JSA FOR preparation of roads and asphalt work

JOB TITLE:

Step Task/Activity Description POTENTIAL ACCIDENTS OR Hazard Controls


HAZARDS
No
1 Mobilization of Manpower Lack of site awareness • Manpower will be transported to the site using buses that
and equipment on the site meet Saudi Aramco standard, A/C working, Safety belt
fitted for each passenger.
• Require Safety Induction to new workers prior to start
any work in the site. Moreover Safety talk shall be
conducted to explain JSA with all participants before
work on daily basis.
• Train all employees on Fadhili traffic management plan
and requirements.
Interaction with Light & heavy Vehicles
• Follow speed limit 80kmph on temporary access road,
40kmph on internal project access road and 20kmph on
site.
• Head lights to be turn on when on the move.
• Hazard lights to be turn on when vehicle is temporary
stopped along the side of the highway.
• No reverse parking allowed for all equipment and
Adverse Road condition vehicle to be parked “Drive in / Drive out” system.
• No worker will be allowed to walk on the project roads.

• Not to take any unwanted risk during shifting.


• Plan ahead for the route and always be alert for any
consequences.
• Get a map and use and use alternative route for better
road condition.
• Presence of mind while behind the wheel and expect the
unexpected. Make eye contact with other commuters.
• Intrusion
• Vehicle/equipment check prestart, First aid kit, warning
triangle, spare tire, jack & communication device.
JSA FOR preparation of roads and asphalt work
JOB TITLE:

Step Task/Activity Description POTENTIAL ACCIDENTS OR Hazard Controls


HAZARDS
No

• Barricade the area with hard barricade/grill.

2 Set up work area • Lighting is not enough • Prior to start of work we have to ensure there is adequate
light.
• Congestion of work area
• The access area clear of any sort of obstruction

• Slips , Trip and Fall


• Good housekeeping to ensure all around the area

3 Welfare provision • Heat stress • Cool drinking water station shall be available with regular
water supply
• Sanitary waste • Toilet facilities with proper disposal of sanitary waste
• Hand wash facilities

• General waste • General waste to be collected in designated area and


deposed properly
• No proper prayer area • Prayer area shall be provided with proper signs. No prayer
allowed in non-designated areas in site
• Improper parking • Proper parking area shall be provided
4 Work start-up preparation • Unaware of the work • Obtain work permit before starting the job.
• Conduct toolbox meeting, explain the Job safety
Analysis to all the craftsmen involved in the area.
• Supervisor must ensure that all work activities are
carried out by competent personnel.
5 Fixing of concrete jerseys for • Unauthorized riding of forklift • Only SA certified operators shall operate fork lift.
Road preparation • Personnel other than the operator shall be prohibited
JSA FOR preparation of roads and asphalt work
JOB TITLE:

Step Task/Activity Description POTENTIAL ACCIDENTS OR Hazard Controls


HAZARDS
No
Use of forklift from riding.
• Overload • Forklift shall not be used beyond their rated capacity.
• Avoid over stacking of the load.
• Load forklifts only when moving on a level surface
or uphill on an incline.
• Do not allow any person to stand or walk under the
elevated forks, whether loaded or unloaded.
• Collision • Reverse alarm to be checked by the operator prior to
run the forklift.
• Forklift shall not be left running while unattended.
• Trained Flagman shall be present.
• Forks shall not be left in the up position while forklift
is unattended.
• Do not hold the barrier by hand while equipment is
working.
• Do not stand at line of fire.
• Protruding Elevated forks
• Do not stand in front or nearby concrete barrier when
it is offloaded or positioned by forklift.
• Move slowly no speeding with load on fork.
• Pinch points
• Make sure load is properly aligned before moving

• Uneven condition
JSA FOR preparation of roads and asphalt work
JOB TITLE:

