New Development Project Dashboard

Daily Project Summary 12/19/2023


LAQ Update Drilling Performance HSE Update
Wells Status New Pad New Wells Existing Pad Existing Wells Total Pad / Wells MR-11 RD-20-II Total Stop Cards Total Close Open Near Miss 5
Plan V/s Actual (Drilling)
Locations Reviewed 19 26 12 18 31 / 44 Wells Driled BS 0 0 0 MR-11 8 2 6 3 4 4 4 4 4
4

To be Acquired 14 14 0 0 14 / 14 Wells Drilled TS 2 2 4 RD-20 -II 6 1 5 0 3


2.5
HSE Remarks
Under / Ready For Drilling 1 3 5 8 6 / 11 Meterage Drill (Total) 1528 980 2508 2

Under Negotiation 2 3 2 3 4/6 Meterage Drill (Month) 1175 935 2110


1
0.5
Civil Work In Progress 2 6 5 7 7 / 13 Meterage Current Well 1037 112 1149
0
May-22 Jun-22 Jul-22 Aug-22
Drilling Status Meterage / Day ABP Plan Revised Plan Actual
Rig Name Well Start Days on Well Current Depth Avg ROP Current ROP Remarks Next Well
Planned Actual In Aug-22 : 3 Wells top sections drilled, 4th Well TS in progress
1 Well Bottom Section drilling in progress
Observed String Stuck @ 978M, Efforts to release Stuckup in
MR -11 EDI-046-D2 5-Aug 501 1054 6.4 7.4 110 2.1 EDI-046-D3
progress
RD-20-II EDI-070-D4 21-Aug 486 137 6.26 7.53 85 0.2 Drilling in progress EDI-34-D5

MR-11 :EDC-046-D3 MR-11 : EDC-046:D2, RD-20: EDI-072-D9 RD-20 EDD-007-D2 RD-20 EDD-070 D4
600
Drilling Metrage / Day
1200
Drilling Metrage / Day 96 500
Drilling Meterage / Day 138 0 7 0 0 450
Drilling Meterage/day 90 140
Drilling Meterage/day 44
33 49 400 0
48 120
24857
500 1000
177 400 350
129 12
400 800
99 0 100
300 26
300
91 250 80 42
300
42 600 62 93
297 34 200 168 60
119 200
150
200 400
50 40
25
19 100
25 20 3 0 0
100 0
127
22 53
100 200 20
10 50
14
0 0 17 0 0 0
CC
l l l l l l l g g g g g ug Aug Aug Aug Aug Aug Aug Aug CC 773 774 775 776 777 778 779 780 781 782 783 784 785 CC 5 6 7 8
-Ju -Ju -Ju -Ju -Ju -Ju -Ju Au Au Au Au Au CC 7 8 9 0 1 2 79 79 79 79
25 26 27 28 29 30 31 1- 2- 4- 6- 8- 10
-A
12
-
14
-
16
-
18
-
20
-
22
-
24
- 44 44 44 44 44 44 44 44 44 44 44 44 44 78 78 78 79 79 79 44 44 44 44
44 44 44 44 44 44

0 1 2 3 4 5 6 7 8 9 10 11 12 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 0 1 2 3 4 5 6 7 8 9 10 11 12 0 1 2 3 4 5 6 7 8 9 10 11 12 0 1 2 3 4 5 6 7 8 9 10 11 12
0 0 0 0 0
EDI-046-D3 EDI-046-D2 EDC-072-D9 EDD-007-D2 EDD-070-D4
200 200 200 200 200
Depth(m) in MD

Depth(m) in MD

Depth(m) in MD

Depth(m) in MD

Depth(m) in MD
400 400 400 400 400

600 600 600 600 600


800 800 800
800 800
1000 1000 1000
1000 1000
Planned Planned Planned Planned Planned
1200 Actual 1200 Actual 1200 Actual 1200 Actual 1200 Actual
IPM R1 RD-20
19.5 386.0 Schramm ILM R1 Drilling Time ROP
3% 52% (hrs / % aGE) 75.0 (HRS / % AGE)
211.7 10.00 (mts / hr)
16% 45% 8.54
8.00 7.25
6.26
6.00 5.81
5.27

