BLDNG TECH.

 How many concrete hollow blocks do


you need for a wall that has a length of
 A paint defect caused by fungus and
6 meters and a height of 4 meters?
growing on the paint film or caulk and is
a. 305
identifiable by its grey, brown, green or
dark black “splotchy” spots
 Filipino term for baseboard
a. Mildew
a. Rodapis

 For suspended slabs, beam, columns,


 A type of admixture that helps speed up
arches, stairs, walls of 100mm thickness
setting time, to develop earlier strength
a. Class B
and to reduce length of time for
protection
 Consist of a combination of
a. Acceleration
geosynthetic components; are usually
sheet or edge drains consisting of a
 Is the officer or other designated
prefabricated core which a geotextile
authority charged with the
filter is bonded
administration and enforcement of the
a. Geocomposites
building code
Office of the Building Official (OBO)
 Columns in which a concrete core is
reinforced with a steel or cast-iron
 A type of handless lockset key-operated
designed to support a part of load is
to give double security
a. Composite
a. Deadbolt

 What is the standard weight of a 16mm


(no. 5) diameter hot-rolled wieldable
deformed or plain steel bar per meter
length?
a. 1.578 kilos

 Concrete covers for pipes, conduits, and


fittings shall not be less than ____ for
concrete not exposed to earth or
weather.
a. 20mm

 Water proofing appropriate for a


firewall
a. Elastomeric

 What is the concrete proportion for


Class “C”?
a. 1:3:6
PROF. PRAC.  Under BP 344, slope of ramp shall not
exceed the gradient of
 What should be submitted when you
1:12
lost your PRC Identification Card
Notarized affidavit of loss
 What is the minimum dimension of a
PWD toilet?
 Who manages the sewer water
1.7m
treatment plant?
DENR
 Under PD 1096, minimum dimension of
habitable area
 If Jesse’s boss could put up an
2.0m
Architectural Firm in the Philippines,
what should be his first move to
 Who approves the subdivision plan?
register his business
HLURB
Register his company at SEC
 Who approves the PERT-CPM chart?
 What is the change in elevation from
owner
the street level of the dropped curb?
25mm

 NO, the extension of the construction


 What is the distance of the Building
may no longer require the services of an
Main Entrance to the Elevator?
architect as stipulated in the 2010 SPP
30m

 As far as the civil liability of the project


is concern, who is liable when a building  Foreign architects offering regular
collapse due to fault in construction? design services are subject to full
ARCHITECT IN CHARGE OF compliances with what rule and section
CONSTRUCTION of R.A. No. 9266

 How do you treat new members of the Rule 4, Section 33


profession?
Give equal opportunities like senior
members  What part of the regular design services
does an architect prepares an initial
 Soil testing is the duty of statement of probable construction
Engineer cost?
Project Definition Phase
 If the client decided to hire you for a
Design-Build by Administration, how  Which of the following refers to
much additional fee would you charge overhead?
in addition to your 10% All of the above
7%
 Under BP 220, what is the minimum  Also known as the Subdivision and
area of windows for habitable rooms? Condominium Buyer’s Protective
10% of floor area Decree
PD 957

 Under BP 344, what is the minimum


water closet stall area?  This method of compensation is
1.70m x 1.80m applicable only to non-creative work
such as accounting, secretarial,
research, data gathering, preparation of
 Factories and workshops using reports and the like.
incombustible and non-explosive MDPE
materials are classified as?
Industrial
 It refers to the author or authors o a set
of architectural plans or specifications
 Multiplier of multiple of direct personal who are in charge of their preparation
expenses ranges from whether made by them personally or
1.5-2.5 under their immediate supervision
Authorship

 Which of the following is not a basis for


regular design services?  Under BP 220, when are elevators
None of the above required?
For 5 storeys and beyond

