Professional Documents
Culture Documents
Zonal Fire
Zonal Fire
Zonal Fire
Location Serial No. Smoke (SD) Multi (MD) Horne + MCB Remark
Genarator 1 20 5 3
Dormitory-1 2 1
ZONE-1
Dormitory-2 3 1
Laboratory+ Print Head 4 2 1
Glaze Ball Mill 5 1
CNC + Electric Workshop 6 1 1
Total= 21 7 8
Kiln-1 (Gate) 7 1
Kiln-1 (Control Room) 8 2
Digital Print-1 9 2 1
Packing-1 10 1
Packing-3 11 1
ZONE-2
Kiln-2 (Gate) 12 1
Kiln-2 (Control Room) 13 2
Packing-2 14 1
Load Point Area 15 1
Mould 16 1
Cartoon Godown 17 1
Total= 6 0 9
ZONE-3
Press-2 (Gate) 22 1
Press-2 (Control Room) 23 1
Digital Print-2 24 2 1
Press-3 (Gate) 25 1
Press-3 (Control Room) 26 1
Kiln-3 (Control Room) 27 2
Total= 9 0 5
Office 28 6 3
Ball Mill-1 (Gate) 29 1
ZONE-4
GRAND TOTAL= 45 7 27