RSG

Facility Management
Key Handover Form
Project
(H2) AMAALA SFSP OFFICE – STAFF Date :
02-11-2023
: VILLAGE
Door Door Key Key
N Location Room Checked Received Comments
o Type No. Quantity Number
.
1 Staff Village Main Generator Metal 3 N/A ✓
2 Staff Village ATS -Panel Metal 3 N/A ✓
3 Staff Village Backup Generator Panel Metal ✓
3 N/A
4 Staff Village ATS Panel - Kitchen Metal 3 N/A ✓
5 Staff Village Potable water Pump Panel Metal 3 N/A ✓
6

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

RSG PD Contractor FM Service Provider RSG Other


FM

Name Name Name Name Name

Signature Signature Signature Signature Signature

Date Date Date Date Date

RSG-FM-FRM-047 rev01
Oct 2022 1 of 1 Key Handing Over (COPY)