Application: store
Hazard: Ordinary Hazard group (2)
Area/sp=12.1 m²
No. of sprinkler =
= ⁄ = 12 sp
√
(K)Factor: for ⁄ ˝sprinkler diameter equal (from 5.3--to 5.8)
d: Nozzle Diameter
√ √
√ ⁄
P1 = 11.5 psi
Q1 = 25.7 gpm
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf1 =
√
Prepared by Engr.Ahmed Bahaa
Tel: +201091618181 E-Mail: ah.engineer@yahoo.com
Prepared by Engr.Ahmed Bahaa
P2 = 24.72 psi
Q2 = 53.8 gpm
3-Determine Rate of water & pressure for SP3 (Q3) & (P3):
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf2 =
P3 = 29.12 psi
Q3 = 84.3 gpm
4-Determine Rate of water & pressure for SP4 (Q4) & (P4):
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf3 =
P4 = 33.42 psi
Prepared by Engr.Ahmed Bahaa
Tel: +201091618181 E-Mail: ah.engineer@yahoo.com
Prepared by Engr.Ahmed Bahaa
Q4 = 117 gpm
5-Determine Rate of water & pressure @ point (5) (Q5) & (P5):
D4 = 1 ˝
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf4 =
L= 27.4 + 1+ 16 =44.4
√ √
P5 = 41.1 psi
Q5 = 117 gpm
Kpipe = 18.25
6-Determine Rate of water & pressure @ point (6) (Q6) & (P6):
D5 = 2˝
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf5 =
L= (Pipe length)
L= 10.21 ft
√
(For pipe)
P6 = 42.83 psi
Prepared by Engr.Ahmed Bahaa
Tel: +201091618181 E-Mail: ah.engineer@yahoo.com
Prepared by Engr.Ahmed Bahaa
Q6 = 236.44 gpm
7-Determine Rate of water & pressure @ point (7) (Q7) & (P7):
D6 = 2 ˝
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf6 =
L= (Pipe length)
L= 10.21 ft
√
(For pipe)
P7 = 45 psi
Q7 = 358.86 gpm
8-Determine Rate of water & pressure @ point-8-(Q7)&(P7):
D7 = 3˝
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf7 =
L= (Pipe length)
L= 20.34 ft
√
(For pipe)
P8 = 49.27 psi
Q8 = Q7 = 358.86 gpm
Prepared by Engr.Ahmed Bahaa
Tel: +201091618181 E-Mail: ah.engineer@yahoo.com
Prepared by Engr.Ahmed Bahaa
D8 = 4˝
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf8 =
L= (Pipe length)
L= 63.64 ft
√
(For pipe)
P9 = 53 psi
Q9 = Q8 = 358.86 gpm
D9 = 6˝
Use (CHART FRICTION LOSS FOR OPEN PIPING SYSTEM) schedule (40)
by (pipe diameter & )
Pf9 =
√
(For pipe)
= 74.76 psi
= 5.2 bar
= 375 gpm
P = 5.2 bar
Phy = 1 bar
Qhy = 100 gpm
HP =
HP =
Ppump = P + Phydrant
Ppump = 5.2 + 1=6.2 bar
Qpump = + Qhydrant
Tank Capacity = m3