Annexure 1.7 Salient Info

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 14

Technical Documentation- National Registry of Specified Dams

Annexures 1.7
SALIENT INFORMATION OF EACH SPECIFIED DAM
Under jurisdiction of each State Dam Safety Organization
The following Salient Information shall be provided in HARD COPY and SOFT COPY by each State Dam
Safety Organization on each specified dam under its jurisdiction

Sr. Information Remark


No.
1 Name of the State or UT in which the Dam in Located :- Maharashtra
2 Name of the Dam :- Sonwala Storage Tank
3 Full Address of the Dam Sonwala, kekanwadi
Latitude: 18’48’25”ºN Longitude: 76’15’45”ºE :- Tq. Ambajogai Dist. Beed

4 Name of the Dam Owner :- Super intending Engineer


Beed Irrigation Project Circle
Parli V.
5 Full Address of the Dam Owner :- Sinchan Bhavan Parli
Vaijanath
6 Commissioning of the Dam :- 2010
Date of Commissioning of the Dam
7 Material with which the Dam was Constructed :- Earth work, Concrete

8 Salient Features of the Dam

Height (m) (above deepest foundation level) :- 13.23


Length of the crest (m) :- 247
Bottom width (m) :-
Top width (m) :- 3
Capacity of the reservoir (in m3) (a) :-
(a) Active Storage :- 0.8423 Mcum
(b) Dead Storage :- 0.1427 Mcum
Max Flood Discharge (in m3 ) :-
(a) Design Flood :- 499.25 Cumecs
(b) Observed Flood :- Not available
Specially difficult Foundation problems : Yes or No :- No
Unusual Dam Design :- No
9 Inspection Galleries in the Dam Not Applicable
Number :- Not Applicable
Elevation of Galleries (m) :- Not Applicable
Are all Galleries Dry? :- Not Applicable
10 Gates Not Applicable
Method of Operation of Gates :- Not Applicable
Size of each Gate :- Not Applicable
Number of Gates :- Not Applicable
Number of Gates in working condition :- Not Applicable
11 Operation &Maintenance Manual :- No
Was an Operation &Maintenance Manual prepared? :- No
If No, by when is the same likely to be prepared? :- No
12 Silting of Reservoir
Does the Reservoir get silted? :- Yes
If Yes, what percentage of the reservoir capacity is :- 19.83%
lost? (0.167 MM3)
13 Leakage through the Dam Body :-
Peak Water leakage (in m3) :- 0.0008 cumecs
14 Structural Safety Assessment
Was Structural Safety Assessment performed? :- Yes
If Yes, was the Dam found to be safe? :- Yes
If No, was the Dam retrofitted? :- -
If Yes, when was it retrofitted? :- -
If Yes, what was the retrofit measure adopted? :- -
15 Dam Break Analysis
Was Dam Break Analysis performed? :- No
If YES, were Disaster Management Plans prepared? :- No
16 Emergency Action Plan
Was an Emergency Action Plan prepared? :- No
If Yes, was it shared with the SDMA and DDMA? :- No

Sub Divisional Officer, Executive Engineer,


Minor Irrigation Sub Div, Beed Irrigation
Division, Ambajogai. Beed .
Technical Documentation- National Registry of Specified Dams
Annexures 1.7
SALIENT INFORMATION OF EACH SPECIFIED DAM
Under jurisdiction of each State Dam Safety Organization
The following Salient Information shall be provided in HARD COPY and SOFT COPY by each State Dam
Safety Organization on each specified dam under its jurisdiction

Sr. Information Remark


No.
1 Name of the State or UT in which the Dam in Located :- Maharashtra
2 Name of the Dam :- Chanai Storage Tank No. 2
3 Full Address of the Dam Chanai,
Latitude: 18’44’47”ºN Longitude: 79’19’51”ºE :- Tq. Ambajogai Dist. Beed

4 Name of the Dam Owner :- Super intending Engineer


Beed Irrigation Project Circle
Parli V.
5 Full Address of the Dam Owner :- Sinchan Bhavan Parli
Vaijanath
6 Commissioning of the Dam :-
Date of Commissioning of the Dam
7 Material with which the Dam was Constructed :- Earth work, Concrete