4.00

R2 2.00
R0 R3 37.0 R0 R3 R2
261.5 44.0 5% 131.6 17.0 32.5
28% 4% 7% 0.00
35% 6% EDI-046-D3 EDI-046-D2 EDC-072-D9 EDD-007-D2 EDD-070-D4
Schramm Schramm RD-20 RD-20 RD-20
Drill (mts)/ Drilling
Date Well Name Total ROP Rate Activity Description Final Planned (in Final Cum. Final Planned
D Hrs S. No. Depth (m)
Rig Expenditure days) Planned (Hrs.) Days 0 1 2 3 4 Planned
5 6 v/ 7s Actual
8 days
9 10 11 12
Hourly Rate Total EDI-046-D3 25-Jul 31-Jul Event Rig Rates EDI-046-D3 Time Based CC 22 (13 3/8"X 9 5/8" X 5 1/2 " - 3 CP Directional Wells) 0
ILM - - - ILM 25-Jul EDI-046-D3 53 8.0 6.63 17 1/2" CONDUCTOR HOLE 0 0.00 0.0 0.00
1 Already installed & cemented upto surface 0 0.00 0.0 0.00
100
IPM 19.50 - - IPM 35,000 - 26-Jul EDI-046-D3 75 0 0.0
R1 386.00 131.00 77.25 R1 1,102,000 6,015,083 3,973,019 27-Jul EDI-046-D3 75 19 3.5 5.43 SURFACE HOLE 12 1/4" 25 0.00 0.0 0.00 200
R2 37.00 12.75 1.00 R2 991,800 526,894 46,654 28-Jul EDI-046-D3 94 0 0.0 2 P/up & M/up 12 1/4" Bit with slick BHA.RIH to tag cement, Drill cement, fresh formation to 50 m and POOH 50 0.21 5.0 0.21 300
R3 44.00 28.75 17.50 R3 826,500 990,078 674,821 29-Jul EDI-046-D3 94 119 17.8 6.70 3 P/up & M/up 12 1/4" Bit with DD & MWD BHA & RIH 50 0.13 3.0 0.33 400
R0 261.50 99.00 58.75 0 R0 - - - 30-Jul EDI-046-D3 213 42 7.0 6.00 4 Resume drilling from 50 m & drill down to section TD 510 m. Trip according to hole condition 510 3.13 75.0 3.46
500
Total 748.00 271.50 154.50 Total 7,532,055.21 4,694,493.55 31-Jul EDI-046-D3 255 177 18.5 9.57 5 Circulation for final POOH 510 0.04 1.0 3.50

