. H;)l At~M .. htH, Ohtrk'tJt.C,. Y;)nbU A.·sJMtt'l~h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT :..:..:N:.=.EO=-:M:.:.;.._ _ _ _ _ _ _ _ _ _ _ _ __ PROJECT NO: 21J4037
-----
PROJ ECT: Neom desalination plant to '!layal transmisssion system. (LO-5) DATE SAMPLED: 30/1212021
SAMPLE SOURCE: TP: 7 DEPTH: 1.20 m DATE RECEIVED: 6/1/2022
SAMPLE DESCRIPTIO" Grayiesh Brown Well graded SAND with silt fr gravel. SAMPLE NO.: B·2
ENVT. CONDo TEMP. 24.4°C HUMADITY: 39%
---------------
DATE STARTED: 23/01/22 DATE COMPLETED: 2710112022

2.20 .... ~ MAXIMUM DRY DENSITY: 2.17 glee


OPT. MOISTURE CONTENT: 5.40 %
2.15 I I· I· /

PENETRATION AT: 0.1"


2.10
CBR at 100% of MDD: 62
2.05 1 1/
CBR at 95% of MDD: 43

CBR at 90% of MDD: 28

1.95 I - I

TESTED BY: M.ARFAN


1.90 +-1---+---+---+---+---\----\----1----1----1----1
20 25 30 35 40 45 50 55 60 65 70
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin


---------

RGF·YNB·PHY·SOIL·05·04
01.08.2021 Copy Rights Reserved By RGF
CL:-l;../~/JJ ~~ if9.)f~
RrVADH (,EjEOTECHNIQUE& FOUNDATIONS CO..
'P~O. no" iO:l7'1, V.;t.nbU JL!.s';t\~~"'·h" MVAS 51.0()0~ KSA 'TcJ.epht:>nth +96& t:t4) :;lil~0992 I a2~3 f'~t);;: ~>66 (14l. 'l2SO!J46 'E~il! f"$f~ya",uu4'Weflg~tad6nc~$.:.(-()m
t1)(:)l~f)t\~_ Al·N~·'~~tXJ Slt~_~1 .. H~j N-M.;),h."n Off.trtct" ft,(:? V~II00 At·~(\~~ft

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
LlENT NfOM. PROJECT NO: 21J4037
PROJECT:
------------------------------------------­
Neom desalination plant to !!Jayal transmisssion system.(LD-5) DATE SAMPLED: 30/1212021
SAMPLE SOURCE: TP: DEPTH: 1.20 m DATE RECEIVED: 6/112022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded SAND with silt & gravel. SAMPLE NO.: B-2
ENVT. CONDo TEMP. 24.4°C HUMADITY: 39%
DATE STARTED: 23/01/22 DATE COMPLETED: 27/0112022
-------------------
-------------------

MAXIMUM DRY DENSITY: 2.17 glee


2.20 . .- .•,--....,--,---,
OPT. MOISTURE CONTENT: 5.40 %

2.1S I .\ .' \ \' /'1.


PENETRATION AT: 0.2"
2.10
CBR at 100% of MDD: 68

2.0S I AI'
CBR at 95% of MOD: 48

2.00 I I / I CBR at 90% of MOD: 32

1.95 I I - .I

1.90 +I--+--+--+--+--+--+--+--t---+--I TESTED BY: M.ARFAN


25 30 35 40 45 50 55 (i() (i5 70 75

Axis Title CHECKED BY/REVIEWED BY:


Saeed Akhtar

APPROVED BY: Awais Nisar

RGF- YNB-PHY-SOll-OS-04
01.08.2021 Copy Rights Reserved By RGF
r--::----~ Ct.::A..::,.-rV I, ~~J'l:?) I~
:::.:...::::.:::.=.:.::.:;:=:!....!~==dl!=! RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. fWlt. 30:211. 'Y.<itlbu AhSInt.Jy~h. M'(AS Sl@. KSA T('J~nm "!)uS (l-d) a1~('Y,r;)1 / a'S0993. fa..! -f~1S6 "h<1' ;,;t:'>0946 f.~:afi: r$"YMlbu@e*l$eokle-tKcu:om
.ltx:;)titm: N:·.u~\Y':,tmll)d S,tft~l.) tIJt Al.MJh~ Dhttkl... R,C.~ v:,tnb\J A1-$if'i~Iy~h

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: 2/1/Z(J2.2
------------1
SAMPLE SOURCE: TP: 08 DEPTH: 0.60 m DATE RECEIVED: 6/1/2(J2.2
SAMPLE DESCRIPTION: Brown Silty SAND w-I'-:-'t'h-g-ra-Y-e'I.-------­ SAMPLE NO.:
SAMPLED BY: RGF
----------~~--------------------------
ENVT. CONDo TEMP. 24.7°C HUMIDITY: 41%
DATE STARTED: 23101/22 DATE COMPLETED: 2710112022

Mould No: F-1 Weight: 6470 gms Volume: 2115 cc

Soaked CBR 96 Hrs

900

in value
Beoc~
Ratio
800

~
(Ib/in" N 700
(in) (Ibs) (Cor.CBR) c:
::0
600 /
.2
Ql
500
,/
/
ru
> 400 /'
en
c:
.;:
ru
Ql
300
./
/ AT n 7"

m 200 /
100
;/ ATO.1"

