Professional Documents
Culture Documents
Abebech Tsige Laundry Soap Factory Final
Abebech Tsige Laundry Soap Factory Final
Laundry soap
1000-1500 1000-1500 1000-1500
1 Maching 1 1,041,500 1 159,000 1 391,000
kg/hr kg/hr kg/hr
Machine
2 Vehicles
ISUZU
NPR 1 26,801
1 Vehicles NP
ISUZU
NPR 1 26,801
NP
Toyota
1 38,630
HULUX
5 Packing Materials
1000-1500
1 391,000
kg/hr
Proforma Invoice 3
KAKI private Limited Company
Selected
Quantity Unit Price Suppliers
Model
Required (Birr)
KAKI
private
Limited
Company
roforma 3
ECH Trading
Selected
Total Supplier
Price
(Birr)
3,800
3,900
TATECH
12,800
Trading
20,500
3,075
23,575
Selected
Supplier
Mehamed
Tiko
House
and
Office
Equipme
nt
Trading
iopia PLC Supplier-3: Modern Building Industries PLC
Total
Unit Price
Price Unit Price Unit Price Total Price
Quantity After
(Birr/Ton (Birr/Kg) (Birr/Ton) (Birr/Ton)
VAT(15%)
)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
2,520 - - - - -
- 1 1.85 2.13 1,850 1,850
2,520 1,850
378 277.50
2,898 2,128
Selected
Suppliers
Selected
Suppliers
#REF!
#REF!
Abebech Tsige Laundry Soap Factory
Detail Investment
1 Electrical Installation
Existing
Ser Investment
Item Description Unit Quantity
No Cost
(In Birr)
1 Boiler set 1 136,000
2 Ploder set 2 172,593
3 Melting Tank set 1 70,000
4 Mixer set 1 76,238
Sub Total 454,831
4 Vechicle
Sub Total
2 HP laserjet Printer 1102 pcs 1 3,800
3 Fax Machine JX210P pcs 1 3,900
4 Dell 790 Computer RAM 2GB pcs 1 12,800
Sub Total
VAT(15%)
Grand Total
5 Doble pad Stal pcs 1 3,500
6 Single pad stal pcs 1 3,000
7 Computer Table pcs 1 2,650
8 Shalf pcs 1 4,450
9 Hi Bag pcs 2 4,600
Sub Total
VAT(15%)
Grand Total
Total Planned Office Furniture and Equipment
Total Office Furniture and Equipment
6 Working Capital
7 Pre-production Cost
Existing Planned Total
Ser
Item Description Investment Investment Investment
No
Cost(birr) Cost(birr) cost (birr)
1 Pre-production Cost 149,254 - 149,254
2 Pre-production interst - 241,929 241,929
Total 149,254 241,929 391,183
Planned
Total Value
Investment
(Birr)
Cost(USD)
136,000
172,593
70,000
76,238
454,831
Total Cost
60,000
182,000
67,000
62,000
10,000
381,000
7,307,028
219,211
73,070
219,211
182,676
8,001,195
10,000
191,786
9,000
200,786
8,201,981
Existing Planned
Total Value
Investment Investment
(Birr)
Cost(birr) Cost(birr)
10,000 - 10,000
10,000 10,000
- 3,800 3,800
- 3,900 3,900
- 12,800 12,800
20,500
3,075
23,575
- 3,500 3,500
- 3,000 3,000
- 2,650 2,650
- 4,450 4,450
- 9,200 9,200
22,800
3,420
26,220
49,795
59,795
Abebech Tsige Laundry Soap Factory
I. Project Investment
Description Amount Percentage
Total Fixed Investment Costs 12,842,304 64%
Pre-production Capital Expenditure 391,183 2%
Working Capital 6,780,331 34%
Total 20,013,818 100%
N.B: The data used for developing Assumption are taken from research comodity study ,specification of mac
