Contents Chapter 01
‘ ................................................................................................................ Error! Bookmark not defined.
Abhinav RJ
PROJECT PREFACE ................................................................................................................................... 2
No ratings yet
ACKNOWLEDGEMENT............................................................................................................................. 2
ABSTRACT................................................................................................................................................ 3
3:RATE ANALYSIS:.................................................................................................................................... 8
Definition: ............................................................................................................................................... 8
OBS of the project shows the organized breakdown structure of the company. The OBS
Document 20 pages
displays organizational relationships and then uses them for assigning work to resources in a project.
.............................................................................................................................................................. 17 Estimation of Building
6. PROJECT SCHEDULE: ......................................................................................................................... 17 Saurav Gautam
7:ANALYSIS OF RESULTS........................................................................................................................ 18 100% (1)
.............................................................................................................................................................. 18
Document 23 pages
Document 12 pages
Document 52 pages
House Estimation
Sheikh Nouman Mohsin Ramzi
100% (1)
Document 21 pages
Rate Anaylsis
Prajwal Shivakar
No ratings yet
Document 27 pages
EN
RESOURCE WORK SUMMARY REPORT .................................................... Error! Bookmark Upload
not defined.
Document 6 pages
ACKNOWLEDGEMENT
Document 64 pages
I have taken efforts in this project. However, it would not have been possible
Estimation All
without the kind support and help of my Teachers especially I am greatly
Aso Gardi
thankful to sir Ubaid Ahmed Mughal lecturer of civil engineering department
No ratings yet
who has been an excellent guide and also a great source of inspiration for me I
would also like to pay gratitude to all the teaching and non-teaching staff
members in this mighty project who helped me directly or indirectly and eased
my work.
Document 16 pages
Estimation Slide
Rupendra Yadav
No ratings yet
Document 29 pages
Construction Project usually takes large time period. Therefore, it has taken
about one year to complete.in this project, MS project was used for planning Document 9 pages
To make an estimate of the time required, rate analysis and the resources used
by using ms project.
Document 32 pages
quantities first. Then we have to assign the resources to different tasks in thre Document 33 pages
ms project. Also we have to give the the unit rates of the materials and labours Estimation and Costing OFA
so that we may able to know about the cost of the quantities calculated in the
Commercial Building…
Belal Rizvi
No ratings yet
Document 7 pages
Document 17 pages
Document 20 pages
Concept of Project
AD Management
Unlock this document Subscribe with a free trial Priyanka Roy Chowdhury
Read and download full documents. Cancel anytime No ratings yet
estimation of the project. The project must be completed with in the required
OR
time and the cost.
Unlock this page after an ad
EN Upload
Document 146 pages
4
Estimation
What is Scribd? Documents
HaymanAHMED
No ratings yet
Plan of the 15 Marla House
Document 3 pages
Document 22 pages
Document 6 pages
BSBPMG531 Assessment
thank pinh
No ratings yet
Fig: 1
Document 83 pages
Document 13 pages
Estimation:
Document 4 pages
4
Definition: Intership Report Final
Estimation (or estimating) is the process of finding an estimate, Mr.Bhaskar Wabhitkar
or approximation, which is a value that is usable for some purpose even.For 100% (1)
the construction, we calculate the quantities of the materials that are required
in the construction process.
Construction Estimating
There are many methods available for detail estimation but two commonly
Techniques
used methods
civilsadiq
1. Separate or individual wall method No ratings yet
2. Center-line Method
Document 22 pages
This method can also be worked out inOR a quicker way. as follows: No ratings yet
For long walls Unlock this page after an ad
I. First of all, find the length of the foundation trench of the long wall “out-to-
EN Upload
out” in the same manner as explained above.