0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
0.5000 258 783
Remarks: C.MDD = 2.16 glcc CBR @ 90 % Compaction at 0.1" 26
C.OMC = 5.55 % CBR @ 90 % Compaction at 0.2" 31
TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: C;QPpd Akhtar
---------------------- ---------------------
RGF· YNB·PHY·SOIL·OS·04
01.08.2021 APPROVED BY: CopyA'tl!l1aiS\cN&511-11 i}yCRrin
~t!) v ·~~if0~1~
f AnERlcornpaoy ,,!~J~' v';''!.
~
CL:,l.:;../U I,:.:·
- " "
RIYADH GEOTECHN1QUE & FOUNDATIONS CO.
·P.O, Box j0211~ Y~nbu Al"Si~ly:;J;h.. MY"$. Sl000 f{~A 't(!"Jt.pbon~: ·.,,)6.6 (Id) )'5(')9+)l.I3i~j
A r3){~ ..:!)6.6 t14) :U5b'j)4G fmJU: fS',Y.Jfli>u«pertgeosctM)(cs,c-Om
hJoC~t't):n: .Al.J.J3w::m::md Slrot't. Hal Ai· Mahan Ohtrkl. A"C.. V..nbu ht.5'n31v:..h

Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED:


-------1
SAMPLE SOURCE: TP: 8 DEPTH: 0.60 m DATE RECEIVED: 6/1/2022
SAMPLE DESCRIPTION: Brown Silty SAND with gravel. SAMPLE NO.:
SAMPLED BY: RGF
-------------------­
ENVT. CONDo TEMP. 24.7°C HUMIDITY: 41%
DATE STARTED: 23/01122 DATE COMPLETED: 27/01/2022
Mould No: F-2 Weight: 6432 gms. Volume: 2106 cc
---------­

Soaked CBR 96 Hrs

1400
Penitration I Load Bearing Bearing 1300
1200 ...
value Ratio
(lb/inL) (Cor.CBR) N'
c
:a
1100
1000
900 V
~ ----­
(1) 800 /
:::l
iii 700 ./
> 600 ./
01
C
·c 500 / AT 0.2"
<II
(1) 400
./'
CIl
300 / AT 0.1"

200
,/
100
,/
0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: C.MDD = 2.16 g/ee CBR @ 95 % Compaction at 0.1" = 42


C.OMC = 5.55 % CBR @ 95 % Compaction at 0.2" = 46
TESTED BY: M.ARFAN CHECKED BY/REVIEWED BY: Saeed Akhtar

RGF· YNI3-PHY·SOIL-05-04
01.08.2021 APPROVED BY: eopy1\Wqi*.N.imG rYB@fl
Cl:.-L:./UJ,~~J't?.),~
AnERI RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.()~ Box 3o:~ra., Y;;Jnbu Af..s!~f~ah, MYM S1()¢(}, ';51\ '1'(!~n«!'; ..966- {It})2~:lI3::f~) t;Vi~ t!lM ,(iit} :jl'!H>i>46 £t»llfl: rg1.y.muu&effgt>Oittenuu:flm
tm:~dflm AJ..}.!;lv.ran:aruJ Sf,"l. Hal JJd~Mah.tt Uidrld. tLC,,~ Vaotw Al.SIf)."dVah

CBR"

PROJECT: Neom desalination plant to gayal transmisssion system.(LD-5) DATE SAMPLED:


-------1
SAMPLE SOURCE: M-TP: 8 DEPTH: 0.60 m DATE RECEIVED: 6/112022
SAMPLE DESCRIPTION: Brown Silty SAND with gravel. SAMPLE NO.:
SAMPLED BY: RGF
ENVT. CONDo TEMP.
------------------------------------------
24.7"C HUMIDITY: 43%
DATE STARTED: 23101/22 DATE COMPLETED: 27/0112022
Mould No.: F-3 Weight: 6415 Volume: 2114 cc

Soaked CBR 96Hrs

1BOO

(Lbs) I
value
(Ib/in"'
Bearing
Ratio
(Cor.CBR) N
1600

1400 ~
..---
L'V­
t:

~ 1200
(1)
::l
iii
1000 L
> BOO / ATO.Z"
OJ
t:
.;:
<U
600 /
(1)
OJ
400
;/ AT 0.1"

200
;'
a V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: CMDD = 2.16 glee CBR @ 100 % Compaction at 0.1" 58


COMC'" 5.55 % CBR @ 100 % Compaction at 0.2" 64

TESTED BY: M.ARFAN CHECKED BY IREVIEWED BY: Saeed Akhtar


RGF· YNB·PHY·SOI[·05·0~
01.08.2021 APPROVED BY: c('PY1i~ffi!f?tlimfi ~9?tie
Cl.:,l;:./uJ, .~~ ify.)j~
RIYADH GEOTECHNIOUE.& FOUNDATIONS CO.
P.O. n~ 30111~ Y;)t\hu A1"'~M'I'~'~. MYA,l'i 51000, il:SA Te-1t'phOOf'-! ".9btj (U~ ;J:l~1·1 ~n50993. F:u;! ~ {1.t} !J2SQ946 tJY'l,1il;te!'Y4hhU~i'iaelY...t':kHh:'(!1~f;t)M
l«"o)li-i)m ft!·N"-~f\Ml(f Stf(:(:l;, H31 i\l"htlhli-h 01~V1(t, rt.(;"" Va,tlW N·$~f1X*fy)h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT :~N~EO~M~.___________________________ PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: 2/112022
SAMPLE SOURCE: TP: 8 DEPTH: O.60m DATE RECEIVED: 6/1/2022
SAMPLE DESCRIPTIO" Brown Silty SAND with gravel. SAMPLE NO.:
ENVT. CONDo TEMP. 24.7°C HUMADITY: 41%
---------------­
DATE STARTED: 23/01/22 DATE COMPLETED: 27/0112022

2.20 MAXIMUM DRY DENSITY: 2.16 glee


OPT. MOISTURE CONTENT: %
2.15 I 1/
7

PENETRATION AT: 0.1"


