DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 23OB0405


Contract Name: Construction of Multi-Purpose Building Phase 1 - National Government Offices Bldg., Marikina City
Location of the Contract: Marikina City

BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________


ITEM UNIT PRICE AMOUNT
DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART I FACILITIES FOR THE ENGINEER - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Provision of Field Office for the _________________________________ _________________________________
A.1.1 (8) mo. 11.00
Engineer (Rental Basis) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART II OTHER GENERAL REQUIREMENTS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
B.5 (1) Project Billboard / Signboard each 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Occupational Safety and Health _________________________________ _________________________________
B.7 (1) l.s. 1.00
Program _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
B.9 (1) Mobilization/ Demobilization l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
CIVIL, MECHANICAL, ELECTRICAL _________________________________ _________________________________
PART III - -
AND SANITARY / PLUMBING WORKS _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART A CONCRETE WORKS - - _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Structural Concrete, (4000psi, Class _________________________________ _________________________________
900 (1) h m3 815.24
A, 14days) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Reinforcing Steel (Deformed, Grade _________________________________ _________________________________
902 (1) a kgs 43,591.56
40) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Reinforcing Steel (Deformed, Grade _________________________________ _________________________________
902 (1) b kgs 116,204.55
60) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
903 (1) Formworks and Falseworks l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 23OB0405


Contract Name: Construction of Multi-Purpose Building Phase 1 - National Government Offices Bldg., Marikina City
Location of the Contract: Marikina City

BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________

ITEM UNIT PRICE AMOUNT


DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
903 (2) Formworks and Falseworks m2 1,590.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART B MASONRY WORKS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
100 mm CHB Non Load Bearing _________________________________ _________________________________
1046 (2) a1 m2 641.65
(Including Reinforcing Steel) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
150 mm CHB Non Load Bearing _________________________________ _________________________________
1046 (2) a2 m2 577.72
(Including Reinforcing Steel) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
150 mm CHB Load Bearing _________________________________ _________________________________
1046 (1) a2 m2 70.70
(Including Reinforcing Steel) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART C FINISHING WORKS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1021 (1) a Cement Floor Finish (Plain) m2 1,280.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1027 (1) Cement Plaster Finish m2 4,962.30
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1018 (1) Glazed Tiles and Trims m2 3,477.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART D FABRICATED MATERIALS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1012 (6) Glass and Glazing l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
ROOF FRAMING AND ROOFING _________________________________ _________________________________
PART E - -
WORKS _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 23OB0405


Contract Name: Construction of Multi-Purpose Building Phase 1 - National Government Offices Bldg., Marikina City
Location of the Contract: Marikina City

BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________

ITEM UNIT PRICE AMOUNT


DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
Prepainted Metal Sheets (Corrugated _________________________________ _________________________________
_________________________________ _________________________________
1014 (1) a2 type, Long span, above 0.427 mm m2 862.00
_________________________________ _________________________________
thk) _________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Fabricated Metal Roofing Accessory _________________________________ _________________________________
1013 (2) a lm 116.40
(Ridge/Hip Rolls), Gauge 26 _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Fabricated Metal Roofing Accessory _________________________________ _________________________________
1013 (2) b lm 116.40
(Flashings), Gauge 26 _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Fabricated Metal Roofing Accessory _________________________________ _________________________________
1013 (2) c lm 116.40
(Gutter), Gauge 24 _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1038 (1) Reflective Insulation m2 862.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1047 (2) Structural Steel (Trusses) l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1047 (2) b Structural Steel (Purlins) kg 7,555.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1047 (5) b Metal Structure Accessories (Sagrod) kg 1,101.66
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Metal Structure Accessories _________________________________ _________________________________
1047 (4) b pcs 189.00
(turnbuckle) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART F PAINTING - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1032 (1) a Painting Works (Masonry/Concrete) m2 12,405.75
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART G WATERPROOFING - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 23OB0405


Contract Name: Construction of Multi-Purpose Building Phase 1 - National Government Offices Bldg., Marikina City
Location of the Contract: Marikina City

BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________

ITEM UNIT PRICE AMOUNT


DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1016 (2) Built-Up and Preformed Membrane m2 844.49
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART H ELECTRICAL WORKS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Conduits, Boxes & Fittings (Conduit _________________________________ _________________________________
1100 (10) l.s. 1.00
Works/Conduit Rough-in) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1101 (33) Wires and Wiring Device l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Panelboard with Main & Branch _________________________________ _________________________________
1102 (1) l.s. 1.00
Breakers _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1103 (1) Lighting Fixtures and Lamps l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART I. PLUMBING WORKS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1002 (24) Cold Water Lines l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1001 (9) Storm Drainage and Downspout l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART J MECHANICAL WORKS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1200(1) Ventilating Equipment l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1203 (1) b Electric Elevator l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 23OB0405


Contract Name: Construction of Multi-Purpose Building Phase 1 - National Government Offices Bldg., Marikina City
Location of the Contract: Marikina City

BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________

ITEM UNIT PRICE AMOUNT


DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Automatic Fire Sprinkler System _________________________________ _________________________________
1202 (1) l.s. 1.00
(AFSS) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1208 (1) Fire Alarm System l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL

AMOUNT IN WORDS: ____________________________________________________________________________________


___________________________________________________________________________
Submitted By: Date: _____________________
Calendar Days: 330
Name & Signature of Bidder's Representative

Position

Name of Firm

Address
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 23OB0405


Contract Name: Construction of Multi-Purpose Building Phase 1 - National Government Offices Bldg., Marikina City
Location of the Contract: Marikina City

SUMMARY OF BID PRICE


(All Parts of Bill Quantities)

Contract ID:
Part No. Part Description Total Amount

TOTAL AMOUNT IN WORDS:

Name: _____________________________________________________________________________________ in the capacity as: _________________________________

Signed: _____________________________________________________________________________________ Date: ____________________________________

Duly authorized to sign the Bid for and/or in behalf of: ___________________________________________________________________________________
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 23OB0405


Contract Name: Construction of Multi-Purpose Building Phase 1 - National Government Offices Bldg., Marikina City
Location of the Contract: Marikina City

MINIMUM EQUIPMENT REQUIRED

DESCRIPTION CAPACITY NUMBER OWNED LEASED

Welding Machine Gas/Diesel Driven 2

Acetylene Outfit Cutter - 2

Cut-Off Machine - 2

Dump Truck All Model ( 12yd3) 1

One Bagger Mixer 4 to 6 cu.ft./min 1


Flexible Shaft Type, 2"
Concrete Vibrator 1
head dia. With 5Amp. Gas
SE 130 LC-2, 0.80cu.m.,
Backhoe w/ Breaker 1
99Hp
Lifting Machine All Models, 36-40mt 1
25mm Maximum rebar
Bar Bender 1
diameter, three phase
- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

*Minimum Testing and Equipment Materials in accordance with D.O. # 86 series of 1990*

* SHOW PROOF OF OWNERSHIP.

THE LEASED EQUIPMENT SHALL BE LISTED


IN DETAIL TO INCLUDE THE BRAND, SERIAL NO.,
CAPACITY, AND PRESENT LOCATIONS,

You might also like