Professional Documents
Culture Documents
t1-Pp-113-Cvl-cal-00003 - Calculation Sheet For Primary Air Fan Boiler Foundation (A) Rev.1 - 97
t1-Pp-113-Cvl-cal-00003 - Calculation Sheet For Primary Air Fan Boiler Foundation (A) Rev.1 - 97
Reviewed by : Checked by :
Timor-1
Coal Fired Steam Power Plant 2 X 50 MW
(Timor-1 CFSPP Project)
Date: CIVIL
Log
in
Comm No: MECHANICAL
ELECTRICAL
☐
REVIEW
A APPROVED
I&C PLN DOC. NO. :
SUPPORT 10163B-00-C-02-UHN-0007-00-
B ☐ APPROVED AS NOTED
C ☐ NOT APPROVED
CONTRACTOR DOC. NO. :
PLN UIP NUSRA (HO) T1-PP-113-CVL-CAL-00003
I ☐ INFORMATION
PLN UPP TIMOR
4.
Comply
5. Please check and clarify how to get Is value for settlement calculation.
Please clarify HCOG 3.4 m.
6.
Reviewed by : Checked by :
Please clarify how to get angle of internal friction soil, its different with other calculation
document.
7.
Reviewed by : Checked by :
Nspt on depth 3 m = 50
Comply
8. Please revise concrete compressive strength to 30 Mpa.
Using worst Bh according to Nspt graph
9. Please compare analysis for BH 7 and BH 8.
Please clarify there are same equipment load at empy, operation, and test? On feeding data, didn’t mention different value for (empty,
operation, and test)
10.
Reviewed by : Checked by :
Reviewed by : Checked by :
REVISION HISTORY
TABLE OF CONTENT
1. GENERAL 4
1.1. OUTLINE PROJECT AND SCOPE 4
1.2. SPECIFICATIONS, CODES, AND STANDARDS 4
1.3. DESIGN PHILOSOPHY 4
1.4. MATERIAL PROPERTIES 4
1.5. SOIL PROPERTIES 4
2. GENERAL LAYOUT 5
3. OUTLINE OF FOUNDATION 5
3.1. FLOWCHART OF FOUNDATION ANALYSIS 6
3.2. FOUNDATION DIMENSION 7
3.3. MATERIAL 8
3.4. FOUNDATION & STRUCTURE WEIGHT 9
3.5. EQUIPMENT LOAD (E) 9
3.6. WIND LOAD 10
3.7. SEISMIC LOAD 11
3.8. LOAD COMBINATION 12
4. FOUNDATION STABILITY 25
4.1. BEARING PRESSURE CHECK 25
4.2. SLIDING STABILITY CHECK 32
4.3. OVERTURNING STABILITY CHECK 38
5. FOUNDATION DESIGN 45
5.1. PUNCHING SHEAR CHECK 49
5.2. ONE WAY SHEAR CHECK 50
5.3. FOOTING REINFORCEMENT 50
5.4. PEDESTAL REINFORCEMENT 54
5.5. FOUNDATION SETTLEMENT 78
6. DYNAMIC ANALYSIS 80
6.1. DYNAMIC SOIL PARAMETER 80
6.2. SPRING CONSTANT 80
6.3. MASS AND MASS MOMENT OF INERTIA 81
6.4. NATURAL FREQUENCY OF FOUNDATION 82
6.5. EMBEDDED FACTOR FOR DAMPING RATIO 82
6.6. MASS RATIO FOR DAMPING RATIO 82
6.7. EFFECTIVE DAMPING COEFFICIENT 83
6.8. DAMPING RATIO 83
6.9. RESONANCE FREQUENCY CHECK 83
6.10. VIBRATION AMPLITUDO 83
7. SUMMARY OF CALCULATION 84
1. GENERAL
1.1. OUTLINE PROJECT AND SCOPE
PROJECT : TIMOR-1 COAL FIRED STEAM POWER PLANT 2 X 50 MW
COMPANY : PT. PERUSAHAAN LISTRIK NEGARA (PERSERO)
CONTRACTOR : CONSORTIUM OF PT. IKPT - PT. PP (PERSERO) TBK. -
ITOCHU CORPORATION - SUMITOMO HEAVY INDUSTRIES LTD. AND
PT. MEDCO POWER INDONESIA
LOCATION : PANAF VILLAGE, WEST KUPANG DISTRICT, KUPANG REGENCY OF
NUSA TENGGARA TIMUR PROVINCE
STRUCTURE PRIMARY AIR FAN FOUNDATION
*Note : if hu>0.6 m, using Qall for hu = 0.6 m(based on Soil Inverstigation) in this calculation 1
Actual Qall from plan level (hu= 1.15) > Qall (hu = 0.6 m)
2. GENERAL LAYOUT
3. OUTLINE OF FOUNDATION
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
3.38 (Xi) Z
A A
P1a COG P2
X
(0,0,0) Lp Lf
P1b
b1 b2 b3
bf
Foundation Plan
b4
P1b
Y
ha1 ha
P1a P2 hp
1.27 (Yi)
hs
Pcap hf
(0,0,0) b1 b2 b3
bf
COG of Foundation
Coordinate to
Reference W.x W.y W.z
W (ton) x (m) y (m) z (m)
Footing (Pcap) 47.26 3.620 0.400 0.000 171.09 18.91 0.00
Pedestal - P1a 63.16 2.150 1.700 0.000 135.79 107.37 0.00
Pedestal - P2 19.52 6.665 1.840 0.000 130.09 35.91 0.00
Pedestal - P1b 1.83 3.900 2.740 0.000 7.13 5.01 0.00
Total 131.77 444.10 167.20 0.00
Foundation Center of gravity 3.37 1.27 0.00
Xp Yp Zp
COG of Machine
Coordinate to
Reference W.x W.y W.z
W (ton) x (m) y (m) z (m)
Motor (L1) 6.40 2.200 3.400 0.000 14.08 21.76 0.00
Fan (L2, L3, L4) 10.45 5.195 3.400 0.000 54.29 35.53 0.00
Actuator (L5) 0.20 5.310 1.900 -2.675 1.06 0.38 -0.54
Total 17.05 69.43 57.67 -0.54
Center of gravity 4.07 3.38 -0.03
Xpm Ypm Zpm
3.3. MATERIAL
Concr. Comp Strength, fc' = 300 kg/cm2 Unit weight soil γs = 1800 kg/m³
Concrete unit weight = 2400 kg/m3 Unit weight water γw = 1000 kg/m³
Steel yield strength = 4000 kg/m3 Angle of internal friction θ = 45 degree
Steel unit weight = 7850 kg/m3
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
Area of equipment
Afx = Bs x He = 4 m x 6 m = 24.00 m2
Afz = Ls x He = 3 m x 6 m = 18.00 m2
Y Wx Y Wz
X Mz Z Mx
L B
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
Sm1 = Fv x S1
= 1.9 x 0.25 = 0.475 g
To = 0.2 x Sd1/Sds
= 0.2 x 0.317 / 0.77 = 0.082 s
Ts = Sd1 / Sds
= 0.317 / 0.77 = 0.412 s
SDs 0.770
Cs = = = 0.462
(R/I) (2.5/1.5)
Cs = = 0.462
Cs min = Max (0.044 x SDS x I ; 0.01) = 0.051
Cs min = 0.5 x S1/(R/Ie), if S1 ≥ 0.6g = -
Seismic base shear
Vmotor = Cs x Wmot = 0.462 x 6.4 = 2.96 ton
Vfan = Cs x Wfan = 0.462 x 10.45 = 4.83 ton
Vaktuator = Cs x Waktuator = 0.462 x 0.2 = 0.09 ton
VStructure = Cs x Ws = 0.462 x 68.94 = 31.85 ton
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
Load Combination Allowable Strength Design for Foundation Stability Check (Permanent)
Fx Fy Fz Mz Mx
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
Load Combination Allowable Strength Design for Foundation Stability Check (Temporary)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
1.11D+1.11E(E)+1.11P(E)+0.7VX++0.21VZ++0.7VEX+
109 27.81 169.14 8.34 17.42 95.07
+0.21VEZ+
1.11D+1.11E(E)+1.11P(E)+0.7VX++0.21VZ-+0.7VEX+
110 27.81 169.14 -8.34 -17.42 95.07
+0.21VEZ-
1.11D+1.11E(E)+1.11P(E)+0.7VX-+0.21VZ++0.7VEX-
111 -27.81 169.14 8.34 17.42 -21.0
+0.21VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX++0.7VZ++0.21VEX+
113 8.34 169.14 27.81 58.06 54.43
+0.7VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX-+0.7VZ++0.21VEX-
114 -8.34 169.14 27.81 58.06 19.60
+0.7VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX++0.7VZ-+0.21VEX+
115 8.34 169.14 -27.81 -58.1 54.43
+0.7VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX+
121 21.06 164.41 6.36 13.27 79.94
+0.16VZ++0.53VEX++0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX+ +0.16VZ-
122 21.06 164.41 -6.36 -13.27 79.94
+0.53VEX++0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX-
123 -21.06 164.41 6.36 13.27 -7.98
+0.16VZ++0.53VEX-+0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX- +0.16VZ-
124 -21.06 164.41 -6.36 -13.27 -7.98
+0.53VEX-+0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX+
125 6.36 164.41 21.06 43.96 49.25
+0.53VZ++0.16VEX++0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX-
126 -6.36 164.41 21.06 43.96 22.71
+0.53VZ++0.16VEX-+0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX+ +0.53VZ-
127 6.36 164.41 -21.06 -43.96 49.25
+0.16VEX++0.53VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX- +0.53VZ-
128 -6.36 164.41 -21.06 -43.96 22.71
+0.16VEX-+0.53VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX++0.21VZ+
158 29.38 176.91 9.91 22.75 100.40
+0.7VEX++0.21VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX++0.21VZ-
159 29.38 176.91 -6.77 -12.09 100.40
+0.7VEX++0.21VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX-+0.21VZ+
160 -26.24 176.91 9.91 22.75 -15.7
+0.7VEX-+0.21VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX-+0.21VZ-
161 -26.24 176.91 -6.77 -12.09 -15.7
+0.7VEX-+0.21VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX++0.7VZ+
162 9.91 176.91 29.38 63.39 59.76
+0.21VEX++0.7VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX-+0.7VZ+
163 -6.77 176.91 29.38 63.39 24.93
+0.21VEX-+0.7VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX++0.7VZ-
164 9.91 176.91 -26.24 -52.7 59.76
