Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Annexure -3

Revision No.: R0
HSE RISK ASSESSMENT Date:20-07-2022

Name of Work :- KNPCC-10: Construction of Residential,Non-Residential & Institutional buildings at Polytechnic college Campus, Gurudev
PROJECT: Chauraha, GT Road, Kanpur and Multi Storied officer's Colony of Uttar Pradesh Metro Rail Corporation inside Metro Depot,GT Road, Kanpur DATE:
Architectural finishes, Plumbing, Drainage, External development and E&M Works REV: R1

DOC. TITLE: SHE RISK ASSESSMENT FOR CONCRETE REPAIRING WORK

Hazard / Environment Aspect

Risk/ Impact Level


Probability Rating
Severity Rating

Residual Risk/
SL. No. ACTIVITY Existing control Measures Action By
Source/ Possible

Impact
People at risk
Situation / Act Outcome

1 Storing,shifting and • Ensure that the waterproofing material shall be shifted by manually
stacking of i.e rolling of material on shall not be allowed while shifting.
plastering materials. Fall of material
may cause • AllMaterials shall be properly stacked at designated place along with
Inadequate/ faulty Workmen, labelled and as per chemical class.
Serious injury 3 3 L ALARP Site Engineer
method of shifting Engineer
which lead to
(LTA) Fatal • Special precaution shall be ensured for temporary storing of
chemicals at site itself during usage .

Improper access & •Ensure that the access should be safe,clean and obstacle free.
Egress.
Use of unsafe Workmen,
Fall of person. •Use of proper ladder. 3 5 L ALARP Site Engineer
ladder. Engineer
Obstruction on
the path. •Ladder should be placed /positioned in 1:4 way.

• Ensure that stacking height shall be below 2 m Height.


Improper stacking Workmen,
Lead to collapse. 3 3 L ALARP Site Engineer
of materials. Engineer • Approach / accessibility shall be easy.

• MSDS to be displayed in local language at the required location like


store ,site etc.
Non Display of • Store flammable material seperately as per the class and
Workmen, manufacturer recommendation.
MSDS & Safe Use Health Hazards 3 5 L ALARP Site Engineer
Engineer
Instruction. • Sufficient number/type of fire extinguisher should be provided.
• Necessary training to be conducted for the workere.supervisors and
Paramedics on the MSDS of each chemicals.
Revision No.: R0
HSE RISK ASSESSMENT Date:20-07-2022

Name of Work :- KNPCC-10: Construction of Residential,Non-Residential & Institutional buildings at Polytechnic college Campus, Gurudev
PROJECT: Chauraha, GT Road, Kanpur and Multi Storied officer's Colony of Uttar Pradesh Metro Rail Corporation inside Metro Depot,GT Road, Kanpur DATE:
Architectural finishes, Plumbing, Drainage, External development and E&M Works REV: R1

DOC. TITLE: SHE RISK ASSESSMENT FOR CONCRETE REPAIRING WORK

Working in •Ensure that the working area should be hard barricade and platform
difficult , shall be provided toe guard.
Reduce working
congested Workmen,
efficiency of 3 5 L ALARP Site Engineer
location which is Engineer
workers.
not visible to •No work shall be allowed simiultaneously at two level
other workers.

•PTW system of height work issued.


• Rigid standard guard rails.top rails ,mid rails & toe guard provided all
the edges.

• Opening covered by suitable means materials


Non facilated
proper Access & Reduce working • Sufficient lighting arrangement to be provided
Workmen
Egress as job efficiency of 3 3 L ALARP Site Engineer
/Engineer • Standard Access and egress provided.
duration is very workers.
Preparation of Floor small
2 • Working platform minimum 900 mm walkway provided for manual
Surface for Plasering
movement and secured
•The hand rail already fixed at the edge of the concourse slab shhould
removed only during the brick shifting at height. As soonas the
shiftingactivity is over,the hard hand railing must be restored
immediately.
• Only Inspected hand tools should be used Which is having Proper
body earthing ,damaged free cable with industrial Top.
• Pep talk or tool box talk conducted before start the work.
Use faulty Hand Workmen
Lead to injury • Only trained workers engaged for the work. 2 3 L ALARP Site Engineer
Tools /Engineer
• All mandatory PPE's to be ensure if applicable for work.
• Strict Supervision to be provided.
Flying object, Dust
Particles Eye Injury, Workmen
Respiratory • Ensure the use of suitable PPE`s like hand gloves ,goggles,Nose Mask, 3 3 L ALARP
/Engineer
Disorder Ear Plug while chipping Work. Site Engineer
Revision No.: R0
HSE RISK ASSESSMENT Date:20-07-2022

Name of Work :- KNPCC-10: Construction of Residential,Non-Residential & Institutional buildings at Polytechnic college Campus, Gurudev
PROJECT: Chauraha, GT Road, Kanpur and Multi Storied officer's Colony of Uttar Pradesh Metro Rail Corporation inside Metro Depot,GT Road, Kanpur DATE:
Architectural finishes, Plumbing, Drainage, External development and E&M Works REV: R1

DOC. TITLE: SHE RISK ASSESSMENT FOR CONCRETE REPAIRING WORK

Application of
Plaster Materials Improper Workmen •Only trained authorized person or mason to be deployed for mortar
3 Handling of Skin Irritation, 3 3 L ALARP
/Engineer Handling.
Mortar Eye Injury Site Engineer

Workmen • Only authorized person should be allowed to handle the cables.


4 Use of Electricity Electric shock, Personal 3 3 L ALARP Site Engineer
/Engineer
Burn fire by Injury,health
Electricity effect • Proper connection accessories to be used.
Fall from Height Severe Injury Workmen • While working at height (If required), full body harness with proper
/Engineer 3 3 L ALARP Site Engineer
5 Work at height anchoring to be Ensured.

Improper
placement of • Ensure that the Empty & Filled Drums shall be Segregated.
Mortar,Poor Slip & Trip Workmen 3 3 L ALARP Site Engineer
House Keeping /Engineer • Maintained good House keeping.
6 Disposal of waste
Spilage of
Admixture/Faulty • Unwanted Set Mortar should be disposed through Authorized
3 3 L ALARP Site Engineer
method of Leading to Eye Workmen Disposal Agencies.
disposal. /Skin Injury. /Engineer

You might also like