OPENINGS
Area of the door = (1.2 x2.85) M2
= 3.42 M2
Area of the window = (1.98 x 2) M2
= 3.96 M2
There are 6 windows therefore
= (3.96 x 6) M2
= 23.76 M2
Total area of openings = (23.76 +3.96) M2
= 27.18 M2
ACTUAL WALL AREA
Actual wall area = (125.7 -27.18) M2
= 98.52 M2
AREA OF A BLOCK
Area of a block = (0.45 x 0.23) M2
= 0.1035 M2
NUMBER OF BLOCKS
Number of blocks = area of the actual wall
Area of one block
= 27.18 M2
0.1035 M2
= 952 blocks
BEAM
Assuming the beam height is 0.3 m
Taking the thickness of the wall that is 0.15 m and the calculated
line meter is 125.7 m
Volume of the beam = (0.3 x 0.15 x 125.7) m3
= 5.7 m3
Dry volume of beam = (5.7 x 1.54) m3
= 8.78 m3
For residential buildings M20 concrete is used in the ratio of
1:1.5:3
Total ratio is 5.5
Volume of cement = 1 x 8.78
5.5
=1.596 m3
Mass of cement = (1.596 x 1440) kg
= 2298.24 kg
Amount in bags = 2298.24
50
= 46 bags of cement
Volume of sand = 1.5 x 8.78
5.5
= 2.39 m3
Volume of aggregate = 3 x 8.78
5.5
= 4.79 m3
Volume of water = mass of cement x 0.5
= 2298.24 x 0.5
= 1149.12 litres
STEEL RODS
Steel bars overlap = 50D
Assuming we are using 12mm bars
50 x 12mm = 600mm
= 60cm
12m – 0.6 m = 11.4m
Total line meter = 34.94 m
11.4 m
= 3 bars
Multiply it by 4
3 x 4 = 12 steel bars of Ø 12mm
STIRRUP
Assuming we are using 1 inch cover beam
1 inch = 2.5 cm
= 0.25 m
Taking the total = (0.1 x2) + (0.25 x2)
= 0.7 m
0
Ocre of 135 = 0.05 m
Total = 0.05 x 2
= 0.1 m
Total of stirrup length = 0.7 + 0.1
= 0.8 m
Amount of stirrup = total line metre
Space btn stirrups
= 34.94
0.2
= 175 stirrups
Amount of stirrup bars = length of bar
Stirrup length
= 12
8
= 15 pieces
1 rebur = 15 pieces
? reburs = 175 pieces
= 175
15
= 12 bars of Ø8mm
TERRAZO
1 terrazo area = 1.42 m2
Area of the room = 75.4 m2
Number of piece = 75.4
1.42
= 53 pieces of terrazzo
GYPSUM
Area of one gypsum board = 2.88 m2
Area of the room = 75.4 m2
Number of pieces = 75.4
2.88
= 27 pieces