The company is assumed to start production at 60% and increase by 15% per annum untill it reaches 90% and re
Percentage
Unit Price Unit Price
Types of Product Share of
(Birr) Per Ton
Product Mix
3 Cost Estimate
Raw Material
Unit of Unit Price Requirement
Type of Raw Material
Measurment (Birr) Per
1 Kg of output
Sub-Total
Investment
Description Rate(%)
cost (Birr)
3.8. Insurance
Investment
Insurance Rate
Description cost Insurance Cost
(%)
(Birr)
Fixed Asset
Percentage of Depreciation
Original cost
Description Original Annually
(Birr)
cost(%) (Birr)
A. Depreciation
Building and construction 1,307,169 5% 65,358
Machinary and Equipment 8,656,812 12% 1,038,817
Vehicle 2,567,000 20% 513,400
Office Furniture & Equipment 59,795 10% 5,980
Sub total 1,623,555
B. Amortaization
Pre-production Cost 149,254 10% 14,925
Pre-production interst 241,929 10% 24,193
Sub total 39,118
Total 1,662,674
3.11. Salary Expense
Monthly
No of Salary Scale
Categories of staff Salary
Employee ( Birr)
(Birr)
1. General Manager Office
1.1. General Manager 1 8,000 8,000
1.2. Executive Secretary 1 3,000 3,000
2. Production and Technical
Manager 1 5,000 5,000
2.1. Production Supervision 1 4,000 4,000
2.2.1. Direct Worker 4 3,500 14,000
2.2.1 Unskilled Worker 4 1,500 6,000
2.2. Repair and Maintenance
2.2.1.General Mechanic 1 3,000 3,000
3. Administration & Finance
Department Manager 1 5,000 5,000
3.1. Administration Section Head 1 4,000 4,000
3.1.2. Administration officer 1 3000 3,000
3.1.3. Office Guard 2 1,000 2,000
4.1.4. Store Keeper 1 1,500 1,500
3.1.5. Cleaner 2 1,500 3,000
3.2. Finance Section
3.2.1. Accountant 1 3,000 3,000
3.2.2. Payroll Administrator 1 3,000 3,000
4. Marketing Department Manger
4.1. Sales Head 1 3,000 3,000
4.2. Procurement head / Purchaser 1 5,000 5,000
Total 25 75,500
Employees Salary incrased by 5% of basic Salary each year
Annual costs
Description
(Birr)
ty study ,specification of machineries and equipments ,proforma invoice and Promoter feasibilty study
Machine Share
(%)
92%
8%
100%
721 17,658,375
288 6,486,750
1,874 45,443,287
2,883 69,588,412
oduction of Various Product (In Ton) Annual Revenue per Various Types of Product (In Birr)
200gm Total 100gm 150gm 200gm
1,124 1,730 10,595,025 3,892,050 27,265,972
1,405 2,162 13,243,781 4,865,062 34,082,466
1,687 2,595 15,892,537 5,838,075 40,898,959
Annual Raw
Cost of Raw Annual Raw
Material
Material Cost Annual Cost of Raw Material at Different Production
Material Per Requirement
at 100% Capacity
1Kg of at 100%
Production
Output Production
Capacity
(In Birr) capacity
(In Birr)
(In Kg) 60% 75%
Total Annual
Total Required Unit cost of
cost for
Pieces of Packing
packing
Packing Materials
Material materials
(In Birr)
(In Birr)
43,245 7.77 336,187
23,064 7.77 179,300
112,437 7.77 874,085
1,389,571
Total Fuel
Unit Cost per Total Annual
Requirements
liter Cost
( Liters)
12,000 18.38 220,560
10,000 18.38 183,800
404,360
8,087