Depth(m) in MD
600
6 POOH & laydown 12 1/4" BHA. 510 0.21 5.0 3.71
1-Aug EDI-046-D3 432 48 21.3 2.26 700
Date Well Name Drilled From To Hours Rate Activity Description Time (Hrs) Time (days) Depth (mts) Type of Operation 2-Aug EDI-046-D3 480 33 8.5 3.88 7 M/arrangement to lower 9 5/8" casing 510 0.08 2.0 3.79
800
23:00 0:00 1.00 R1 C&C MUD, PRIOR TO P/O. 1.00 0.44 75.00 11 P/up 8 1/2" PDC Bit + DD BHA, RIH to test MM + MWD tool at shallow depth. Conduct Shallow Well Test 510 0.08 2.0 4.56 900
25-Jul-22 EDI-046-D3 7-Aug EDI-046-D2 27 127 11.8 10.81
26-Jul-22 EDI-046-D3 0:00 0:45 0.75 R1 POOH FROM 75 M TO 29 M. 0.75 0.47 75.00 8-Aug EDI-046-D2 154 297 24.0 12.38 12 RIH to tag Cement.Start drilling cement, shoe track and fresh formation. 510 0.17 4.0 4.73 1000
26-Jul-22 EDI-046-D3 5:15 7:30 2.25 R1 COMPLETE POOH 12 1/4" SLICK BHA. 2.25 0.75 75.00 12-Aug EDI-046-D2 513 0 0.0 16 Short trip as per hole condition & again RIH to bottom. 1010 0.10 2.5 7.77 1100
26-Jul-22 EDI-046-D3 18:45 22:00 3.25 R1 CONDUCT SHALLOW WELL TEST, OBSERVE TOOL FAILURE. 3.25 1.35 75.00 18-Aug EDI-046-D2 909 0 0.0 22 RIH 5 1/2" casing & circulate 2 cycles to maintain mud as per cementer. 1208 0.35 8.5 10.65
1200 Planned
27-Jul-22 EDI-046-D3 0:00 1:00 1.00 R1 P/OUT MWD TOOL FOR CHECK AND P/OUT AND B/OFF UBHO AND NMDC AND LAY DOWN 1.00 1.48 75.00 20-Aug EDI-046-D2 958 96 20.0 4.80 24 Rig down cementing gear / Install 5 1/2" casing on 9 5/8" casing head & Rig released. 1208 0.13 3.0 11.11
27-Jul-22 EDI-046-D3 4:45 5:15 0.50 R1 RIH WITH DIRECTIONAL BHA, OBSERVE STAND POST CRACK AGAIN. 0.50 1.66 75.00 23-Aug EDI-046-D2 1054 0 0.0 1300
29-Jul-22 EDI-046-D3 23:45 0:00 0.25 R1 TRIED TROUBLESHOOTING FOR MWD TOOL TO GET PULSE, BUT FAILED. 0.25 4.40 213.00 14 M/arrangement to lower 9 5/8" casing 500 0.08 2.0 4.40 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
0 Planned days
30-Jul-22 EDI-046-D3 0:00 0:30 0.50 R1 TRIED TROUBLESHOOTING FOR MWD TOOL TO GET PULSE, BUT FAILED. 0.50 4.42 213.00 15 RIH 9 5/8" casing to drill depth. 500 0.19 4.5 4.58
CIRCULATION PRIOR TO POOH. 200
30-Jul-22 EDI-046-D3 0:30 0:45 0.25 R1 0.25 4.43 213.00 16 M/A for cementing 9 5/8'' casing & Cement 9 5/8" casing to surface. 500 0.33 8.0 4.92
COMPLETED POOH 12 1/4" DD BHA TO REPLACE MWD TOOL. 400
0:45 7:00 6.25 R1 6.25 4.69 213.00 17 WOC/Laydown landing joint/install 9 5/8" casing bowl & flow line/N/up BOP & riser/ Conduct BOP Test 500 0.33 8.0 5.25

Depth(m) in MD
600
30-Jul-22 EDI-046-D3
5.25 START R/I WITH 12 1/4" DD BHA WITH REPLACED MWD TOOL.CARRIED OUT SHALLOW TEST @ 10:15AM, FOU 5.25 4.91 213.00 800
30-Jul-22 EDI-046-D3 7:00 12:15 R1 PRODUCTION HOLE (8 1/2") 500 0.00 0.0 5.25
1.00 COMPLETED R/I AND TAGGED BOTTOM AT 213M. 1.00 4.96 213.00 1000
30-Jul-22 EDI-046-D3 12:30 13:30 R1 19 RIH to tag Cement.Start drilling cement, shoe track and fresh formation. 500 0.17 4.0 5.50
30-Jul-22 EDI-046-D3 13:30 13:45 0.25 R1 C&C MUD FOR GEL BREAK. 0.25 4.97 213.00 20 Continue drilling & drill down to 700 m 700 1.13 27.0 6.62 1200

