GENERAL NOTES

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
should not be less than
25mm for beams & columns and
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
being under compression.
6- Construction joints shall be located
at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.

DESIGNED BY:

P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

PROJECT TITLE Plot No

RESIDENTIAL BUILDING Block No


TYPICAL BENDING DETAIL 2 OF LINKS
LOCATION

1 OWNER
10

DRAWING TITLE Job No


COLUMN'S AND AXIS AT FOUNDATION LEVEL
Scale 1 :100

TYPICAL COLUMN
MAIN BAR LAPPING

File name Date Rev. Sheet No


GENERAL STRUCTURAL NOTES
Dec. 2022
15m Street
E D D* C C* B B* A* A

Retaining Wall20cm
N
Plot Limit
Thickness

1
10
1

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
1*
3-Max-Aggregate size 20mm for
TYPICAL COLUMN
2* beams & col.s and 30mm for found.s.
MAIN BAR LAPPING
4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3 50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located
4 at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.

Neighbour
TYPICAL BENDING DETAIL 1 OF LINKS
(SHAPE CODE 61)
15m Street

4*

6 DESIGNED BY:

P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com


TYPICAL BENDING DETAIL 2 OF LINKS
(SHAPE CODE 33)
7 PROJECT TITLE Plot No

RESIDENTIAL BUILDING Block No

LOCATION

OWNER
8

DRAWING TITLE Job No


COLUMN AND AXIS AT FOUNDATION LEVEL
Scale 1 :100

TYPICAL BENDING DETAIL OF MAIN REIN. BAR


(SHAPE CODE 51)

Neighbour

File name Date Rev. Sheet No

COLUMN AND AXIS AT FOUNDATION LEVEL Dec. 2022


DIMENSION IN MM

Basement & Ground 1st & 2nd 6th Floor Roof Floor
3rd & 4th Floor 5th Floor
Floor Floor Columns Floor Columns
Columns Columns Columns

20T20 20T16 18T16


Columns

16T16 12T16 10T16


N
3R8-150
C1 3R8-150
2R8-150
NOTES
4R8-150 4R8-150 4R8-150 1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
link 3R8-150 link 3R8-150 link 3R8-150 3-Max-Aggregate size 20mm for
link 4R8-150 link 4R8-150 link 4R8-150
beams & col.s and 30mm for found.s.
18T16 18T16 16T16 12T16 10T16
4- Concrete cover for reinforcement
should not be less than
25mm for beams & columns and
50mm for foundations.
2R8-150
5- Over laps of steel should not be less
C2 4R8-150 4R8-150
3R8-150 2R8-150
than 45 times larger bar size &should
always be located within concrete
being under compression.
link 4R8-150 link 4R8-150 link 3R8-150 link 3R8-150 link 3R8-150
6- Construction joints shall be located
at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
RAFT OUT SIDE

T 16@150MM.V. T 16@150MM.V T 12@150MM.H


T 12@150MM.H.
Shear Wall

T 12@150MM.V&H Rɸ 8@300MM.V&H T 16@150MM.V R 8@300MM.V&H

RETAINING WALL(W1) RAFT IN SIDE LIFT WALL(W2) SECTION


horizontal section horizontal section

DESIGNED BY:

P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

PROJECT TITLE Plot No

RESIDENTIAL BUILDING Block No

LOCATION
1
10

OWNER

DRAWING TITLE Job No


TYPICAL BENDING DETAIL 2 OF LINKS COLUMN DETAILS
Scale 1 :100
TYPICAL BENDING DETAIL 1 OF LINKS (SHAPE CODE 33)
(SHAPE CODE 61)

TYPICAL COLUMN TYPICAL BENDING DETAIL OF MAIN REIN. BAR


(SHAPE CODE 51)
MAIN BAR LAPPING

File name Date Rev. Sheet No


COLUMN DETAILS Dec. 2022
*C

N
B2

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
beams & col.s and 30mm for found.s.
3T16
4- Concrete cover for reinforcement
*4 should not be less than
25mm for beams & columns and
50mm for foundations.
LIFT PLAN 5- Over laps of steel should not be less
DIM. IN mm than 45 times larger bar size &should
SCALE 1:100 3T16 always be located within concrete
being under compression.
B2 SECTION 6- Construction joints shall be located
at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
L

DESIGNED BY:

P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

PROJECT TITLE Plot No

Block No

LOCATION

selected Material 50cm Compacted to 95%M.D.D.


