Professional Documents
Culture Documents
Initial Pile Load Test Drawing-37+655-20-10-2023
Initial Pile Load Test Drawing-37+655-20-10-2023
20 T8 @ 100c/c
100
1.5 TURN AT
THE END OF SPIRAL
T8 @ 100c/c
350
20
75
300
MESH DETAIL AT
100
CUT OFF LEVEL
14.3975 M
a2 TOP OF PILE
A A (THE CLEAR COVER OF MESH REINFORCEMENT IS
20mm FROM TOP OF PILE. ACTUAL LEGS TO BE
T8-a2 CALCULATED AS PER PILE DIA & ABOVE SPACING )
T16-a3
@100c/c
15-T20-a1 @1500c/c
a3 75
10000
75mm CLEAR COVER TO
ANY REINFORCEMENT CAST-IN-SITU PILE
15 - T20-a1
ALONG PERIPHERY
NOTES:
FOUNDATION LEVEL
LOAD ON INITIAL TEST PILE ( NORMAL LOAD CONDITION)
-9.6025 M
BORE FOR PILE VERTICAL VERTICAL TEST LATERAL LOAD ON PILE LATERAL LOAD ON PILE TEST LATERAL
75
1200 HOLE NO. PIER CAPACITY (Ton) LOAD (Ton) UNDER FIXED HEAD UNDER FREE HEAD LOAD (Ton)
CONDITION (Ton) CONDITION (Ton)
SECTIONAL ELEVATION BH - 02 P1 400 1000 12.00 5.00 12.50
SCALE 1:25
1200
SECTION B-B
SCALE 1:10
CLIENT: EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : AUTHORITY ENGINEER : DRAWN PARVEEN CONSTRUCTION OF FOUR LANE BADARPUR BYPASS FROM DESIGN CHAINAGE
DESIGN PRABU KM: 27+300 AT CROSSING WITH NH-6 (OLD NH-44) NEAR SIDDESWAR PT.-I
BRIDGECON INFRACONSULTANTS VILLAGE TO DESIGN CHAINAGE KM: 38+400 ON NH-37 (OLD NH-44) AT
S.S. BUILDERS. CHECKED PRANJAL
PVT. LTD. KANDIGRAM CHAITA VILLAGE IN THE STATE OF ASSAM ON EPC MODE UNDER
APPROVED FARRUKH
249,NEW MODEL TOWN, 265, OKHLA INDUSTRIAL ESTATE BHARATMALA PARIYOJANA IN ECONOMIC CORRIDORS.
PHASE - III, NEW DELHI-110020 SAFETY CONSULTANT : PROOF
LUDHIANA (PUNJAB). CONSULTANT
DETAILS OF INITIAL TEST PILE FOR FLYOVER AT CH.@ 37655.000
PH: +91-11-41832060
PH: +91-9254123666 AUTHORITY
+91-11-41832061 (SHEET 1 OF 1)
ENGINEER
0 First Issue PRABU PRANJAL FARRUKH 18-10-2023 REV. SCALE
BUILDING INFRASTRUCTURE-BUILDING THE NATION DATE 18-10-2023 DRAWING NO. BIC-STR-FLY-BARAK-12101 0 AS SHOWN
REV. PARTICULARS DES. CHD. VER. DATE