596,247
346,272.47
102,680
448,952.47
Annual Salary
( Birr)
96,000
36,000
60,000
48,000
168,000
72,000
36,000
60,000
48,000
36,000
24,000
18,000
36,000
36,000
36,000
36,000
60,000
906,000
easibilty study
al at Different Production
ity
90%
17,374,111
17,374,111
5,967,810
14,179,517
1,903,731
1,324,854
3,282,295
259,470
26,917,677
44,291,788
Abebech Tsige Laundry S
Operating Cost Determi
P
Description
1 2 3
1.Direct Costs
Imported Raw Material 11,582,741 14,478,426 17,374,111
Local Raw Material 17,945,118 22,431,398 26,917,677
Electric Power 162,984 162,984 162,984
Packing Material 1,389,571 1,598,007 1,837,708
Sub-total 31,080,415 38,670,815 46,292,481
2.Indirect Costs
Salary and wage 906,000 951,300 998,865
Travel & Perdiem 72,480 76,104 79,909
Fringe Benefit 45,300 47,565 49,943
Uniform & Protective 14,000 14,000 14,000
Office Supplies 14,000 14,000 14,000
Telephone, Postage & Internet 6,000 6,000 6,000
Audit and Legal Fee 15,000 15,000 15,000
Administrative Expense 20,000 20,000 20,000
Fuel, Oil and Lubricant Expense 596,247 596,247 596,247
Utility Expenses 8,000 8,000 8,000
Cleaning Expense 7,000 7,000 7,000
Miscelaneous Expense 5,000 5,000 5,000
Repair & Maintenance 735,931 772,728 811,364
Insurance 177,858 177,858 177,858
Sub-total 2,622,817 2,710,802 2,803,187
Total 33,703,231 41,381,617 49,095,668
Abebech Tsige Laundry Soap Factory
Operating Cost Determination
Project Years
4 5 6 7 8 9 10
Period
Description
(Months) 0 1 2
1.Direct Costs
Imported Raw Material 3 2,895,685 2,895,685 3,619,606
Local Raw Material 1 1,495,427 1,495,427 1,869,283
Electric Power 1 13,582 13,582 13,582
Packing Material 1 115,798 115,798 133,167
Sub-total 4,520,491 4,520,491 5,635,639
2.Indirect Costs
Salary and wage 1 75,500 75,500 79,275
Travel & Perdiem 1 6,040 6,040 6,342
Fringe Benefit 1 3,775 3,775 3,964
Uniform & Protective 6 7,000 7,000 7,000
Office Supplies 1 1,167 1,167 1,167
Telephone, Postage & Internet 1 500 500 500
Audit and Legal Fee 1 1,250 1,250 1,250
Administrative Expense 1 1,667 1,667 1,667
Fuel, Oil and Lubricant Expense 1 49,687 49,687 49,687
Utility Expenses 1 667 667 667
Cleaning Expense 1 583 583 583
Miscelaneous Expense 1 417 417 417
Repair & Maintenance 1 61,328 61,328 64,394
Insurance 12 177,858 177,858 177,858
Cash on Hand (For 5 days) 0.17 468,100 468,100 574,745
Finished Goods (For 5 days) 0.17 468,100 468,100 574,745
Account Recievable (For 10 days) 0.33 936,201 936,201 1,149,489
Sub-total 2,259,840 2,259,840 2,693,749
Total 6,780,331 6,780,331 8,329,388.0
Increasing in working Capital - 1,549,057
B.Existing Working Capital 819,940
1. Raw materials 415,290
2. Monthly salary 11,900
3. Finished goods 392,750
Total Existing working capital 819,940
Proposed Working Capital
Requirement 5,960,391
ch Tsige Laundry Soap Factory
king Capital Determination
Project Years
3 4 5 6 7 8 9
4,343,528
2,243,140
13,582
