Septic Tank & Leach Field

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

LEACH FIELD AND SEPTIC TANK COORDINATE


E E

B D

ST: SEPTIC TANK C


LF: LEACH FIELD

KEY PLAN B
N

PROJECT NORTH
N
H
RT
NO
UE
°

TR
° 27°
043.6 90

P21A
P21A
P21A
P21A

0° 0°
27 18

C
OPENING FLOOR
13450 X 800 MM

OPENING FLOOR
12650 X 800 MM

GENERATOR
OPENING FLOOR
80X80 CM

MAD2
A

1 11

CHANNEL
CABLE

CABLE CHANNEL

CHANNEL
CABLE

CHANNEL
CABLE

This Area
A
ISLAMIC EMIRATE OF AFGHANISTAN
ISLAMIC
DA AFGHANISTAN
EMIRATEBRESHNA
OF AFGHANISTAN
SHERKAT

DA AFGHANISTAN BRESHNA SHERKAT


C
B
A TF- 20.08.23 DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING and
COMMISSIONING of 220/110/10 kV TRANSFORMER in NOOR-ULJIHAD
SUBSTATION, HERAT PROVINCE AFGHANISTAN
Rev. Qua Sheet № Doc. Signature Date DABS-014
Stage Sheet Total Sheet
MORTEZA MOBAREZ
Prepared ALI REZA SAADAT CONTROL BUILDING-STRUCTURAL DRAWINGS WP
Checked M.A.ULGER
Approved Y.BILIMEN TURKMENENERGO
GURLUSHYK