+0.21VEX++0.7VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX-+0.7VZ-
165 -6.77 176.91 -26.24 -52.7 24.93
+0.21VEX-+0.7VEZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1SP
166 2.51 159.66 1.42 4.81 41.95
+0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1SP
167 0.32 159.66 1.42 4.81 34.49
+0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1SP
168 1.42 159.66 2.24 7.61 38.22
+0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1SP
169 1.42 159.66 0.59 2.01 38.22
+0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1SP
170 2.51 159.66 1.42 4.81 41.95
+0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1SP
171 0.32 159.66 1.42 4.81 34.49
+0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1SP
172 1.42 159.66 2.24 7.61 38.22
+0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1SP
173 1.42 159.66 0.59 2.01 38.22
+0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1SP
174 2.51 159.66 1.42 4.81 41.95
+0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1SP
175 0.32 159.66 1.42 4.81 34.49
+0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1SP
176 1.42 159.66 2.24 7.6 38.22
+0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1SP
177 1.42 159.66 0.59 2.0 38.22
+0.75WZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1SP
178 2.51 159.66 1.42 4.81 41.95
+0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1SP
179 0.32 159.66 1.42 4.81 34.49
+0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1SP
180 1.42 159.66 2.24 7.61 38.22
+0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1SP
181 1.42 159.66 0.59 2.01 38.22
+0.75WZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP
182 22.58 171.96 7.88 18.45 85.12
+0.53VX++0.16VZ++0.53VEX++0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP+0.53
183 22.58 171.96 -4.83 -8.09 85.12
VX++0.16VZ-+0.53VEX++0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP+0.53
184 -19.53 171.96 7.88 18.45 -2.79
VX-+0.16VZ++0.53VEX-+0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP+0.53
185 -19.53 171.96 -4.83 -8.09 -2.79
VX-+0.16VZ-+0.53VEX-+0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP+0.16
186 7.88 171.96 22.58 49.14 54.43
VX++0.53VZ++0.16VEX++0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP+0.16
187 -4.83 171.96 22.58 49.14 27.89
VX-+0.53VZ++0.16VEX-+0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP+0.16
188 7.88 171.96 -19.53 -38.77 54.43
VX++0.53VZ-+0.16VEX++0.53VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA+1SP+0.16
189 -4.83 171.96 -19.53 -38.77 27.89
VX-+0.53VZ-+0.16VEX-+0.53VEZ-
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX+
194 28.51 79.05 9.04 19.80 76.98
+0.21VZ++0.7VEX++0.21VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX+ +0.21VZ-
195 28.51 79.05 -7.64 -15.03 76.98
+0.7VEX++0.21VEZ-
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX-
196 -27.11 79.05 9.04 19.80 -39.1
+0.21VZ++0.7VEX-+0.21VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX- +0.21VZ-
197 -27.11 79.05 -7.64 -15.03 -39.1
+0.7VEX-+0.21VEZ-
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX+
198 9.04 79.05 28.51 60.44 36.34
+0.7VZ++0.21VEX++0.7VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX-
199 -7.64 79.05 28.51 60.44 1.51
+0.7VZ++0.21VEX-+0.7VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX+ +0.7VZ-
200 9.04 79.05 -27.11 -55.7 36.34
+0.21VEX++0.7VEZ-
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX- +0.7VZ-
201 -7.64 79.05 -27.11 -55.7 1.51
+0.21VEX-+0.7VEZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Permanent)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Temporary)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
1.35D+1L+1.35E(E)+1.35P(E)+1VX++0.3VZ++1VEX+
512 39.73 206.05 11.92 24.88 128.03
+0.3VEZ+
1.35D+1L+1.35E(E)+1.35P(E)+0.3VX++1VZ++0.3VEX+
516 11.92 206.05 39.73 82.94 69.98
+1VEZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
545 4.04 191.59 1.70 5.77 53.82
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
546 -0.64 191.59 1.70 5.77 37.91
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
547 1.70 191.59 3.45 11.74 45.86
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
548 1.70 191.59 -0.06 -0.20 45.86
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
549 4.04 191.59 1.70 5.77 53.82
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
550 -0.64 191.59 1.70 5.77 37.91
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
551 1.70 191.59 3.45 11.74 45.86
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
552 1.70 191.59 -0.06 -0.20 45.86
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
553 4.04 191.59 1.70 5.77 53.82
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
554 -0.64 191.59 1.70 5.77 37.91
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
555 1.70 191.59 3.45 11.74 45.86
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
556 1.70 191.59 -0.06 -0.20 45.86
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
557 4.04 191.59 1.70 5.77 53.82
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
558 -0.64 191.59 1.70 5.77 37.91
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
559 1.70 191.59 3.45 11.74 45.86
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
560 1.70 191.59 -0.06 -0.20 45.86
+1.6SP+1.6WZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
561 41.64 215.51 13.83 31.37 134.52
VZ++1VEX++0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
562 41.64 215.51 -10.01 -18.39 134.52
VZ-+1VEX++0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
563 -37.82 215.51 13.83 31.37 -31.3
+0.3VZ++1VEX-+0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
564 -37.82 215.51 -10.01 -18.39 -31.3
+0.3VZ-+1VEX-+0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
565 13.83 215.51 41.64 89.43 76.5
+0.3VX++1VZ++0.3VEX++1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
566 -10.01 215.51 41.64 89.43 26.71
+1VZ++0.3VEX-+1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1/2TF+1.2TA+1.6SP
567 13.83 215.51 -37.82 -76.4 76.47
+0.3VX++1VZ-+0.3VEX++1VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
568 -10.01 215.51 -37.82 -76.4 26.71
+1VZ-+0.3VEX-+1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+
573 40.79 119.78 12.98 28.49 111.61
+0.3VZ++1VEX++0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+ +0.3VZ-
574 40.79 119.78 -10.86 -21.27 111.61
+1VEX++0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-
575 -38.67 119.78 12.98 28.49 -54.3
+0.3VZ++1VEX-+0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-+0.3VZ-
576 -38.67 119.78 -10.86 -21.27 -54.3
+1VEX-+0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+
577 12.98 119.78 40.79 86.55 53.55
+1VZ++0.3VEX++1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-
578 -10.86 119.78 40.79 86.55 3.79
+1VZ++0.3VEX-+1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+ +1VZ-
579 12.98 119.78 -38.67 -79.3 53.55
+0.3VEX++1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-+1VZ-
580 -10.86 119.78 -38.67 -79.3 3.79
+0.3VEX-+1VEZ-
4. FOUNDATION STABILITY
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
150 159.66 4.81 38.22 8.12 4.85
SP
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
151 159.66 4.81 38.22 8.12 4.85
SP
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
152 159.66 4.81 38.22 8.12 4.85
SP
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
153 159.66 4.81 38.22 8.12 4.85
SP
1.11D+1.11E(E)+1.11P(E)+0.7VX++0.21VZ++0.7VE
109 169.14 17.42 95.07 11.32 2.42
X+ +0.21VEZ+
1.11D+1.11E(E)+1.11P(E)+0.7VX++0.21VZ-
110 169.14 -17.42 95.07 8.82 4.92
+0.7VEX+ +0.21VEZ-
1.11D+1.11E(E)+1.11P(E)+0.7VX-
