RSG

Facility Management
Key Handover Form
Project
(H2) AMAALA TBCV Date : 02-11-2023
:
Door Door Key Key
N Location Room Checked Received Comments
o Type No. Quantity Number
.
1 Area 17 Switch Gear Metal 1 N/A ✓
Room
2 Area 17 Switch Gear Room Metal 2 N/A ✓

3 Area 17 Filtration and Blower Metal N/A ✓


Room
4 Area 17 Main Metal N/A ✓
Generator-1
5 Area 17 Main Metal N/A ✓
Generator-2
6 Area 17 Main Metal N/A ✓
Generator-3
7 Area 17 Main Metal N/A ✓
Generator-4
8 Area 17 Main Metal N/A ✓
Generator-5
9 Area 17 Main Metal N/A ✓
Generator-6
10 Area 17 Main Metal N/A ✓
Generator-7
11 Area 19 Backup Metal N/A ✓
Generator Panel- Kitchen
12 Area 19 ATS Panel - Kitchen Metal N/A ✓

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

RSG PD Contractor FM Service Provider RSG Other


FM

Name Name Name Name Name

Signature Signature Signature Signature Signature

Date Date Date Date Date

RSG-FM-FRM-047 rev01
Oct 2022 1 of 1 Key Handing Over (COPY)