RSG

Facility Management
Key Handover Form
Project
(H2) : AMAALA TBCV Date : 02-11-2023
Door Door Key Key
N Location Room Checked Received Comments
o Type No. Quantity Number
.
1 Area 9 Switch Gear Metal 1 N/A ✓
Room
2 Area 9 Switch Gear Metal 2 N/A ✓
Room
3 Area 9 Filtration and Metal N/A ✓
Blower Room

4 Area 9 Main Metal N/A ✓


Generator-1
5 Area 9 Main Metal N/A ✓
Generator-2
6 Area 9 Main Metal N/A ✓
Generator-1
7 Area 9 Main Metal N/A ✓
Generator-2
8 Area 9 Main Metal N/A ✓
Generator-1
9 Area 9 Main Metal N/A ✓
Generator-2
10 Area 9 Main Metal N/A ✓
Generator-1
11 Area 11 Backup Metal N/A ✓
Generator Panel-
Kitchen
12 Area 11 ATS Panel - Metal N/A ✓
Kitchen
13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

RSG PD Contractor FM Service Provider RSG Other


FM

Name Name Name Name Name

Signature Signature Signature Signature Signature

Date Date Date Date Date

RSG-FM-FRM-047 rev01
Oct 2022 1 of 1 Key Handing Over (COPY)
RSG
Facility Management
Key Handover Form
(H2)

RSG-FM-FRM-047 rev01
Oct 2022 2 of 1 Key Handing Over (COPY)