111 169.14 17.42 -21.0 7.41 6.33
+0.21VZ++0.7VEX-+0.21VEZ+
1.11D+1.11E(E)+1.11P(E)+0.7VX-+0.21VZ-+0.7VEX-
112 169.14 -17.42 -21.0 4.91 8.83
+0.21VEZ-
1.11D+1.11E(E)+1.11P(E)+0.21VX++0.7VZ++0.21V
113 169.14 58.06 54.43 12.87 0.88
EX+ +0.7VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX-
114 169.14 58.06 19.60 11.69 2.05
+0.7VZ++0.21VEX-+0.7VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX++0.7VZ-
115 169.14 -58.1 54.43 4.54 9.20
+0.21VEX+ +0.7VEZ-
1.11D+1.11E(E)+1.11P(E)+0.21VX-+0.7VZ-
116 169.14 -58.1 19.60 3.37 10.37
+0.21VEX- +0.7VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX+
121 164.41 13.27 79.94 10.32 3.04
+0.16VZ++0.53VEX++0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX+
122 164.41 -13.27 79.94 8.42 4.94
+0.16VZ-+0.53VEX++0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX-
123 164.41 13.27 -7.98 7.36 6.00
+0.16VZ++0.53VEX-+0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX-
124 164.41 -13.27 -7.98 5.46 7.90
+0.16VZ-+0.53VEX-+0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX+
125 164.41 43.96 49.25 11.49 1.87
+0.53VZ++0.16VEX++0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX-
126 164.41 43.96 22.71 10.59 2.76
+0.53VZ++0.16VEX-+0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX+
127 164.41 -43.96 49.25 5.19 8.17
+0.53VZ-+0.16VEX++0.53VEZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX-
128 164.41 -43.96 22.71 4.29 9.07
+0.53VZ-+0.16VEX-+0.53VEZ-
0.5D+0.5E(E)+0.5P(E)+0.7VX++0.21VZ++0.7VEX+
133 75.58 17.42 74.60 6.83 -0.69
+0.21VEZ+
0.5D+0.5E(E)+0.5P(E)+0.7VX++0.21VZ-+0.7VEX+
134 75.58 -17.42 74.60 4.33 1.81
+0.21VEZ-
0.5D+0.5E(E)+0.5P(E)+0.7VX-+0.21VZ++0.7VEX-
135 75.58 17.42 -41.5 2.92 3.22
+0.21VEZ+
0.5D+0.5E(E)+0.5P(E)+0.7VX-+0.21VZ-+0.7VEX-
136 75.58 -17.42 -41.5 0.42 5.72
+0.21VEZ-
0.5D+0.5E(E)+0.5P(E)+0.21VX++0.7VZ++0.21VEX+
137 75.58 58.06 33.96 8.38 -2.23
+0.7VEZ+
0.5D+0.5E(E)+0.5P(E)+0.21VX-+0.7VZ++0.21VEX-
138 75.58 58.06 -0.87 7.20 -1.06
+0.7VEZ+
0.5D+0.5E(E)+0.5P(E)+0.21VX++0.7VZ-+0.21VEX+
139 75.58 -58.1 33.96 0.05 6.09
+0.7VEZ-
0.5D+0.5E(E)+0.5P(E)+0.21VX-+0.7VZ-+0.21VEX-
140 75.58 -58.1 -0.87 -1.12 7.26
+0.7VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX+
158 176.91 22.75 100.40 12.20 2.18
+0.21VZ+ +0.7VEX++0.21VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX+
159 176.91 -12.09 100.40 9.70 4.67
+0.21VZ-+0.7VEX++0.21VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX-
160 176.91 22.75 -15.7 8.29 6.08
+0.21VZ+ +0.7VEX-+0.21VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX-
161 176.91 -12.09 -15.7 5.79 8.58
+0.21VZ-+0.7VEX-+0.21VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX
162 176.91 63.39 59.76 13.74 0.63
++0.7VZ+ +0.21VEX++0.7VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX-
163 176.91 63.39 24.93 12.57 1.80
+0.7VZ+ +0.21VEX-+0.7VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX
164 176.91 -52.7 59.76 5.42 8.95
++0.7VZ-+0.21VEX++0.7VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX-
165 176.91 -52.7 24.93 4.25 10.13
+0.7VZ-+0.21VEX-+0.7VEZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
166 159.66 4.81 41.95 8.24 4.73
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
167 159.66 4.81 34.49 7.99 4.98
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
168 159.66 7.61 38.22 8.32 4.65
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
169 159.66 2.01 38.22 7.92 5.06
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
170 159.66 4.81 41.95 8.24 4.73
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
171 159.66 4.81 34.49 7.99 4.98
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
172 159.66 7.61 38.22 8.32 4.65
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
173 159.66 2.01 38.22 7.92 5.06
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
174 159.66 4.81 41.95 8.24 4.73
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
175 159.66 4.81 34.49 7.99 4.98
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
176 159.66 7.61 38.22 8.32 4.65
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
177 159.66 2.01 38.22 7.92 5.06
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
178 159.66 4.81 41.95 8.24 4.73
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
179 159.66 4.81 34.49 7.99 4.98
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
180 159.66 7.61 38.22 8.32 4.65
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
181 159.66 2.01 38.22 7.92 5.06
SP +0.75WZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
182 171.96 18.45 85.12 11.17 2.80
+1SP +0.53VX++0.16VZ++0.53VEX++0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
183 171.96 -8.09 85.12 9.27 4.70
+1SP+0.53VX++0.16VZ-+0.53VEX++0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
184 171.96 18.45 -2.79 8.21 5.76
+1SP+0.53VX-+0.16VZ++0.53VEX-+0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
185 171.96 -8.09 -2.79 6.31 7.66
+1SP+0.53VX-+0.16VZ-+0.53VEX-+0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
186 171.96 49.14 54.43 12.34 1.63
+1SP+0.16VX++0.53VZ++0.16VEX++0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
187 171.96 49.14 27.89 11.45 2.52
+1SP+0.16VX-+0.53VZ++0.16VEX-+0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
188 171.96 -38.77 54.43 6.04 7.93
+1SP+0.16VX++0.53VZ-+0.16VEX++0.53VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
189 171.96 -38.77 27.89 5.14 8.83
+1SP+0.16VX-+0.53VZ-+0.16VEX-+0.53VEZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX+
194 79.05 19.80 76.98 7.22 -0.80
+0.21VZ++0.7VEX++0.21VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX+
195 79.05 -15.03 76.98 4.73 1.70
+0.21VZ-+0.7VEX++0.21VEZ-
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX-
196 79.05 19.80 -39.1 3.31 3.11
+0.21VZ++0.7VEX-+0.21VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.7VX-
197 79.05 -15.03 -39.1 0.82 5.61
+0.21VZ-+0.7VEX-+0.21VEZ-
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX
198 79.05 60.44 36.34 8.77 -2.34
+ +0.7VZ++0.21VEX++0.7VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX-
199 79.05 60.44 1.51 7.60 -1.17
+0.7VZ++0.21VEX-+0.7VEZ+
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX
200 79.05 -55.67 36.34 0.44 5.98
+ +0.7VZ-+0.21VEX++0.7VEZ-
0.5D+0.5E(O)+0.5P(O)+0.6TF+0.6TA+1SP+0.21VX-
201 79.05 -55.7 1.51 -0.73 7.15
+0.7VZ-+0.21VEX-+0.7VEZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I1+1SP
232 152.65 0.00 37.14 7.45 4.95
+0.75WX+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I1+1SP
233 152.65 0.00 29.68 7.20 5.20
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I1+1SP
234 152.65 2.80 33.41 7.53 4.88
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I1+1SP
235 152.65 -2.80 33.41 7.13 5.28
+0.75WZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
236 152.65 0.00 37.14 7.45 4.95
+0.75WX+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
237 152.65 0.00 29.68 7.20 5.20
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
238 152.65 2.80 33.41 7.53 4.88
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
239 152.65 -2.80 33.41 7.13 5.28
+0.75WZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
240 152.65 0.00 37.14 7.45 4.95
+0.75WX+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
241 152.65 0.00 29.68 7.20 5.20
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
242 152.65 2.80 33.41 7.53 4.88
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
243 152.65 -2.80 33.41 7.13 5.28
+0.75WZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
244 152.65 0.00 37.14 7.45 4.95
+0.75WX+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
245 152.65 0.00 29.68 7.20 5.20