II. The length of the foundation concrete is the same. 4
III. For the Document 28 pages
Whatlength of the firstDocuments
is Scribd? footing or first step of the brick wall, subtract two
offsets (2x6"=12") in foundation concrete from the length of the trench or CE1401
concrete. EstimationandQuantityS…
IV. For the second footing subtract from the length of the 1st footing two
Tarak A Positive
offsets (2x2.25"= 4.5"), for 3rd footing subtract from the length of the 2nd
footing 2 offsets (4.5") and in this way deal with the long walls up to the super- 100% (5)
structure.
For short walls
Follow the same method but instead of subtracting add two offsets to get the
Document 35 pages
corresponding lengths in-to-in.
Time Estimation of A
Building
2: Center Line Method of Estimation Avalanche Saini
No ratings yet
• In this method, total length of centre lines of walls, long and short, has
to be found out.
• Find the total length of centre lines of walls of same type, having same
Document 185 pages
type of foundations and footings and then find the quantities by
Building Structure Design -
multiplying the total centre length by the respective breadth and the
Graduation Project
height.
Kalomenni
• In this method, the length will remain the same for excavation in No ratings yet
foundations, for concrete in foundations, for all footings, and for
superstructure (with slight difference when there are cross walls or
number of junctions).
Document 23 pages
• This method is quicker but requires special attention and considerations Quantity Surveying Is A
at the junctions, meeting points of partition or cross walls. Term or Processes Used i…
Amanu Worku
• For rectangular, circular polygonal (hexagonal, octagonal etc) buildings
having no inter or cross walls, this method is quite simple. No ratings yet
Document 44 pages
Document 38 pages
• Thus in the case of a building with one partition wall or cross wall having
4
two junctions, deduct one breadth of the respective item of work from
Document 299 pages
the total centre length.
CD-18-Modified Final
• For buildings having different types of walls, each set of walls shall have Project Report
to be dealt separately.
joknibb
• Find the total centre length of all walls of one type and proceed in the No ratings yet
same manner as described above. Similarly find the total centre length
of walls of second type and deal this separately, and so on.
Document 24 pages
• Suppose the outer walls (main walls) are of A type and inner cross walls
are of B type. Ppt2 Quantity Ch2
Àbïyãñ Sëlömõñ
• Then all A type walls shall be taken jointly first, and then all B type walls
No ratings yet
shall be taken together separately.
• In such cases, no deduction of any kind need be made for A type walls,
but when B type walls are taken, for each junction deduction of half
breadth of A type walls (main Walls) shall have to be made from the
Document 3 pages
total centre length of B type walls.
Estimating Construction
• At corners of the building where two walls are meeting, no subtraction Costs: An Overview of…
or addition is required. TALHA AHMED HASSAN…
No ratings yet
• In the figure, the double cross-hatched areas marked P,Q,R, & S come
twice, while blank areas, A,B,C, & D do not come at all, but these
portions being equal in magnitude, we get the correct quantity.
Document 19 pages
CH 1 & 2
Green Myanmar
No ratings yet
Document 29 pages
Document 20 pages
Document 13 pages
AD
Unlock this document Subscribe with a free trial
Read and download full documents. Cancel anytime
OR
Unlock this page after an ad
EN Upload
Document 122 pages
4
Esc Material
What is Scribd? Documents
ylvps aishwarya
No ratings yet
From Everand
From Everand
Networking Project:
Students Guide
Mohammad Nor Ihsan Md Zin
4/5 (2)
From Everand
Document 18 pages
Document 6 pages
4
Document 7 pages
What is Scribd? Documents
Work Rate
Experiment No. 2
Assistant Rs 500.00/day
Beldar Rs 950.00/day Determination of Maximu…
Blacksmith Rs 500.00/day umar
Carpenter Rs 1,000.00/day
No ratings yet
Chief Land Surveyor Rs 3,500.00/day
Concrete Lifter Operator Rs 1,000.00/day
Concrete Vibrator Operator Rs 1,000.00/day
Design Engineer Rs 2,000.00/day
Draft Man Rs 1,200.00/day Document 6 pages
Document 7 pages
Project Team: Experiment No. 1
PROJECT TEAM comprises of people who are responsible for the Calibration of Speedy…
execution of the project umar
No ratings yet
PROJECT MANAGER:
Project manager is the person who is fully responsible of every activity done at
the site. Project manager manages the project completely. Project Manager is
Document 12 pages
Document 2 pages
Unlock this document Subscribe with a free trial Notice of Internship UET
Read and download full documents. Cancel anytime umar
the overall in charge of the project who stationed at the project site and looks
OR
after all the project matters. Responsibilities of the Project Manager include No ratings yet
Document 1 page
Memorandum Writing
umar
No ratings yet
AD Subscribe to remove ads.
