Comparison Roof System & Indicative Cost

Project : 92 Unit Shop Office at Bukit Indah

Option 1 Option 2
Indicative Cost (RM) Indicative Cost (RM)
Supply Install Supply Install
0.47mm TCT 0.47mm TCT
Metal Roof Covering I-Clip 720 CSC Realcolor I-Clip 720 CSC Realcolor Primero
Primero Z18 Z19

28.73/m2 16-20/m2 28.73/m2 16-20/m2


Galvanise Coating
*100% Zinc *100% Zinc
Composition

Coating Mass Z180g/m2 Z180g/m2

50mm thick X 16kg/m3


Insulation Kextra Ecowool Brownie 7.90/m2 1.50-2.50/m2 - - -
EWBL 1.35

Kextra Double Sided Kextra Small Bubble Foil


Sisalation 3.80/m2 1.50-2.50/m2 5.80/m2 2.00-2.50/m2
Woven Foil (BB238FM-10)

40.43 34.53
Prepare by : Norfarah Aqilah
Email : aqilah@kextra.com.my
No. tel: 012-5227994