Step Task/Activity Description POTENTIAL ACCIDENTS OR Hazard Controls


HAZARDS
No
6 Checking of Heavy equipment • Hot surface • Only the authorized person shall perform the activity
Loader/Bulldozer/Grader/ Roller Burns of equipment checking and shall wear full PPEs at all
compacter/Dump truck/Trailer. Fire times to avoid direct contact with hot surface.
• Conduct equipment inspection daily and complete
the daily checklist.
• Oil leakage • Clean oil spill immediately.
• Slip • The heavy equipment must have SA approved
Inspection sticker.
• Area shall be compacted enough to sustain the
equipment.
• The Rigger and Operator jointly verify the area and
• Loose soil Working condition.
• Ensure back-up alarm working.
7 Movement of heavy equipment • Collision with other vehicle or • Only SA certified operator shall operate the
in preparation of access road. pedestrian. equipment.
Loader/Bulldozer/Grader/ Roller • Ran over • Ensure back-up alarm working.
compacter/Dump truck/Trailer. • Loose soil • Ensure Rotating light working.
• Driver should not over speed and carefully manage
turns and humps.
• Trained flagman shall be provided to control the
unauthorized entry of pedestrian and to guide the
driver in blind spots position.
• Ground personnel shall maintain a safe distance from
the operating equipment.
• No one should rest or sleep under or near the heavy
equipment.
• Heavy equipment shall not be left running
unattended.
• All heavy equipment shall be installed with PWAS
and other warning devices.
JSA FOR preparation of roads and asphalt work
JOB TITLE:

Step Task/Activity Description POTENTIAL ACCIDENTS OR Hazard Controls


HAZARDS
No
• All work shall be properly planned and explained to
all workers involved.
• Provide water truck to maintain the spraying of water
in temporary access route.
• Driver should not use mobile phone while driving to
maintain the firm grip of the steering wheel.
• Keep safe following distance.
• Do not operate Equipment an extreme slopes.
• Switch on the headlights when poor weather
8 Asphalt handling • Skin and eye contact • Wear proper PPE (safety glass, disposable cover all,
• Hot material hand gloves).
• Know your eye wash station.
• Avoid direct skin contact by using (leather hand
gloves, disposable cover all, face shield).
• Wear proper PPE (Safety glass, leather gloves, and
full sleeve clothes).
9 Supply and application of sub • Dump truck in reverse movement. • Ensure that the driver is aware of the exact point to
base and base course. • Sticky load dump the materials, by means of flagman.
• Dust and flying debris • Flagman shall be provided in the location at all times
• and always wear reflective vest.
• Driver must raise the dump box slowly and
coordinate with the signal man for the continuous
flow of the materials down.

• All crew in the area shall wear dust mask and stand
in a safe distance during dumping of materials.
• Wear safety glasses.
JSA FOR preparation of roads and asphalt work
JOB TITLE:

Step Task/Activity Description POTENTIAL ACCIDENTS OR Hazard Controls


HAZARDS
No
10 Supply and application of • Working in exposed environment. • Wear complete PPE including hard hat, safety
Asphaltic Binder and Surface • Working around machinery. glasses coverall, reflective vest and hand gloves.
course with Prime coat and Tact • Pedestrians • Provide cool water in the working area and drink
coat. • Exposure to chemical regularly.
• Safe distance 5 meter on all side must be maintain
during vehicle movement.
• A truck controller shall be provided for all reversing
vehicles with restricted rear vision.
• Safety warning alarm system shall be installed on
vehicle.
• Rotating light / Back-up alarm working
• Provide pedestrian lane and flag man to control the
unauthorized entry in the working area.
• Wear all additional PPE as required by
MSDS.(Mask, Disposable cover all, rubber gloves)
• Safe material storage with MSDS available at work
site.
• Eye wash station shall be available.
• Emergency contact numbers to be displayed.
11 Housekeeping • Slip, trip and fall • Store and arrange the materials properly.
• Removed rubbish and dispose in an approved area.
• DE nailing area shall be provided with proper
signage.
• Never over stack the material.