Document 8 pages
15 Toughest Interview
Questions and Answers!: …
johnlem
No ratings yet
Document 2 pages
AD
Unlock this document Subscribe with a free trial
Read and download full documents. Cancel anytime
activities like demolition of existing structure, clearing & grubbing etc. He is the
one who prepare the inspection request OR of site work items and submit to
Unlock
consultant for the purpose this page
of checking theafter
work aninadaccordance with drawings
and specifications. Consultant, thereafter, issues the order toENproceed further
Upload
if the work is ok Document 1 page
5
Survey and CP Intro
What Engineer:
Structural is Scribd? Documents
umar
He is an engineer who is responsible for the structural works is responsible for
No ratings yet
performing the activities related with concrete foundation, column, beam, slab,
formwork, steel truss fabrication and erection. He makes the structures
according to the plan and issues assignment to the foremen that what is assigned
to them every day and gives report to the construction Manager.
He is the person who is responsible for the electrical related items at the 1000 Solved Problems in
site.he is responsible for: Fluid K Subram 20347920
RhiscptreohLtusocan
Fire alarm system
39% (23)
Telecommunication
Lighting system of the project
Wiring
Emergency system Document 29 pages
Stream Gauging
umar
No ratings yet
Document 4 pages
Planning Engineer:
Planning Engineer is the key and very important person at project site who
Document 6 pages
coordinates with all the construction staff and reports directly to the project
manager. The specific duties of planning engineer are schedule development, BFW Pump
progress monitoring and management coordination. He interfaces with and Girish Chandra Gowala
obtains input from project personnel for the development of project plans and No ratings yet
schedules that reflect the defined scope of work. He also develops and
coordinates quantity and labor expenditure rates for all project activities. His
progress monitoring activities includes is to collect the information from site
staff and update schedules to assess planned progress against actual progress.
Document 3 pages
He asses impact of critical path and near-critical activities and report critical
CV - Site Civil Engineer
work activities to the project manager. With reference to the management
Engr. Abdul Hafeez
coordination, he present and answer questions on project plans and schedules
No ratings yet
at project meetings.
Contractor:
Polymer Composites
Lecture
Shamawn Muktadeer Shovon
100% (1)
Document 12 pages
Unlock this document Subscribe with a free trial Pipe Line Pigging
Read and download full documents. Cancel anytime Santosh Kumar Bogela
project and is normally paid for services provided to the project by the
OR most common concept of a
originating general contractor. While the No ratings yet
subcontractor is in building works and civil engineering,
Unlock this page after an ad the range of
opportunities for subcontractor is much wider and it is possible that the
EN Upload
greatest number now operate in the information technology and information
sectors of business 4
Document 8 pages
What is Scribd? Documents
Quantity Surveyor/ Surveyor: Ascent Princeton Precast
He works under supervision of planning engineer and report directly to
Stadium Design
him in all matters. He prepares the company running bills, bill of quantities,
keith_tian
estimation of changed works, checking of sub contractor bills etc. He prepares
No ratings yet
early stages budgets and detail cost plans. He performs cost control during the
project. He identifies analyses and develops responses to commercial risks. He
allocates the work to the subcontractors.
Document 2 pages
Quality Control (QC) Engineer: HAZOP Analysis of Group
He is responsible for the quality of the materials for example: for preparing 15: Isaac Law Shek Xiang…
concrete mix design, welding procedure, checking quality of materials at site. vijaymoorthy14
He checks the quality of work before the inspection request is submitted to the No ratings yet
consultant. He directly report to the project manager and keep close contacts
with construction manager.