2-Aug-22 EDI-046-D3 16:00 17:00 1.00 R1 CIRCULATED WITH HIGH VIS PILL PRIOR TO FINAL POOH. 1.00 8.10 513.00
2-Aug-22 EDI-046-D3 17:00 0:00 7.00 R1 POOH 12 1/4" SECTION DRILLING ASSEMBLY UPTO 20M AND FURTHER IN PROGRESS. 7.00 8.40 513.00
3-Aug-22 EDI-046-D3 0:00 1:30 1.50 R1 COMPLETED POOH 12 1/4" SECTION DRILLING ASSEMBLY. 1.50 8.46 513.00
4-Aug-22 EDI-046-D3 14:45 15:30 0.75 R1 M/A FOR 9 5/8" CASING R/I. 0.75 10.04 513.00
4-Aug-22 EDI-046-D3 15:30 23:30 8.00 R1 R/I IN 19 NOS CASING JOINTS UPTO 218M, OBSERVED PROBLEM IN CASING SPINNER. 8.00 10.38 513.00
5-Aug-22 EDI-046-D3 4:00 8:30 4.50 R1 COMPLETED LOWERING 9 5/8" CASINGS. LOWERED TOTAL 44 NOS OF 9 5/8" CASING JOINTS. 4.50 10.75 513.00
5-Aug-22 EDI-046-D3 11:00 12:15 1.25 R1 CIRCULATION PRIOR TO CEMENTING JOB. 1.25 10.91 513.00
7-Aug-22 EDI-046-D2 14:30 16:15 1.75 R1 P/O UP TO SURFACE,B/OFF BIT AND LAY DOWN. 1.75 1.43 94.00
7-Aug-22 EDI-046-D2 17:00 19:00 2.00 R1 P/UP SDMM SCRIBE THE SAME, M/UP UBHO NMDC, LOWERING MWD TOOL MEANTIME CONDUCT SHALLOW TES 2.00 1.54 94.00
CONTINUED R/I WITH 12 1/4" DD BHA. OBSERVED HELD UP AT 82 M, CLEARED THE SAME WITH
7-Aug-22 EDI-046-D2 19:00 22:00 3.00 R1
CIRCULATION. WASHED DOWN LAST 2 SINGLES AND TAG BOTTOM @ 94 M.
3.00 1.67 94.00
9-Aug-22 EDI-046-D2 23:15 23:45 0.50 R1 CIRCULATION PRIOR TO SHORT TRIP. 0.50 3.74 451.00
9-Aug-22 EDI-046-D2 23:45 0:00 0.25 R1 SHORT TRIP IN PROGRESS. P/O 4 NOS OF SINGLES AND FURTHER IN PROGRESS. 0.25 3.75 451.00
10-Aug-22 EDI-046-D2 0:00 2:30 2.50 R1 COMPLETED SHORT TRIP UPTO 213M. P/O & R/I 25 NOS OF DRILL PIPES, OBSERVED NO TIGHT PULL DURING 2.50 3.85 451.00
10-Aug-22 EDI-046-D2 16:45 17:30 0.75 R1 C&C MUD PRIOR TO WIPER TRIP UP TO 95M. 0.75 4.48 513.00
10-Aug-22 EDI-046-D2 17:30 19:30 2.00 R1 P/O UPTO 95 MTRS, 32 DP'S & 13 HWDP'S. 2.00 4.56 513.00
10-Aug-22 EDI-046-D2 22:00 23:30 1.50 R1 RIH FOR WIPER TRIP, & LOWERED UPTO 400 MTRS. 1.50 4.73 513.00
8/11/2022 EDI-046-D2 0:00 1:15 1.25 R1 TAGGED BOTTOM @ 513 MTRS. 1.25 4.80 513.00
8/11/2022 EDI-046-D2 1:30 2:30 1.00 R1 TWO CYCLES OF CIRCULATION GIVEN AT BOTTOM WITH TWO NUMBERS OF ALPINE STICKS. 1.00 4.85 513.00
8/11/2022 EDI-046-D2 2:30 4:30 2.00 R1 POOH UPTO 258 MTRS, 27 DP'S. 2.00 4.94 513.00
8/11/2022 EDI-046-D2 6:00 6:30 0.50 R1 CONTD. P/O UP TO SURFACE WITH DD BHA. B/OFF BIT AND SDMM, LAY DOWN THE SAME. 0.50 5.02 513.00
8/11/2022 EDI-046-D2 13:30 18:00 4.50 R1 RIH 44 NOS CASING JOINTS UPTO 503M-GL. SLOW LOWERING AS GEARS OF CASING SPINNER NOT WORKING 4.50 5.50 513.00
8/11/2022 EDI-046-D2 23:15 0:00 0.75 R1 CIRCULATION PRIOR TO CEMENTING JOB. 0.75 5.75 513.00
