Estimation-Problem 1
Estimate the quantities for the following items of work for a Single room building.
l. Earth work excavation in foundation.
2 _ P.C.C bed concrete 1:4:8.
3 _ s.S.M in C.M 1:6.
4. Burnt brick masonry in C.M 1:6.
I
A 3.00
T
BRICK MASONRY
ROOM INCM{1:6) -
6MX4M
D 5
P.C.C BED CONCRETE 1:4:8
I- 0.90 --t
PLAN SECTION ON AA
D- DOOR-1.0X2.1 OM
LIN1EL-15CM THICK All dimensions are In metre