Reply Comment Sheet: Etude Flow Assurance - Redémarrage Et Intégration de RGT Rom Dans Le Réseau Zoiph2 Et Ozoi Rev

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Reply Comment Sheet

Etude Flow assurance _Redémarrage et Intégration de


PROJET
RGT ROM dans le réseau ZOIph2 et OZOI
REFERENCE Rev A Date : 13/01/2021

DOCUMENT 140106FPRA00001

APPROBATION CODE DATE SUBMITTED FOR : APPROBATION :


INFORMATION [IFI] APPROVED [APP]
TRANSMITTAL
REVIEW [IFR] APPROVED WITH COMMENT. [AC] ✘
.pdf APPROBATION [IFA] REVIEWED WITH COMMENT. [RWC]
FORMAT
other CONSTRUCTION [IFC] NOT APPROVED [NA]

Item Comments By

Commentaire client
Since the new wells are part of the M7 production considered for senario 02, then rephrase
the sentence:
01 Sabrine.K
Réponse d’EPPM :
Updated

Commentaire client
In case of alignment on MP the capacity of separators MP to be verified.
02 Sabrine.K
Réponse d’EPPM :
Updated

Commentaire client
Distinguish the two cases for each year of production
03 Sabrine.K
Réponse d’EPPM :
Updated