8/12/2022 EDI-046-D2 0:00 1:00 1.00 R1 1.00 5.79 513.00
8/12/2022 EDI-046-D2 21:00 22:45 1.75 R1 1.75 6.68 513.00
8/12/2022 EDI-046-D2 22:45 0:00 1.25 R1 1.25 6.73 513.00
8/13/2022 EDI-046-D2 5:30 6:00 0.50 R1 0.50 6.98 513.00
8/13/2022 EDI-046-D2 6:00 6:30 0.50 R1 0.50 7.00 513.00
8/13/2022 EDI-046-D2 9:30 11:00 1.50 R1 1.50 7.19 513.00
8/13/2022 EDI-046-D2 11:00 15:45 4.75 R1 4.75 7.39 513.00
8/13/2022 EDI-046-D2 15:45 18:00 2.25 R1 2.25 7.48 513.00
8/14/2022 EDI-046-D2 16:15 16:30 0.25 R1 0.25 8.42 732.00
8/15/2022 EDI-046-D2 10:00 10:30 0.50 R1 0.50 9.17 852.00
8/15/2022 EDI-046-D2 10:30 11:30 1.00 R1 1.00 9.21 852.00
8/15/2022 EDI-046-D2 11:45 15:00 3.25 R1 3.25 9.35 852.00
8/16/2022 EDI-046-D2 0:00 2:00 2.00 R1 2.00 9.81 909.00
8/16/2022 EDI-046-D2 9:45 10:45 1.00 R1 1.00 10.18 909.00
8/16/2022 EDI-046-D2 13:45 17:30 3.75 R1 3.75 10.46 909.00
8/16/2022 EDI-046-D2 18:45 20:15 1.50 R1 1.50 10.57 909.00
8/17/2022 EDI-046-D2 2:30 5:00 2.50 R1 2.50 10.94 909.00
8/17/2022 EDI-046-D2 7:30 13:00 5.50 R1 5.50 11.27 909.00
8/17/2022 EDI-046-D2 13:00 15:00 2.00 R1 2.00 11.35 909.00
8/17/2022 EDI-046-D2 16:00 17:45 1.75 R1 1.75 11.47 909.00
8/18/2022 EDI-046-D2 4:00 5:30 1.50 R1 1.50 11.96 909.00
8/18/2022 EDI-046-D2 10:00 12:45 2.75 R1 2.75 12.26 909.00
8/18/2022 EDI-046-D2 12:45 15:30 2.75 R1 2.75 12.37 909.00
8/18/2022 EDI-046-D2 16:30 20:00 3.50 R1 3.50 12.56 909.00
8/18/2022 EDI-046-D2 20:00 23:30 3.50 R1 3.50 12.71 909.00
8/18/2022 EDI-046-D2 23:30 0:00 0.50 R1 0.50 12.73 909.00
8/19/2022 EDI-046-D2 0:00 1:30 1.50 R1 1.50 12.79 909.00
8/19/2022 EDI-046-D2 1:30 7:30 6.00 R1 6.00 13.04 909.00
8/19/2022 EDI-046-D2 9:30 12:15 2.75 R1 2.75 13.24 909.00
8/19/2022 EDI-046-D2 12:30 17:30 5.00 R1 5.00 13.46 909.00
8/20/2022 EDI-046-D2 15:30 18:00 2.50 R1 RESUME DRILLING,D/DOWN UP TO 1006 M,OBSERVED STATIC LOSS 2.5 BBL/HOUR AND DYNAMIC 2.50 14.48 1,006.00
8/20/2022 EDI-046-D2 20:00 21:00 1.00 R1 OBSERVED STATIC AND DYNEMIC LOSS.STATIC LOSS 1.2 BBL'S /HOUR AND DYNEMIC LOSS 16 BBL' 1.00 14.60 1,034.00
8/21/2022 EDI-046-D2 2:00 3:00 1.00 R1 PUMPED 18 BBL'S OF HIGH VIS. PILL & CIRCULATED OUT THE SAME. OBSERVED NO STATIC OR DYNAMIC MU 1.00 14.85 1,054.00
8/21/2022 EDI-046-D2 3:00 6:00 3.00 R1 P/O 13 SINGLES UPTO 930 MTRS FOR SHORT TRIP. MEAN TIME OBSERVED TIGHT PULL @ 1012M,990M,965 3.00 14.98 1,054.00
8/21/2022 EDI-046-D2 6:00 10:15 4.25 R1 CONT.R/I,TAGG BOTTOM AT 8:30 AM,D/DOWN FROM 1054M TO 1062M,MEANTIME DRILLING STOP DUE TO 4.25 15.16 1,054.00
8/21/2022 EDI-046-D2 11:15 14:00 2.75 R1 AGAIN DRILLING RESUME,D/DOWN FROM 1062M TO 1083M.MEANTIME TDS MOTOR BOLT BROKEN. 2.75 15.31 1,054.00
