4 Phase Project Development
4 Phase Project Development
WITHIN 15 YEARS)
-SAME AS THE PASIG RIVER REHABILITATION PROGRAM WHERE THE POLICY “NO RELOCATION, NO
DEMOLITION” WILL BE APPLIED. INFORMAL SETTLERS WILL BE RELOCATED TO A TENEMENT HOUSING.
- AFTER THE 1ST YEAR OF FINISHING THE RELOCATION OF INFORMAL SETTLERS, ESPLANADE AND
PROMENADE STARTS THE CONSTRUCTION PHASE
- BIOLOGICAL TREATMENT WILL START ON 1ST DAY OF THE COMMENCEMENT OF THE REVITALIZATION.
2ND PHASE-ALLOCATION (2ND BIOLOGICAL TREATMENT AND ALLOCATE PARKS AND OPEN SPACES, ALLOT
EDUCATIONAL FACILITIES/SPACES) – 4 YEARS
• WATER IRIS: TAKES UP EXCESS NUTRIENTS THAT HAVE SEEPED INTO THE SUBTRATE.
• SOFT RUSH: REMOVAL OF NUTRIENTS FROM SEWAGE WATER. ABLE TO TAKE UP NITROGEN AND
PHOSPHORUS COMPOUNDS.
• WATER SPINACH: REMOVAL OF TOTAL NITROGEN AND TOTAL PHOSPHORUS.
• WATER MINT: REDUCES COLIFORM BACTERIA, ORGANIC NUTRIENTS,AND HEAVY METALS.
• POLYGONUN HYDROPIPER BAGEN: REMOVAL OF BIOLOGICAL OXYGEN DEMAND, CHEMICAL
OXYGEN DEMAND, NUTRIENT, AND METAL.
• WATER IRIS: TAKES UP EXCESS NUTRIENTS THAT HAVE SEEPED INTO THE SUBTRATE.
• FANWORT: AIDS IN REMOVING CARBON DIOXIDE AND SUPPLYING OXYGEN IT ALSO SUPPLIES
METABOLIC DEMANDS FOR RAPID GROWTH.
• CATTAILS:
-THE PLANTING AND RELOCATING OF DIFFERENT FAUNAS TO FURTHER ENHANCE THE CAPABILITIES OF
PROTECTING THE AREA FROM NATURAL DISASTERS AND ENHANCE THE BEAUTIFICATION OF THE DAVAO
RIVER.