2.10 I I·' I .I /1
CBR at 100% of MDD: 58
2.05 I I,,"
CBR at 95% of MDD: 42

2.00 I /1 CBR at 90% of MDD: 26

1.95

TESTED BY: M.ARFAN


1.90 +1-----1--1----+----1----+----1-----,1----+----1
20 25 30 35 40 45 50 55 60 65
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar Yasin

RGF- YN B-PHY-SOIL-OS·04
01.08.2021 Copy Rights Reserved By RGF
CL:-~UI~~&ifL:?.)I.~
AnERlcol1lp;ll1)' RIYADH GEOTECHN1QUE & FOUNDATIONS CO..
Il~O" flO~--1027:l.l' Ya.n:bU AI..Sl~;Yil-h.. M'lAS 51000, K5A T(:l,phOf\e-~ --tgf>G- (34) U2!?,O!>?'l/ :l~S0993 F~)(: ~~'6 (14) 32509illi trm~U: f.gf'y~f'ibtJ~~t"i8'l}hS·dl!'Il-{'e5...eom
lO(',,;l\k)n: At·N~m.h,)nd SUt'trl.. H-iil AI·M,)P01Ifi O;;i.tt'i(\.: *,.C., V,*l\b\.I AlvSffl.utyah

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT : NEOM. PROJECT NO: 21J4037
------------------------------------------
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: 2/1/2022
SAMPLE SOURCE: TP: 8 DEPTH: 0.60 m DATE RECEIVED: 6/1/2022
SAMPLE DESCRIPTION: Brown Silty SAND with gravel. SAMPLE NO.: 1
ENVT. CONDo TEMP. 24.7°C HUMADITY: 41%
DATE STARTED: 23/01122 DATE COMPLETED: 27/01/2022
-----------------
------------------

MAXIMUM DRY DENSITY: 2.16 glee


220 ~
OPT. MOISTURE CONTENT: %

2.15 11~-+--+-~+--f-~-.....-t-.....-j:;17:r'c:.c..·II~____
PENETRATION AT: 0.2"
2.10 I /1
CBR at 100% of MDD: 64

2.05 I j""
CBR at 95% of MDD: 46

2.00 I / CBR at 90% of MDD: 31

1.95 1 ',M"

1.90 +1----f---I-----l-----+---f---+--+---f-----J TESTED BY: M.ARFAN


25 30 35 40 45 50 55 60 65 7()
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar yasin

RGF- YNB·PHY-50Il-05-04
01,08,2021 Copy Rights Reserved By RGF
./ . . . -~. AI" _r"
, - , "CA..;... l.;./U I" ~>::f vl?.)I:r~
RIYADH GEOTECHNIQUe & FOUNDATIONS CO.
P.(')~ »ox ;J()2n.. Y,i)",ooMe$Ir~;;Y~h. MYAS 5lt;;lXi. t(-;sh \1rl~ph"~J 1'966 (14) !il~~2-/.):l~j. fa'JI_~ +?OO (14) 3i5i)~fI() rimall! t"'-'YMtnJePt!(I$~tie:ntC!).tOOl
to{~~~m Al·N~~_wn4_'ttW. l1~1 AJ.·Ml;I.h;)t1 1)h:1ti{t.,. R,C... YiIliJ\l Al~$ln;jl... ~h
CtJR-/

PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: _. ___ _
SAMPLE SOURCE: TP: 09 DEPTH: 0.60 m DATE RECEIVED: -_.- - .­
--~---------------
SAMPLE DESCRIPTION: Grayiesh Brown Well graded Gravel with silt & sand. SAMPLE NO,:
SAMPLED BY: RGF
, CONDo TEMP. HUMIDITY: 40%
26101122 3010112022

Mould No: M-4

Soaked CBR 96 Hrs

1000

Bearing 900
Ratio
800 ~
~
N
(Cor.CBR) .E
a 700
/
..

600
<lJ
.a ./
V
500
>'"
C) 400 / -.
I:
.;:: / ATO.2"
'"
<lJ
300
m
200 / A, U.·'
100 /
0 /
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

2.22 glee 32
5.35% 36
TESTED BY: W/SAL KHAN BY: Saeed Akhtar

RGF· YNB·PHY·SOIL·05-04
01.08.2021 APPROVED BY: copyPli~Il~(;}ff3Va(iin
f .. E RI,-"
Gl:A..:../YI., ~~ ifl.:?..J'~
RIYADH GEOTECHNIQUE &. fOUNDATIONS CO.
V~OA Do~: lOth, "1',)noo Ai,Si~""~hf M'fM :SiOOO, "SA It':'~hf)11<< ..$66 {:t4) ~nS0992'J ~'S<»ll r")j( ~96;6 t14}Z}~~946 fmilU: f8'·y~nb\JVer~~!cnc:oeu;orn
tM.J»mm "'''NaWA1\dlld$.lTi'i''t. W.." M-M.>ium Dhhlrt. R.l:,. 'Yanhu .lU...."i1n,.;1h..ah '

CBR·2

PROJECT: Neom desalination plant to gayol tronsmisssion system.(LD-S) DATE SAMPLED:


-------1
SAMPLE SOURCE: TP: 9 DEPTH: 0.60 m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded Gravel with silt & sand. SAMPLE NO.: B-1
SAMPLED BY: RGF
ENVT. CONDo TEMP. 74.3°C HUMIDITY: _ _40%~__
-------­
DATE STARTED: 26/01122 DATE COMPLETED: 30/0112022
Mould No: M-5 Weight: 6475 Volume: 2110 cc