153,142
6,753,392
117,125
9,370
5,856
7,000
1,167
500
1,250
1,667
49,687
667
583
417
95,139
177,858
692,854
692,854
1,385,708
3,239,702
9,993,094
18,055
Abebech Tsegi Laundry Soap factory
Fund Allocation And Source of Fund
I. Fund Allocation
Existing Total
Planned
Investment Investment
Ser. No. Description Investment
Cost Cost
Cost (Birr)
(Birr) (Birr)
1 Electric Installation - 251,527.77 251,528
2 Building and construction 1,307,169 - 1,307,169
3 Machinary and Equipment 454,831 8,201,981 8,656,812
4 Vehicle - 2,567,000 2,567,000
5 Office Furniture & Equipment 10,000 49,795 59,795
Sub-total 1,772,000 10,818,776 12,842,304
6 Pre-production Cost 149,254 - 149,254
7 Pre-production interst - 241,929 241,929
Sub-total 149,254 241,929 391,183
8 Working Capital 819,940 5,960,391 6,780,331
Sub-total 819,940 5,960,391 6,780,331
Total 2,741,195 17,021,095 20,013,818
Investment cost
Total
Ser. No. Description Existing Planned
Investment
Investment Investment
Cost(Birr)
Cost (Birr) Cost(Birr)
Balance in
Amount to be Commetment
Loan Disbursement To be
Purpose of Disbursement Disbursed (In Birr)
Plan Disbursed to
(In Birr)
12,008,150
Sub-total 4,299,670
Sub-total 3,064,706
Total 12,008,150 -
2. Equity Disbursement Schedule
Balance in
Amount to be Commitment
Equity To be
Purpose of Disbursement Disbursed (In Birr)
Disbursement Plan Disbursed to
(Birr)
8,005,668
Building & Construction 1,307,169 Existing
Office Furniture 10,000 Existing
Machinary and Equipment 454,831 Existing
Existing 5,264,473
Pre Production Cost 149,254 Existing
Working Capital 819,940 Existing
Sub-total 2,741,195
Pre-production interst 241,929 To DBE
Electric Installation 251,528 To EPPCO
1st Procurement of Machinary and
Disbursement its accessories (40% Deposit via 3,280,792
SWIFT Transfer) To the supplier
Sub-total 3,774,249
Working Capital (30% cost for
2nd L/C Opening for imported Raw 868,706
Material) To the supplier
Disbursement
Sub-total 868,706
Procurement of machineries and
its accessories (Remaining 60% of
3rd 621,519
machineries cost to be disbursed To the supplier
Disbursement with Loan)
Sub-total 621,519
Total 8,005,668 -
Equity to be Blocked 5,264,473
Months to be
Condition for
Disbursed
Disbursement
(2013)
After verification of
the effective
utilization of
previous Apr-14
disbursement and
arrival of improted
items
After verification of
the effective
utilization of Jun-14
previous
disbursements
Expected Months
to be Disbursed
(2013)
Already utilized
Dec-13
Feb-14
Mar-14
Abebech Tsige Lau
Deprecia
Percentage
of Depreciation
Description Original cost
Original Annually
cost 1
A. Depreciation
Building and construction 1,307,169 5% 65,358 1,241,811
Machinary and Equipment 8,656,812 10% 865,681 7,791,131
Vehicle 2,567,000 20% 513,400 2,053,600
Office Furniture & Equipment 59,795 10% 5,980 53,816
Sub Total 12,590,776 1,450,419 11,140,357
B. Amortaization