Cum.
Rig Expenditure Date Total Drill (mts)/ Day Drilling Hrs ROP Rate Activity Description Activity Description Final Final Activity Description Final Final Cum. Final
Depth Final Planned (in Final Cum. Final Depth Final
S. No. S. No. Planned Planned ( S. No. Depth (m) Planned (in Planned (Hr Planned
Hourly Rate Total EDD-007-D2 25-Jul 31-Jul Event Rig Rates EDD-007-D2 Time Based CC 25 (13 3/8"X 9 5/8" X 5 1/2 " - 3 CP Directional Wells) (m) days) Planned (Hrs.) Planned Days (13 3/8"X 9 5/8" X 5 1/2 " - 3 CP Directional Wells) (m) Planned (13 3/8"X 9 5/8" X 5 1/2 " - 3 CP Directional Wells)
(in days) Hrs.) days) s.) Days
ILM 75.00 2.50 - ILM 31-Jul 25 20 0.0 17 1/2" CONDUCTOR HOLE 0.00 0.0 0.00 17 1/2" CONDUCTOR HOLE 0 0.00 0.0 Days
0.00 17 1/2" CONDUCTOR HOLE 0 0.00 0.0 0.00
IPM - - - IPM 35,000 - 1-Aug 45 3 0.0 1 Already installed & cemented upto surface 25 0.00 0.0 0.00 1 PJSM 0 0.02 0.5 0.02 1 Already installed & cemented upto surface 0 0.00 0.0 0.00
R1 211.65 78.00 - R1 1,102,000 3,581,500 - 2-Aug 48 0 0.0 SURFACE HOLE 12 1/4" 25 0.00 0.0 0.00 2 Spud the well with 17 1/2" BIT and drill down to 25 m TD. 25 0.21 5.0 0.23 SURFACE HOLE 12 1/4" 25 0.00 0.0 0.00
P/up & M/up 12 1/4" Bit with slick BHA.RIH to tag cement, Drill cement, fresh formation to 50 m and P/up & M/up 12 1/4" Bit with slick BHA.RIH to tag cement, Drill cement, fresh
2 50 0.21 5.0 0.21 3 Circulate to hole clean 25 0.02 0.5 0.25 2 50 0.21 5.0 0.21
R2 32.50 13.25 - R2 991,800 547,556 - 3-Aug 48 0 0.0 POOH formation to 50 m and POOH
R3 17.00 9.50 - R3 826,500 327,156 - 4-Aug 48 50 11.5 4.35 3 P/up & M/up 12 1/4" Bit with DD & MWD BHA & RIH 50 0.13 3.0 0.33 4 POOH & lay down 17 1/2" BHA 25 0.04 1.0 0.29 3 P/up & M/up 12 1/4" Bit with DD & MWD BHA & RIH 50 0.13 3.0 0.33
Resume drilling from 50 m & drill down to section TD 450 m. Trip according to hole
4 Resume drilling from 50 m & drill down to section TD 480 m. Trip according to hole condition 480 2.92 70.0 3.25 5 M/arrangement for lowering 13 3/8" casing. 25 0.08 2.0 0.38 4 450 3.33 80.0 3.67
R0 131.55 55.25 - R0 - - - 5-Aug 98 34.11 5.5 6.20 condition
Total 467.70 158.50 - Total 4,456,212.50 - 6-Aug 132.11 93.24 11.0 8.48 5 Circulation for final POOH 480 0.04 1.0 3.29 6 RIH 2 joints 13 3/8" conductor casing 25 0.08 2.0 0.46 5 Circulation for final POOH 450 0.04 1.0 3.71
7-Aug 225.35 99.41 18.5 5.37 6 POOH & laydown 12 1/4" BHA. 480 0.17 4.0 3.46 7 M/arrngmnt for cementing job/cementing 13 3/8" casing 25 0.10 2.5 0.56 6 POOH & laydown 12 1/4" BHA. 450 0.17 4.0 3.88