Soaked CBR 96 Hrs

1600
Bearing 1500
1400
value Ratio ~

.......-­ .-----­
L
1300
(lb/lo )
(Cor.CBR) N'" 1200
c
1100
~ 1000 .-----'
III 900 L
::l V
(ii 800
> 700 / AT 0.2"
en /
c 600
'C
<'Q 500
-/' v.
III
CO 400 sf
300 /
200 /'
100 ?
o V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

CBR@ 95 % 52
CBR @ 95 % Comoaction at 0.2" 56
TESTED BY: WISAI. KHAN CHECKED BY/REVIEWED BY: Snppr/ Akhtar
---------------------- -------------------
RGF· YNB·PHY·SOIL·05·04
01.0B.2021 APPROVED BY: copy~lifAYf{~~f1l8yoft8in
Cl.;:...l;../{J I~ ~~ J'l;-'.)';.(.::/
An IERI COl1\p.'Iny 'RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
F,O.. nOI( 1<)111 t 'fMlUu AJ~n.;Jy"h~ M'fAs ~100Q~ xSA 'felt<Pb~: "'966 {1.1) !"i~91'/ ~'$(}19)' h)l! .t;t)6 fi4) :li~946 trn-aHt flJf,y~rllm@efl8~1»'I(!oC~1,torn
t()('J)llnm Al,HAw.an:arHl '8tTf"l't Hal M-Mah.m {)khk.. R.C.. Y:mhu AJ.~lntiiv,,)h

CBH.,J

Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED:


-------1
M-TP: 9 DEPTH: 0.60 m DATE RECEIVED:
-- -------1
I~AMI'Lt. DESCRIPTION: Grayiesh Brown Well graded Gravel with silt Ii sand. SAMPLE NO.:
PLED BY: RGF
ENVT. eOI'm. TEMP.
-------------------------------------------
24.3°( HUMIDITY: 43%
26101122 DATE COMPLETED: 3010112022
Mould No.: M-6 Weight: 6435 gms. Volume: 2108 cc

Soaked CBR 96Hrs

2000
Bearing Bearing 1800
value
(lb/in<1
Ratio
1600 ~
I ~
N
(in) (Lbs) (Cor.CBR) t:: ..
:c 1400

1200 ~
(J) V
2
ro 1000 /
>
OJ
t::
800
/ AT 0.2"

.;:: //
ro 600
(J)
ro
400 / ATO.1"

200 /
0 V
0.0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

Remarks: 69

TESTED BY: WISAL KHAN CHECKED BYIREVIEWED BY: Saeed Akhtar


RGF- YNB·PHY -SOI[-05·0~
01.08.2021 APPROVED BY: (GIll' o'~~eW&gtfBr51ein
.~
. ...v 1.:.A••;;,,~VI,~AJ'v)j~
~~l -..... +*

AnERICortlPlWY 'W.!:'$,.~ v"'RlYADH GEOTECHNIQUe& FOUNDATIONS CO.


p,o.., Bi):)I:.3021t1 YahW Ai.,5;Mfy;ah. MYA..IJ '5;1000, Ks.A _,e1f'PhOOt~-~~6 J14~ 32~1_/tJ~_$f}993 FOIl!; .%-G (l-4)tJ25CD46 (maU: 19tvY"hl>U6'.. tiat':'()'5,tJi}fh':~U;(fflI
~<><\>1I<>l\1 AI·;',,,,.","" ~I_l,
11.1 A1M~h,n (>1>111,), !'t~. 'i.nWAI~h

TEST REPORT
C.B.R. DENSITY RELATIONSHIP
CLIENT :.:.:N=.:EO::.::M~. _ _ _ _ _ _ _ _ _ _ _ _ __ PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gaya/ transmisssion system.(LO-5)
-- --­
DATE SAMPLED: 22/01/2022
SAMPLE SOURCE: TP: 9 DEPTH: 0.60 m DATE RECEIVED: 22/01/2022
SAMPLE DESCRIPTIO" Grayiesh Brown Well graded Gravel with silt Ii sand. SAMPLE NO.: B-1
ENVT. CONDo TEMP. 24.3 DC HUMADITY: 40%
DATE STARTED: 26/01/22 DATE COMPLETED: 3010112022
-----------------­

2.25 MAXIMUM DRY DENSITY: 2.22 glee


OPT. MOISTURE CONTENT: 5.35 %

2.20 I "V

PENETRA TlON AT: O. 1"


2.15

CBR at 100% of MDD: 69


2.10
CBR at 95% of MDD: 52

2.05 I Y CBR at 90% of MDD: 32

2.00 1 1 - I

TESTED BY: WISAL KHAN


1.95 +1---+----cf----+---+----j----j-----+---+----1f----I
25 30 35 40 45 50 5S 60 65 70 7S

Axi" Title CHECKED BY/REVIEWED BY:


Saeed Akhtar

APPROVED BY: Awais Nisar Yasin

RGF· YNB-PHY·SOll-05-04
01.08.2021 Copy Rights Reserved By RGF
-';..Ai · _ r ·
.I

~1f)
,ti1l>
vr;Iit~Gl::..-l.;;:./UI!) ~~i
- _.. c./0~,;J~
..
AnEo.company "t_~. UOAj RIYADH GEOTECHNIOUE& FOUNDATIONS CO.
p~o_ nox 302711' Y;.\n'bU Al"'SI~'iy~h" MYA$ 51000.. )!SA- T."j~pho.nc! +966 {lA) 3~S0992' J a2~3 Fu! ..1)66 (14. 3;;t50;',)46 lim"n: t$'~y.illt'lb\J~~tt6~o$dcn<·~'S-,(OM
\'<.K:~U"Jl~ At.NJW3Mn(;f :'ittlC'tt~ H.Jl Aj~M;,h4Jn Ot>ltict, n.c" Y.afl\>v N.slf,a,:Jyat.