Pre-production Cost 149,254 10% 14,925 134,329
Pre-production interst 241,929 10% 24,193 217,736
Sub Total 391,183 39,118 352,065
Total 12,981,959 1,489,537 11,492,422
Depreciation Cost Per Annum 1,489,537
Replacement
Project Y
Description
1 2 3 4
Vehicle
Total
Abebech Tsige Laundry Soap Factory'!B2
Depreciation Schedule
Project Years
2 3 4 5 6 7 8
Project Years
5 6 7 8 9 10
2,567,000
2,567,000
9 10
718,943 653,585
865,681 -
513,400 -
5,980 -
2,104,003.9 653,585
14,925 -
24,193 -
39,118 -
2,143,122 653,585
1,489,537 1,489,537
Abebech Tsige Laundry Soap Factory
Loan Repayment Schedule
8.5%
Interest
Principal Outstanding
Year Payment
Repayment Balance
at 8.5%
Total loan Proposed 12,008,150
2014,
31-Mar-14 31,040 4,299,670
30-Apr-14 62,482 8,943,444
30-Jun-14 148,407 12,008,150
Total Pre-operating Interest 241,929
2015,
30-Apr 667,119 765,520 11,341,031
30-Aug 667,119 321,329 10,673,911
30-Dec 667,119 302,427 10,006,792
Sub-total 2,001,358 1,389,276
2016,
30-Apr 667,119 283,526 9,339,672
30-Aug 667,119 264,624 8,672,553
30-Dec 667,119 245,722 8,005,433
Sub-total 2,001,358 793,872
2017,
30-Apr 667,119 226,821 7,338,314
30-Aug 667,119 207,919 6,671,194
30-Dec 667,119 189,017 6,004,075
Sub-total 2,001,358 623,757
2018,
30-Apr 667,119 170,115 5,336,956
30-Aug 667,119 151,214 4,669,836
30-Dec 667,119 132,312 4,002,717
Sub-total 2,001,358 453,641
2019,
30-Apr 667,119 113,410 3,335,597
30-Aug 667,119 94,509 2,668,478
30-Dec 667,119 75,607 2,001,358
Sub-total 2,001,358 283,526
2020,
30-Apr 667,119 56,705 1,334,239
30-Aug 667,119 37,803 667,119
30-Dec 667,119 18,902 -
Sub-total 2,001,358 113,410
Grand Total 12,008,150
-
Abebech Tsige Laundry Soap Fa
Projected Income Statement
Project Y
Description
1 2 3 4
Sales Revenue 41,753,047 52,191,309 62,629,571 62,629,571
Operating Costs: 33,703,231 41,381,617 49,095,668 49,192,672
Gross Profit 8,049,816 10,809,692 13,533,903 13,436,899
Less Depreciation 1,489,537 1,489,537 1,489,537 1,489,537
Profit Before Interest 6,560,279 9,320,154 12,044,366 11,947,362
Less: Interest and Other
1,389,276 793,872 623,757 453,641
Charges
Profit Before Income tax 5,171,002 8,526,282 11,420,609 11,493,720
Less: Income tax 1,809,851 2,984,199 3,997,213 4,022,802
Net Profit 3,361,152 5,542,084 7,423,396 7,470,918
sige Laundry Soap Factory
ted Income Statement
Project Years
5 6 7 8 9 10
62,629,571 62,629,571 62,629,571 62,629,571 62,629,571 62,629,571
49,294,526 49,401,473 49,513,768 49,631,677 49,755,481 49,885,476
13,335,045 13,228,098 13,115,803 12,997,894 12,874,090 12,744,095
1,489,537 1,489,537 1,489,537 1,489,537 1,489,537 1,489,537
11,845,507 11,738,560 11,626,266 11,508,357 11,384,552 11,254,558
283,526 - - - - -
11,561,982 11,738,560 11,626,266 11,508,357 11,384,552 11,254,558
4,046,694 4,108,496 4,069,193 4,027,925 3,984,593 3,939,095
7,515,288 7,630,064 7,557,073 7,480,432 7,399,959 7,315,463
Abebech Tsige Laundry Soap Fact
Profit &/Or Loss Projection
Project Ye
Description
1 2 3 4
Revenue 41,753,047 52,191,309 62,629,571 62,629,571
Less: Operating Costs 33,703,231 41,381,617 49,095,668 49,192,672
Gross profit 8,049,816 10,809,692 13,533,903 13,436,899
Less: Deprication 1,489,537 1,489,537 1,489,537 1,489,537
Profit Before Interest &
6,560,279 9,320,154 12,044,366 11,947,362
Tax
Less: Interest 1,389,276 793,872 623,757 453,641
Profit before tax 5,171,002 8,526,282 11,420,609 11,493,720
Less: Profit Tax (35%) 1,809,851 2,984,199 3,997,213 4,022,802
Net Profit 3,361,152 5,542,084 7,423,396 7,470,918
- - - -
sige Laundry Soap Factory
&/Or Loss Projection
Project Years
5 6 7 8 9 10
62,629,571 62,629,571 62,629,571 62,629,571 62,629,571 62,629,571
49,294,526 49,401,473 49,513,768 49,631,677 49,755,481 49,885,476
13,335,045 13,228,098 13,115,803 12,997,894 12,874,090 12,744,095
1,489,537 1,489,537 1,489,537 1,489,537 1,489,537 1,489,537
283,526 - - - - -
11,561,982 11,738,560 11,626,266 11,508,357 11,384,552 11,254,558
4,046,694 4,108,496 4,069,193 4,027,925 3,984,593 3,939,095
7,515,288 7,630,064 7,557,073 7,480,432 7,399,959 7,315,463
- - - - - -
Abebech Tsige Laundry S
Cash Flow Project
Description
0 1 2 3
Cash Inflows
Owner's Equity 8,005,668
Loan 12,008,150
Net Profit 3,361,152 5,542,084 7,423,396
Depreciation 1,489,537 1,489,537 1,489,537
Total Cash Inflows 20,013,818 4,850,689 7,031,621 8,912,933
Cash out Flows
Fixed assets 12,842,304
Project Years
4 5 6 7 8 9 10
Description
1 2 3
A. ASSETS
Current Assets
Cash 1,840,985 3,659,566 6,790,112
Inventory 6,780,331 8,329,388 9,883,398
Total C. Assets 8,621,316 11,988,954 16,673,510
Fixed Assets
Electric Installation 251,528 251,528 251,528
Building and construction 1,241,811 1,176,453 1,111,094
Machinary and Equipment 7,791,131 6,925,449 6,059,768
Vehicle 2,053,600 1,540,200 1,026,800
Office Furniture & Equipment 53,816 47,836 41,857
Total Fixed Assets 11,391,885 9,941,466 8,491,046
Intangible Asset
Pre-production cost 134,329 119,403 104,478
Pre-production interst 217,736 193,543 169,350
Total Intangible Assets 352,065 312,946 273,828
Total Assets 20,365,266 22,243,366 25,438,385
B. LIABILITY
DBE Loan 10,006,792 8,005,433 6,004,075
Total Liability 10,006,792 8,005,433 6,004,075
C. CAPITAL
Equity contribution 8,005,668 8,005,668 8,005,668
Retained earning 2,352,806 6,232,265 11,428,642
Total Capital 10,358,474 14,237,933 19,434,310
Total Liab. & capital 20,365,266 22,243,366 25,438,385
- - -
Abebech Tsige Laundry Soap Factory
Balance Sheet Projection
Project Years
4 5 6 7 8 9
4,002,717 2,001,358 -
4,002,717 2,001,358 - - - -
45,194,542
9,993,094
55,187,635
251,528
653,585
-
-
-
905,113
-
-
-
56,092,748
8,005,668
48,087,080
56,092,748
56,092,748
-
Abebech Tsige Laundry So
Calcualtion of Financial Internal
Working Fixed
Total
Year Revenue Capital Asset Initial Inv't.