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
246 152.65 2.80 33.41 7.53 4.88
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
247 152.65 -2.80 33.41 7.13 5.28
+0.75WZ-
Temporary Condition
Lateral Sliding
Fy
L/C Loading Combination Fx Fz Frest Check
(ton) (ton) (ton) (ton) Ratio
1.11D+1.11E(E)+1.11P(E)+0.21VX-
114 -8.34 27.81 29.03 169.14 3.43
+0.7VZ++0.21VEX-+0.7VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX++0.7VZ-
115 8.34 -27.81 29.03 169.14 3.43
+0.21VEX+ +0.7VEZ-
1.11D+1.11E(E)+1.11P(E)+0.21VX-+0.7VZ-
116 -8.34 -27.81 29.03 169.14 3.43
+0.21VEX- +0.7VEZ-
117 1D+0.75L+0.75Lr+1E(E)+1P(E)+0.75WX+ 1.10 0.00 1.10 152.65 84.11
0.5D+0.5E(E)+0.5P(E)+0.21VX-+0.7VZ-+0.21VEX-
140 -8.34 -27.81 29.03 75.58 1.98
+0.7VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX+
158 29.38 9.91 31.00 176.91 3.33
+0.21VZ+ +0.7VEX++0.21VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX+
159 29.38 -6.77 30.15 176.91 3.42
+0.21VZ-+0.7VEX++0.21VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX-
160 -26.24 9.91 28.05 176.91 3.68
+0.21VZ+ +0.7VEX-+0.21VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.7VX-
161 -26.24 -6.77 27.10 176.91 3.81
+0.21VZ-+0.7VEX-+0.21VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX
162 9.91 29.38 31.00 176.91 3.33
++0.7VZ+ +0.21VEX++0.7VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX-
163 -6.77 29.38 30.15 176.91 3.42
+0.7VZ+ +0.21VEX-+0.7VEZ+
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX
164 9.91 -26.24 28.05 176.91 3.68
++0.7VZ-+0.21VEX++0.7VEZ-
1.11D+1.11E(O)+1.11P(O)+1TF+1TA+1SP+0.21VX-
165 -6.77 -26.24 27.10 176.91 3.81
+0.7VZ-+0.21VEX-+0.7VEZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
166 2.51 1.42 2.88 159.66 33.10
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
167 0.32 1.42 1.45 159.66 65.80
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
168 1.42 2.24 2.65 159.66 36.04
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
169 1.42 0.59 1.53 159.66 62.22
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
170 2.51 1.42 2.88 159.66 33.10
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
171 0.32 1.42 1.45 159.66 65.80
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
172 1.42 2.24 2.65 159.66 36.04
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
173 1.42 0.59 1.53 159.66 62.22
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
174 2.51 1.42 2.88 159.66 33.10
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
175 0.32 1.42 1.45 159.66 65.80
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
176 1.42 2.24 2.65 159.66 36.04
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
177 1.42 0.59 1.53 159.66 62.22
SP +0.75WZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
178 2.51 1.42 2.88 159.66 33.10
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
179 0.32 1.42 1.45 159.66 65.80
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
180 1.42 2.24 2.65 159.66 36.04
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
181 1.42 0.59 1.53 159.66 62.22
SP +0.75WZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
182 22.58 7.88 23.92 171.96 4.22
+1SP +0.53VX++0.16VZ++0.53VEX++0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
183 22.58 -4.83 23.09 171.96 4.37
+1SP+0.53VX++0.16VZ-+0.53VEX++0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
184 -19.53 7.88 21.06 171.96 4.79
+1SP+0.53VX-+0.16VZ++0.53VEX-+0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
185 -19.53 -4.83 20.12 171.96 5.02
+1SP+0.53VX-+0.16VZ-+0.53VEX-+0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
186 7.88 22.58 23.92 171.96 4.22
+1SP+0.16VX++0.53VZ++0.16VEX++0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
187 -4.83 22.58 23.09 171.96 4.37
+1SP+0.16VX-+0.53VZ++0.16VEX-+0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
188 7.88 -19.53 21.06 171.96 4.79
+1SP+0.16VX++0.53VZ-+0.16VEX++0.53VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
189 -4.83 -19.53 20.12 171.96 5.02
+1SP+0.16VX-+0.53VZ-+0.16VEX-+0.53VEZ-
190 0.6D+0.6E(O)+0.6P(O)+0.6TF+0.6TA+1SP+1WX+ 2.31 0.85 2.46 95.80 27.08
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
246 0.00 0.82 0.82 152.65 112.15
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
247 0.00 -0.82 0.82 152.65 112.15
+0.75WZ-
248 0.6D+0.6E(E)+0.6P(E)+1SP+1WX+ 1.46 0.00 1.46 91.59 44.30
Permanent Condition
Overtuning Resisting
Overtuning
L/C Loading Combination Mx Mz Mrx Mrz
Ratio
(ton.m) (ton.m) (ton.m) (ton.m)
101 1D+1E(E)+1P(E) 0.00 33.41 230.52 444.1 13.29
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
150 4.81 38.22 230.52 444.1 11.62
SP
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
151 4.81 38.22 230.52 444.1 11.62
SP
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
152 4.81 38.22 230.52 444.1 11.62
SP
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
153 4.81 38.22 230.52 444.1 11.62
SP
Temporary Condition
Overtuning Resisting
Overtuning
L/C Loading Combination Mx Mz Mrx Mrz
Ratio
(ton.m) (ton.m) (ton.m) (ton.m)
1.11D+1.11E(E)+1.11P(E)+0.7VX++0.21VZ++0.7VE
109 17.42 95.07 255.42 492.1 5.18
X+ +0.21VEZ+
1.11D+1.11E(E)+1.11P(E)+0.7VX++0.21VZ-
110 -17.42 95.07 255.42 492.1 5.18
+0.7VEX+ +0.21VEZ-
1.11D+1.11E(E)+1.11P(E)+0.7VX-
111 17.42 -21.04 255.42 492.1 14.67
+0.21VZ++0.7VEX-+0.21VEZ+
1.11D+1.11E(E)+1.11P(E)+0.7VX-+0.21VZ-+0.7VEX-
112 -17.42 -21.04 255.42 492.1 14.67
+0.21VEZ-
1.11D+1.11E(E)+1.11P(E)+0.21VX++0.7VZ++0.21V
113 58.06 54.43 255.42 492.1 4.40
EX+ +0.7VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX-
114 58.06 19.60 255.42 492.1 4.40
+0.7VZ++0.21VEX-+0.7VEZ+
1.11D+1.11E(E)+1.11P(E)+0.21VX++0.7VZ-
115 -58.06 54.43 255.42 492.1 4.40
+0.21VEX+ +0.7VEZ-
1.11D+1.11E(E)+1.11P(E)+0.21VX-+0.7VZ-
116 -58.06 19.60 255.42 492.1 4.40
+0.21VEX- +0.7VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX+
121 13.27 79.94 248.27 478.3 5.98
+0.16VZ++0.53VEX++0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX+
122 -13.27 79.94 248.27 478.3 5.98
+0.16VZ-+0.53VEX++0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX-
123 13.27 -7.98 248.27 478.3 18.71
+0.16VZ++0.53VEX-+0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.53VX-
124 -13.27 -7.98 248.27 478.3 18.71
+0.16VZ-+0.53VEX-+0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX+
125 43.96 49.25 248.27 478.3 5.65
+0.53VZ++0.16VEX++0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX-
126 43.96 22.71 248.27 478.3 5.65
+0.53VZ++0.16VEX-+0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX+
127 -43.96 49.25 248.27 478.3 5.65
+0.53VZ-+0.16VEX++0.53VEZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.08D+0.75L+0.75Lr+1.08E(E)+1.08P(E)+0.16VX-
128 -43.96 22.71 248.27 478.3 5.65
+0.53VZ-+0.16VEX-+0.53VEZ-
0.5D+0.5E(E)+0.5P(E)+0.7VX++0.21VZ++0.7VEX+
133 17.42 74.60 114.14 219.9 2.95
+0.21VEZ+
0.5D+0.5E(E)+0.5P(E)+0.7VX++0.21VZ-+0.7VEX+
134 -17.42 74.60 114.14 219.9 2.95
+0.21VEZ-
0.5D+0.5E(E)+0.5P(E)+0.7VX-+0.21VZ++0.7VEX-
135 17.42 -41.51 114.14 219.9 5.30
+0.21VEZ+
0.5D+0.5E(E)+0.5P(E)+0.7VX-+0.21VZ-+0.7VEX-
136 -17.42 -41.51 114.14 219.9 5.30
+0.21VEZ-
0.5D+0.5E(E)+0.5P(E)+0.21VX++0.7VZ++0.21VEX+
137 58.06 33.96 114.14 219.9 1.97
+0.7VEZ+
0.5D+0.5E(E)+0.5P(E)+0.21VX-+0.7VZ++0.21VEX-
138 58.06 -0.87 114.14 219.9 1.97
+0.7VEZ+
0.5D+0.5E(E)+0.5P(E)+0.21VX++0.7VZ-+0.21VEX+
139 -58.06 33.96 114.14 219.9 1.97
+0.7VEZ-
0.5D+0.5E(E)+0.5P(E)+0.21VX-+0.7VZ-+0.21VEX-
140 -58.06 -0.87 114.14 219.9 1.97
+0.7VEZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
166 4.81 41.95 230.52 444.1 10.59
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