OWNER

DRAWING TITLE Job No


LIFT DETAILS
Scale 1 :100
TYPICAL REINF. DETAIL OF LIFT WALL(W1) (SEC. L-L)
DIM. IN mm
SCALE 1:100
LIFT PLAN REINFORCEMENT
DIM. IN mm
SCALE 1:150
File name Date Rev. Sheet No
LIFT DETAILS Dec. 2022
A A
Y

1 1

T16@100mmC/C-TOP Y16@100
N
T16@100mmC/C-BOTT.

2B.R
*1 1*
1B.R

NOTES
T16@100mmC/C-BOTT.

R.W R.B1
T16@100mmC/C-TOP

*2 2* R.B2
1- Steel fy not less than 460 N/mm2.
mm003

2- Concrete fcu should not be less


than 30N/mm2 for 28days strength.
2 2 SCALE 1:1000
DIM. IN M 3-Max-Aggregate size 20mm for
2B.R beams & col.s and 30mm for found.s.
3 3
4- Concrete cover for reinforcement
should not be less than
X X 25mm for beams & columns and
1B.R

50mm for foundations.


5- Over laps of steel should not be less
*3 3* than 45 times larger bar size &should
*T16@100mmC/C-TOP always be located within concrete
4 4 being under compression.
Y *T16@100mmC/C-BOTT. 6- Construction joints shall be located
at onefifth of span of slabs.
THICKNESS IS 30cm 300mm
7- Bearing Capacity= 200 kN/m2.
RAMP PLAN RAMP REINFORCEMENT PLAN

8T20

N.G.L
4T12
Y16@100

DESIGNED BY:
8T20

STIRRUP 2R8@125mm C/C P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com


Y16@100
PROJECT TITLE Plot No
R.W
R.B2
R.B1
Block No
8T16

R.B2
LOCATION
basement floor level

RAMP BAR STARTER


4T12
OWNER

RAFT
8T16 DRAWING TITLE Job No
RAMP DETAILS
STIRRUP 2R8@125mm C/C SCALE 1:1000 Scale 1 :100
DIM. IN M

File name Date Rev. Sheet No

RAMP DETAILS Dec. 2022


E D D* C C* B B* A* A
BOTTOM REINFORCEMENT DETAILS

(MESH) T16@200mm, BOTTOM BOTH WAY MESH.


(ADDITIONAL) T16@200mm,BOTTOM ADDITIONAL UNDER COLUMN.
X2 X1
INTEGRAL BEAM ALL AROUND THE RAFT EXTENSION
Raft Line
Retaining Wall20cm
Plot Limit
N
Thickness
2.40 2.40 2.40 3.00 2.40

2.40

2.40

2.40
3.00
NOTES
1- Steel fy not less than 460 N/mm2.
6.00

3.00 2- Concrete fcu should not be less


1* THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
RAFT THICKNESS.
3.00 3-Max-Aggregate size 20mm for

3.00
2* beams & col.s and 30mm for found.s.
3.00

4- Concrete cover for reinforcement


3.00
3.00
2 should not be less than

3.00
25mm for beams & columns and

3.00
3
50mm for foundations.
mm008
5- Over laps of steel should not be less
2.40 T16@15cm c/c T12@15cm c/c
than 45 times larger bar size &should
T12@15cm c/c
always be located within concrete
being under compression.
3.00

3.00 4.50 3.00 3* WATER PROOFING AS/SPEC. 200mm THICK


retaining WALL SECTION
TWO LAYERS OF 3.2mm
BITUMINOUS PROTECTION BOARD
T16@125mm c/c
6- Construction joints shall be located
4 GUNITING FOR SHORING WORKS at onefifth of span of slabs.

3.00
3.00

7- Bearing Capacity= 200 kN/m2.


T16@100mm c/c

6.00
T16@200mm c/c

90cm THIK. RAFT SLAB

50mm PROTECTION SCREED.


TWO LAYERS OF 3.2mm BITUMINOUS
PROTECTION BOARD
2.40 4.00 4* WATER PROOFING AS/SPEC.
3.00
10cm P.C.C.
POLYTHENE SHEET.
DETAIL(A) 25cm REPLACED WELL COMPACTED SOIL TO 95% M.D.D
3.00

