Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Duri, 12 April 2022

Attention to
HR Manager
PT Prakarsa Pramandita
Duri,

Subject : Application for Employment

Dear Sir,
As I am interest to joining your company as Coacher position, this position is in
accordance with my previous experience. the enclose resume will outline my
experience and achievement I will be happy to provide reference or further
information.

I have more than 25 years’ experience in oil and Gas Company at several
Departments and experience. Now I have been working as a Coacher at SIFP V&V
Team Duri of Pertamina Hulu Rokan

I am looking for new challenges and Making even more attractive.


I also offer strong business skill ranging from the ability to build relationships with
corporate client and other team to hand on experience in retail operation. most of all,
you will find that I am a self-motivation professional and make every effort to achieve
her goals
I enclose my CV for you inspection and looking forward to hearing from you soon, I
am available for interview at your convenience

Sincerely yours,

Edward Jamal

EDJ- Health Environment and Safety Page 1 of 9


4PT
PERSONAL
Nama : Edward Jamal,S.Kom
E-mail : e2rdje@gmail.com
E-mail PHR : mk.edward.jamal@pertamina.com
Place/Date of Birth : Bengkalis/January, 08th, 1967
Passport No : C4603805
License No : 0922-6701-000016
Nationality : Indonesia
Marital Status : Married
Address (House) : Jl.Cengkeh No.64. Kel. Babussalam Duri- Riau
Phone /WA : 085265232462

Summary Qualification;
 I have been working as V&V Coacher at SIFP (Serius injuri and Vatality
Prevention) V&V Duri of PHR HOU-Duri for 1 (One) Year. Before that I have
work at CPI project more than 25 years’ experience in oil and gas company at
several Departments. August 2020 – December 2020 I Have Worked as HSE
Supervisor. at PT RUI (Radian Utama Interinsco) at Cogen Area-11. on July
2017 until June 2020 I have worked 3 Years at PT SMBR as a TA QA-QC SMO
Team HOOU CIF and also at the SLO North CPI Project. More Than 5 Years
as TA CIF Construction at Project Close Out of PT Rekindworleyparsons
for project Inventory at HOOU CPI Duri. I have worked 2 Years as HES
Technical Assist. at Tripatra Flour, Extend 3 Years as Contract
Coordinator at Tripatra Fluor under WMT HO. 2 Years as Material Coord.
and 1 Year as Asst. Engineer at FAMT Engineering Support HO Duri, 2 Years
as Lead Programmer at Engineering Support and 6 Years at Production DSF
as Data Management. Familiar with MS Office , MS Excel, Create Drawing ,
MS Project and Primavera.
 Has a good leadership and communication (social activities & organization )
Committee work planning. Ability to build network and relationship to
convince and Influence others. Active English writing and conversation
 Has profound knowledge of HES Aspect.
o HES Inspection and Verification base on MSW
o Certification (AK3U) Inspector and Supervision
o Certification HES Trainer conduct by Chevron
o Certification Confine Space Entry
o Construction Supervisor Training by Tripura Fluor
o ISO, 2018 SHE Management System.
o Certification (SMITH SYSTEM) and DDC Training

EDJ- Health Environment and Safety Page 2 of 9


EXPERIENCE
Employee : PT. Singgar Mulia Engineering Consultant
From : Mei 2021 – Now
Position : V&V Coacher at PHR Duri Area
 Observing contractor at all location of HO Duri
 Ensure alignment with SIFP (V&V) team for it protocol. Coaching and
validation of HSE Pertamina Hulu Rokan Process
 Ensure All contractor carry Out work according to the correct protocol and
HES MSW Regulation
 Participant to development and implementation of corporate and owner
programs in industrial safety Heal and Environment
 Observe and review V&V plan document in accordance with serious injury
and Fatality Prevention as the main focus.
 Update status V&V result to respective organization

Employee : PT. Radiant Utama Interinsco


From : August 2020 – December 2020
Position : HES Supv at CPI HRSG (Heat Recovery Steam Generations
Location at - Cogen North Area-11 Heavy Oil Unit Duri FieldR
 Review and monitoring HES Policy During The Crews of Contractor
Working at Cogen Facilities Area
 Supervision Piping crews working at Confine space and hazardous area,
such as ; Entry Watch, Fire watcher and Crews Test gas detector
around The Cogen Area
 Review and Monitoring permit requirements such as GWP, Hot Permit,
IHE, CSEP,Lifting & Riging etc
 Ensure that all Contractor's are always in compliance with Company's
HES policy during performance of work at job site.