8 Salient Features of the Dam

Height (m) (above deepest foundation level) :- 20.65


Length of the crest (m) :- 311
Bottom width (m) :-
Top width (m) :- 3
Capacity of the reservoir (in m3) (a) :-
(a) Active Storage :- 0.9125 Mcum
(b) Dead Storage :- 0.1297 Mcum
Max Flood Discharge (in m3 ) :-
(a) Design Flood :- 137.58 Cumecs
(b) Observed Flood :- Not available
Specially difficult Foundation problems : Yes or No :- No
Unusual Dam Design :- No
9 Inspection Galleries in the Dam Not Applicable
Number :- Not Applicable
Elevation of Galleries (m) :- Not Applicable
Are all Galleries Dry? :- Not Applicable
10 Gates Not Applicable
Method of Operation of Gates :- Not Applicable
Size of each Gate :- Not Applicable
Number of Gates :- Not Applicable
Number of Gates in working condition :- Not Applicable
11 Operation &Maintenance Manual :- No
Was an Operation &Maintenance Manual prepared? :- No
If No, by when is the same likely to be prepared? :- No
12 Silting of Reservoir :-
Does the Reservoir get silted? :- Yes
If Yes, what percentage of the reservoir capacity is :- 3.68%
lost? 0.033 MM3
13 Leakage through the Dam Body :-
Peak Water leakage (in m3) :- 0.0042
14 Structural Safety Assessment
Was Structural Safety Assessment performed? :- Yes
If Yes, was the Dam found to be safe? :- Yes
If No, was the Dam retrofitted? :- -
If Yes, when was it retrofitted? :- -
If Yes, what was the retrofit measure adopted? :- -
15 Dam Break Analysis
Was Dam Break Analysis performed? :- No
If YES, were Disaster Management Plans prepared? :- No
16 Emergency Action Plan
Was an Emergency Action Plan prepared? :- No
If Yes, was it shared with the SDMA and DDMA? :- No

Sub Divisional Officer, Executive Engineer,


Minor Irrigation Sub Div, Beed Irrigation
Division, Ambajogai. Beed .
Technical Documentation- National Registry of Specified Dams
Annexures 1.7
SALIENT INFORMATION OF EACH SPECIFIED DAM
Under jurisdiction of each State Dam Safety Organization
The following Salient Information shall be provided in HARD COPY and SOFT COPY by each State Dam
Safety Organization on each specified dam under its jurisdiction

Sr. Information Remark


No.
1 Name of the State or UT in which the Dam in Located :- Maharashtra
2 Name of the Dam :- Sakud Storage Tank No. 2
3 Full Address of the Dam Sakud,
Latitude: 18’46’21”ºN Longitude: : 75’25’00”ºE :- Tq. Ambajogai Dist. Beed

4 Name of the Dam Owner :- Super intending Engineer


Beed Irrigation Project Circle
Parli V.
5 Full Address of the Dam Owner :- Sinchan Bhavan Parli
Vaijanath
6 Commissioning of the Dam :- 2009
Date of Commissioning of the Dam
7 Material with which the Dam was Constructed :- Earth work, Concrete

8 Salient Features of the Dam

Height (m) (above deepest foundation level) :- 17.18 M.


Length of the crest (m) :- 200 M.
Bottom width (m) :-
Top width (m) :- 3
Capacity of the reservoir (in m3) (a) :-
(a) Active Storage :- 0.6997 Mcum
(b) Dead Storage :- 0.5111 Mcum
Max Flood Discharge (in m3 ) :-
(a) Design Flood :- 98.39 Cumecs
(b) Observed Flood :- Not available
Specially difficult Foundation problems : Yes or No :- No
Unusual Dam Design :- No
9 Inspection Galleries in the Dam Not Applicable
Number :- Not Applicable
Elevation of Galleries (m) :- Not Applicable
Are all Galleries Dry? :- Not Applicable
10 Gates Not Applicable
Method of Operation of Gates :- Not Applicable
Size of each Gate :- Not Applicable
Number of Gates :- Not Applicable
Number of Gates in working condition :- Not Applicable
11 Operation &Maintenance Manual :- No
Was an Operation &Maintenance Manual prepared? :- No
If No, by when is the same likely to be prepared? :- No
12 Silting of Reservoir :-
Does the Reservoir get silted? :- Yes
If Yes, what percentage of the reservoir capacity is :- 5.46%
lost? 0.041MM3
13 Leakage through the Dam Body :-
Peak Water leakage (in m3) :- 0.00053 cumecs
14 Structural Safety Assessment
Was Structural Safety Assessment performed? :- Yes
If Yes, was the Dam found to be safe? :- Yes
If No, was the Dam retrofitted? :- -
If Yes, when was it retrofitted? :- -
If Yes, what was the retrofit measure adopted? :- -
15 Dam Break Analysis
Was Dam Break Analysis performed? :- No
If YES, were Disaster Management Plans prepared? :- No
16 Emergency Action Plan
Was an Emergency Action Plan prepared? :- No
If Yes, was it shared with the SDMA and DDMA? :- No

