1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
should not be less than
25mm for beams & columns and
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
being under compression.
6- Construction joints shall be located
at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
DESIGNED BY:
1 OWNER
10
TYPICAL COLUMN
MAIN BAR LAPPING
Retaining Wall20cm
N
Plot Limit
Thickness
1
10
1
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
1*
3-Max-Aggregate size 20mm for
TYPICAL COLUMN
2* beams & col.s and 30mm for found.s.
MAIN BAR LAPPING
4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3 50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located
4 at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
Neighbour
TYPICAL BENDING DETAIL 1 OF LINKS
(SHAPE CODE 61)
15m Street
4*
6 DESIGNED BY:
LOCATION
OWNER
8
Neighbour
Basement & Ground 1st & 2nd 6th Floor Roof Floor
3rd & 4th Floor 5th Floor
Floor Floor Columns Floor Columns
Columns Columns Columns
DESIGNED BY:
LOCATION
1
10
OWNER
N
B2
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
beams & col.s and 30mm for found.s.
3T16
4- Concrete cover for reinforcement
*4 should not be less than
25mm for beams & columns and
50mm for foundations.
LIFT PLAN 5- Over laps of steel should not be less
DIM. IN mm than 45 times larger bar size &should
SCALE 1:100 3T16 always be located within concrete
being under compression.
B2 SECTION 6- Construction joints shall be located
at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
L
DESIGNED BY:
Block No
LOCATION
1 1
T16@100mmC/C-TOP Y16@100
N
T16@100mmC/C-BOTT.
2B.R
*1 1*
1B.R
NOTES
T16@100mmC/C-BOTT.
R.W R.B1
T16@100mmC/C-TOP
*2 2* R.B2
1- Steel fy not less than 460 N/mm2.
mm003
8T20
N.G.L
4T12
Y16@100
DESIGNED BY:
8T20
R.B2
LOCATION
basement floor level
RAFT
8T16 DRAWING TITLE Job No
RAMP DETAILS
STIRRUP 2R8@125mm C/C SCALE 1:1000 Scale 1 :100
DIM. IN M
2.40
2.40
2.40
3.00
NOTES
1- Steel fy not less than 460 N/mm2.
6.00
3.00
2* beams & col.s and 30mm for found.s.
3.00
3.00
25mm for beams & columns and
3.00
3
50mm for foundations.
mm008
5- Over laps of steel should not be less
2.40 T16@15cm c/c T12@15cm c/c
than 45 times larger bar size &should
T12@15cm c/c
always be located within concrete
being under compression.
3.00
3.00
3.00
6.00
T16@200mm c/c
5
3.00
5.00
5.00
3.00
6
DESIGNED BY:
2.40
LOCATION
2.40 2.40 2.40 2.40 2.40
2.00
2.00
2.00
2.00
2.00
OWNER
8
T16@125mmC/C,TOP.B.W
X2 X1
INTEGRAL BEAM ALL AROUND THE RAFT EXTENSION
Raft Line
Retaining Wall20cm
Plot Limit
N
Thickness
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
1* THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
RAFT THICKNESS.
3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
mm008
5- Over laps of steel should not be less
T16@15cm c/c T12@15cm c/c
than 45 times larger bar size &should
T12@15cm c/c
always be located within concrete
3* WATER PROOFING AS/SPEC. 200mm THICK
retaining WALL SECTION
being under compression.
TWO LAYERS OF 3.2mm
BITUMINOUS PROTECTION BOARD
T16@125mm c/c
6- Construction joints shall be located
4 GUNITING FOR SHORING WORKS at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
Neighbour
T16@100mm c/c
T16@200mm c/c
6
DESIGNED BY:
LOCATION
OWNER
8
Neighbour
T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C T16@200mm C/C
OWNER
Retaining Wall20cm
Plot Limit
USE T12@150mm, BOTTOM BOTH WAY MESH.
N
Thickness
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
B1
always be located within concrete
3* being under compression.
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
Neighbour
B2
4* )
B
( T&
16
4T
4T
16
4T16 (T&B)
(T
5
&B
B2
)
SCB
4T16 (T&B)
4T16 (T&B)
6
B3 DESIGNED BY:
B)
4T
mm032
&
16
4T16 (T&B)
(T
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
(T
16
&
4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No
T16@150mm
OWNER
8
160
T12@150mm
DRAWING TITLE Job No
BASEMENT COVER SLAB BOTTOM
REINFORCEMENT
Scale 1 :100
T16@150mm
Plot Limit
B Additional-2T12@300mmC/C, B,W. AT COLUMN ZONE.