Date Well Name Depth Drilled From To Hours Rate Activity Description Time (Hrs) Time (days)Depth (mts) WOC/ back-off landing joint/ fabrication of riser & diverter for 12 1/4"
7 M/arrangement to lower 9 5/8" casing 480 0.08 2.0 3.54 8 25 0.21 5.0 0.77 7 M/arrangement to lower 9 5/8" casing 450 0.08 2.0 3.96
8-Aug 324.76 137.72 22.0 6.26 section drilling.
31-Jul-22 EDC-072-D9 25.00 Mob M/A FOR PRE SPUD - 25.00 9-Aug 462.48 0 16.0 - 8 RIH 9 5/8" casing to drill depth. 480 0.17 4.0 3.71 SURFACE HOLE 12 1/4" 25 0.00 0.0 0.77 8 RIH 9 5/8" casing to drill depth. 450 0.17 4.0 4.13
- - 25.00 P/up & M/up 12 1/4" Bit with slick BHA.RIH to tag cement, Drill cement,
R2 RIH SLICK BHA WITH 12 1/4" PDC BIT 9 M/A for cementing 9 5/8'' casing & Cement 9 5/8" casing to surface. 480 0.33 8.0 4.04 9 50 0.21 5.0 0.98 9 M/A for cementing 9 5/8'' casing & Cement 9 5/8" casing to surface. 450 0.33 8.0 4.46
31-Jul-22 EDC-072-D9 10-Aug 462.48 6.52 1.0 6.52 fresh formation to 50 m and POOH