167 4.81 34.49 230.52 444.1 12.88
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
168 7.61 38.22 230.52 444.1 11.62
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I1+1
169 2.01 38.22 230.52 444.1 11.62
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
170 4.81 41.95 230.52 444.1 10.59
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
171 4.81 34.49 230.52 444.1 12.88
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
172 7.61 38.22 230.52 444.1 11.62
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I2+1
173 2.01 38.22 230.52 444.1 11.62
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
174 4.81 41.95 230.52 444.1 10.59
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
175 4.81 34.49 230.52 444.1 12.88
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
176 7.61 38.22 230.52 444.1 11.62
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I3+1
177 2.01 38.22 230.52 444.1 11.62
SP +0.75WZ-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
178 4.81 41.95 230.52 444.1 10.59
SP +0.75WX+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
179 4.81 34.49 230.52 444.1 12.88
SP +0.75WX-
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
180 7.61 38.22 230.52 444.1 11.62
SP +0.75WZ+
1D+0.75L+0.75Lr+1E(O)+1P(O)+1TF+1TA+0.75I4+1
181 2.01 38.22 230.52 444.1 11.62
SP +0.75WZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
182 18.45 85.12 248.27 478.3 5.62
+1SP +0.53VX++0.16VZ++0.53VEX++0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
183 -8.09 85.12 248.27 478.3 5.62
+1SP+0.53VX++0.16VZ-+0.53VEX++0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
184 18.45 -2.79 248.27 478.3 13.46
+1SP+0.53VX-+0.16VZ++0.53VEX-+0.16VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
185 -8.09 -2.79 248.27 478.3 30.70
+1SP+0.53VX-+0.16VZ-+0.53VEX-+0.16VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
186 49.14 54.43 248.27 478.3 5.05
+1SP+0.16VX++0.53VZ++0.16VEX++0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
187 49.14 27.89 248.27 478.3 5.05
+1SP+0.16VX-+0.53VZ++0.16VEX-+0.53VEZ+
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
188 -38.77 54.43 248.27 478.3 6.40
+1SP+0.16VX++0.53VZ-+0.16VEX++0.53VEZ-
1.08D+0.75L+0.75Lr+1.08E(O)+1.08P(O)+1TF+1TA
189 -38.77 27.89 248.27 478.3 6.40
+1SP+0.16VX-+0.53VZ-+0.16VEX-+0.53VEZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I1+1SP
233 0.00 29.68 230.52 444.1 14.96
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I1+1SP
234 2.80 33.41 230.52 444.1 13.29
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I1+1SP
235 -2.80 33.41 230.52 444.1 13.29
+0.75WZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
236 0.00 37.14 230.52 444.1 11.96
+0.75WX+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
237 0.00 29.68 230.52 444.1 14.96
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
238 2.80 33.41 230.52 444.1 13.29
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I2+1SP
239 -2.80 33.41 230.52 444.1 13.29
+0.75WZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
240 0.00 37.14 230.52 444.1 11.96
+0.75WX+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
241 0.00 29.68 230.52 444.1 14.96
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
242 2.80 33.41 230.52 444.1 13.29
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I3+1SP
243 -2.80 33.41 230.52 444.1 13.29
+0.75WZ-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
244 0.00 37.14 230.52 444.1 11.96
+0.75WX+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
245 0.00 29.68 230.52 444.1 14.96
+0.75WX-
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
246 2.80 33.41 230.52 444.1 13.29
+0.75WZ+
1D+0.75L+0.75Lr+1E(E)+1P(E)+0.8B+0.8I4+1SP
247 -2.80 33.41 230.52 444.1 13.29
+0.75WZ-
248 0.6D+0.6E(E)+0.6P(E)+1SP+1WX+ 0.00 25.02 138.31 266.5 10.65
5. FOUNDATION DESIGN
1.2D+1.6Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1.6SP
## 544 191.59 2.79 45.86 9.53 6.04
+0.8WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
## 545 191.59 5.77 53.82 10.01 5.56
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
## 546 191.59 5.77 37.91 9.47 6.09
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
## 547 191.59 11.74 45.86 10.17 5.40
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
## 548 191.59 -0.20 45.86 9.34 6.23
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
## 549 191.59 5.77 53.82 10.01 5.56
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
## 550 191.59 5.77 37.91 9.47 6.09
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
## 551 191.59 11.74 45.86 10.17 5.40
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
## 552 191.59 -0.20 45.86 9.34 6.23
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
## 553 191.59 5.77 53.82 10.01 5.56
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
## 554 191.59 5.77 37.91 9.47 6.09
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
## 555 191.59 11.74 45.86 10.17 5.40
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
## 556 191.59 -0.20 45.86 9.34 6.23
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
## 557 191.59 5.77 53.82 10.01 5.56
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
## 558 191.59 5.77 37.91 9.47 6.09
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
## 559 191.59 11.74 45.86 10.17 5.40
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
## 560 191.59 -0.20 45.86 9.34 6.23
+1.6SP+1.6WZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
## 561 215.51 31.37 134.52 15.53 1.98
+1VX++0.3VZ++1VEX++0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
## 562 215.51 -18.39 134.52 14.60 2.91
+1VX++0.3VZ-+1VEX++0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
## 563 215.51 31.37 -31.35 12.06 5.45
+1VX-+0.3VZ++1VEX-+0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
## 564 215.51 -18.39 -31.35 11.13 6.38
+1VX-+0.3VZ-+1VEX-+0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
## 565 215.51 89.43 76.47 17.74 -0.23
+0.3VX++1VZ++0.3VEX++1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
## 566 215.51 89.43 26.71 16.07 1.44
+0.3VX-+1VZ++0.3VEX-+1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1/2TF+1.2TA+1.6SP
## 567 215.51 -76.44 76.47 16.81 0.70
+0.3VX++1VZ-+0.3VEX++1VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
## 568 215.51 -76.44 26.71 15.13 2.38
+0.3VX-+1VZ-+0.3VEX-+1VEZ-
0.9D+0.9E(O)+0.9P(O)+0.9TF+0.9TA+1.6SP+1.6W
## 569 143.70 4.33 42.36 7.57 4.10
X+
0.9D+0.9E(O)+0.9P(O)+0.9TF+0.9TA+1.6SP+1.6W
## 570 143.70 4.33 26.44 7.04 4.64
X-
0.9D+0.9E(O)+0.9P(O)+0.9TF+0.9TA+1.6SP+1.6W
## 571 143.70 10.30 34.40 7.73 3.94
Z+
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
0.9D+0.9E(O)+0.9P(O)+0.9TF+0.9TA+1.6SP+1.6W
## 572 143.70 -1.64 34.40 7.11 4.56
Z-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1V
## 573 119.78 28.49 111.61 10.67 -0.93
X+ +0.3VZ++1VEX++0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1V
## 574 119.78 -21.27 111.61 10.15 -0.42
X+ +0.3VZ-+1VEX++0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1V
## 575 119.78 28.49 -54.26 8.74 1.00
X-+0.3VZ++1VEX-+0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1V
## 576 119.78 -21.27 -54.26 8.22 1.51
X-+0.3VZ-+1VEX-+0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.
## 577 119.78 86.55 53.55 12.87 -3.14
3VX+ +1VZ++0.3VEX++1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.
## 578 119.78 86.55 3.79 11.20 -1.47
3VX-+1VZ++0.3VEX-+1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.
## 579 119.78 -79.33 53.55 12.36 -2.62
3VX+ +1VZ-+0.3VEX++1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.