2.00
2.00
NOTES
1.50
1.50
1.50
5.00 3.00 3.00
3.00 2.00 1- Steel fy not less than 460 N/mm2.
3.00 2- Concrete fcu should not be less
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
B1
mm032 SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
5.00
3.00
3.00
25mm for beams & columns and
3.00
3.00 3
50mm for foundations.
2.00 5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
B1
2.47
always be located within concrete
3.00
3* being under compression.
3.50
1.50
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
3.00
3.00
1.50
1.50
refer to slab 7- Bearing Capacity= 200 kN/m2.
2.00 rein. details
Neighbour
B2
3.00
3.88
4*
1.50
1.50
3.00
2.47
5
B2
6.00
6.00
1.50 SCB
5.00
11.39
B3 C DESIGNED BY:
1.50 mm032
C
7.00 3.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
2.40
LOCATION
2.40 2.40 2.40 2.40 1.50
2.00
2.00
2.00
2.00
1.50
1.50
OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
A
DRAWING TITLE Job No
B BASEMENT COVER SLABTOP
Scale 1 :100
REINFORCEMENT
B
A
B
Neighbour B
A
SCB
SCB
SCB
SCB
CB1
1
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2
B1
B1
4* )
B
( T&
16
4T
SCB 4T
16
B4 CB4 4T16 (T&B)
(T
5
&B
B4
)
SCB
4T16 (T&B)
4T16 (T&B)
6
B4 CB4 DESIGNED BY:
B)
4T
&
16
4T16 (T&B)
(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
(T
16
SCB
&
4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No
LOCATION
OWNER
8
CB1 B1 B1 B1 B1 CB1
SCB
SCB
SCB
CB1
1
4.00
4.00
4.00
4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
3.00
5.00
3.00
2 should not be less than
3.00
25mm for beams & columns and
3.00
3.00 3 50mm for foundations.
2.00
5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
2.47
3.00
3* being under compression.
3.50
230
B1
4 at onefifth of span of slabs.
3.00
3.00
3.00
refer to slab 7- Bearing Capacity= 200 kN/m2.
1.50
2.00 rein. details
B2
3.88
B1
B1
4.50
4*
2.00
1.50
3.00
SCB B4 CB4
2.47
5
B4
6.00
6.00
4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00
C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00
SCB
6.00
7 PROJECT TITLE Plot No
mm032 C
4.00
C RESIDENTIAL BUILDING
A Block No
LOCATION
2.40 2.40 2.40 2.40
2.00
2.00
2.00
2.00
4.00
1.50
OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B GROUND FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A
B
B
A
SCB
SCB
SCB
CB1
1
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
S1 SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
S2
3* being under compression.
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2
B1
B1
4* )
B
( T&
16
4T
SCB 4T
16
B4 CB4 4T16 (T&B)
(T
5
&B
B4
)
SCB
4T16 (T&B)
4T16 (T&B)
6
B4 CB4 DESIGNED BY:
B)
4T
&
16
4T16 (T&B)
(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
(T
16
SCB
&
4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No
LOCATION
OWNER
8
CB1 B1 B1 B1 B1 CB1
SCB
SCB
SCB
CB1
1
4.00
4.00
4.00
4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
5.00
3.00
3.00
25mm for beams & columns and
3.00
3.00 3
50mm for foundations.
2.00 5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
S2 2.47
3.00
3* being under compression.
3.50
1.50
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
3.00
3.00
3.00
1.50
refer to slab 7- Bearing Capacity= 200 kN/m2.
2.00 rein. details
B2
3.88
2.00
BAR AT EDGE SLAB
Scale 1 : 2000
B1
B1
4.50
2.00
4*
1.50
3.00
SCB B4 CB4
2.47
5
B4
6.00
6.00
4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00
C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00
SCB
mm032 6.00
7 PROJECT TITLE Plot No
C
4.00
C RESIDENTIAL BUILDING
A Block No
LOCATION
2.40 2.40 2.40 2.40
2.00
2.00
2.00
2.00
4.00
1.50
OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B 1ST, 3rd, 5th FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A
B
B
A
SCB
SCB
SCB
SCB
CB1
1
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2
B1
B1
4* )
B
( T&
16
4T
SCB 4T
16
B4 CB4 4T16 (T&B)
(T
5
&B
B4
)
SCB
4T16 (T&B)
4T16 (T&B)
6
B4 CB4 DESIGNED BY:
B)
4T
&
16
4T16 (T&B)
(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
(T
16
SCB
&
4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No
LOCATION
OWNER
8
CB1 B1 B1 B1 B1 CB1
SCB
SCB
SCB
CB1
1
4.00
4.00
4.00
4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
3.00
5.00
3.00
2 should not be less than
3.00
25mm for beams & columns and
3.00
3.00 3 50mm for foundations.