Sub Divisional Officer, Executive Engineer,


Minor Irrigation Sub Div, Beed Irrigation
Division, Ambajogai. Beed .
Technical Documentation- National Registry of Specified Dams
Annexures 1.7
SALIENT INFORMATION OF EACH SPECIFIED DAM
Under jurisdiction of each State Dam Safety Organization
The following Salient Information shall be provided in HARD COPY and SOFT COPY by each State Dam
Safety Organization on each specified dam under its jurisdiction

Sr. Information Remark


No.
1 Name of the State or UT in which the Dam in Located :- Maharashtra
2 Name of the Dam :- Dongarpimpla Storage Tank
No. 1
3 Full Address of the Dam Dongarpimpla
Latitude: 18’40’05”N Longitude: 76’20’30”E :- Tq. Ambajogai Dist. Beed

4 Name of the Dam Owner :- Super intending Engineer


Beed Irrigation Project Circle
Parli V.
5 Full Address of the Dam Owner :- Sinchan Bhavan Parli
Vaijanath
6 Commissioning of the Dam :- June 2009
Date of Commissioning of the Dam
7 Material with which the Dam was Constructed :- Earth work, Concrete

8 Salient Features of the Dam

Height (m) (above deepest foundation level) :- 13.25 M.


Length of the crest (m) :- 162 M.
Bottom width (m) :-
Top width (m) :- 3
Capacity of the reservoir (in m3) (a) :-
(a) Active Storage :- 0.7696 Mcum
(b) Dead Storage :- 0.0841 Mcum
Max Flood Discharge (in m3 ) :-
(a) Design Flood :- 89.25 Cumecs
(b) Observed Flood :- Not available
Specially difficult Foundation problems : Yes or No :- No
Unusual Dam Design :- No
9 Inspection Galleries in the Dam Not Applicable
Number :- Not Applicable
Elevation of Galleries (m) :- Not Applicable
Are all Galleries Dry? :- Not Applicable
10 Gates Not Applicable
Method of Operation of Gates :- Not Applicable
Size of each Gate :- Not Applicable
Number of Gates :- Not Applicable
Number of Gates in working condition :- Not Applicable
11 Operation &Maintenance Manual :- No
Was an Operation &Maintenance Manual prepared? :- No
If No, by when is the same likely to be prepared? :- No
12 Silting of Reservoir :-
Does the Reservoir get silted? :- Yes
If Yes, what percentage of the reservoir capacity is :- 5.56%
lost? 0.037 MM3
13 Leakage through the Dam Body :-
Peak Water leakage (in m3 ) :- 0.00039 cumecs
14 Structural Safety Assessment
Was Structural Safety Assessment performed? :- Yes
If Yes, was the Dam found to be safe? :- Yes
If No, was the Dam retrofitted? :- -
If Yes, when was it retrofitted? :- -
If Yes, what was the retrofit measure adopted? :- -
15 Dam Break Analysis
Was Dam Break Analysis performed? :- No
If YES, were Disaster Management Plans prepared? :- No
16 Emergency Action Plan
Was an Emergency Action Plan prepared? :- No
If Yes, was it shared with the SDMA and DDMA? :- No

Sub Divisional Officer, Executive Engineer,


Minor Irrigation Sub Div, Beed Irrigation
Division, Ambajogai. Beed .
Technical Documentation- National Registry of Specified Dams
Annexures 1.7
SALIENT INFORMATION OF EACH SPECIFIED DAM
Under jurisdiction of each State Dam Safety Organization
The following Salient Information shall be provided in HARD COPY and SOFT COPY by each State Dam
Safety Organization on each specified dam under its jurisdiction

Sr. Information Remark


No.
1 Name of the State or UT in which the Dam in Located :- Maharashtra
2 Name of the Dam :- Dongarpimpla Storage Tank
No. 2
3 Full Address of the Dam Dongarpimpla
Latitude: 18’40’05”N Longitude: 70’90’63”E :- Tq. Ambajogai Dist. Beed

4 Name of the Dam Owner :- Super intending Engineer


Beed Irrigation Project Circle
Parli V.
5 Full Address of the Dam Owner :- Sinchan Bhavan Parli
Vaijanath
6 Commissioning of the Dam :- June 2009
Date of Commissioning of the Dam
7 Material with which the Dam was Constructed :- Earth work, Concrete

8 Salient Features of the Dam

Height (m) (above deepest foundation level) :- 14.65 M.