Benefits
Recovery Recovery
0 - 20,013,818
1 41,753,047 41,753,047
2 52,191,309 52,191,309
3 62,629,571 62,629,571
4 62,629,571 62,629,571
5 62,629,571 62,629,571
6 62,629,571 62,629,571
7 62,629,571 62,629,571
8 62,629,571 62,629,571
9 62,629,571 62,629,571
10 62,629,571 9,993,094 905,113 73,527,777
Total Cost
Operating Net Benefit
Replacement Total Costs Profit Tax Including
Costs Before Tax
Profit Tax
20,013,818 20,013,818 (20,013,818)
33,703,231 33,703,231 1,809,851 35,513,082 8,049,816
41,381,617 41,381,617 2,984,199 44,365,816 10,809,692
49,095,668 49,095,668 3,997,213 53,092,881 13,533,903
49,192,672 49,192,672 4,022,802 53,215,474 13,436,899
2,567,000 49,294,526 51,861,526 4,046,694 55,908,220 10,768,045
49,401,473 49,401,473 4,108,496 53,509,970 13,228,098
49,513,768 49,513,768 4,069,193 53,582,961 13,115,803
49,631,677 49,631,677 4,027,925 53,659,602 12,997,894
49,755,481 49,755,481 3,984,593 53,740,075 12,874,090
49,885,476 49,885,476 3,939,095 53,824,571 23,642,301
IRR 53%
58,027,931 NPV 58,027,931
36,373,490
Net Benefit
After Tax
(20,013,818)
6,239,965
7,825,493
9,536,690
9,414,097
6,721,351
9,119,602
9,046,610
8,969,969
8,889,497
19,703,206
39%
36,373,490
Abebech Tsige Laundry So
If Revenue Decreases b
Working Fixed
Total
Year Revenue Capital Asset Initial Inv't.
Benefits
Recovery Recovery
0 - - - - 20,013,818
1 37,577,743 - - 37,577,743 -
2 46,972,178 - - 46,972,178 -
3 56,366,614 - - 56,366,614 -
4 56,366,614 - - 56,366,614 -
5 56,366,614 - - 56,366,614 -
6 56,366,614 - - 56,366,614 -
7 56,366,614 - - 56,366,614 -
8 56,366,614 - - 56,366,614 -
9 56,366,614 - - 56,366,614 -
10 56,366,614 9,993,094 905,113 67,264,820 -
Working Fixed
Total
Year Revenue Capital Asset Initial Inv't.
Benefits
Recovery Recovery
0 - - - - 20,013,818
1 41,753,047 - - 41,753,047 -
2 52,191,309 - - 52,191,309 -
3 62,629,571 - - 62,629,571 -
4 62,629,571 - - 62,629,571 -
5 62,629,571 - - 62,629,571 -
6 62,629,571 - - 62,629,571 -
7 62,629,571 - - 62,629,571 -
8 62,629,571 - - 62,629,571 -
9 62,629,571 - - 62,629,571 -
10 62,629,571 9,993,094 905,113 73,527,777 -
Working Fixed
Total
Year Revenue Capital Asset Initial Inv't.