TEST REPORT
C.B.R. - DENSITY RELATIONSHIP
CLIENT .. NEOM . PROJECT NO: 21J4037
PROJECT: Neom desalination plant to gayal transmisssion system. (LD-5) DATE SAMPLED: 22/01/2022
SAMPLE SOURCE: TP: 9 DEPTH: 0.60m DATE RECEIVED: 2210112022
SAMPLE DESCRIPTION: Grayiesh Brown Well graded Gravel with silt ft sand. SAMPLE NO.:
ENVT. CONDo TEMP. 24.3°C HUMADlTY: 40%
DATE STARTED: 26/01122 DATE COMPLETED: 3010112022

MAXIMUM DRY DENSITY: 2.22 glee


2.25 .. c..•. _c••,.c • OPT. MOISTURE CONTENT: %
-. ....
2.20 ..
/
c .
..
..

;/
/' PENETRATION AT: 0.2"
2.15 .. V ..

2.10
..

/'
V CBR at 100% of MDD: 76

/' CBR at 95% of MDD: 56

2.05
--

V ' .

CBR at 90% of MDD: 36


/'
2.00
/
1.95 TESTED BY: WISAL KHAN
30 35 40 45 50 55 60 65 70 75 80
Axis Title CHECKED BY/REVIEWED BY:
Saeed Akhtar

APPROVED BY: Awais Nisar yasin

RGF- YNB-PHY·SOIL-05-04
01.08.2021 Copy Rights Reserved By RGF
CHEMICAL TESTS ON SOIL

LAYDOWN No. 1

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


fq f~ER"~""
P,O. Box 9182. JedrJah 21413~ KSI\
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
Telephone:: +966 (12) 671SG2i /6176860 fax! ·1966(12) 6715426
Location: Gamalha Sf. near Arbaeen SL intefSection~ Mushrefah Olstdct~
Em311: '8f'...wp@eJi8eO$dcnce~.com
leddah

TEST REPORT
CHEMICAL ANALYSIS OF SOIL
CLIENT: NEOM Comp<luy
PROJECT: NEOM Desalination Plant to Gayal Transmission S)'I:iU:!Hl (LD-01)
SOURCE:
-~
Trial Pits RECEIVING DATE; 27.03.2022
LOCATION: - i PRO) hLT NO.: 21J4037
SAMPLING
- iREPORl DATE: 29.03.2022
DATE:
SAMPLEDBY: iRGF IENV. CON: T : 22.7 oC H: 45%

~ERSTESTED
LAB. REF. No. :
O.
UNIT METHOD RESULTS
DEPTH
pH - BS-1377-3 8.74
LD-1 TP-Ol Chloride (Cl) (H20 Ext) % " 0.0565
II
B-1 Sulphate (SOg) (H20 Ext) % 0.1165
0.60 Carbonate as CaCOg % ASTM D-4373-14 8
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.76
LD-1 TP-02 Chloride (Cl) (H20 Ext) % II
0.0495
II
Sc3 Sulphate (S03) (H20 Ext) % 0.0665
1.00 Carbonate as CaC03 % ASTM D-4373-14 6
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.78
II
LD-1 TP-03 Chloride (CI) (H20 Ext) % 0.0055
II
B-1 Sulphate (S03) (H20 Ext) % 0.0035
0.60 Carbonate as CaC03 % ASTM D-4373-14 9
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.84
II
LD-1 TP-04 Chloride (CI) (H20 Ext) % 0.0045
II
B-1 ) % 0.0012
0.60 Carbonate as CaC03 % ASTM D-4373-14 4
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.72
II
LD-1 TP-05 Chloride (Cl) (H20 Ext) % 0.0285
II
S-2 Sulphate (S03) (H20 Ext) % 0.2415
0.50 Carbonate as CaC03 % ASTM D-4373-14 5
Organic Content % AASHTO-T -267 -

TESTED BY: Ibrahim REVIEWED BY/ CHECKED BY : -

APPROVED BY: ~"W _____


..t~~\!.A.lJdU1 Majid

(CHEMIST INCHARGE)

RFG-J ED-CHE-SOIL-02-01
01.01.2015
RIYADH GEOTECHNIOUE & FOUNDATIONS CO.
P.O, SO)( 9182, Jcddah 21413, KSA Telepnone: +%6 (12) 6715621/6176860 Fax: .a.96G (12) 6715426 Email: r8f~wp@erI6€lOsdcnces,com
Location: Garnatha St. near Arbaeen Sf. Intersec.tlon, Moshrerah District. Jeddah

TEST REPORT
CHEMICAL ANALYSIS OF SOIL
CLIENT: NEOM CtCOlnt>llnV

TP.NO.
PARAMETERS TESTED UNIT METHOD RESULTS
DEPTH (m)
pH - BS-1377-3 8.82
LD-1 TP-06 Chloride (Cl) (H20 Ext) I % " 0.0115
B-2
1.10 Carbonate as CaC03
q=t ASTM 0-4373-14
11
0.0065
8
Organic Content % AASHTO-T-267 -
pH - BS-1377-3
II
Chloride (CI) (H20 Ext) %
II
%
Carbonate as CaC03 % ASTM 0-4373-14
Organic Content % AASHTO-T-267
pH - BS-1377-3
Chloride (CI) (H20 Ext) % "
II
%
Carbonate as CaC03 % ASTM D-4373-14
Organic Content % AASHTO-T-267
pH - BS-1377-3
II
Chloride (Cl) (H20 Ext) %
II
%
Carbonate as CaC03 % ASTM 0-4373-14
Organic Content % AASHTO-T-267
pH - BS-1377-3
II
Chloride (CI) (H20 Ext) %
II
%
Carbonate as CaC03 % ASTM 0-4373-14
Organic Content % AASHTO-T -267