5
3.00
5.00

5.00
3.00

6
DESIGNED BY:
2.40

P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com


3.00

6.99 7 PROJECT TITLE Plot No


RAFT THICKNESS 800mm
RESIDENTIAL BUILDING Block No

LOCATION
2.40 2.40 2.40 2.40 2.40
2.00

2.00

2.00

2.00

2.00

OWNER
8

DRAWING TITLE Job No


RAFT BOTTOM REINFORCEMENT
Scale 1 :100

File name Date Rev. Sheet No

RAFT BOTTOM REINFORCEMENT Dec. 2022


15m Street
E D D* C C* B B* A* A TOP REINFORCEMENT

T16@125mmC/C,TOP.B.W

X2 X1
INTEGRAL BEAM ALL AROUND THE RAFT EXTENSION
Raft Line
Retaining Wall20cm
Plot Limit
N
Thickness

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
1* THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
RAFT THICKNESS.
3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
mm008
5- Over laps of steel should not be less
T16@15cm c/c T12@15cm c/c
than 45 times larger bar size &should
T12@15cm c/c
always be located within concrete
3* WATER PROOFING AS/SPEC. 200mm THICK
retaining WALL SECTION
being under compression.
TWO LAYERS OF 3.2mm
BITUMINOUS PROTECTION BOARD
T16@125mm c/c
6- Construction joints shall be located
4 GUNITING FOR SHORING WORKS at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.

Neighbour
T16@100mm c/c
T16@200mm c/c

90cm THIK. RAFT SLAB

50mm PROTECTION SCREED.


15m Street

TWO LAYERS OF 3.2mm BITUMINOUS


PROTECTION BOARD
4* WATER PROOFING AS/SPEC.
10cm P.C.C.
POLYTHENE SHEET.
DETAIL(A) 25cm REPLACED WELL COMPACTED SOIL TO 95% M.D.D
5

6
DESIGNED BY:

P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

7 PROJECT TITLE Plot No


RAFT THICKNESS 800mm
RESIDENTIAL BUILDING Block No

LOCATION

OWNER
8

DRAWING TITLE Job No


RAFT TOP REINFORCEMENT
Scale 1 :100

Neighbour

File name Date Rev. Sheet No

RAFT TOP REINFORCEMENT Dec. 2022


G.L
N
TO BE DICIDED ON SITE

T16@125mm C/C T16@125mm C/C T16@125mm C/C


NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
T16@100mm C/C T16@200mm C/C T16@100mm C/C T16@200mm C/C T16@100mm C/C T16@200mm C/C T16@100mm C/C beams & col.s and 30mm for found.s.
Ø12@150 C/C CLOSED STIRRUPS col.zone col.zone col.zone 4- Concrete cover for reinforcement
ALL ARROUND THE RAFT EXTENSION should not be less than
SECTION X1-X1 THROUGH COLUMN STRIP 25mm for beams & columns and
DETAIL(A) 50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
being under compression.
G.L
6- Construction joints shall be located
at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
TO BE DICIDED ON SITE

T16@125mm C/C T16@125mm C/C T16@125mm C/C

T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C

Ø12@150 C/C CLOSED STIRRUPS


ALL ARROUND THE RAFT EXTENSION
SECTION X2-X2 THROUGH MIDDLE STRIP DESIGNED BY:

T16@15cm c/c T12@15cm c/c


P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

DETAIL(A) T12@15cm c/c Plot No


PROJECT TITLE

WATER PROOFING AS/SPEC. 200mm THICK


Block No
retaining WALL SECTION
TWO LAYERS OF 3.2mm
BITUMINOUS PROTECTION BOARD
LOCATION
T16@125mm c/c
GUNITING FOR SHORING WORKS

OWNER

T16@100mm c/c DRAWING TITLE Job No


Ø12@150 C/C CLOSED STIRRUPS T16@200mm c/c RAFT SECTION
Scale 1 :100
ALL ARROUND THE RAFT EXTENSION 90cm THIK. RAFT SLAB

50mm PROTECTION SCREED.


TWO LAYERS OF 3.2mm BITUMINOUS
PROTECTION BOARD
WATER PROOFING AS/SPEC.
10cm P.C.C.
POLYTHENE SHEET. File name Date Rev. Sheet No
DETAIL(A) 25cm REPLACED WELL COMPACTED SOIL TO 95% M.D.D Dec. 2022
RAFT SECTION
15m Street
E D D* C C* B B* A* A

SLAB BOTTOM REINFORCEMENT DETAILS

Retaining Wall20cm
Plot Limit
USE T12@150mm, BOTTOM BOTH WAY MESH.
N
Thickness

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should

B1
always be located within concrete
3* being under compression.
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details

Neighbour
B2

BAR AT EDGE SLAB


Scale 1 : 2000
B1
15m Street

4* )
B
( T&
16

4T
4T

16
4T16 (T&B)

