Professional Documents
Culture Documents
Feeder Protection M2 - NGCP Side - Test Report
Feeder Protection M2 - NGCP Side - Test Report
INSTRUMENT DATA
Make/Brand Omicron
Model No. CMC 356
Serial No. AN148E/102005943
Calibration Date September 21, 2023-2024
RELAY DATA
Relay Function 67P, 67G, 50/51G
Make Sifang
Model No. CSC - 211
Serial No. SFJB400006807022000003
Settings & Calculation NGCP
RELAY SETTING
Line CT Pri 1000 Line PT Pri 69kV L-L
Line CT Sec 5 Line PT Sec 115V L-L
TEST DATA
1.1 CT MEASUREMENTS (Metering Secondary Injection)
Phase Current Injected (A) Expected Value (A) Measured Value (A) REMARKS
PHASE A 10 V 10 V 10 V OK
PHASE B 20 V 20 V 19.987 V OK
PHASE C 30 V 30 V 29.983 V OK
Acceptance Criteria: ≤ ±2.5% setting
3.2 NON DIRECTIONAL EARTH FAULT (67G_Stage2) I_Set = 0.31 A, TMSg = 0.05
Measured Time (ms) Measured Time (ms) Measured Time (ms) Measured Time (ms)
PHASE Pickup (A) Drop Off (A) @ 322.6% TAP @ 645.2% TAP @ 967.7% TAP @ 1290% TAP REMARKS
295.4ms 184.3ms 150.7ms 133.4ms
3I0 0.325 0.3 310.1 194.4 162 142.5 OK
Trip Region: Clockwise Rotation: from 20° to -141°
Current: ≤ ±2.5% setting or ±0.02In
Acceptance Criteria:
Time Delay: ≤ ± 1% times of setting or +40ms, at 2 times of operating current
Remarks:
TESTING & COMMISSIONING
FEEDER PROTECTION RELAY
TEST REPORT
Tested by: JOHN CARLO B. IGNACIO Approved by: PORTIA O. IBIAS Approved by: