Wall Finishes
In-situ finishing
Floor Finishes
Ceiling Finishes
GYMNASIUM
Wall Finishes
In-situ finishing
Floor Finishes
GYMNASIUM (CONT'D)
Miscellaneous
25mm x 25mm x 4mm thick L-angle m 20 35.00 700.00
25mm x 25mm x 4mm aluminium RHS in powder coat finish m 18 150.00 2,700.00
Ceiling Finishes
MULTIPURPOSE HALL
Wall Finishes
In-situ finishing
Floor Finishes
In-situ finishing
Miscellaneous
25mm x 25mm x 4mm aluminium RHS in powder coat finish m 18 150.00 2,700.00
COST STUDY - ID AREA BUDGET (FINISHING)
Ceiling Finishes
Wall Finishes
In-situ finishing
Miscellaneous
5mm thick aluminium tile inlay m 16 50.00 800.00
Floor Finishes
Miscellaneous
25mm x 25mm x 4mm aluminium RHS in powder coat finish m 46 150.00 6,900.00
Ceiling Finishes
Wall Finishes
In-situ finishing
Miscellaneous
5mm thick aluminium tile inlay m 12 50.00 600.00
Floor Finishes
Miscellaneous
25mm x 25mm x 4mm aluminium RHS in powder coat finish m 40 150.00 6,000.00
Ceiling Finishes
Wall Finishes
In-situ finishing
Miscellaneous
5mm thick aluminium tile inlay m 16 50.00 800.00
Floor Finishes
Miscellaneous
25mm x 25mm x 4mm aluminium RHS in powder coat finish m 46 150.00 6,900.00
Ceiling Finishes