Alternative Solution:
1 hour 60 minutes
= x
6 units 1 hour
60 minutes 10 minutes
= =
6 units unit
Conversion cost per Unit Cycle time x Conversion cost per time
Delivery cycle time Wait time + Throughput time
Customer Response time Receipt time + (Waiting time + Manufacturing time) + Delivery time
Noreen-Garrison
Horngren
Compare to Noree-Garrison and Hansen, queue time (waiting time) is given, but in Horngren, this is
computed/estimated, based sa Manufacturing time and Capacity ng Planta.
Process time - essential to convert raw materials to finish products. Without this, we can't convert product
Move time - possible mawala 'to basta magkakalapit ang dep't
Inspection time - possible din na wala 'to if products are good or within the standard
Wait/Queue time - possible din nawala to if maganda ang scheduling process
1. Throughput time
Process 2.0 days
Move 0.6 days
Queue 5.0 days
Inspection 0.4 days
Total 8.00 days
2. Only process time represents value-added time; therefore, the computation of the MCR would be as follows:
Value-added time 2.00 days
MCE = =
Throughput time 8.00 days
= 25%
Thus, once put into production, a typical unit is actually being worked on only 25% of the time.
NVA) activities
Annual average number of orders for gears 92 motorcycles
Manufacturing time per order for gears 1.5 hours
Annual machine capacity 300 hrs a month
Analysis: Stick with selling cycles and scooters as compared sa pabibilisan ko nga pero liliit naman ang profit. Bawal
naman magsesell ka ng motorcycles tas ieexpand si scooter since nasa isang assembly line lang kayo. Kung iimprove
yung isa, maaapektuhan yung isa. Kailangan kung iimprove mo yung isang product, damay lahat ng product sa
assembly line na iyon.
Final Solution: Sell both motorcycles and scooters
turing time.
s mabilis sya so mas mabilis masatisfy ang customer.
man ang profit. Bawal
g kayo. Kung iimprove