(T
5

&B
B2

)
SCB

4T16 (T&B)

4T16 (T&B)
6
B3 DESIGNED BY:

B)
4T
mm032

&
16
4T16 (T&B)

(T
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

(T

16
&

4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No

Refer to slab reinforcement


LOCATION
G.F LEVEL

T16@150mm
OWNER
8

160
T12@150mm
DRAWING TITLE Job No
BASEMENT COVER SLAB BOTTOM
REINFORCEMENT
Scale 1 :100
T16@150mm

Neighbour RETAINING WALL


ENTRANCE STAIR DETAILS

File name Date Rev. Sheet No

BASEMENT COVER SLAB BOTTOM REINFORCEMENT Dec. 2022


15m Street
E D D* C C* B B* A* A
TOP REINFORCEMENT DETAILS
A T12@300mmC/C, B,W. MESH.

Plot Limit
B Additional-2T12@300mmC/C, B,W. AT COLUMN ZONE.

C Additional-2T16@300mmC/C, B,W. AT COLUMN ZONE.


N
1

2.00

2.00
NOTES

1.50

1.50
1.50
5.00 3.00 3.00
3.00 2.00 1- Steel fy not less than 460 N/mm2.
3.00 2- Concrete fcu should not be less
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
mm032 SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement

5.00
3.00

SLAB THICKNESS 230mm


2 should not be less than

3.00
25mm for beams & columns and

3.00
3.00 3
50mm for foundations.
2.00 5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should

B1
2.47
always be located within concrete
3.00
3* being under compression.
3.50

1.50
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
3.00

3.00
1.50

1.50
refer to slab 7- Bearing Capacity= 200 kN/m2.
2.00 rein. details

Neighbour
B2

3.00
3.88

BAR AT EDGE SLAB


Scale 1 : 2000
B1
15m Street

4*
1.50

1.50
3.00

2.47
5
B2
6.00

6.00

1.50 SCB
5.00

Mesh Bars-T12@300 Additional Bars-2T16@300


A
6

11.39
B3 C DESIGNED BY:

1.50 mm032
C
7.00 3.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
2.40

7 PROJECT TITLE Plot No


C
C RESIDENTIAL BUILDING
A Block No

LOCATION
2.40 2.40 2.40 2.40 1.50
2.00

2.00

2.00

2.00

1.50
1.50

OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
A
DRAWING TITLE Job No
B BASEMENT COVER SLABTOP
Scale 1 :100
REINFORCEMENT
B
A

B
Neighbour B
A

File name Date Rev. Sheet No

BASEMENT COVER SLABTOP REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A

SLAB BOTTOM REINFORCEMENT DETAILS

USE T12@150mm, BOTTOM BOTH WAY MESH.


N

SCB

SCB

SCB

SCB

CB1
1

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2

BAR AT EDGE SLAB


Scale 1 : 2000

B1
B1

4* )
B
( T&
16

4T
SCB 4T

16
B4 CB4 4T16 (T&B)

(T
5

&B
B4

)
SCB

4T16 (T&B)

4T16 (T&B)
6
B4 CB4 DESIGNED BY:

B)
4T

&
16
4T16 (T&B)

(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

(T

16
SCB

&

4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No

LOCATION

OWNER
8
CB1 B1 B1 B1 B1 CB1

DRAWING TITLE Job No


GROUND FLOOR COVER SLAB BOTTOM
REINFORCEMENT
Scale 1 :100

File name Date Rev. Sheet No

GROUND FLOOR COVER SLAB BOTTOM REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A
TOP REINFORCEMENT DETAILS
A T12@300mmC/C, B,W. MESH.

B Additional-2T12@300mmC/C, B,W. AT COLUMN ZONE.

C Additional-2T16@300mmC/C, B,W. AT COLUMN ZONE.


N
SCB

SCB

SCB

SCB

CB1
1

4.00

4.00

4.00

4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00

3.00 3.00 3.00 2.00


3.00 2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
3.00

5.00
3.00
2 should not be less than

3.00
25mm for beams & columns and

3.00
3.00 3 50mm for foundations.
2.00
5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
2.47
3.00
3* being under compression.
3.50

1.50 6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
3.00

3.00

3.00
refer to slab 7- Bearing Capacity= 200 kN/m2.
1.50
2.00 rein. details
B2
3.88

2.00 BAR AT EDGE SLAB


Scale 1 : 2000

B1
B1

4.50

4*
2.00
1.50
3.00

SCB B4 CB4
2.47
5
B4
6.00

6.00

4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00

C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00

SCB
6.00
7 PROJECT TITLE Plot No
mm032 C
4.00
C RESIDENTIAL BUILDING
A Block No

LOCATION
2.40 2.40 2.40 2.40
2.00

2.00

2.00

2.00

4.00
1.50

OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B GROUND FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A

B
B
A

File name Date Rev. Sheet No

GROUND FLOOR COVER SLABTOP REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A

SLAB BOTTOM REINFORCEMENT DETAILS

USE T12@150mm, BOTTOM BOTH WAY MESH.