TESTED BY: Ibrahim REVIEWED BY / CHECKED BY, _~bdUl Majid

APPROVED BY: - . . .... ~----

(CH 1ST INCHARGE)

RFG-JEO-CHE-SOIL-02-01
01.01.2015
CHEMICAL TESTS ON SOIL

LAYDOWN No. 3

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


rq f P.O. 00)( 9182. Jeddah 21413. KSI\
CL,l.;/ul., ~~t-?,-:?)I~
,:::.An:.::E=R.::.I=-==~~~~;:;;;J RIYADH GEOTECHNIQUE & fOUNDATIONS CO.
Telephone: .f966 (12) 671S621/6176860 F3X: -t966 (12)6715416 ErnaU: rgf-wp@edUCOSc1CnCe5:,com
LocaHon : G~rn<4th3 St. ne-ar Arbaeen Sf. intersection, Musllrefah District. Jeddah

TEST REPORT

I CHEMICAL ANALYSIS OF SOIL I


CLIENT: NEOM Comnany
~ROJEC1': _ .....­
NEOM Desalination Plant to Gayal Transmission Sy~Ht:lll (LD-03)
SOURCE:
~.......
Trial Pits IltECEIVING DATE: 30.01.2022
LOCATION: - iPRO)hLT NO.: 21J4037
SAMPLING
DATE:
- .REPOR'l DATE: 23.03.2022

SAMPLED BY: RGF iENV. CON: T: 23.6 oC H: 44%


Im­ m
LAB. REF. No. : ICHJ-21j0275 (S)
TP.NO.
PARAMETERS TESTEu Ul"l11 METHOD RESULTS
DEPTH(m)
pH - BS-1377-3 8.78
11
LD-3 TP-01 Chloride (CI) (H 20 Ext) % 0.1135
11
B-1 Sulphate (S03) (H20 Ext) % 0.0965
0.60 Carbonate as CaCOg % ASTM D-4373-14 3
Organic Content % AASHTO-T -267 -
pH - BS-1377-3 8.80
II
LD-3TP-02 Chloride (CI) (H20 Ext) % 0.0425
II
5-3 Sulphate (S03) (H20 Ext) % 0.0935
1.00 Carbonate as CaC03 % ASTM D-4373-14 4
Organic Content % AASHTO-T-267 -
pH - BS-1377-3
II
8.84
LD-3TP-03 Chloride (CI) (H20 Ext) % 0.1205

U.
II
B-1 Sulphate (SOg) (H20 Ext) 0.0735
0.60 Carbonate as CaC03 ASTM D-4373-14 4
Organic Content AASHTO-T -267 -
pH - BS-1377-3 8.86
II
LD-3TP-04 Chloride (Cl) (H20 Ext) % 0.0425
II
B-3 Sulphate (S03) (H 20 Ext) % 0.0700
1.00 Carbonate as CaC03 % ASTM D-4373-14 5
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.89
LD-3TP-05 Chloride (Cl) (H20 Ext) % II
0.0850
II
B-1 Sulphate (S03) (H20 Ext) % 0.0200
0.60 Carbonate as CaCOg % ASTM D-4373-14 5
Organic Content % AASHTO-T-267 -

TESTED BY: Ibrahim REVIEWED BY / CHECKED BY:

APPROVED BY:
--~~~~-----"'~-

(CH

RFG-JED-CHE-SOIL-02-01
01.01.2015
rc.q f lCal
C),~
~M}
-: ;.-I..,:- -. I'"",--'\""..--'--'""'u'./....
v
VKA'
I ..- I -
j ....- .
.. .
w ~-.Ai, ,;7/ -, If:;! _"'/
- .--:,.,:>''/
... U'. 1"""...-'/
_~n~_lillillilCOmpany Il.'.~lm~ __ ~-=-- RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
.
.~r"
::r­

P.o. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621/6176860 Fax: .. 966 (12) 6715426 Email: rBf~wp@erlBeosciences.com
location: Garnatha Sf. near Arbaeen 51. intersection, Mushrefah District, JeddOlh

TEST REPORT
CHEMICAL ANALYSIS OF SOIL
CLIENT: NEOM Company _.
PROJECT: NEOM Desalination Plant to Gayal Transmission System (LD-03)
SOURCE: Trial Pits RECEIVING DATE: 30.01.2022
LOCATION: - PROJECT NO.: 21J4037
SAMPLING
- REPORT DATE: 23.03.2022
DATE:
SAMPLED BY: RGF ENV.CON:T: 23,6 DC H: 44%
__' 0 ­

LAB. REF. No.: CHJ-21j0275 (S)


TP.NO.
PARAMETERS TESTED UNIT, METHOD RESULTS
DEPTH (m)
pH - BS-1377-3 8.88
LD-3 TP-06 Chloride (CI) (H20 Ext) % " 0,2410
B-1 Sulphate (S03) (H20 Ext) % " 0.0315
0.60 Carbonate as CaC03 % ASTM D-4373-14 5
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.87
LD-3TP-07 Chloride (Cl) (H20 Ext) % " 0.0340
11
B-1 Sulphate (S03) (H20 Ext) % 0.0210
0.60 Carbonate as CaC03 % ASTM D-4373-14 4
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.92
11
LD-3 TP-08 Chloride (CI) (H20 Ext) % 0.0200
S-3 Sulphate (S03) (H20 Ext) % " 0.0130
1.00 Carbonate as CaC03 % ASTM D-4373-14 6
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.72
II
LD-3 TP-09 Chloride (CI) (H20 Ext) % 0.0320
B-2 Sulphate (S03) (H20 Ext) % " 0.0146
0.60 Carbonate as CaC03 % ASTM D-4373-14 5
Organic Content % AASHTO-T-267 -
pH - BS-1377-3
Chloride (Cl) (H 20 Ext) % "
Sulphate (S03) (H20 Ext) % "
Carbonate as CaC03 % ASTM D-4373-14
Organic Content % AASHTO-T-267