## 580 119.78 -79.33 3.79 10.68 -0.95
3VX-+1VZ-+0.3VEX-+1VEZ-
## 584 1.2D+1L+0.5Lr+1.2E(T)+1.2P(T)+1.2WT+1.6WX+ 183.18 0.00 48.05 9.06 5.82
## 585 1.2D+1L+0.5Lr+1.2E(T)+1.2P(T)+1.2WT+1.6WX- 183.18 0.00 32.13 8.52 6.36
## 586 1.2D+1L+0.5Lr+1.2E(T)+1.2P(T)+1.2WT+1.6WZ+ 183.18 5.97 40.09 9.22 5.66
## 587 1.2D+1L+0.5Lr+1.2E(T)+1.2P(T)+1.2WT+1.6WZ- 183.18 -5.97 40.09 9.22 5.66
## 588 0.9D+0.9E(T)+0.9P(T)+0.9WT+1.6WX+ 137.39 0.00 38.03 6.86 4.30
## 589 0.9D+0.9E(T)+0.9P(T)+0.9WT+1.6WX- 137.39 0.00 22.11 6.33 4.84
## 590 0.9D+0.9E(T)+0.9P(T)+0.9WT+1.6WZ+ 137.39 5.97 30.07 7.02 4.14
## 591 0.9D+0.9E(T)+0.9P(T)+0.9WT+1.6WZ- 137.39 -5.97 30.07 7.02 4.14
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I1+1.6SP+1.
## 601 183.18 0.00 48.05 9.06 5.82
6WX+
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I1+1.6SP+1.
## 602 183.18 0.00 32.13 8.52 6.36
6WX-
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I1+1.6SP+1.
## 603 183.18 5.97 40.09 9.22 5.66
6WZ+
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I1+1.6SP+1.
## 604 183.18 -5.97 40.09 9.22 5.66
6WZ-
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I2+1.6SP+1.
## 605 183.18 0.00 48.05 9.06 5.82
6WX+
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I2+1.6SP+1.
## 606 183.18 0.00 32.13 8.52 6.36
6WX-
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I2+1.6SP+1.
## 607 183.18 5.97 40.09 9.22 5.66
6WZ+
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I2+1.6SP+1.
## 608 183.18 -5.97 40.09 9.22 5.66
6WZ-
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I3+1.6SP+1.
## 609 183.18 0.00 48.05 9.06 5.82
6WX+
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I3+1.6SP+1.
## 610 183.18 0.00 32.13 8.52 6.36
6WX-
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I3+1.6SP+1.
## 611 183.18 5.97 40.09 9.22 5.66
6WZ+
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I3+1.6SP+1.
## 612 183.18 -5.97 40.09 9.22 5.66
6WZ-
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I4+1.6SP+1.
## 613 183.18 0.00 48.05 9.06 5.82
6WX+
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I4+1.6SP+1.
## 614 183.18 0.00 32.13 8.52 6.36
6WX-
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I4+1.6SP+1.
## 615 183.18 5.97 40.09 9.22 5.66
6WZ+
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.2D+1L+0.5Lr+1.2E(E)+1.2P(E)+1B+1I4+1.6SP+1.
## 616 183.18 -5.97 40.09 9.22 5.66
6WZ-
## 617 0.9D+0.9E(E)+0.9P(E)+1.6SP+1.6WX+ 137.39 0.00 38.03 6.86 4.30
## 618 0.9D+0.9E(E)+0.9P(E)+1.6SP+1.6WX- 137.39 0.00 22.11 6.33 4.84
## 619 0.9D+0.9E(E)+0.9P(E)+1.6SP+1.6WZ+ 137.39 5.97 30.07 7.02 4.14
## 620 0.9D+0.9E(E)+0.9P(E)+1.6SP+1.6WZ- 137.39 -5.97 30.07 7.02 4.14
Bearing Pressure 17.74 -3.14
φVc = 0.75 x Min (Vc1, Vc2, Vc3) = 743.28 ton > Pu = 74.33 ton . OK
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
P5
P1
P4
qmax qmin
qr
qr44
qmax qmin
qr2 qr1
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
Reinforcement Design
Slab Thickness Hf = 800 mm Concrete Comp Strength f'c = 300 kg/cm2
Concrete Cover cc = 75 mm Yield stress of Steel fy = 4000 kg/cm2
Effective Depth d = 692 mm Rebar Diameter D = 22 mm
Width b = 3400 mm Rebar Spacing s = 150 mm
Reinforcement Layer n = 2 layers
Mmax 140033.87
Rn = = = 107510.77 kg/m2 = 10.75 kg/cm2
0.8xbxd^2 0.8x3400x692^2
0.85 fc ` 2Rn
req 1 1 ρreq = 0.0027
f y 0.85 fc
4/3 ρreq = 0.0037
2
Asuse = b/s x 0.25 x π x d = 3400/150 x 0.25 x π x 22^2 = 8616 mm2
Based on case #2
2 2
Ultimate Moment Mu -3 = 1/24x (qr1 + qr2)/2 x (b3) x Lf - 1/12 x (qr3+qr4) x b2
= 1.04 ton.m
Rebar Diameter D = 16 mm
Rebar Spacing s = 200 mm
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
Mmax 1041.93
Rn = = = 799.94 kg/m2 = 0.08 kg/cm2
0.8xbxd^2 0.8x3400x692^2
0.85 fc ` 2Rn
req 1 1 ρreq = 0.0000
fy 0.85 fc
4/3 ρreq = 0.0000
2
Asuse = b/s x 0.25 x π x d = 3400/200 x 0.25 x π x 16^2 = 3418 mm2
Pf
qmax
Reinforcement Design
Slab Thickness Hf = 800 mm Concrete Comp Strength f'c = 300 kg/cm2
Concrete Cover cc = 75 mm Yield stress of Steel fy = 4000 kg/cm2
Effective Depth d = 692 mm Rebar Diameter D = 16 mm
Width b = 7240 mm Rebar Spacing s = 150 mm
Reinforcement Layer n = 2 layers
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
Mmax 185598.48
Rn = = = 66916.57 kg/m2 = 6.69 kg/cm2
0.8xbxd^2 0.8x7240x692^2
0.85 fc ` 2Rn
req 1 1 ρreq = 0.0017
fy 0.85 fc
4/3 ρreq = 0.0023
2
Asuse = b/s x 0.25 x π x d = 7240/150 x 0.25 x π x 16^2 = 9705 mm2
2
Asuse = b/s x 0.25 x π x d = 7240/200 x 0.25 x π x 16^2 = 7278 mm2
P1a P2
Lp Lf
P1b
b1 b2 b3
bf
SDs 0.770
Cs = = = 0.462
(R/I) (2.5/1.5)
Cs = = 0.462
Cs min = Max (0.044 x SDS x I ; 0.01) = 0.051
Cs min = 0.5 x S1/(R/Ie), if S1 ≥ 0.6g = -
Seismic base shear
Vmotor = Cs x Wmot = 0.462 x 6.4 = 2.96 ton
Vfan P1 = Cs x Wfan = 0.462 x 5.55 = 2.56 ton
Vstructure P1 = Cs x Ws = 0.462 x 52.71 = 24.35 ton
Lateral force seismic load at center of gravity (COG) :
hi1 = Hcog + Hf (Equipment)
hi2 = 0.5 x Hf (Footing)
Mx = Fi * hi
Mz = Fi * hi
No Element Wi hi Wi x hi Wi x hi V Fi Mx Mz
(ton) (m) ∑Wi x hi) (ton) (ton) (ton.m) (ton)
1 Motor (L1) 6.40 3.40 21.76 0.23 2.96 6.81 23.15 23.15
2 Fan P1 (L2+L4) 5.55 3.40 18.87 0.20 2.56 5.91 20.08 20.08
3 Sructure 52.71 1.04 54.81 0.57 24.35 17.15 17.84 17.84
95.4 1.0 29.87 29.87 61.08 61.08
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Permanent)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Temporary)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
1.35D+1L+1.35E(E)+1.35P(E)+1VX++0.3VZ++1VEX+
512 29.87 103.85 8.96 18.32 61.08
+0.3VEZ+
1.35D+1L+1.35E(E)+1.35P(E)+0.3VX++1VZ++0.3VEX+
516 8.96 103.85 29.87 61.08 18.32
+1VEZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
545 4.04 98.36 1.70 3.06 11.01
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
546 -0.64 98.36 1.70 3.06 -4.90
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
547 1.70 98.36 3.45 9.02 3.06
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
548 1.70 98.36 -0.06 -2.91 3.06
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
549 4.04 98.36 1.70 3.06 11.01
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
550 -0.64 98.36 1.70 3.06 -4.90
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
551 1.70 98.36 3.45 9.02 3.06
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
552 1.70 98.36 -0.06 -2.91 3.06
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
553 4.04 98.36 1.70 3.06 11.01
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
554 -0.64 98.36 1.70 3.06 -4.90
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
555 1.70 98.36 3.45 9.02 3.06
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
556 1.70 98.36 -0.06 -2.91 3.06
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
557 4.04 98.36 1.70 3.06 11.01
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
558 -0.64 98.36 1.70 3.06 -4.90
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
559 1.70 98.36 3.45 9.02 3.06