2.00
5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
2.47
3.00
3* being under compression.
3.50
1.50
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
3.00
3.00
3.00
refer to slab 7- Bearing Capacity= 200 kN/m2.
1.50
2.00 rein. details
B2
3.88
B1
B1
4.50
2.00
4*
1.50
3.00
SCB B4 CB4
2.47
5
B4
6.00
6.00
4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00
C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00
SCB
6.00
7 PROJECT TITLE Plot No
mm032 C
4.00
C RESIDENTIAL BUILDING
A Block No
LOCATION
2.40 2.40 2.40 2.40
2.00
2.00
2.00
2.00
4.00
1.50
OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B 2nd, 4th FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A
B
B
A
SCB
SCB
SCB
SCB
CB1
1
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
mm032
1*
THIS DENOTATION IS USED FOR than 30N/mm2 for 28days strength.
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
6- Construction joints shall be located
230
B1
4 at onefifth of span of slabs.
refer to slab 7- Bearing Capacity= 200 kN/m2.
rein. details
B2
B1
B1
4* )
B
( T&
16
4T
SCB 4T
16
B4 CB4 4T16 (T&B)
(T
5
&B
B4
)
SCB
4T16 (T&B)
4T16 (T&B)
6
B4 CB4 DESIGNED BY:
B)
4T
&
16
4T16 (T&B)
(T
mm032 P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
(T
16
SCB
&
4T
B)
7 PROJECT TITLE Plot No
TYPICAL OPENING DETAIL
RESIDENTIAL BUILDING Block No
LOCATION
OWNER
8
CB1 B1 B1 B1 B1 CB1
SCB
SCB
SCB
CB1
1
4.00
4.00
4.00
4.00
NOTES
1- Steel fy not less than 460 N/mm2.
7.00
B1
SLAB THICKNESS.
SCB 3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
SLAB THICKNESS 230mm 4- Concrete cover for reinforcement
3.00
5.00
3.00
2 should not be less than
3.00
25mm for beams & columns and
3.00
3.00 3 50mm for foundations.
2.00
5- Over laps of steel should not be less
3.00 than 45 times larger bar size &should
always be located within concrete
2.47
3.00
3* being under compression.
3.50
230
B1
4 at onefifth of span of slabs.
3.00
3.00
3.00
refer to slab 7- Bearing Capacity= 200 kN/m2.
1.50
2.00 rein. details
B2
3.88
B1
B1
4.50
4*
2.00
1.50
3.00
SCB B4 CB4
2.47
5
B4
6.00
6.00
4.00 SCB
Mesh Bars-T12@300 Additional Bars-2T16@300
A
6
B4 CB4 C DESIGNED BY:
2.00
C
7.00 A P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
3.00
SCB
6.00
7 PROJECT TITLE Plot No
mm032 C
4.00
C RESIDENTIAL BUILDING
A Block No
LOCATION
2.40 2.40 2.40 2.40
2.00
2.00
2.00
2.00
4.00
1.50
OWNER
8 Mesh Bars-T12@300 Additional Bars-2T12@300
CB1 B1 B1 B1 B1 CB1
A
DRAWING TITLE Job No
B 6th FLOOR COVER SLAB TOP
Scale 1 :100
REINFORCEMENT
B
A
B
B
A
NOTES
1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
1* than 30N/mm2 for 28days strength.
3-Max-Aggregate size 20mm for
2* beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
2 should not be less than
25mm for beams & columns and
3
50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
always be located within concrete
3* being under compression.
THIS DENOTATION IS USED FOR 6- Construction joints shall be located
4 SLAB THICKNESS. at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
SLAB THICKNESS 230mm
mm032
5.70
4*
6.07
230
6
DESIGNED BY:
refer to slab
rein. details
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
BAR AT EDGE SLAB
7 Scale 1 : 2000 PROJECT TITLE Plot No
LOCATION
T12@150.B&T c/c
OWNER
8
STAIR ROOF COVER SLAB BOTTOM & TOP REINFORCEMENT Dec. 2022
A B C D E
Cantilever=1620
5410 4210 4060 4060
COL.ZONE COL.ZONE
2Y12@300 2Y12@300
N
230
230
230
230
6T16
being under compression.