TESTED BY: Ibrahim / Tayyab REVIEWED BY / CHECKED BY:


--~~~----~----

APPROVED BY:
~(C~H~E~r~~~~~--

RFG-J ED-CHE-SOI L-02-01


01.01.2015
CHEMICAL TESTS ON SOIL

LAYDOWN No. 5

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


CA..::,l;./UI,:;: ·Ai~ ~'-:?) I~
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
P.O. Box 9182, Jeddah 21.,13, KSA Telephone: +956 t1Z) 6715621/6176860 f~)x~ +966 (12) 6715426 £m",lI: rsf.wp@lerig(.'osdenceu;onl
lOl:atioo : G.uoalha St. near ArbOlcl'n St. intersecHon, Mushrefah Dldr!ct, Jeddah

TEST REPORT

I CHEMICAL ANALYSIS OF SOIL I


II~~:
NEOM Company
NEOM Desalination Plant to Gayal Transmission System (LD-05)
SOURCE: Trial Pits iRECEIVING DATE: I
30.01.2022
LOCATION:
~........
- !h{OJECl NO.: • 21J4037
SAMPLING
:­ REPORT DATE: 23.03.2022
DATE:
I H:
SAMPLED BY: RGF ENV.CON:T: 22.7 oC ; 45%
LAB. REF. No. : CHJ-22/0275 (S)

TP. NO.
PARAMETERS TESTED UNIT METHOD RESULTS
DEPTH(m)
pH - BS-1377-3 8.92
II
LD-5TP-01 Chloride (Cl) (H20 Ext) % 0.0055
II
B-1 Sulphate (S03) (H20 Ext) % 0.0030
0.00~0.60 Carbonate as CaC03 % ASTM D-4373-14 4.00
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.79
II
LD-5 TP-05 Chloride (Cl) (H20 Ext) % 0.2480
11
S-3 I Sulphate (S03) (H20 Ext) % 0.0835
0.00~1.00 Carbonate as CaC03 % ASTM D-4373-14 5.00
Organic Content % AASHTO-T-267 -
pH - BS-1377-3
II
8.76
LD-5TP-OH Chloride (Cl) (H:,<U Ext) % 0.1275
II
S-2 Sulphate (S03) (H20 Ext) % 0.1035
0.50 Carbonate as CaC03 % ASTM D-4373-14 6.00
Organic Content % AASHTO-T-267 -
pH - BS-1377-3 8.78
II
LD-5TP-09 Chloride (CI) (H20 Ext) % 0.2695
II
B-2 Sulphate (S03) (H20 Ext) % 0.1960
0.60 Carbonate as CaC03 % ASTM D-4373-14 8.00
Organic Content % AASHTO-T-267 -
TESTED BY: Ibrahim/ REVIEWED BY / CHECKED BY: ~~~bdUl~ajid ._~

APPROVED BY: ~~
~T INCHARGE)

RFG-JED-CHE-SOIL-02-01
01.01.2015
APPENDIX-C

PHOTOGRAPHS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


TRIAL PITS
LAYDOWN No. 01

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


CORE BOX PHOTOS PAGE: (1) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-01 (Excavation)

Trial Pit No. LD1-TP-01 (Excavation)


CORE BOX PHOTOS PAGE: (2) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-01 (Excavation)

Trial Pit No. LD1-TP-01 (Bulk Sample)


CORE BOX PHOTOS PAGE: (3) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-02 (Excavation)

Trial Pit No. LD1-TP-02 (Excavation)


CORE BOX PHOTOS PAGE: (4) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-02 (Excavation)

Trial Pit No. LD1-TP-02 (Bulk Sample)


CORE BOX PHOTOS PAGE: (5) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-03 (Excavation)

Trial Pit No. LD1-TP-03 (Excavation)


CORE BOX PHOTOS PAGE: (6) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-03 (Excavation)

Trial Pit No. LD1-TP-03 (Bulk Sample)


CORE BOX PHOTOS PAGE: (7) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-03 (Bulk Sample)

Trial Pit No. LD1-TP-04 (Excavation)


CORE BOX PHOTOS PAGE: (8) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-04 (Excavation)

Trial Pit No. LD1-TP-04 (Excavation)


CORE BOX PHOTOS PAGE: (9) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-04 (Bulk Sample)

Trial Pit No. LD1-TP-04 (Bulk Sample)


CORE BOX PHOTOS PAGE: (10) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-05 (Excavation)

Trial Pit No. LD1-TP-05 (Excavation)


CORE BOX PHOTOS PAGE: (11) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-05 (Excavation)

Trial Pit No. LD1-TP-05 (Bulk Sample)


CORE BOX PHOTOS PAGE: (12) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-05 (Bulk Sample)

Trial Pit No. LD1-TP-06 (Excavation)


CORE BOX PHOTOS PAGE: (13) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-06 (Excavation)

Trial Pit No. LD1-TP-06 (Excavation)


CORE BOX PHOTOS PAGE: (14) of (14)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD1-TP-06 (Bulk Sample)

Trial Pit No. LD1-TP-06 (Bulk Sample)


TRIAL PITS
LAYDOWN No. 03

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


CORE BOX PHOTOS PAGE: (1) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-01 (Excavation)

Trial Pit No. LD3-TP-01 (Excavation)


CORE BOX PHOTOS PAGE: (2) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-01 (Excavation)

Trial Pit No. LD3-TP-01 (Bulk Sample)


