Part 1: Job Description: Field Calibration for Valves & Transmitters at FEC area Location: FEC Area
JRA Date: 26-02-2011 JRA No./ Revision: 11-195 JRA Leader: Michael Middleton Scribe: Abrar-ul-Hassan
Review Team: (e.g. Ops Review Team) Khizar Hayat, Farhan, Adnan, Zahid, Tahir & Abrar-ul-Hassan
List Associated Procedures/work instructions or Temporary WIs:
Hazard Check List (FRCP identified below must reference applicable FRCP Control Measures – refer to FRCP Handbooks)
√ Falls from Heights √ Access / Egress Confined Space √ Manual Handling Fatigue/Over Exertion √ Slips, Trips & Falls
√ Competence of
√ Falling Objects Collisions √ Noise Illumination Environmental
Personnel
√ Liquid/Gas Under Flaring/Hydrocarbon
Oil/Chemical Flammable Materials Moving Machinery Electricity
Pressure Release
Surface Mobile
√ Ignition Source Light Vehicles
Corrosive Substance Chemical Exposure Naked Flames Equipment
(Sparks/Electrical) (FRCP)
(FRCP)
Hazardous Materials √ Equipment Other
Isolation √ Working at Heights Lifting Operations (please specify)
Management Safeguarding
(FRCP) (FRCP) (FRCP)
(FRCP) (FRCP)
Step
Hazard Hazard Effect Hazard Controls Controls Acceptable
Job Steps Use Checklist as a Guide to Injury/Damage or
No. Use Hierarchy of Controls/FRCP Control Measures Y/N
be Specific Environmental Effect
01 Mobilization of Un inducted Personal Ensure inducted and medically fit and Yes
personnel and people injury approved people from project HSE
Equipment should inter the working area
CONTROLLED DOCUMENT
Page 1 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
Sub standard Back Injury Use rated PVC tubing for field calibration
fittings of valves and pressure regulator are
fitted and set accordingly
CONTROLLED DOCUMENT
Page 2 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
strain or exertion
Use mechanical aid where if it is required
04 Demobilisation Poor House Slip, Trip & Job Supervisor to ensure the area was Yes
Keeping Fall clean and tidy
Proper house keeping and Laboratory
container must be neat and clean all the
time
CONTROLLED DOCUMENT
Page 4 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
Alternatives Considered: What are the other possible means of achieving the job outcome?
Part 3: Contingency Plans: What rescue equipment, PPE etc could be needed if something went wrong? Reference Field ERP
Full time communication with CCR to be made in case of any emergency / muster (Secure the place and go to the designated operation muster
point
Fire Extinguisher shall be on site
CONTROLLED DOCUMENT
Page 5 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.