N
SCB

SCB

SCB

SCB

CB1
1

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
S1 SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
S2
3* being under compression.
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2

BAR AT EDGE SLAB


Scale 1 : 2000

B1
B1

4* )
B
( T&
16

4T
SCB 4T

16
B4 CB4 4T16 (T&B)

(T
5

&B
B4

)
SCB

4T16 (T&B)

4T16 (T&B)
6
B4 CB4 DESIGNED BY:

B)
4T

&
16
4T16 (T&B)

(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

(T

16
SCB

&

4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No

LOCATION

OWNER
8
CB1 B1 B1 B1 B1 CB1

DRAWING TITLE Job No


1ST, 3rd, 5th FLOOR COVER SLAB BOTTOM
REINFORCEMENT
Scale 1 :100

File name Date Rev. Sheet No

1ST UP TO 6TH FLOOR COVER SLAB BOTTOM REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A
TOP REINFORCEMENT DETAILS
A T12@300mmC/C, B,W. MESH.

B Additional-2T12@300mmC/C, B,W. AT COLUMN ZONE.

C Additional-2T16@300mmC/C, B,W. AT COLUMN ZONE.


N
SCB

SCB

SCB

SCB

CB1
1

4.00

4.00

4.00

4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00

3.00 3.00 3.00 2.00


3.00 2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement

5.00
3.00

S1 SLAB THICKNESS 230mm


3.00
2 should not be less than

3.00
25mm for beams & columns and

3.00
3.00 3
50mm for foundations.
2.00 5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
S2 2.47
3.00
3* being under compression.
3.50

1.50
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
3.00

3.00

3.00
1.50
refer to slab 7- Bearing Capacity= 200 kN/m2.
2.00 rein. details
B2
3.88

2.00
BAR AT EDGE SLAB
Scale 1 : 2000

B1
B1

4.50
2.00
4*
1.50
3.00

SCB B4 CB4
2.47
5
B4
6.00

6.00

4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00

C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00

SCB
mm032 6.00
7 PROJECT TITLE Plot No
C
4.00
C RESIDENTIAL BUILDING
A Block No

LOCATION
2.40 2.40 2.40 2.40
2.00

2.00

2.00

2.00

4.00
1.50

OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B 1ST, 3rd, 5th FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A

B
B
A

File name Date Rev. Sheet No

1ST UP TO 6TH FLOOR COVER SLABTOP REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A

SLAB BOTTOM REINFORCEMENT DETAILS

USE T12@150mm, BOTTOM BOTH WAY MESH.


N

SCB

SCB

SCB

SCB

CB1
1

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2

BAR AT EDGE SLAB


Scale 1 : 2000

B1
B1

4* )
B
( T&
16

4T
SCB 4T

16
B4 CB4 4T16 (T&B)

(T
5

&B
B4

)
SCB

4T16 (T&B)

4T16 (T&B)
6
B4 CB4 DESIGNED BY:

B)
4T

&
16
4T16 (T&B)

(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

(T

16
SCB

&

4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No

LOCATION

OWNER
8
CB1 B1 B1 B1 B1 CB1

DRAWING TITLE Job No


2nd, 4th FLOOR COVER SLAB BOTTOM
REINFORCEMENT
Scale 1 :100

File name Date Rev. Sheet No

GROUND FLOOR COVER SLAB BOTTOM REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A
TOP REINFORCEMENT DETAILS
A T12@300mmC/C, B,W. MESH.

B Additional-2T12@300mmC/C, B,W. AT COLUMN ZONE.

C Additional-2T16@300mmC/C, B,W. AT COLUMN ZONE.