Employee : Singgar Mulia Brown & Root Company


From : July 2017 – June 2020 ( 2 Years 10 Months)
Position : TA QA/QC SMO Duri, FIC CPI SMO Duri at - Heavy Oil Unit Duri Field
 Tracking and Review data management QC, controls also modify as
necessary for Surveillance Report
 Combine data base for Analyst data QAQC All Contractors and make
sure the Data was completed for Reporting.
 Check and Review Material Install and Replace Contractor Report
 Collect and Make sure All Contractor Document was comply before send
to Owner (CPI Manage)
 Monitoring and review each AFE Project Document as well
 Assist QA/QC Team to Analyst data Management and Ensuring the
installed material is the same as the one in the document Project.
 Assist QA/QC Team to Created and edit drawing for supporting and
verification data of construction, Piping and electrical QA/QC
EDJ- Health Environment and Safety Page 3 of 9
Employee : PT RekindWorleyParsons. PCO IM Facility Dept. CPI Duri.
Period : March 2012 – July 2017 (5 Years 4 Months)
Position : TA Project Closed Out SLN (Sumatera Line North) Bekasap
CPI Duri
 Analyze each transaction that have already charges at pertinent AFE
bases data download all finances have already be at that project.
 Assist AFE Owner / Project Control to review details charge /expenditure
project and process transfer charge to Accounting
 Tracking Material issued of Project Close Out and measure progress
material Inventory by Contractor
 Review Joint Survey Result as final quantity has submitted by contractors
 Field inspection Walk Through, clarify discrepancy items if any prepare
inventory AFE Project.
 Preparing Material Project Close Out Report, including: conduct physical
inventory and Field verification.
 Monitoring and Filed Verification of Matrial data to support Project MFE
 Arrange Material Report all Business Partner under MFE IM Chevron Pari-
125 to Complete Weekly and Monthly of Material Report
 Review material procedures for estimating, scheduling and material
controls also modify as necessary.
 Tracking and Completed Document data PIS (Put in Service) For CPI
Representative to SKK Migas.

Employee : PT Tripatra Fluor HO FO Waste Injection Facility Chevron Duri.


Period : November 2005 – March 2012 (6 Years and 5 Months)
Position : TA HES 3 Years at Waste Managemant Team
Contract Coordinator 3 Years 5 Months Project Control SCM CPI
 Report to Team Manager Waste Management Team
 Execute and control contractor’s activities in the quantity survey of project
construction. Work an inspection and measurement plan as part of quantity
survey of project.
 with company’s contractors
 Asst. to Provide Material Budget Propose for All Contractor under WMT
 Create and develop Material Junk, B3 and Non B3 of Waste Report for TM
Representative to KLH and BP MIGAS
 Review and monitoring Cost Material Project of contractor under WMT
 Record data material Junk Yard and Material Waste B3 and Non B3 at B3
Shelter Area-6
 Tracking and Develop Material Project Report (Using-up, Changed and
Transferring Material for Waste Management Facilities
 Prepare Document accident and incident investigations

EDJ- Health Environment and Safety Page 4 of 9


Employee : PT. Dayatama Polanusa . HO-FO CPI Project Engineering.
Period : February 2002 September 2004 ( 2 Years 7 Months )
Position : Material Coordinator.
 Direct Report to Team Manager Waste Management Team.
 Tracking and Develop Record contractor (Using-up, Changed and
Transferring Material for Waste Management Facilities)
 Monitoring Budget Contructor In and Out Waste Management
 Provide Report Plan and Progress report by Microsoft Project
 Prepare and Monitoring SFI Well Capacity for Material Engineering Report
and update work breakdown status for data Sharing
 Monitoring and update WMT Project All WMT Facility
 Measure and report progress of activities against schedules
 Design Layout and Access Control for all WMT Facilities
 Asst. CPI WMT to Prepare and completed Contractor document Project

Employee : PT. Daima Lestari ( Seconded CPI Project Duri )


From : February 2001 February 2002 (1 Year )
Position : Asst. Engineer at OES (Operation Engineering Support)
 Direct Report to Team Leader Operation Engineer Support FOMT Duri
 Supervision Contractor to review Tool and Equipment Material Issued for
installing at field according to company required
 racking and provide Material Engineering Work Request by MP2 to support
Engineer’s activities at location.
 Pipe line Identification (Infra Structure Maintenance Team)
 Review certification of materials
 Prepare Drawing for Piping and Construction.
 Prepare DSF pipe ID and Number
 Inspect Material Requested and Field Verification
 Create Schedule project priorities and sharing all of data to website and
server folder