Length of the crest (m) :- 116 M.
Bottom width (m) :-
Top width (m) :- 3
Capacity of the reservoir (in m3) (a) :-
(a) Active Storage :- 0.6793 Mcum
(b) Dead Storage :- 0.069 Mcum
Max Flood Discharge (in m3 ) :-
(a) Design Flood :- 74.41 Cumecs
(b) Observed Flood :- Not available
Specially difficult Foundation problems : Yes or No :- No
Unusual Dam Design :- No
9 Inspection Galleries in the Dam Not Applicable
Number :- Not Applicable
Elevation of Galleries (m) :- Not Applicable
Are all Galleries Dry? :- Not Applicable
10 Gates Not Applicable
Method of Operation of Gates :- Not Applicable
Size of each Gate :- Not Applicable
Number of Gates :- Not Applicable
Number of Gates in working condition :- Not Applicable
11 Operation &Maintenance Manual :- No
Was an Operation &Maintenance Manual prepared? :- No
If No, by when is the same likely to be prepared? :- No
12 Silting of Reservoir :-
Does the Reservoir get silted? :- Yes
If Yes, what percentage of the reservoir capacity is :- 4.57%
lost? 0.032MM3
13 Leakage through the Dam Body
Peak Water leakage (in m3) :- 0.00051 cumecs
14 Structural Safety Assessment
Was Structural Safety Assessment performed? :- Yes
If Yes, was the Dam found to be safe? :- Yes
If No, was the Dam retrofitted? :- -
If Yes, when was it retrofitted? :- -
If Yes, what was the retrofit measure adopted? :- -
15 Dam Break Analysis
Was Dam Break Analysis performed? :- No
If YES, were Disaster Management Plans prepared? :- No
16 Emergency Action Plan
Was an Emergency Action Plan prepared? :- No
If Yes, was it shared with the SDMA and DDMA? :- No

Sub Divisional Officer, Executive Engineer,


Minor Irrigation Sub Div, Beed Irrigation
Division, Ambajogai. Beed .
Technical Documentation- National Registry of Specified Dams
Annexures 1.7
SALIENT INFORMATION OF EACH SPECIFIED DAM
Under jurisdiction of each State Dam Safety Organization
The following Salient Information shall be provided in HARD COPY and SOFT COPY by each State Dam
Safety Organization on each specified dam under its jurisdiction

Sr. Information Remark


No.
1 Name of the State or UT in which the Dam in Located :- Maharashtra
2 Name of the Dam :- Rajewadi Storage Tank
3 Full Address of the Dam Rajewadi
Latitude: 18’45’75” N Longitude: 76’55’15” E :- Tq. Ambajogai Dist. Beed

4 Name of the Dam Owner :- Super intending Engineer


Beed Irrigation Project Circle
Parli V.
5 Full Address of the Dam Owner :- Sinchan Bhavan Parli
Vaijanath
6 Commissioning of the Dam :- 2010
Date of Commissioning of the Dam
7 Material with which the Dam was Constructed :- Earth work, Concrete

8 Salient Features of the Dam

Height (m) (above deepest foundation level) :- 14.30 M.