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
560 1.70 98.36 -0.06 -2.91 3.06
+1.6SP+1.6WZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
561 31.78 110.64 10.87 21.76 64.51
VZ++1VEX++0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
562 31.78 110.64 -7.05 -14.88 64.51
VZ-+1VEX++0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
563 -27.96 110.64 10.87 21.76 -57.6
+0.3VZ++1VEX-+0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
564 -27.96 110.64 -7.05 -14.88 -57.6
+0.3VZ-+1VEX-+0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
565 10.87 110.64 31.78 64.51 21.76
+0.3VX++1VZ++0.3VEX++1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
566 -7.05 110.64 31.78 64.51 -14.88
+1VZ++0.3VEX-+1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1/2TF+1.2TA+1.6SP
567 10.87 110.64 -27.96 -57.6 21.76
+0.3VX++1VZ-+0.3VEX++1VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
568 -7.05 110.64 -27.96 -57.6 -14.88
+1VZ-+0.3VEX-+1VEZ-
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+
573 30.93 61.49 10.02 20.23 62.99
+0.3VZ++1VEX++0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+ +0.3VZ-
574 30.93 61.49 -7.90 -16.41 62.99
+1VEX++0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-
575 -28.81 61.49 10.02 20.23 -59.2
+0.3VZ++1VEX-+0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-+0.3VZ-
576 -28.81 61.49 -7.90 -16.41 -59.2
+1VEX-+0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+
577 10.02 61.49 30.93 62.99 20.23
+1VZ++0.3VEX++1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-
578 -7.90 61.49 30.93 62.99 -16.41
+1VZ++0.3VEX-+1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+ +1VZ-
579 10.02 61.49 -28.81 -59.2 20.23
+0.3VEX++1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-+1VZ-
580 -7.90 61.49 -28.81 -59.2 -16.41
+0.3VEX-+1VEZ-
Mz 64513.09
Rn = = = 3720.11 kg/m2 = 0.37 kg/cm2
0.8xbxd^2 0.8x3400x2525^2
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
2
Asuse = b/s x 0.25 x π x d = 3400/150 x 0.25 x π x 22^2 = 8616 mm2
Mx 64513.09
Rn = = = 2941.48 kg/m2 = 0.29 kg/cm2
0.8xbxd^2 0.8x4300x2525^2
0.85 fc ` 2Rn
req 1 1 ρreq = 0.0001
fy 0.85 fc
4/3 ρreq = 0.0001
2
Asuse = b/s x 0.25 x π x d = 4300/150 x 0.25 x π x 22^2 = 10897 mm2
5.4.2. PEDESTAL 2
P1a P2
Lp Lf
P1b
b1 b2 b3
bf
SDs 0.770
Cs = = = 0.462
(R/I) (2.5/1.5)
Cs = = 0.462
Cs min = Max (0.044 x SDS x I ; 0.01) = 0.051
Cs min = 0.5 x S1/(R/Ie), if S1 ≥ 0.6g = -
Seismic base shear
Vfan P2 = Cs x Wfan = 0.462 x 4.9 = 2.26 ton
Vstructure P2 = Cs x Ws = 0.462 x 16.24 = 7.50 ton
Lateral force seismic load at center of gravity (COG) :
hi1 = Hcog + Hf (Equipment)
hi2 = 0.5 x Hf (Footing)
Mx = Fi * hi
Mz = Fi * hi
No Element Wi hi Wi x hi Wi x hi V Fi Mx Mz
(ton) (m) ∑Wi x hi) (ton) (ton) (ton.m) (ton)
1 Fan P2 (L3+L4) 4.90 3.40 16.66 0.50 2.26 4.85 16.49 16.49
2 Sructure 16.23 1.04 16.88 0.50 7.50 4.91 5.11 5.11
33.5 1.0 9.76 9.76 21.60 21.60
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Permanent)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Temporary)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
1.35D+1L+1.35E(E)+1.35P(E)+1VX++0.3VZ++1VEX+
512 9.76 32.96 2.93 6.48 21.60
+0.3VEZ+
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.35D+1L+1.35E(E)+1.35P(E)+0.3VX++1VZ++0.3VEX+
516 2.93 32.96 9.76 21.60 6.48
+1VEZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
545 4.04 31.68 1.70 3.53 11.49
+1.6SP+1.6WX+
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
546 -0.64 31.68 1.70 3.53 -4.43
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
547 1.70 31.68 3.45 9.50 3.53
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
548 1.70 31.68 -0.06 -2.44 3.53
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
549 4.04 31.68 1.70 3.53 11.49
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
550 -0.64 31.68 1.70 3.53 -4.43
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
551 1.70 31.68 3.45 9.50 3.53
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
552 1.70 31.68 -0.06 -2.44 3.53
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
553 4.04 31.68 1.70 3.53 11.49
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
554 -0.64 31.68 1.70 3.53 -4.43
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
555 1.70 31.68 3.45 9.50 3.53
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
556 1.70 31.68 -0.06 -2.44 3.53
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
557 4.04 31.68 1.70 3.53 11.49
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
558 -0.64 31.68 1.70 3.53 -4.43
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
559 1.70 31.68 3.45 9.50 3.53
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
560 1.70 31.68 -0.06 -2.44 3.53
+1.6SP+1.6WZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
561 11.67 35.63 4.84 10.45 25.57
VZ++1VEX++0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
562 11.67 35.63 -1.02 -2.51 25.57
VZ-+1VEX++0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
563 -7.85 35.63 4.84 10.45 -17.6
+0.3VZ++1VEX-+0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
564 -7.85 35.63 -1.02 -2.51 -17.6
+0.3VZ-+1VEX-+0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
565 4.84 35.63 11.67 25.57 10.45
+0.3VX++1VZ++0.3VEX++1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
566 -1.02 35.63 11.67 25.57 -2.51
+1VZ++0.3VEX-+1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1/2TF+1.2TA+1.6SP
567 4.84 35.63 -7.85 -17.6 10.45
+0.3VX++1VZ-+0.3VEX++1VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
568 -1.02 35.63 -7.85 -17.6 -2.51
+1VZ-+0.3VEX-+1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+
573 10.83 19.80 3.99 8.69 23.81
+0.3VZ++1VEX++0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+ +0.3VZ-
574 10.83 19.80 -1.87 -4.27 23.81
+1VEX++0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-
575 -8.70 19.80 3.99 8.69 -19.4
+0.3VZ++1VEX-+0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-+0.3VZ-
576 -8.70 19.80 -1.87 -4.27 -19.4
+1VEX-+0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+
577 3.99 19.80 10.83 23.81 8.69
+1VZ++0.3VEX++1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-
578 -1.87 19.80 10.83 23.81 -4.27
+1VZ++0.3VEX-+1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+ +1VZ-
579 3.99 19.80 -8.70 -19.4 8.69
+0.3VEX++1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-+1VZ-
580 -1.87 19.80 -8.70 -19.4 -4.27
+0.3VEX-+1VEZ-
Mz 25572.10
Rn = = = 1194.90 kg/m2 = 0.12 kg/cm2
0.8xbxd^2 0.8x3400x2805^2
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
2
Asuse = b/s x 0.25 x π x d = 3400/150 x 0.25 x π x 22^2 = 8616 mm2
Mx 25572.10
Rn = = = 944.81 kg/m2 = 0.09 kg/cm2
0.8xbxd^2 0.8x4300x2805^2
0.85 fc ` 2Rn
req 1 1 ρreq = 0.0000
fy 0.85 fc
4/3 ρreq = 0.0000
0.85 fc 0.85 600 ρmax = 0.0053
max 0.75
fy 600 fy
ρmin = 0.0018
2
Asuse = b/s x 0.25 x π x d = 4300/150 x 0.25 x π x 22^2 = 10897 mm2
SDs 0.770
