GROUND LEVEL 100

20 T8 @ 100c/c

100
1.5 TURN AT
THE END OF SPIRAL

T8 @ 100c/c
350

20
75
300
MESH DETAIL AT

100
CUT OFF LEVEL
14.3975 M
a2 TOP OF PILE
A A (THE CLEAR COVER OF MESH REINFORCEMENT IS
20mm FROM TOP OF PILE. ACTUAL LEGS TO BE
T8-a2 CALCULATED AS PER PILE DIA & ABOVE SPACING )
T16-a3
@100c/c
15-T20-a1 @1500c/c

a3 75

10000
75mm CLEAR COVER TO
ANY REINFORCEMENT CAST-IN-SITU PILE

15 - T20-a1
ALONG PERIPHERY

NOTES:

PILE LENGTH : 24000


1. THE INITIAL PILE LOAD TEST TO BE DONE AGAINST THE PILE CAPACITIES PROVIDED BY GEOTECHNICAL EXPERT.
2. CONCRETE SHALL BE DESIGN MIX AND HAVE MINIMUM 28 DAYS CHARACTERISTIC STRENGTH OF 35 MPA ON
1200 150MM CUBES.
3. ALL REINFORCING STEEL SHALL BE HYSD BARS GRADE Fe 500D .
SECTION A-A 15 - T20-a1
4. CLEAR COVER TO ANY REINFORCEMENT IN THE PILE SHALL NOT BE LESS THAN 75mm.
SCALE 1:10 ALONG PERIPHERY 5. CONCRETING FOR TEST PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS OPERATION.
NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN PILE.
6. REQUIREMENT OF TEMPORARY LINER IF ANY TO STABILIZE BORE SHALL BE DECIDED BY PILING AGENCY.
7. SAME PILE IS USED FOR BOTH VERTICAL AND LATERAL LOAD TESTING,FIRST VERTICAL LOAD
TEST SHALL BE CARRIED OUT AND THEN LATERAL LOAD TEST SHALL BE PROCEED
B B 8. THE LOAD TEST SHALL BE IN ACCORDANCE WITH THE INDIAN STANDARD CODE OF PRACTICE FOR DESIGN AND
a4 CONSTRUCTION OF PILE FOUNDATION IS 2911 (PART IV) LOAD TEST ON PILES.
- INITIAL LOAD TEST SHALL BE CONDUCTED FOR NOT LESS THAN 2.5 TIMES THE DESIGN LOAD.
9. LAP LENGTHS
LL = 52*D WHERE D : DIAMETER OF SMALLEST BAR IN OVERLAP.
75
15-T20-a1 T8-a4 10. 100% LAPPING OF REINFORCEMENT IS PERMITTED HOWEVER LAPPING SHALL NOT BE DONE IN TOP 10m LENGTH
@150c/c OF PILE.
a3 11. THE METHOD OF BORING & INSTALLATION OF TEST PILE SHALL BE SAME AS FOR THE WORKING PILE.
75mm CLEAR COVER TO
12. THE TEST PILE DESIGN IS CARRIED OUT WITH NO VERTICAL LOAD ON THE PILE. HENCE THE PROVIDED
ANY REINFORCEMENT REINFORCEMENT IS ONLY FOR THE TEST PILE. FOR THE WORKING PILE, THE REINFORCEMENT WOULD BE PROVIDED
1.5 TURN AT AS PER THE COMBINED DESIGN LOADS (BOTH VERTICAL AND LATERAL LOADS).
THE END OF SPIRAL 13. THE LOAD AND CAPACITIES ARE AS:

FOUNDATION LEVEL
LOAD ON INITIAL TEST PILE ( NORMAL LOAD CONDITION)
-9.6025 M
BORE FOR PILE VERTICAL VERTICAL TEST LATERAL LOAD ON PILE LATERAL LOAD ON PILE TEST LATERAL
75

1200 HOLE NO. PIER CAPACITY (Ton) LOAD (Ton) UNDER FIXED HEAD UNDER FREE HEAD LOAD (Ton)
CONDITION (Ton) CONDITION (Ton)
SECTIONAL ELEVATION BH - 02 P1 400 1000 12.00 5.00 12.50
SCALE 1:25

1200

SECTION B-B
SCALE 1:10

CLIENT: EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : AUTHORITY ENGINEER : DRAWN PARVEEN CONSTRUCTION OF FOUR LANE BADARPUR BYPASS FROM DESIGN CHAINAGE
DESIGN PRABU KM: 27+300 AT CROSSING WITH NH-6 (OLD NH-44) NEAR SIDDESWAR PT.-I
BRIDGECON INFRACONSULTANTS VILLAGE TO DESIGN CHAINAGE KM: 38+400 ON NH-37 (OLD NH-44) AT
S.S. BUILDERS. CHECKED PRANJAL
PVT. LTD. KANDIGRAM CHAITA VILLAGE IN THE STATE OF ASSAM ON EPC MODE UNDER
APPROVED FARRUKH
249,NEW MODEL TOWN, 265, OKHLA INDUSTRIAL ESTATE BHARATMALA PARIYOJANA IN ECONOMIC CORRIDORS.
PHASE - III, NEW DELHI-110020 SAFETY CONSULTANT : PROOF
LUDHIANA (PUNJAB). CONSULTANT
DETAILS OF INITIAL TEST PILE FOR FLYOVER AT CH.@ 37655.000
PH: +91-11-41832060
PH: +91-9254123666 AUTHORITY
+91-11-41832061 (SHEET 1 OF 1)
ENGINEER
0 First Issue PRABU PRANJAL FARRUKH 18-10-2023 REV. SCALE
BUILDING INFRASTRUCTURE-BUILDING THE NATION DATE 18-10-2023 DRAWING NO. BIC-STR-FLY-BARAK-12101 0 AS SHOWN
REV. PARTICULARS DES. CHD. VER. DATE

You might also like