Length of the crest (m) :- 390 M.
Bottom width (m) :-
Top width (m) :- 3
Capacity of the reservoir (in m3) (a) :-
(a) Active Storage :- 0.7994 Mcum
(b) Dead Storage :- 0.065 Mcum
Max Flood Discharge (in m3 ) :-
(a) Design Flood :- 71.11 Cumecs
(b) Observed Flood :- Not available
Specially difficult Foundation problems : Yes or No :- No
Unusual Dam Design :- No
9 Inspection Galleries in the Dam Not Applicable
Number :- Not Applicable
Elevation of Galleries (m) :- Not Applicable
Are all Galleries Dry? :- Not Applicable
10 Gates Not Applicable
Method of Operation of Gates :- Not Applicable
Size of each Gate :- Not Applicable
Number of Gates :- Not Applicable
Number of Gates in working condition :- Not Applicable
11 Operation &Maintenance Manual :- No
Was an Operation &Maintenance Manual prepared? :- No
If No, by when is the same likely to be prepared? :- No
12 Silting of Reservoir :-
Does the Reservoir get silted? :- Yes
If Yes, what percentage of the reservoir capacity is :- 1.95%
lost? 0.0348mm3
13 Leakage through the Dam Body :-
Peak Water leakage (in m3) :- 0.00033 cumecs
14 Structural Safety Assessment
Was Structural Safety Assessment performed? :- Yes
If Yes, was the Dam found to be safe? :- Yes
If No, was the Dam retrofitted? :- -
If Yes, when was it retrofitted? :- -
If Yes, what was the retrofit measure adopted? :- -
15 Dam Break Analysis
Was Dam Break Analysis performed? :- No
If YES, were Disaster Management Plans prepared? :- No
16 Emergency Action Plan
Was an Emergency Action Plan prepared? :- No
If Yes, was it shared with the SDMA and DDMA? :- No

Sub Divisional Officer, Executive Engineer,


Minor Irrigation Sub Div, Beed Irrigation
Division, Ambajogai. Beed .
Technical Documentation- National Registry of Specified Dams
Annexures 1.7
SALIENT INFORMATION OF EACH SPECIFIED DAM
Under jurisdiction of each State Dam Safety Organization
The following Salient Information shall be provided in HARD COPY and SOFT COPY by each State Dam
Safety Organization on each specified dam under its jurisdiction

Sr. Information Remark


No.
1 Name of the State or UT in which the Dam in Located :- Maharashtra
2 Name of the Dam :- Surnarwadi Storage Tank
3 Full Address of the Dam Surnarwadi
Latitude: 18’53’60”N Longitude: 76’12’30”E :- Tq. Ambajogai Dist. Beed

4 Name of the Dam Owner :- Super intending Engineer


Beed Irrigation Project Circle
Parli V.
5 Full Address of the Dam Owner :- Sinchan Bhavan Parli
Vaijanath
6 Commissioning of the Dam :- 2010
Date of Commissioning of the Dam
7 Material with which the Dam was Constructed :- Earth work, Concrete

8 Salient Features of the Dam

Height (m) (above deepest foundation level) :- 17.50 M.


Length of the crest (m) :- 240 M.
Bottom width (m) :-
Top width (m) :- 3
Capacity of the reservoir (in m3) (a) :-
(a) Active Storage :- 1.559 Mcum
(b) Dead Storage :- 0.165 Mcum
Max Flood Discharge (in m3 ) :-
(a) Design Flood :- 187.25 Cumecs
(b) Observed Flood :- Not available
Specially difficult Foundation problems : Yes or No :- No
Unusual Dam Design :- No
9 Inspection Galleries in the Dam Not Applicable
Number :- Not Applicable
Elevation of Galleries (m) :- Not Applicable
Are all Galleries Dry? :- Not Applicable
10 Gates Not Applicable
Method of Operation of Gates :- Not Applicable
Size of each Gate :- Not Applicable
Number of Gates :- Not Applicable
Number of Gates in working condition :- Not Applicable
11 Operation &Maintenance Manual :- No
Was an Operation &Maintenance Manual prepared? :- No
If No, by when is the same likely to be prepared? :- No
12 Silting of Reservoir :-
Does the Reservoir get silted? :- Yes
If Yes, what percentage of the reservoir capacity is :- 8.91%
lost? 0.07112mm3
13 Leakage through the Dam Body :-
Peak Water leakage (in m3) :- 0.00168 cumecs
14 Structural Safety Assessment
Was Structural Safety Assessment performed? :- Yes
If Yes, was the Dam found to be safe? :- Yes
If No, was the Dam retrofitted? :- -
If Yes, when was it retrofitted? :- -
If Yes, what was the retrofit measure adopted? :- -
15 Dam Break Analysis
Was Dam Break Analysis performed? :- No
If YES, were Disaster Management Plans prepared? :- No
16 Emergency Action Plan
Was an Emergency Action Plan prepared? :- No
If Yes, was it shared with the SDMA and DDMA? :- No

Sub Divisional Officer, Executive Engineer,


Minor Irrigation Sub Div, Beed Irrigation
Division, Ambajogai. Beed .