CORE BOX PHOTOS PAGE: (3) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-02 (Excavation)

Trial Pit No. LD3-TP-02 (Excavation)


CORE BOX PHOTOS PAGE: (4) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-02 (Excavation)

Trial Pit No. LD3-TP-02 (Bulk Sample)


CORE BOX PHOTOS PAGE: (5) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-03 (Excavation)

Trial Pit No. LD3-TP-03 (Excavation)


CORE BOX PHOTOS PAGE: (6) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-03 (Excavation)

Trial Pit No. LD3-TP-03 (Bulk Sample)


CORE BOX PHOTOS PAGE: (7) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-03 (Bulk Sample)

Trial Pit No. LD3-TP-04 (Excavation)


CORE BOX PHOTOS PAGE: (8) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-04 (Excavation)

Trial Pit No. LD3-TP-04 (Excavation)


CORE BOX PHOTOS PAGE: (9) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-04 (Bulk Sample)

Trial Pit No. LD3-TP-04 (Bulk Sample)


CORE BOX PHOTOS PAGE: (10) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-05 (Excavation)

Trial Pit No. LD3-TP-05 (Excavation)


CORE BOX PHOTOS PAGE: (11) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-05 (Excavation)

Trial Pit No. LD3-TP-05 (Bulk Sample)


CORE BOX PHOTOS PAGE: (12) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-05 (Bulk Sample)

Trial Pit No. LD3-TP-06 (Excavation)


CORE BOX PHOTOS PAGE: (13) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-06 (Excavation)

Trial Pit No. LD3-TP-06 (Excavation)


CORE BOX PHOTOS PAGE: (14) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-06 (Bulk Sample)

Trial Pit No. LD3-TP-06 (Bulk Sample)


CORE BOX PHOTOS PAGE: (15) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-07 (Excavation)

Trial Pit No. LD3-TP-07 (Excavation)


CORE BOX PHOTOS PAGE: (16) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-07 (Bulk Sample)

Trial Pit No. LD3-TP-07 (Bulk Sample)


CORE BOX PHOTOS PAGE: (17) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-08 (Excavation)

Trial Pit No. LD3-TP-08 (Excavation)


CORE BOX PHOTOS PAGE: (18) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-08 (Excavation)

Trial Pit No. LD3-TP-08 (Bulk Sample)


CORE BOX PHOTOS PAGE: (19) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-08 (Bulk Sample)

Trial Pit No. LD3-TP-09 (Excavation)


CORE BOX PHOTOS PAGE: (20) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-09 (Excavation)

Trial Pit No. LD3-TP-09 (Bulk Sample)


CORE BOX PHOTOS PAGE: (21) of (21)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD3-TP-09 (Bulk Sample)


TRIAL PITS
LAYDOWN No. 05

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000004 REVISION CODE: 01


CORE BOX PHOTOS PAGE: (1) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-01 (Excavation)

Trial Pit No. LD5-TP-01 (Excavation)


CORE BOX PHOTOS PAGE: (2) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-01 (Excavation)

Trial Pit No. LD5-TP-01 (Bulk Sample)


CORE BOX PHOTOS PAGE: (3) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-02 (Excavation)

Trial Pit No. LD5-TP-02 (Excavation)


CORE BOX PHOTOS PAGE: (4) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-02 (Excavation)

Trial Pit No. LD5-TP-02 (Bulk Sample)


CORE BOX PHOTOS PAGE: (5) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-02 (Bulk Sample)

Trial Pit No. LD5-TP-03 (Excavation)


CORE BOX PHOTOS PAGE: (6) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-03 (Excavation)

Trial Pit No. LD5-TP-03 (Excavation)


CORE BOX PHOTOS PAGE: (7) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-03 (Bulk Sample)

Trial Pit No. LD5-TP-04 (Excavation)


CORE BOX PHOTOS PAGE: (8) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-04 (Excavation)

Trial Pit No. LD5-TP-04 (Excavation)


CORE BOX PHOTOS PAGE: (9) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-04 (Bulk Sample)

Trial Pit No. LD5-TP-05 (Excavation)


CORE BOX PHOTOS PAGE: (10) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-05 (Excavation)

Trial Pit No. LD5-TP-05 (Excavation)


CORE BOX PHOTOS PAGE: (11) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-05 (Bulk Sample)

Trial Pit No. LD5-TP-06 (Excavation)


CORE BOX PHOTOS PAGE: (12) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-06 (Excavation)

Trial Pit No. LD5-TP-06 (Excavation)


CORE BOX PHOTOS PAGE: (13) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-06 (Bulk Sample)

Trial Pit No. LD5-TP-06 (Bulk Sample)


CORE BOX PHOTOS PAGE: (14) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-07 (Excavation)

Trial Pit No. LD5-TP-07 (Excavation)


CORE BOX PHOTOS PAGE: (15) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-07 (Excavation)

Trial Pit No. LD5-TP-07 (Bulk Sample)


CORE BOX PHOTOS PAGE: (16) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-08 (Excavation)

Trial Pit No. LD5-TP-08 (Excavation)


CORE BOX PHOTOS PAGE: (17) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-08 (Excavation)

Trial Pit No. LD5-TP-08 (Bulk Sample)


CORE BOX PHOTOS PAGE: (18) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-09 (Excavation)

Trial Pit No. LD5-TP-09 (Excavation)


CORE BOX PHOTOS PAGE: (19) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-09 (Excavation)

Trial Pit No. LD5-TP-09 (Bulk Sample)


CORE BOX PHOTOS PAGE: (20) of (20)
PROJECT: NEOM Desalination Plant to Gayal Transmission System
CLIENT: NEOM Company

Trial Pit No. LD5-TP-09 (Bulk Sample)