N
SCB

SCB

SCB

SCB

CB1
1

4.00

4.00

4.00

4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00

3.00 3.00 3.00 2.00


3.00 2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
3.00

5.00
3.00
2 should not be less than

3.00
25mm for beams & columns and

3.00
3.00 3 50mm for foundations.
2.00
5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
2.47
3.00
3* being under compression.
3.50

1.50
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
3.00

3.00

3.00
refer to slab 7- Bearing Capacity= 200 kN/m2.
1.50
2.00 rein. details
B2
3.88

2.00 BAR AT EDGE SLAB


Scale 1 : 2000

B1
B1

4.50
2.00
4*
1.50
3.00

SCB B4 CB4
2.47
5
B4
6.00

6.00

4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00

C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00

SCB
6.00
7 PROJECT TITLE Plot No
mm032 C
4.00
C RESIDENTIAL BUILDING
A Block No

LOCATION
2.40 2.40 2.40 2.40
2.00

2.00

2.00

2.00

4.00
1.50

OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B 2nd, 4th FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A

B
B
A

File name Date Rev. Sheet No

GROUND FLOOR COVER SLABTOP REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A

SLAB BOTTOM REINFORCEMENT DETAILS

USE T12@150mm, BOTTOM BOTH WAY MESH.


N

SCB

SCB

SCB

SCB

CB1
1

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2

BAR AT EDGE SLAB


Scale 1 : 2000

B1
B1

4* )
B
( T&
16

4T
SCB 4T

16
B4 CB4 4T16 (T&B)

(T
5

&B
B4

)
SCB

4T16 (T&B)

4T16 (T&B)
6
B4 CB4 DESIGNED BY:

B)
4T

&
16
4T16 (T&B)

(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

(T

16
SCB

&

4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No

LOCATION

OWNER
8
CB1 B1 B1 B1 B1 CB1

DRAWING TITLE Job No


6th FLOOR COVER SLAB BOTTOM
REINFORCEMENT
Scale 1 :100

File name Date Rev. Sheet No

GROUND FLOOR COVER SLAB BOTTOM REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A
TOP REINFORCEMENT DETAILS
A T12@300mmC/C, B,W. MESH.

B Additional-2T12@300mmC/C, B,W. AT COLUMN ZONE.

C Additional-2T16@300mmC/C, B,W. AT COLUMN ZONE.


N
SCB

SCB

SCB

SCB

CB1
1

4.00

4.00

4.00

4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00

3.00 3.00 3.00 2.00


3.00 2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.

B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
3.00

5.00
3.00
2 should not be less than

3.00
25mm for beams & columns and

3.00
3.00 3 50mm for foundations.
2.00
5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
2.47
3.00
3* being under compression.
3.50

1.50 6- Construction joints shall be located

230
B1
4 at onefifth of span of slabs.
3.00

3.00

3.00
refer to slab 7- Bearing Capacity= 200 kN/m2.
1.50
2.00 rein. details
B2
3.88

2.00 BAR AT EDGE SLAB


Scale 1 : 2000

B1
B1

4.50

4*
2.00
1.50
3.00

SCB B4 CB4
2.47
5
B4
6.00

6.00

4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00

C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00

SCB
6.00
7 PROJECT TITLE Plot No
mm032 C
4.00
C RESIDENTIAL BUILDING
A Block No

LOCATION
2.40 2.40 2.40 2.40
2.00

2.00

2.00

2.00

4.00
1.50

OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B 6th FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A

B
B
A

File name Date Rev. Sheet No

GROUND FLOOR COVER SLABTOP REINFORCEMENT Dec. 2022


E D D* C C* B B* A* A

SLAB BOTTOM & TOP REINFORCEMENT DETAILS

USE T12@150mm, BOTTOM & TOP BOTH WAY MESH.


N
1

NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
1* than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
THIS DENOTATION IS USED FOR 6- Construction joints shall be located
4 SLAB THICKNESS. at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
SLAB THICKNESS 230mm
mm032
5.70

4*
6.07

230
6
DESIGNED BY:
refer to slab
rein. details
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
BAR AT EDGE SLAB
7 Scale 1 : 2000 PROJECT TITLE Plot No

RESIDENTIAL BUILDING Block No

LOCATION

T12@150.B&T c/c

OWNER
8

DRAWING TITLE Job No


T12@150 c/c
STAIR ROOF COVER SLAB TOP
REINFORCEMENT
Scale 1 :100
T12@150 c/c

File name Date Rev. Sheet No


LIFT WALL ROOF COVER

STAIR ROOF COVER SLAB BOTTOM & TOP REINFORCEMENT Dec. 2022
A B C D E
Cantilever=1620
5410 4210 4060 4060

COL.ZONE COL.ZONE

2Y12@300 2Y12@300

N
230

L/4 L/4 L/4 L/4 L/4 L/4


NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
230

beams & col.s and 30mm for found.s.