Employee : PT. Tripatra Engineering and Construction CPI Project Duri


From : September 1998 February 2000 (1 Year 5 Months)
Position : Lead Programmer, at Field Asset Management Team “West Office” Duri
 Created Program data base Weekly and Monthly Report completed with
Graphic for CPI Engineering support
 Update work requested, such as; Material Requested, Drawing Request
for Engineering etc.
 Tracking CP-002 Material Request until completed received at Warehouse
 Providing and Monitoring Equipment data for Man Power and Equipment
Service.
 Prepared Material Equipment Report for Change and hand over Material
From Owner to user CPI.
 Prepare Material Report Weekly and Monthly Report

EDJ- Health Environment and Safety Page 5 of 9


Employee : PT. Guna Sarana Agung under FMT CPI Project Duri
From : January 1992 September 1998 (6 Years 7 Month)
Position : Data Management at AMT Facilities CPI Duri
 Tracking and prepare data report and sharing data via Server.
 Asst Analyst for Weekly and Monthly Report according to job order
priorities and availability.
 Develop programs or procedures for DREAM and OPAS Performance
History. Maintenance data base system, personal records and operating
Historical data of equipment for Drilling project.
 Assist. To support CPI for Material Requested.
 Instructor MS Office Training all of Steam Operator and CGS Operator.

EDUCATION
Year Degree Place
2010 University of Lancang Kuning Pekanbaru Majority Pekanbaru
Tecnical of Information System (S1)
1991 Academy of System Informatics and Computer Padang
University of Putra Indonesia. Bachelor of Science
in System Information
1986 Senior High School Duri

OTHER TRAINING / COURSES


Year Training Place
2022 MVSP Training by V&V Duri Duri
2022 Work Shop SIFP V&V Rumbai
2020 MVSP Training by PT Chevron Duri
2019 First aid Training by CPT Chevron Duri
2018 ISO 45001 SHE MM, ISO 9001 System Pekanbaru
Management Mutu
2018 Refresh Smith System Training by SMBR Duri
2017 Scaffolding and lifting Training SMBR Duri
2016 Skill Communication Training by Worleyparsons Duri
2015 Primavera Training by RekindWorleyparsons Duri
2014 DDC Training by RekindWorleyparsons Duri
2013 Change Management by RekindWorleyparsons Duri
2013 English Communication Skill by Rekendworley Duri
2013 Leadership Management Training Duri
2012 Ocupacional Health and Safety (AK3U) Duri
2012 HES Induction and DDC Training Duri
2011 Motor Vehicle Safety Practice By CPI WMT Duri
2010 Construction Supervisor Training by Tripura Fluor Duri
2007 H2S Training By Chevron HO FO Duri

EDJ- Health Environment and Safety Page 6 of 9


2006 Respiratory Protection Training By Chevron Duri
2005 FSWP (Fundamental Safe Work Practices) Duri
2005 Leadership Training by LNI Jakarta
2001 Database of Material Training Duri
2000 Web Site Design by IT CPI Duri
1998 English Training By LET at CPI Production Duri
General Communication Skill-I, II and III
1997 English Training By LET at CPI Production Duri
Basic Communication Skill-I, II and III
1997 Defensive Driving Course Duri
1996 Data Dream (Management system) By IT. Duri
1996 Administration and Document Control Training Rumbai

ORGANIZATION
Periode Explanations Place
Year
2019-2022 Publics Relation of “Yasmalah” Duri Duri
2016-2019 Secretary of INKAI Affiliation Chevron Duri Duri
Coordinator of People Education“Rumah
2013-2015 Duri
Aspirasi”
2013-2016 Chairman of IKA SMA-2 86/86 Duri Mandau Duri
2006-2012 Secretary of INKAI Affiliation Chevron Duri Duri
2009-2011 Instructor of Smith System HES Training Duri
Staff committee of Blood Donor by CPI Joint with
2006-2009 Duri
Medical and PALMER Dumai
2004-2007 Chairman Alumni UPI-YPTK Padang - Duri Duri
Participant of Computer Technology and
Nov-2000 Pekanbaru
Information Seminar at Pekanbaru
Instructor of Basic Ms Office Application
1997-1998 Duri
Workshop for CPI operator FAMT Pari Office-125

Regards,

Edward Jamal #321868

EDJ- Health Environment and Safety Page 7 of 9


EDJ- Health Environment and Safety Page 8 of 9
EDJ- Health Environment and Safety Page 9 of 9

You might also like