(PROBLEM

Location :
Dept :
Activity :

No Problem Cause
1.1

1.2
1 Productivity tidak tercapai

1.3

2.1
2 Actual weather diatas Plan
PICA
(PROBLEM IDENTIFICATION AND CORRECTIV
PIT B536 & B2
Engineering
Mining

Cause Corrective Action


Front Loading Lembek 1.1.1 Alokasi fleet material bagus 1.1.1.1
1.1.2 Laminating front loading
1.1.3 Kepangawasan khusus

Haul road undulating 1.2.1 Laminating haul road


1.2.2 Compacting 1.2.2.1
1.2.3 Kepangawasan khusus

Disposal Lembek 1.3.1 Laminating dumping area


1.3.2 Kepangawasan khusus

Curah hujan tinggi 2.1.1 Kesiapan unit support Grader dan D85
2.1.2 Blok air meminimalkan air masuk ke PIT
2.1.3 Percepatan slippery
CA
D CORRECTIVE ACTION) WEEK 46

Remarks Due Date


Pembuatan Sequence yang mengakomodir material bagus

Kordinasi dgn TMU peminjaman compact


Prepared Approved

Date : Date :

PIC Status
Yuli Yahya/Engineering Open
Hamdani/Production Open
Hamdani/Production

Hamdani/Production Open
Hamdani/Production & Manajemen Open
Hamdani/Production Open

Hamdani/Production Open
Hamdani/Production Open

Yoga/Plant Open
Hamdani/Production Open
Hamdani/Production Open