Professional Documents
Culture Documents
Ecosan Late - Boq Dibo New
Ecosan Late - Boq Dibo New
A. SUBSTRUCTURE
A.2 Excavation -
Excavate oversite average depth
150mm to remove the vegetable soil
A.2.1 and remove from site SM 16.00 5,000
-
A.6 Approved brickwall in cement-mortar (1:4)
A.10 Steps/Ramp
Erect 150mm thick brick masonry
A.10.1 frame for steps/Ramp SM 15.00 30,000
Fill
Fill for steps/Ramp with murram,
A.10.2 compact fully to receive blinding CM 6.12 15,000
COLLECTION
Page No. 1
Page No. 2
B. SUPERSTRUCTURE
B.4 Erect
Urine aTank
150mm thick selected burnt
Chamber;
clay brick wall for lockable chamber
to house Jerrycans for collecting
B.4.1 urine for agricultural use SM 1.68
30,000
Total Superstructure Carried to
Summary
C. ROOF
D.6 Plumbing
1 Substructure
2 Superstructure
3 Roofing
4 Finishes
SUB TOTAL
180,000
-
-
80,000
750,000
-
339,429
-
96,000
-
339,000
-
400,000
-
-
-
60,750
-
-
250,000
-
-
450,000
-
180,000
-
-
115,200
-
23,040
-
-
3,263,419
AMOUNT
388,125
-
-
60,000
-
-
450,000
-
-
91,800
-
-
648,000
-
-
-
-
-
1,637,925
3,263,419
1,637,925
4,901,344
AMOUNT
1,009,650
-
-
-
9,900
-
-
60,000
-
-
1,079,550
AMOUNT
78,000
-
54,500
-
60,000
-
-
-
561,600
754,100
AMOUNT
650,000
650,000
-
-
650,000
-
192,000
1,000,000
600,000
250,000
-
500,000
15,400
7,000
30,000
50,000
42,000
-
-
-
250,000
-
150,000
-
500,000
5,536,400
E
4,901,344
1,079,550
754,100
5,536,400
12,271,394
2,208,851
14,480,244