 It covers a broad line of architectural


services ranging from initial problem  Which of the following is not a basis for
identification to activities that would selecting an architect by a client
allow the Architect to initially through direct selection?
conceptualize an array of architectural None of the above
and allied solutions.
Pre-Design Services
 Under BP 344, what is the maximum
dropped curb ramp gradient?
 Under PD 957, what is the minimum 1:12
floor area for open market?
42 m2
 Under Rule 3, Section 14 of R>A 9266,
which of the following is not a subject
 Under NBCP, what is the unit area per for examination?
occupant for offices? None of the Above
9.30 m2
 What is R.A 9266?  The mayor is guilty of what?
The architecture Act of 2004
Misdemeanor

 Who approves, issues, limits or cancels


temporary or special permit to practice  In case of any dispute concerning the
architecture? Service Agreement, the Parties may
Board then venture into a negotiation period
of how many days?
30 days
 Under BP 220, what is the minimum
clear width of stairs?
600mm  Under NBCP, quarantine stations are
classified as what occupancy?
Institutional
 It refers to contracts or arrangements
involving the transfer of systematic
knowledge for the manufacture of a  Who shall designate the Secretary of
product, the application of a process, or the Board and shall provide the
rendering of a service including secretariat and other support services
management contracts; and the to implement the provisions of R.A No.
transfer, assignment or licensing of all 9266?
forms of intellectual property rights. PRC
Technology Transfer

 Under NBCP, what is the minimum


 In order to obtain a building permit, requirement of parking slots for private
how many sets of construction drawing colleges and university?
and technical specifications shall be 1 slot: 3 classrooms
submitted?
7
 Under NBCP, what is the minimum
width of carriageway?
 Under Rule 3, Section 13 of R.A 9266, Depends on the width of sidewalks
which of the following is not a
qualification of an applicant for
examination?  6 months, 1 day, 6 years, P50,000.00,
C and D P500,000.00

 YES
 under what rule and section is the  Which of the following is a basis for the
creation and composition of the Architect’s/ Architectural firm’s
professional regulatory board? professional fee?
All of the above
Rule 2, Section 4

 Included under this specialized practice


 it is the required open space left is the preparation of the Fire Safety and
between the outermost face of the Life Assessment Report (FLAR) required
building/structure and the property by R.A. No. 9514, the 2008 Fire Code of
lines. the Philippines and its 2009 IRR.
Yard Post-Design Services

 how many years as an active  This will standardize the ranges for
practitioner does an architect have to which the Client will compensate an
be in order to qualify as member of the Architect in direct relation to the value
board? of services that the Architect provides.
At least 10 years 2010 SPP

 A court summons a recipient to appear  Under BP 344, what is the minimum


and give oral testimony for use at a door width?
hearing 0.80m

 Under BP 344, what is the length of a  The Architect in this area of practice
wheelchair? undertakes a scientific study
Forensic Architecture
1.10m-1.30m

 Under the SPP Doc 203, it may be


 How many years is the civil liability of
defined as the blending of aesthetics,
the AoR?
functions, space, materials and its
15 years
environment resulting from the
application of various technologies and
skills in different fields
 For a firm, company, partnership, Architecture
corporation or association to be
registered or licensed as such for the
practice of architecture, it shall be
 Can an architect serves as the
composed of how many percent of
Construction Manager?
registered and licensed architect?
Yes
75%
 It is the most common worldwide  Is he entitled to have an interest due to
method of compensation for late payment of fees?
architectural services Yes, because he is already on the
Percentage based on PCC Contract Document Phase

 Architectural partnership is registered  A permit issued by the building official


with for accessory parts of the project with
SEC and BOA very special functions or use which
indicate in the plans specifications that
accompanying the building permits
 Under BP 220, what is the minimum lot application
frontage for single attached socialized Accessory Permit
housing?
48m2
 Under BP 344, what is the minimum
dimension of an elevator car??
 Under BP 220, what is the minimum lot 1.10m x 1.40m
frontage for single attached socialized
housing having an irregular lot?
6.0m  The architect in service prescribes space
plans, stacking diagrams/sections and
computations of areas for the different
 In commendation of the Yolanda activities and spaces to be integrated in
tragedy, the Mayor of Tacloban plans to a building project.
build a monumental park. What Architectural Interior
method of selection is best for this
project?
ADC  It involves the detailed planning and
design to control sound transmission
for compatibility with the architectural
 The architect explains his methodology design concept.
in translating the plan/design Retainer
requirements of the proposed project.
Interview
 When does the work of an architect
starts?
 What must a Foreign Consultant of When the Owner outlines his
foreign architect acquire in order to requirements to the Architect
work and /or do business in the
Philippines?
Clerk-of-works  Who prepares change order?
Architect
 This method of compensation is useful  Under the Negotiation Phase within
when the services are difficult to how many days after the award to the
determine in advance or they are winning bidders the payment to the
interim in nature and often short in architect shall be adjusted so that it will
duration amount to a sum equivalent to ninety
Time Basis (90%) percent of the Professional Fee
15 days

 Under BP 220, what is the maximum


length of block for a row house?  In an ADC, within how many days
400m should the owner be able to pay the
prizes for the winner/s?
Within 30 days
 Under BP 220, what is the minimum
area of windows for bathroom?
1/20 of its floor area  Who shall pay for the VAT the local
government has imposed on the
architect?
 Under PD 957, what is the minimum lot Architect
area for a single detached open
market?
120 m2  This method is fair to both client and
the Architect as the fee is pegged to the
cost of the Project the Client is willing
 Mr. Tony hired Ar. Rogers to plan and to undertake.
design his two-storey residential Percentage based on PCC
building
Yes, because the owner should issue
orders to the contractor only through  Under BP 220, what is the minimum lot
the architect. area for a single detached economic
housing?
72 m2
 Under NBCP, what is the unit area per
occupant for classrooms?
1.80 m2  Which of the following is not a scope of
practice of architecture?
D only
 Who shall pay for the design and
consulting services on acoustic,
communication, electronic, and other  What does DAEDS stand for?
specialty systems which may be Detailed Architectural and Engineering
required in a project? Design Services
Project Proponent
 under BP 220, what is the minimum  PRC means
height of doors other than bathroom Professional Regulation Commission
and mezzanine?
2.00m
 Any person who violates any of the
provision of R.A. No. 966
 under the NBCP, a building permit shall Misconduct
expire if work authorized is not
commended within how many months
from date of such issuance?  It entails the conduct of primary and
12 months secondary researches and assembled
facts used as basis for conclusion.
Architectural Research
 under the NBCP, a carport shall not be
considered part of the TOSL (Total Open
Space within Lot) particularly if?  According to the architect’s SPP of
Entirely roofed 2010, upon signing the owner/client-
architect agreement, how much should
the client pay to the architect to
 In PD 957, design standards for commence the professional services?
residential condominium projects 5% of the construction cost
offsite parking is allowed but must not
be more than how many meters away
from the building it serves?  Which is an unethical action with
200m respect to the architect’s responsibility
to the people?
Shares technical information
 After ___ substantial completion of
contract work
98%  Under BP 344, what is the minimum
walkway headroom clearance?
2.00 meters
 Under PD 1096, what is the minimum
width of a sidewalk?
1.20%  This method of compensation is
frequently used where there is
continuing relationship on a series of
 What is the recommended professional projects.
fee of an architect for group 1 DAEDS PFPE
and DADS for project construction cost
P50,000.00 and less?
DAEDS= 5%, DADS= 3%
 Under PD 957, what is the minimum lot
area for single detached medium cost?
100m2

 You were hired as the Architect for


architectural services only of a 2-storey
single-detached residential building in
Quezon City. Under the Regular Design
Services what is the recommended
professional fee?
10%

 Under PD 957, what is the width for


major roads?
10m