500
500
500
500
6- Construction joints shall be located
600
at onefifth of span of slabs.
3T16 5T16 3T16 CB1 5T16 3T16 3T16
250
300
250
300
250
300
3T16 7- Bearing Capacity= 200 kN/m2.
STIRRUP R8@150mm C/C Section 1-1 Section 2-2 Section 3-3
BEAM 1 ( B 1) STIRRUP R8@150mm C/C B1 B1 CB1 STIRRUP R10@100mm C/C
6T16
3T16 3T16
230
3T16 3T16 3T16
230
230
600
600
600
600
3T16
3T16 3T16 3T16 250
3T16 3T16 300
Section 3-3
STIRRUP R8@150mm C/C 200 200 SCB
Section 1-1 Section 2-2
BEAM 2 ( B 2) B2 B2
DESIGNED BY:
230
600
600
6T16 6T16
RESIDENTIAL BUILDING Block No
600
5T16 5T16 5T16 5T16 5T16
LOCATION
STIRRUP R8@100mm C/C 250 250
Section 1-1 Section 2-2
BEAM 3 ( B3) 3T16
B3 B3
230
230
230
600
800
800
800
3T16
3T16 5T16 250
2T12-Both Side 3T16 300
5T16 3T16 3T16 Section 3-3
STIRRUP 2R8@125mm C/C SCB
250 250 250
BEAM 4 ( B 4) STIRRUP 2R8@125mm C/C Section 1-1 Section 2-2 Section 3-3 File name Date Rev. Sheet No
B3 B3 B3
Dec. 2022
CRANKED BEAM
D* C C*
T16@150mm
MIDD. LANDING(1) T16@150mm
N
T12@150mm
4 T16@150mm
T12@150mm
NOTES
23
4
5
1
1- Steel fy not less than 460 N/mm2.
6 2- Concrete fcu should not be less
CRANKED BEAM
7
than 30N/mm2 for 28days strength.
8
9
TYP.SEC. FLIGHT-1
3-Max-Aggregate size 20mm for
10 beams & col.s and 30mm for found.s.
11
T16@150mm
T12@150mm
600
MIDD. LANDING(1) T16@150mm
DESIGNED BY:
600
4
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
T16@150mm
OWNER
5T16 CRANKED BEAM
T16@150mm
T12@150mm
CRANKED BEAM
DRAWING TITLE Job No
T16@150mm
SECTION 4-4 STAIR DETAILS
Scale 1 :100
MIDD. LANDING(2)
T16@150mm
TYP.SEC. FLIGHT-3
D12@100mm c/c
C.I.M.C D12@100mm c/c (TOP) C.I.M.C
60*60cm 60*60cm
60*60cm
NOTES
Longitudinal Section
7 36----40 4.45 1.40
1.50
D1
N
0cm
D1 Fi e
D1
Ever 4 La er
Co rses see Det
NOTES
R C Beam 1- Steel fy not less than 460 N/mm2.
2- Concrete fcu should not be less
Air Pipe D
than 30N/mm2 for 28days strength.
Diameter = 200m
3-Max-Aggregate size 20mm for
0cm beams & col.s and 30mm for found.s.
4- Concrete cover for reinforcement
should not be less than
25mm for beams & columns and
D1 50mm for foundations.
5- Over laps of steel should not be less
than 45 times larger bar size &should
Depth to be taken on Site always be located within concrete
being under compression.
6- Construction joints shall be located
Air Pipe D at onefifth of span of slabs.
7- Bearing Capacity= 200 kN/m2.
Lo est Water Level taken on Site
EFFLUENT
W DISPOSAL
0.15m 0.15m
WELL PLAN
0.19m
1.50m minim m
D10
0.04m
R C Rin see Det
D2
SECTION W-W
P. O. Box 45158, Khartoum, Sudan Email: abubakreng@yahoo.com
DISPOSAL WELL AND MANHOLES DETAILS File name Date Rev. Sheet No
Dec. 2022
A
DESIGNED BY:
Block No
LOCATION
EXTERNAL SIDE
INTERNAL SIDE
OWNER