Building Checklist
Building Checklist
Date 31 30 31 31 28 31 30 31 30 31 31 30
A Roof
i) Health Checkup
Compressor Plant roof
1 Any Cracks in Roof beam and Slab Central P&F
slab repair
1 Roof repaired with PMM 30.05.20 5 years 01.06.2025 Quaterly ok
Not
4 Day light sheet Condition and No water leakage in Roof Central P&F Oil Storage shed - Holes in Roof Sheet - - - Monthly
ok
Roof Sheet rusted and have holes
8 Roof Sheet Screws should be tight and no water leakage Central P&F - - - - - - Quaterly ok
ok
2 Cleaning of downspout drainage pipe Plant Maintenance - - - - - - Monthly
3 North light glass/Day light cleaning for visibility Plant Maintenance - - - - - - Monthly ok
Not
4 M.S Gutter Cleaning with Mild detergent Plant Maintenance 1st floor Gutter cleaning
ok
Monthly
ok
5 Painiting on MS gutter from bottom Plant Maintenance
Yearly
B Column
i) Health Checkup
1st floor of R.C.C Cracks developed in Not
1 Any Cracks in R.C.C Column Central P&F
Building
5 out of 104
Column and Beam
Quaterly
ok
3 M.S Column Base plate bolts and gap checking Central P&F - - - - - - Quaterly N.A
C Flooring
i) Health Checkup
Several area
Not
3 Epoxy flooring condition Central P&F Compressor plant damaged(Marked on Quaterly
ok
Drawing)
D Brickwall or Facade
i) Health Checkup
Not
2 Any Cracks in Facade/Elevations Central P&F R.C.C and Brickwork joint Quaterly
ok
Not
3 Plaster Condition Central P&F Inner and Outer wall Inner and Outer damaged Monthly
ok
Not
4 All peripheral glass condition and rubber status Central P&F Rubber & Glass damaged Monthly
ok
Subros Building Maintenance Checklist
Date Inspected by
Year-2020 Year-2021
Date 31 30 31 31 28 31 30 31 30 31 31 30
E Road
i) Health Checkup
5 Any cracks in R.C.C/Bitumen Road and Pot Holes Central P&F Monthly
F Boundary Wall
i) Health Checkup
G Parapet Wall
i) Health Checkup
i) Health Checkup
I Building accessories