Rejected - Water Shop Drawing - Commented 31.07.2023
Rejected - Water Shop Drawing - Commented 31.07.2023
Rejected - Water Shop Drawing - Commented 31.07.2023
Date: 30-07-2023
File No.107
Attention: Engineer. Mossab ,
Please find a soft copy of Water shop drawing that are for your Kind
approval.
Best Regards,
Project Name: Mr.Mohamed Yahia Mohamed AL Thahab Aljnebi. File No. 107
Consultant: Man Architects Consultants. Ref No. WT -01
Contractor: Onsite General Contracting and Maintenance. Date: 7/30/2023
Document description :
Remarks
Originator of the submittal/ Eng. Halil Campilo Ocusan Mob. No. 561705676
Contractor Authorizes signature Date: 7/30/2023
The Contractor Statement: We certify that the materials submitted herewith has been reviewed in details and in compliance with
the contract drawing and specifications except as otherwise stated hereabove.
Consultant Comments:
Approval or Comments does not relieve the contractor from his contractual obligations & responsibilities
All the supportive documents must be presented and filed at project site. The Alternative materials should be submitted to ADCE for review with
all the supportive documents, Original catalogues and compliance chart
location bhind the
gurad room
use updated
boundery layuot
provide
professional
drawing
provide
professional
darwing
shower WS
missing
future kitchen
same as other
toilets comments
same as other
toilets comments
less than 2.0 m height