Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Code Exhaust the air of brake system B877(F) Prepared Edited Reviewed Date

SOP919005 Standard Operation Procedure /B876F

3. Use the pin to connect the left 4. Stop pressing when the
1.Disassemble the left and 2.Remove the cover of the
and right pedals, and use the right nozzle overflows the
right caps and loosen the left brake oil cup and add brake
two feet to press the pedal brake fluid. Fasten the right
and right outgassing nuts fluid
repeatedly nut.

5. Prepare a transparent 7. At the same time, the other


hose, one side connect to the one loosen the outgassing nut of 8. Repeat 6 &7, fasten the left
6. Press the pedal to the end
left outgassing nozzle of axle, axle, the air will be exhausted nut when the fluid don’t have
several times with two feet
the other side connect to the with the brake fluid at the same bubble
oil box time

山东临工工程机械有限公司
Standard
StandardOperation Procedure
Operation Procedure 第1 页,共 3页
Code Exhaust the air of brake system B877(F) Prepared Edited Reviewed Date

SOP919005 Standard Operation Procedure /B876F

10. The other one loosen the 12. Attention: When exhaust
11. Repeat 9 &10, fasten the left
9. Remove the pin and press outgassing nut of axle, the air the fluid, the oil cup can’t be
nut when the fluid don’t have
the left pedal to the end will be exhausted with the empty, needs to add the brake
bubble, put on the cap
brake fluid at the same time fluid at the same time

14. The other one loosen the


13. Press the pedal to the 15. Repeat 9 &10, fasten the
outgassing nut of axle, the air 16. Remove the pin and press
end several times with two right nut when the fluid don’t
will be exhausted with the the right pedal to the end
feet have bubble
brake fluid at the same time

山东临工工程机械有限公司
Standard
StandardOperation Procedure
Operation Procedure 第2页,共 3页
Code Exhaust the air of brake system B877(F) Prepared Edited Reviewed Date

SOP919005 Standard Operation Procedure /B876F

19. Remove the pin, press the


17. The other one loosen the right pedal and keep the status, 20. The other one loosen the
18. Repeat 16 &17, fasten
outgassing nut of axle, the air press the left pedal repeatedly outgassing nut of axle, the air
the right nut when the fluid
will be exhausted with the (Exhaust the air of the will be exhausted with the
don’t have bubble
brake fluid at the same time connecting pipe of vacuum brake fluid at the same time
booster )

21. Repeat 19&20, when the


fluid don’t have bubble, fill up
the brake fluid and fasten the
nut, put on the cap

山东临工工程机械有限公司
Standard
StandardOperation Procedure
Operation Procedure 第 3页,共 3页

You might also like