Store Keeper:
Document 1 page
He is responsible for keeping the inventory of all materials to be consumed at Bus + Waterbus Routes:
site and all company assets. He issues the material to site staff on daily basis
Enghave Brygge
and maintains all the record and finally dispatches all this information to head
Jane Wong
office. He works under the control of manager administration.
No ratings yet
Document 1 page
Groundsill 32
Aditya Prayoga
No ratings yet
Document 32 pages
Unlock
maintenance, cost analysis, this page posting,
reconciliation, after an ad
and inventory control. He is No ratings yet
the one who pay labor wages, daily local site purchases, and site staff’s salary
and input all the transactions in the journal. He prepares financial reports
5
through analysis of simple operating statistics and/or financial data. He Document 39 pages
monitors revenue and expenses for departmental or unit accounts; ensures Prestressed For Composite
expenditure control and compliance with funding and reporting requirements.
Sections
He constructs routine spreadsheet applications, prepares financial data for
beast4
input into finance and human resources systems, and generates reports;
No ratings yet
performs calculations which may include interest and depreciation. He should
have bachelor's degree in Accounting, or in a related field including. He works
also under supervision of Manager Administration
Document 4 pages
Supporting Staff: Strength of Materials
This is the staff which is basically the supporter in performing different Problems
activities of the project. These persons are hired by the contractor and play an faizal4ya
important role in carrying out the work on time. Their number depends upon No ratings yet
the scope of the task.
Document 3 pages
5. Work break down (WBS) of a structure: Hoja Tecnica Inverter
Mcquay Serie Mid Miu
Introduction Tatiana Diaz
No ratings yet
WBS of any project shows the work breakdown structure of the project. A
work breakdown structure (WBS) is a chart in which the critical work elements,
called tasks, of a project are illustrated to portray their relationships to each
other and to the project as a whole. The graphical nature of the WBS can help Document 11 pages
a project manager predict outcomes based on various scenarios, which can Metals Building Tech Notes
ensure that optimum decisions are made about whether or not to adopt corazon phil
suggested procedures or changes. No ratings yet
When creating a WBS, the project manager defines the key objectives first and
then identifies the tasks required to reach those goals. A WBS takes the form
of a tree diagram with the "trunk" at the top and the "branches" below. The
Document 111 pages
Document 5 pages
Document 4 pages
AD
Unlock this document Subscribe with a free trial
Read and download full documents. Cancel anytime
primary requirement or objective is shown at the top, with increasingly specific
OR
details shown as the observer reads down.
Unlock this page after an ad
When completed, a well-structured WBS resembles a flowchart
EN
in which all
Upload
elements are logically connected, redundancy is avoided and no critical Document 28 pages
4
elements are left out. Elements can be rendered as plain text or as text within Organization Structure for
boxes. What is Scribd? at the Documents
The elements bottom of the diagram represent tasks small the Construction of a…
enough to be easily understood and carried out. Interactions are shown as Harmeet Singh
lines connecting the elements. A change in one of the critical elements may No ratings yet
Document 2 pages
Upn 300
thiruvenkadam
No ratings yet
Document 12 pages
Giroud Et Al 2014 -
Geomembrane Liner…
Aaron Beckett
No ratings yet
affect one or more of the others. If necessary, these lines can include
Document 25 pages
arrowheads to indicate time progression or cause-and effect well-organized,
PSV Term Sheet
detailed WBS can assist key personnel in the effective allocation of resources,
Anonymous O3q6kIRJ
project budgeting, procurement management, scheduling, quality
No ratings yet
assurance, quality control, risk management, product delivery and service
oriented management.
Document 2 pages
Document 50 pages
The logical constraints representing the relationships among the Danube Building Meterial
activities are then defined. The final product of network development is the Specification Guide
graphical display of sequences in which activities are performed. Using a smartscs
network diagram for project scheduling requires the realistic and accurate No ratings yet
estimates of duration for each activity.
