Clause 7.2.8. Enclosure Tightness Test at Ambient Temperature
Clause 7.2.8. Enclosure Tightness Test at Ambient Temperature
Clause 7.2.8. Enclosure Tightness Test at Ambient Temperature
After the test, the enclosure shall show no breaks, the deformation of the enclosure shall not
affect the normal function of the instrument transformer, and shall not reduce the specified
degree of protection. Superficial damage, such as removal of paint, breaking of cooling ribs or
similar parts, or minor indentations can be ignored.
The tightness test on the enclosure of gas-insulated instrument transformers shall prove
compliance with the requirements given in 6.2.4.2 and shall be performed on a complete
transformer at ambient temperature (20 ± 10) °C.
The method shall be the cumulative method for closed pressurised systems as specified by
IEC 60068-2-17 (test method 1 of Qm test).
Every opening present on the transformer enclosure shall be sealed with the original sealing
device.
The transformer shall be filled with the same gas mixture as used in service at the rated filling
pressure at 20 °C ambient temperature.
The sensitivity of the leakage measurement shall be such as to detect a leakage rate
corresponding to about 0,25 %/year.
NOTE 1 The sensitivity of a leakage measurement changes with the sensitivity of the leakage meter, with the
capacity of the volume of measurement and with the time between two concentration measurements.
The test shall be started after at least 1 h from the completion of the filling of the instrument
transformer, in order to allow stabilisation of the leakage flow.
NOTE 2 The tightness type test is not necessary if the routine tightness test is performed using the cumulative
method (test method 1 of Qm test)
For insulators of gas-insulated instrument transformers, refer to IEC 62155 and IEC 61462-2.
The power-frequency withstand test shall be performed in accordance with IEC 60060-1.
The test voltage shall have the appropriate value given in Table 2, depending on the highest
voltage for equipment. The duration shall be 60 s, unless otherwise specified.
The secondary terminals, the frame, case (if any) and core (if there is a special earth
terminal) shall be connected to earth.