Professional Documents
Culture Documents
DESIGN CASE Dey Simulation Seng Segat With Stripper
DESIGN CASE Dey Simulation Seng Segat With Stripper
Vent1
SPRDSHT-1 TEG Make up Calc
FG_Burner Temperature 205.4 F
4.369e-002 USGPM
LTEG 01 MIX-100
FG KO
Wtr_Cond Mass Flow 268.2 lb/hr
Temperature 132.0 F Drum
TEG
Make-Up
Mass Flow 0.0000 lb/hr Master Comp Mass Flow (H2O) 262.6907 lb/hr
Pressure 730.0 psig 9 LTEG115 Wtr_Cond
Liq Vol Flow @Std Cond 12.39 USGPM
Master Comp Mass Frac (TEGlycol) 0.9910
HCGas
E-101
Vent1
RTEG8C
LTEG R Q_
01 8 DGas104 Cond
RCY-4
RTEG8C
220.0 F Still
RTEG5
SatGas3 Column
LTEG14
120.0 F
Strip
720.0 psig Q1
Gas
TEG
57.14 MMSCFD 36" ID TEG Flash
Sep Bottom
R 12 Strip Gas
Feed Gas Absorber
LTEG13
273.2883 lb/hr _ Liq RCY-2
Bottom _ Liq
LTEG12
Temperature 120.0 F
114.6 lb/MMSCF Temperature 392.4 F
P-100 395.0 Stripper
Pressure 720.0 psig E-103 Column Total Mass Flow 26.49 lb/hr
E-104_Loss
E-104_Loss
Molar Flow 57.00 MMSCFD 0.9911
5.513e+005 Btu/hr Strip_Gas Water Mass Flow 12.1313 lb/hr
Molecular Weight 16.49 323.9 F
220.0 F
RTEG7
RTEG4
Strip_Gas
SatGas3
RTEG6
Hot LTEG
SatGas2
LCV
1.784e-003 MMSCFD
Feed Gas 392.4 F
Integrated
RTEG3
Scrubber
op-100 E-102
LTEG11 3.658 lb/hr
E-100 Heat duty to
Exchangers and 0.9927
RTEG102
reboilers are
based on No
RTEG102 Loss to the
environment
RRCY-1 Hot
LTEG
Temperature 121.0 F
Pressure 720.0 psig
Cond1
Master Comp Mass Frac (TEGlycol) 0.9555
Fri Apr 12 10:30:37 2019 Case: Dehy Simulation_Seng Sengat 720 Psig 120F.hsc Flowsheet: Case (Main)