4- Concrete cover for reinforcement
should not be less than
25mm for beams & columns and
50mm for foundations.
5- Over laps of steel should not be less
CB1 than 45 times larger bar size &should
3T16 5T16 6T16 2L L
5T16 3T16 6T16 always be located within concrete

230
230

230
6T16
being under compression.

500
500
500
500
6- Construction joints shall be located

600
at onefifth of span of slabs.
3T16 5T16 3T16 CB1 5T16 3T16 3T16
250
300
250
300
250
300
3T16 7- Bearing Capacity= 200 kN/m2.
STIRRUP R8@150mm C/C Section 1-1 Section 2-2 Section 3-3
BEAM 1 ( B 1) STIRRUP R8@150mm C/C B1 B1 CB1 STIRRUP R10@100mm C/C

6T16
3T16 3T16

230
3T16 3T16 3T16
230

230

600
600

600
600

3T16
3T16 3T16 3T16 250
3T16 3T16 300
Section 3-3
STIRRUP R8@150mm C/C 200 200 SCB
Section 1-1 Section 2-2
BEAM 2 ( B 2) B2 B2

DESIGNED BY:

3T16 3T16 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

3T16 3T16 3T16


230

230

L L PROJECT TITLE Plot No


600

600
600

6T16 6T16
RESIDENTIAL BUILDING Block No

600
5T16 5T16 5T16 5T16 5T16
LOCATION
STIRRUP R8@100mm C/C 250 250
Section 1-1 Section 2-2
BEAM 3 ( B3) 3T16
B3 B3

STIRRUP R8@100mm C/C


OWNER

DRAWING TITLE Job No


CB4
3T20 3T20 3T20 6T16 Scale 1 :100
3T20 3T20 6T20
230

230

230

230
600
800

800

800

2T12 2T12 2T12


800

Both Side Both Side Both Side

3T16
3T16 5T16 250
2T12-Both Side 3T16 300
5T16 3T16 3T16 Section 3-3
STIRRUP 2R8@125mm C/C SCB
250 250 250
BEAM 4 ( B 4) STIRRUP 2R8@125mm C/C Section 1-1 Section 2-2 Section 3-3 File name Date Rev. Sheet No
B3 B3 B3
Dec. 2022
CRANKED BEAM
D* C C*

T16@150mm
MIDD. LANDING(1) T16@150mm
N
T12@150mm
4 T16@150mm
T12@150mm

NOTES
23
4
5
1
1- Steel fy not less than 460 N/mm2.
6 2- Concrete fcu should not be less
CRANKED BEAM

7
than 30N/mm2 for 28days strength.
8

9
TYP.SEC. FLIGHT-1
3-Max-Aggregate size 20mm for
10 beams & col.s and 30mm for found.s.
11

12 4- Concrete cover for reinforcement


13 should not be less than
14
4* 25mm for beams & columns and
15
16
191817
20 50mm for foundations.
5- Over laps of steel should not be less
DOWN

than 45 times larger bar size &should


5 always be located within concrete
being under compression.
6- Construction joints shall be located
STAIR PLAN T16@150mm at onefifth of span of slabs.
MIDD. LANDING(2)
7- Bearing Capacity= 200 kN/m2.
CRANKED BEAM T16@150mm

T16@150mm
T12@150mm

600
MIDD. LANDING(1) T16@150mm

T16@150mm TYP.SEC. FLIGHT-2

DESIGNED BY:
600

4
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

CRANKED BEAM PROJECT TITLE Plot No

RESIDENTIAL BUILDING Block No


5T16

Refer to slab reinforcement LOCATION


ABOVE FLOOR LEVEL

T16@150mm

OWNER
5T16 CRANKED BEAM
T16@150mm
T12@150mm
CRANKED BEAM
DRAWING TITLE Job No
T16@150mm
SECTION 4-4 STAIR DETAILS
Scale 1 :100
MIDD. LANDING(2)

