06 Asn Ifc STR RF - R00

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F G H

C1 C1 C 1 B5(500X250) C1 C1
1
B(150X250)

B5(500X250)

B6(600X250)
B(150X250)
ELEVATOR
PIT
C2 C2 C2
B4(800X250)
2 SW1
1000.0

B5(500X250)

B6(600X250)
11.9737 m
1000.0

RIB SALB 300mm


14.0000 m
SW2
3 B4(800X250)
C2 C2 C2
B5(500X250)

C2

4 C1 B5(500X250) C1 C1

GENERAL NOTES ABBREVIATIONS


1. ALL DIMENSIONS ARE IN MM & ALL
C: COLUMN
LEVELS ARE IN METERS
2. MINIMUM COMPRESSIVE STRENGTH B: BEAM
Fcu 28 DAYS (N/mm) AS FOLLOWS:

06-Roof A) SUBSTRUCTURE (PLAIN CONCRETE AND


FOUNDATION)
F: FOOTING

1 1 : 100
B) SUPERSTRUCTURE (COLUMNS, BEAMS,
SLABS, WALLS, STAIRS)
3. MINIMUM CONCRETE CLEAR COVER TO
REINFORCMENT:
PC: PLAIN CONCRETE

SW: SHEAR WALL


FOUNDATION 50mm PW: PLANTED WALL
COLUMN 40mm
BEAMS and GIRDERS 30mm
STAIRS 20mm
SLABS 30mm

No. Description Date


MANAGEMENT BUILDING RF FLOOR
LAYOUT
ASN UNIVERSITY
Date 11/22/2021 06-ASN-IFC-STR-RF_R00
Drawn by Author
Checked by Checker Scale As indicated

You might also like