ITR PTG (Painting)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

REPORT NO.

:
INSPECTION AND TEST REPORT
FOR PAINTING PAGE : OF

PROJECT: JOB NO.:

Area / Unit : Equipment No. :

Location : Subcon. Name :

Inspection / Test Date : Notification No. :

Item / Line No. :

Paint System Code No. :

Surface Preparation : 1) Method (Primer Coated Only) :

2) Condition :
External
Applied Products Primer Intermediate Finish
Coat Coat Coat

Applicated
Date & Time

Brand Name
Paint
Batch No.
Material
Thinner Brand Name
Ambient Temp. o
C C
o
C
o

Surface Temp. o
C C
o
C
o

Condition
Relative Humidity % % %
Dew Point o
C C
o
C
o

Painting Method

Dry Film
Thick(µ)

Dry Time
Visual Inspection
Result
D.F.T Gauge Name & No.

Tolerance :

Inspection Result : □ Accept □ Conditionally Accept □ Reject

Reviewed/Approved by Sub-contractor Contractor Client

Name

Signature

Date
Form No. : ITR-PTG-001