GENERAL SUMMARY
BILL NO. DESCRIPTION AMOUNT
SUB TOTAL I
Allow for the Cost of insurance in the joint names of Employer and
Contractor against loss or damage to the works, Plants, materials,
equipments etc. -
Allow for the Cost of Providing Performance Security for 10% of the
Contract Sum -
GS/1
TABLE OF CONTENTS:
BILL NO. 01 - PRIME COSTS AND PROVISIONAL SUMS
8/2/1
BILL NO. 03 - MEASURED WORKS (STAFF HOUSE)
Item DESCRIPTION UNIT QTY RATE AMOUNT
DEMOLITIONS
PRELIMINARIES
8/3/1/1
ITEM DESCRIPTIONS QTY UNIT RATE AMOUNT
BLOCK WORK:
A. 230mm Thick 60 M2
CONCRETE WORKS:
CONCRETE WORK:
C Vertical columns 1 M3
D Horizontal beams 1 M3
REINFORCEMENTS:
E 12mm diameter 60 Kg
F 8mm diameter 20 Kg
FORMWORKS
Wrought Formwork to
8/3/2/1
ITEM DESCRIPTIONS QTY UNIT RATE AMOUNT
ROOF STRUCTURE:
ROOF COVERINGS:
Roof Drainage
I Extra; shoe 4 No
J Extra; swanneck 4 No
8/3/3/1
Item DESCRIPTION QTY UNIT RATE AMOUNT
40mm thick size 1000 x 2400mm high including transome infilled with
A
clear transparent 5mm glazing 1 Nr
40mm thick size 900 x 2400mm high including transome infilled with
B clear transparent 5mm glazing 4 Nr
40mm thick size 800 x 2400mm high including transome infilled with
C
clear transparent 5mm glazing 2 Nr
G 40 x 145mm Frame 48 M
H 25 x 75mm Architraves 48 M
Glazing beads
8/3/4/1
Item DESCRIPTION QTY UNIT RATE AMOUNT
8/3/5/1
Item DESCRIPTION QTY UNIT RATE AMOUNT
A To floors 90 m2
B To walls 90 m2
Kitchen Worktop
8/3/6/1
Item DESCRIPTION UNIT QTY RATE AMOUNT
A Gypsum ceilings 90 m2
EXETERNAL WORK
8/3/7/1
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
TO COLLECTION
8/3/8/1
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
Supply pipes:
H Allow provision sum for water connection
SUM
from the authority
TO COLLECTION -
8/3/8/2
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
Distribution pipes:
Dizany pipes, IPS PIPE PN 16 painted
with special paint; including joints in
running length.Fixing in accordance with
manufacture's instructions.
B Ditto; elbow 16 No
C Ditto; tee 8 No
Flexible piping:
E Flexible pipe to cistern 2 No
J Extra; elbow 9 No
K Extra; tee. 1 No
L Extra; plug. 3 No
TO COLLECTION -
8/3/8/3
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
GULLY TRAP
TO COLLECTION
8/3/8/4
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
MANHOLE:
SEPTIC TANK
TO COLLECTION
8/3/8/5
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
TO COLLECTION -
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
TO COLLECTION
Page No.8/3/8/5
8/3/8/6
ITEM DESCRIPTION OF WORKS QTY UNIT RATE AMOUNT
POWER POINTS
C Tv socket 1 Nr
TO COLLECTION
8/3/9/1
ITEM DESCRIPTION OF WORKS QTY UNIT RATE AMOUNT
TO COLLECTION
8/3/9/2
ITEM DESCRIPTION OF WORKS QTY UNIT RATE AMOUNT
EARTHING
TO COLLECTION
8/3/9/3
ITEM DESCRIPTION OF WORKS QTY UNIT RATE AMOUNT
TO COLLECTION
C O L L E C T I O N:
8/3/9/4
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
PAVING BLOCKS:
KERBSTONE:
8/3/10/1
NIC STAFF HOUSES GENERAL SUMMARY
S/1
BILL NO. 04 - MEASURED WORKS (FENCE WORK)
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
3
D Remove surplus excavated material away from site. 20 M
3
E Backfill excavated materials arround foundation. 4 M
3
F Chain Strip foundations. 11 M
3
G Column bases 9 M
Supply and fix pvc pre coated chain link fence 1500mm
high fixed onto black pipes ms;Including 3 rows strain wires
H and three (3) rows of berbed wires at the top of the black 268 M
pipes; 200mm thick x 200mm wide plain concrete grade 15
(m/s) at the bottom.
Black pipes
8/4/2