Benefits
Recovery Recovery
0 - - - - 22,015,200
1 41,753,047 - - 41,753,047 -
2 52,191,309 - - 52,191,309 -
3 62,629,571 - - 62,629,571 -
4 62,629,571 - - 62,629,571 -
5 62,629,571 - - 62,629,571 -
6 62,629,571 - - 62,629,571 -
7 62,629,571 - - 62,629,571 -
8 62,629,571 - - 62,629,571 -
9 62,629,571 - - 62,629,571 -
10 62,629,571 9,993,094 905,113 73,527,777 -
Total Cost
Operating Net Benefit
Replacement Total Costs Profit Tax Including
Costs Before Tax
Profit Tax
- - 20,013,818 - 20,013,818 (20,013,818)
- 33,703,231 33,703,231 1,809,851 35,513,082 3,874,511
- 41,381,617 41,381,617 2,984,199 44,365,816 5,590,561
- 49,095,668 49,095,668 3,997,213 53,092,881 7,270,946
- 49,192,672 49,192,672 4,022,802 53,215,474 7,173,942
2,567,000 49,294,526 51,861,526 4,046,694 55,908,220 4,505,088
- 49,401,473 49,401,473 4,108,496 53,509,970 6,965,141
- 49,513,768 49,513,768 4,069,193 53,582,961 6,852,846
- 49,631,677 49,631,677 4,027,925 53,659,602 6,734,937
- 49,755,481 49,755,481 3,984,593 53,740,075 6,611,133
- 49,885,476 49,885,476 3,939,095 53,824,571 17,379,344
IRR 28%
22,744,379 NPV 22,744,379
1,089,938
Total Cost
Operating Net Benefit
Replacement Total Costs Profit Tax Including
Costs Before Tax
Profit Tax
- - 20,013,818 - 20,013,818 (20,013,818)
- 37,073,555 37,073,555 1,809,851 38,883,405 4,679,493
- 45,519,779 45,519,779 2,984,199 48,503,978 6,671,530
- 54,005,235 54,005,235 3,997,213 58,002,448 8,624,336
- 54,111,939 54,111,939 4,022,802 58,134,742 8,517,632
2,567,000 54,223,979 56,790,979 4,046,694 60,837,673 5,838,592
- 54,341,621 54,341,621 4,108,496 58,450,117 8,287,950
- 54,465,145 54,465,145 4,069,193 58,534,338 8,164,427
- 54,594,845 54,594,845 4,027,925 58,622,769 8,034,727
- 54,731,029 54,731,029 3,984,593 58,715,623 7,898,542
- 54,874,024 54,874,024 3,939,095 58,813,119 18,653,754
IRR 33%
30,104,856 NPV 30,104,856
8,450,415
Total Cost
Operating Net Benefit
Replacement Total Costs Profit Tax Including
Costs Before Tax
Profit Tax
- - 22,015,200 - 22,015,200 (22,015,200)
- 33,703,231 33,703,231 1,809,851 35,513,082 8,049,816
- 41,381,617 41,381,617 2,984,199 44,365,816 10,809,692
- 49,095,668 49,095,668 3,997,213 53,092,881 13,533,903
- 49,192,672 49,192,672 4,022,802 53,215,474 13,436,899
2,567,000 49,294,526 51,861,526 4,046,694 55,908,220 10,768,045
- 49,401,473 49,401,473 4,108,496 53,509,970 13,228,098
- 49,513,768 49,513,768 4,069,193 53,582,961 13,115,803
- 49,631,677 49,631,677 4,027,925 53,659,602 12,997,894
- 49,755,481 49,755,481 3,984,593 53,740,075 12,874,090
- 49,885,476 49,885,476 3,939,095 53,824,571 23,642,301
IRR 49%
56,183,340 NPV 56,183,340
34,528,898
Net Benefit
After Tax
(20,013,818)
2,064,660
2,606,362
3,273,733
3,151,140
458,394
2,856,645
2,783,653
2,707,012
2,626,539
13,440,249
10%
1,089,938
Net Benefit
After Tax
(20,013,818)
2,869,642
3,687,331
4,627,123
4,494,830
1,791,899
4,179,454
4,095,234
4,006,802
3,913,948
14,714,659
16%
8,450,415
Net Benefit
After Tax
(22,015,200)
6,239,965
7,825,493
9,536,690
9,414,097
6,721,351
9,119,602
9,046,610
8,969,969
8,889,497
19,703,206
35%
34,528,898
Abebech Tsige Laundry Soap Factory
Project Implementation Plan
1. Implementation Plan
2013 2014
Sr.
Type of Activiities
No. Octo Nov Dece Janu Febr March
1 Loan Processing
2 Installation of Electric Power
3 Procurement of Machineries and Equipment
4 Procurement of imported raw materials
5 Erection and installation of Machineries
6 Procurement of Furniture & Equipment
7 Procurement of vehicles
8 Recruitement of Employee
Procurement of raw materials from local
9
market
10 Commencement of operation
2014