Cs = = = 0.462
(R/I) (2.5/1.5)
Cs = = 0.462
Cs min = Max (0.044 x SDS x I ; 0.01) = 0.051
Cs min = 0.5 x S1/(R/Ie), if S1 ≥ 0.6g = -
Seismic base shear
Vfan P2 = Cs x Wfan = 0.462 x 0.2 = 0.09 ton
Vstructure P2 = Cs x Ws = 0.462 x 0.59 = 0.27 ton
Lateral force seismic load at center of gravity (COG) :
hi1 = Hcog + Hf (Equipment)
hi2 = 0.5 x Hf (Footing)
Mx = Fi * hi
Mz = Fi * hi
No Element Wi hi Wi x hi Wi x hi V Fi Mx Mz
(ton) (m) ∑Wi x hi) (ton) (ton) (ton.m) (ton)
1 Actuator (L5) 0.20 1.90 0.38 0.81 0.09 0.29 0.56 0.56
2 Sructure P3 0.58 0.15 0.09 0.19 0.27 0.07 0.01 0.01
0.5 1.0 0.36 0.36 0.57 0.57
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Permanent)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
Load Combination Ultimate Strength Design for Reinforced Concrete Design (Temporary)
Fx Fy Fz Mx Mz
LC No Description
(ton) (ton) (ton) (ton.m) (ton.m)
1.35D+1L+1.35E(E)+1.35P(E)+1VX++0.3VZ++1VEX+
512 0.36 1.05 0.11 0.17 0.57
+0.3VEZ+
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.35D+1L+1.35E(E)+1.35P(E)+0.3VX++1VZ++0.3VEX+
516 0.11 1.05 0.36 0.57 0.17
+1VEZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
545 2.34 0.94 0.00 0.00 7.96
+1.6SP+1.6WX+
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
546 -2.34 0.94 0.00 0.00 -7.96
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
547 0.00 0.94 1.76 5.97 0.00
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I1
548 0.00 0.94 -1.76 -5.97 0.00
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
549 2.34 0.94 0.00 0.00 7.96
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
550 -2.34 0.94 0.00 0.00 -7.96
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
551 0.00 0.94 1.76 5.97 0.00
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I2
552 0.00 0.94 -1.76 -5.97 0.00
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
553 2.34 0.94 0.00 0.00 7.96
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
554 -2.34 0.94 0.00 0.00 -7.96
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
555 0.00 0.94 1.76 5.97 0.00
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I3
556 0.00 0.94 -1.76 -5.97 0.00
+1.6SP+1.6WZ-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
557 2.34 0.94 0.00 0.00 7.96
+1.6SP+1.6WX+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
558 -2.34 0.94 0.00 0.00 -7.96
+1.6SP+1.6WX-
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
559 0.00 0.94 1.76 5.97 0.00
+1.6SP+1.6WZ+
1.2D+1L+0.5Lr+1.2E(O)+1.2P(O)+1.2TF+1.2TA+1I4
560 0.00 0.94 -1.76 -5.97 0.00
+1.6SP+1.6WZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
561 0.36 1.05 0.11 0.17 0.57
VZ++1VEX++0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX++0.3
562 0.36 1.05 -0.11 -0.17 0.57
VZ-+1VEX++0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
563 -0.36 1.05 0.11 0.17 -0.6
+0.3VZ++1VEX-+0.3VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP+1VX-
564 -0.36 1.05 -0.11 -0.17 -0.6
+0.3VZ-+1VEX-+0.3VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP
565 0.11 1.05 0.36 0.57 0.17
+0.3VX++1VZ++0.3VEX++1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
566 -0.11 1.05 0.36 0.57 -0.17
+1VZ++0.3VEX-+1VEZ+
1.35D+1L+1.35E(O)+1.35P(O)+1/2TF+1.2TA+1.6SP
567 0.11 1.05 -0.36 -0.6 0.17
+0.3VX++1VZ-+0.3VEX++1VEZ-
1.35D+1L+1.35E(O)+1.35P(O)+1.2TF+1.2TA+1.6SP +0.3VX-
568 -0.11 1.05 -0.36 -0.6 -0.17
+1VZ-+0.3VEX-+1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+
573 0.36 0.59 0.11 0.17 0.57
+0.3VZ++1VEX++0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX+ +0.3VZ-
574 0.36 0.59 -0.11 -0.17 0.57
+1VEX++0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-
575 -0.36 0.59 0.11 0.17 -0.6
+0.3VZ++1VEX-+0.3VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+1VX-+0.3VZ-
576 -0.36 0.59 -0.11 -0.17 -0.6
+1VEX-+0.3VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+
577 0.11 0.59 0.36 0.57 0.17
+1VZ++0.3VEX++1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-
578 -0.11 0.59 0.36 0.57 -0.17
+1VZ++0.3VEX-+1VEZ+
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX+ +1VZ-
579 0.11 0.59 -0.36 -0.6 0.17
+0.3VEX++1VEZ-
0.75D+0.75E(O)+0.75P(O)+0.9TF+0.9TA+1.6SP+0.3VX-+1VZ-
580 -0.11 0.59 -0.36 -0.6 -0.17
+0.3VEX-+1VEZ-
Rebar nos,
Total rebar nos, = iprov = 16
Circumference of pedestal p = 2156 mm
spacing distance p/iprov = 134.8 mm
Asprov = iprov * An = 0.00608 m2 > As OK
Shear reinforcement
ФVc = 0.75*0.17*√fc*b*d = 1622 kN
0.5 * ФVc = 811 kN
Vu = max (Hxmax, Hzmax) = 2.34 kN
Use Min Reinforcement, 0.5φVc > Hmax
Try rebar :
dia = 13
leg = 2
Rebar pitch = s = 150 mm
2
Av = 0.25 * π * dia^2 = 2.655 cm2 = 3E-04 m
2
Avmin = (0.35*b*s)/fy = 1.13 cm2 = 1E-04 m < Av OK
Vs = (Av*fy*b) / s = 612 kN
ФVc + ФVs = ФVc + 0.85*Vs = 1331 kN > Vu OK
So, applied rebar :
Pedestal reinforcement : use 16 D 22
Pedestal Stirrups : use D 13@150
I1 = = 0.242
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
I2 = = 0.110
If = 0.78
0.24
6. DYNAMIC ANALYSIS
6.1. DYNAMIC SOIL PARAMETER
Based on Final Report for Soil Investigation Timor (Onshore All Area) Rev.0 ;
L = Lf = 3.4 m
B = Bf = 7.24 m
Modulus Young Es = 25.00 Mpa = 2549290.5 kg/m2
Poisson ratio v = 0.3
Shear Modulus Gs = 183341.74 kPa
4
Mass Density ρ = gs / g = 1.835 kN.s / m
Internal damping for concrete material Dyi = 0.05
for rocking :
ro2 = = 2.344 m
Coefficient of βv, βh, and βᴪ (refer to figure 4.1 Design of Structure & Foundation for vibrating
machines), where "βv = βz", "βh = βx" and "βᴪ = βᴪ"
Horizontal ɳh = = 1.267
Rocking ɳѰ = = 1.300
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
kv = = 3172925.5 kN/m
kh = = 2997058.4 kN/m
kѱ = = 13680708 kN.m/rad
Bf
3.40
xi
Lf
1/2
zi Lf
yi
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
m
FOUNDATION PART a (m) b (m) k (m) IΨ (tonne.s2.m)
(tonne.s2/m)
FOOTING F1 3.40 1.73 1.269 13.432 37.916
∑ 13.432 37.916
EQUIPMENT 3.382 1.738 19.884
∑ 1.738 19.884
total 15.170 57.800
2
IΨ = 57.80 tonne.s .m
2
= 566.4 kN.s .m
Where :
a = Width of Section i
b = Depth of Section i
k = Distance from center of mass to base of footing
Magnification Factor
Mv = = 0.437
Mh = = 0.524
Mr = = 0.794
CALCULATION SHEET FOR
Primary Air Fan Boiler
Timor-1 CFSPP 2 X 50 MW Project
7. SUMMARY OF CALCULATION
PARAMETER
Borhole BH-07
Elevation (m) +18.00
Elevation Used (m) +15.00
Soil Category for Seismic Stiff Soil
Based on NSPT values down to 30 m below plant elevation, indicate the average NSPT
summarized in Table 6-2.
1.0
Stiff Soil (SD)
0.9
Hard Soil (SC)
0.8
Spectral Acceleration (g)
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.0 1.0 2.0
Period (second)
For this project we recommend foundation design is based on the 2% exceedance risk for 50 years
design life time and 2500 year earthquake return preriod. Due to the site is classified as Stiff Soil
(SD), we recommend to use PGA at surface (MCER at T = 0s) of 0.308g and 0.293g for Hard Soil
(SC) can be used for design.