Document 5 pages
CATERPILLAR - Catalogue
Pistons-Chemises
Alex
No ratings yet
OR
Unlock this page after an ad
EN Upload
4
What is Scribd? Documents
ANALYSIS OF RESULTS
BASE LINE COST
Baseline Cost Report
Baseline Cost Cost Actual Cost
9000000
8000000
7000000
6000000
5000000
st
o
C
4000000
3000000
2000000
1000000
0
MSProj11 Project Award Design Process Site Construction Interior Works Project Closing
Investigation Process
MSProj11
OR
Unlock this page after an ad
4
BASELINE WORK REPORT
80000
70000
60000
50000
rk
o40000
W
30000
20000
10000
0
MSProj11 Project Award Design Process Site Construction Interior Works Project Closing
Investigation Process
MSProj11
OR
Unlock this page after an ad
EN Upload
4
BUDGET
What is Scribd? COST REPORT
Documents
6000000
5000000
4000000
st
o 3000000
C
2000000
1000000
0
Q1 Q2 Q3 Q4 Q1 Q2
2017 2018
OR
Unlock this page after an ad
5
BUDGET WORK REPORT
35000
30000
25000
20000
rk
o
W
15000
10000
5000
0
Q1 Q2 Q3 Q4 Q1 Q2
2017 2018
OR
Unlock this page after an ad
EN Upload
4
CASH FLOW
What is Scribd?Documents
REPORT
6000000 9000000
8000000
5000000
7000000
4000000 6000000 ts
o
C
5000000 e
st v
it
o 3000000
C la
4000000 u
m
u
2000000 3000000 C
2000000
1000000
1000000
0 0
Q1 Q2 Q3 Q4 Q1 Q2
2017 2018
OR
Unlock this page after an ad
5
RESOURCE COST SUMMARY REPORT
1110519.739
Cost
Material
Work
6675561.365
OR
Unlock this page after an ad
RESOURCE REMAINING WORK REPORT
EN Upload
5
What is Scribd? Documents
3000
2500
2000
rk
o1500
W
1000
500
0
Assistant
AstheticsBeldar
Expert
Blacksmith
Chief
Carpenter
Land
Concrete
Concrete
Surveyor
Design
Lifter
Vibrator
Draft
Engineer
Electrician
ManHelper
Labourer
operator
MasonPlanning
Engineer
Painter
Steel
Engineer
Steel
Binder
Steel
Fixer
Supervisor
Fixer
TruckUnassigned
Driver
Water
White
Man
Wire
Washer
fixer
Operator
Operator
Work
OR
Unlock this page after an ad
Resource
ResourceWork
WorkAvailability
Summary Report
Report
Work Availability
Work Availability
Work Work
Remaining
Remaining
Availability
Availability
Actual Work
12000
18000
16000
10000
14000
8000
12000
rk
o 6000
rk
10000
Wo
W 8000
4000
6000
2000
4000
0
2000
Asthetics
AssistantBeldar
Blacksmith
Expert
Carpenter
Chief
Concrete
Land
Design
Concrete
Lifter
Draft
Engineer
Electrician
Man
Helper
Labourer
Mason
operator
Painter
Planning
SteelSteel
Binder
Steel
Fixer
Supervisor
Fixer
Truck
Unassigned
Driver
Water
White
Man
Wire
Washer
fixer
0 Surveyor
Operator
Vibrator Engineer
Engineer
Q1 Operator
Q2 Q3 Q4 Q1 Q2
4
What is Scribd? Documents
Project Estimation and Chapter 01 Types of Estimate Estimation For Estimation of Survey Dan Chap 3 Notes PDF
Management… Valuation: S… Added by Abhinav RJ Added by sambhavi Building Works -… Building Pemetaan Added by geeta
Added by Er Charmi… Added by Esakki Raja Added by… Added by Saurav… Added by Len
Invite friends
Documents
Language: English Copyright © 2023 Scribd Inc.