T16@150mm
TYP.SEC. FLIGHT-3

File name Date Rev. Sheet No


STAIR DETAILS Dec. 2022
0.20m
3Layer of Bitumen
0.20m

D12@150mm c/c B.W


(TOP & BOTTOM)
N
D12@100mm c/c (TOP)
D12@150mm c/c B.W 2D10
Air Pipe
C.I.M.C

D12@100mm c/c
C.I.M.C D12@100mm c/c (TOP) C.I.M.C
60*60cm 60*60cm
60*60cm
NOTES

DIST BAR 2D10


D12@150mm c/c B.W R.C WALL
BEAM
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
SECTION X-X 3 LAYER of BITUMEN 3-Max-Aggregate size 20mm for
ONE BRICK WALL
beams & col.s and 30mm for found.s.
D12@100mm c/c
4- Concrete cover for reinforcement
should not be less than
25mm for beams & columns and
50mm for foundations.
SEPTIC TANK COVER PLAN 5- Over laps of steel should not be less
D12@150mm c/c B.W
than 45 times larger bar size &should
always be located within concrete
being under compression.
R.C WALL 6- Construction joints shall be located
at onefifth of span of slabs.
ONE BRICK
7- Bearing Capacity= 200 kN/m2.
3No.M.H. hevy duty cover
60 60 cm EACH
3 LAYER of D16@150mm c/c D12@100mm c/c B.W 60*60cm M.H .Cover
Y D12@100mm c/c B.W 0.20m Interception Manhole
BITUMEN GROUND
D12@150mm c/c B.W LEVEL 2D16
(TOP & BOTTOM)

0.25m X D12@100mm c/c B.W X


(TOP & BOTTOM)
10cm
10cm Plain Conc
SECTION Y-Y Out Let
IN LET
to The WATER LEVEL 0.050m
Well
DESIGNED BY:
SEPTIC TANK SIZE
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
NO NUMBER OF
PERSON NO LEAGE FLANGE PROJECT TITLE Plot No

1 1---- 9 2.30 0.75 1.25 R.C Wall Mi 1:2:4 Mortar Block No

D16@150mm c/c D16@150mm c/c


2 10----14 2.75 1.10 1.25 ONE BRICK WALL LOCATION
D12@150mm c/c B.W
(TOP & BOTTOM) SLOPE
3 15----20 3.00 1.15 1.40
0.25m OWNER

4 21----25 3.45 1.25 1.45


Y
DRAWING TITLE Job No
SEPTIC TANK DETAILS
5 26----30 3.60 1.40 1.45 Scale 1 :100

6 31----35 4.00 1.40 1.50

Longitudinal Section
7 36----40 4.45 1.40
1.50

File name Date Rev. Sheet No


SEPTIC TANK DETAILS Dec. 2022
W
DOUBLE SEALED C.I CO ER
22 22 cm R S EA Y DUTY GROUND LE EL

D1
N
0cm
D1 Fi e
D1
Ever 4 La er
Co rses see Det
NOTES
R C Beam 1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
Air Pipe D
than 30N/mm2 for 28days strength.
Diameter = 200m
3-Max-Aggregate size 20mm for
0cm beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
should not be less than
25mm for beams & columns and
D1 50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
Depth to be taken on Site always be located within concrete
being under compression.
6- Construction joints shall be located
Air Pipe D at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
Lo est Water Level taken on Site
EFFLUENT
W DISPOSAL
0.15m 0.15m
WELL PLAN
0.19m

1.50m minim m
D10
0.04m
R C Rin see Det

D2

Detail D2 Detail D1 DESIGNED BY:

SECTION W-W
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

Grease Seale C.I PROJECT TITLE Plot No


GROUND Cover 24 1 cm B.C
LE EL Block No
CONC RING
LOCATION
Z Z
D1 mm
La er
OWNER
0 0cm
1Brick all
Air Pipe D4
DRAWING TITLE Job No
DISPOSAL WELL AND MANHOLES DETAILS
Scale 1 :100
to check
0.20m
oo ro n
0.15m
SECTION Z-Z Inspection Chamber Plan

DISPOSAL WELL AND MANHOLES DETAILS File name Date Rev. Sheet No
Dec. 2022
A

T16@150mmC/C-TOP & BOTTOM


NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
B B T16@150mmC/C-TOP & BOTTOM B 3-Max-Aggregate size 20mm for
beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
should not be less than
TYPICAL WATER TANK PLAN TYPICAL WATER TANK COVER SLAB 25mm for beams & columns and
A 50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
being under compression.
6- Construction joints shall be located
at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.

DESIGNED BY:

SECTION A-A SECTION B-B


P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com

PROJECT TITLE Plot No

Block No

LOCATION
EXTERNAL SIDE
INTERNAL SIDE

OWNER

DRAWING TITLE Job No


WATER TANK DETAILS
Scale 1 :100

TYP. DETAIL OF PIPE


TYPICAL DETAILS OF OPENING
TYPICAL DETAILS A THRU CONC. WALL
File name Date Rev. Sheet No
WATER TANK DETAILS Dec. 2022

You might also like