- - 25.00 WOC/Laydown landing joint/install 9 5/8" casing bowl & flow line/N/up BOP &
R1 D/DN SHOE UPTO 25 M. 10 WOC/Laydown landing joint/install 9 5/8" casing bowl & flow line/N/up BOP & riser/ Conduct BOP Test 480 0.17 4.0 4.21 10 P/up & M/up 12 1/4" Bit with DD & MWD BHA & RIH 50 0.13 3.0 1.10 10 450 0.17 4.0 4.63
31-Jul-22 EDC-072-D9 11-Aug 469 0 0.0 riser/ Conduct BOP Test
D/DN FRESH FORMATION WITH SLICK BHA FROM 25M TO 45 M. Resume drilling from 50 m & drill down to section TD 425 m. Trip
20.00 R1 - - 45.00 PRODUCTION HOLE (8 1/2") 480 0.00 0.0 4.21 11 425 1.75 42.0 2.85 PRODUCTION HOLE (8 1/2") 450 0.00 0.0 4.63
31-Jul-22 EDC-072-D9 12-Aug 469 0 0.0 according to hole condition

- - 45.00 P/up 8 1/2" PDC Bit + DD BHA, RIH to test MM + MWD tool at shallow depth.
R1 CIRC. PRIOR TO P/O OF SLICK BHA. 11 P/up 8 1/2" PDC Bit + DD BHA, RIH to test MM + MWD tool at shallow depth. Conduct Shallow Well Test 480 0.08 2.0 4.29 12 Circulation for final POOH 425 0.04 1.0 2.90 11 450 0.08 2.0 4.71
31-Jul-22 EDC-072-D9 13-Aug 0 0 0.0 Conduct Shallow Well Test
31-Jul-22 EDC-072-D9 R2 POOH & L/DN 12 1/4" SLICK BHA. 12 1/4" PDC BIT B/UP. - - 45.00 14-Aug 14 168 7.0 24.00 12 RIH to tag Cement.Start drilling cement, shoe track and fresh formation. 480 0.17 4.0 4.46 13 POOH & laydown 12 1/4" BHA. 425 0.13 3.0 3.02 12 RIH to tag Cement.Start drilling cement, shoe track and fresh formation. 450 0.17 4.0 4.88
1-Aug-22 EDC-072-D9 R2 L/DN 12 1/4" SLICK BHA. 12 1/4" PDC BIT B/UP. - - 45.00 15-Aug 182 129.43 20.5 6.31 13 Continue drilling & drill down to 730 m 730 1.42 34.0 5.88 14 M/arrangement to lower 9 5/8" casing 425 0.06 1.5 3.08 13 Continue drilling & drill down to 700 m 700 1.33 32.0 6.21
1-Aug-22 EDC-072-D9 R3 PREPARE BENTONITE MUD FOR DRILLING 12 1/4" SECTION - - 45.00 16-Aug 311.43 0 13.0 - 14 Wiper trip as per hole condition & again RIH to bottom. 730 0.10 2.5 5.98 15 RIH 9 5/8" casing to drill depth. 425 0.17 4.0 3.25 14 Wiper trip as per hole condition & again RIH to bottom. 700 0.10 2.5 6.31
1-Aug-22 EDC-072-D9 R0 M/ARR FOR R/I 12 1/4" SECTION DD BHA. - - 45.00 17-Aug 311.43 11.57 3.0 3.86 15 Continue drilling & drill down to 980 m 980 1.42 34.0 7.40 16 M/A for cementing 9 5/8'' casing & Cement 9 5/8" casing to surface. 425 0.17 4.0 3.42 15 Continue drilling & drill down to 900 m 900 1.17 28.0 7.48
- - 45.00 WOC/Laydown landing joint/install 9 5/8" casing bowl & flow line/N/up
R2 P/U & M/U DIRC BHA 16 Short trip as per hole condition & again RIH to bottom. 980 0.10 2.5 7.50 17 425 0.25 6.0 3.67 16 Short trip as per hole condition & again RIH to bottom. 900 0.10 2.5 7.58
1-Aug-22 EDC-072-D9 18-Aug 323 89.56 13.8 6.51 BOP & riser/ Conduct BOP Test
1-Aug-22 EDC-072-D9 R2 SPUDED WELL. SURFACE TEST OF DIRC TOOL DONE - - 45.00 19-Aug 412.56 0 0.5 - 17 Continue drilling & drill down to well TD (1223m) 1223 1.88 45.0 9.38 PRODUCTION HOLE (8 1/2") 425 0.00 0.0 3.67 17 Continue drilling & drill down to well TD (1020 m) 1020 1.00 24.0 8.58
- - 45.00 P/up 8 1/2" PDC Bit + DD BHA, RIH to test MM + MWD tool at shallow
R2 RIH DIRC. BHA WITH 12 1/4" PDC BIT TO BOTTOM 18 Circulate to hole clean & Wiper trip before final POOH 1223 0.31 7.5 9.69 18 425 0.08 2.0 3.75 18 Circulate to hole clean & Wiper trip before final POOH 1020 0.17 4.0 8.75
1-Aug-22 EDC-072-D9 20-Aug 0 0 0.0 depth. Conduct Shallow Well Test
D/DN FORMATION WITH DIRC. BHA FROM 45M TO 48 M.
3.00 R1 - - 48.00 19 POOH to surface & lay down BHA. 1223 0.33 8.0 10.02 19 RIH to tag Cement.Start drilling cement, shoe track and fresh formation. 430 0.13 3.0 3.88 19 POOH to surface & lay down BHA. 1020 0.33 8.0 9.08
1-Aug-22 EDC-072-D9 21-Aug 25 0 0.0
1-Aug-22 EDC-072-D9 R0 MP#1 BREAK DOWN. CIRCULATION AT BOTTOM - - 48.00 22-Aug 25 0 0.0 20 Open Hole Logging 1223 0.33 8.0 10.35 20 Continue drilling & drill down to 730 m 730 1.00 24.0 4.88 20 Open Hole Logging 1020 0.33 8.0 9.42
1-Aug-22 EDC-072-D9 R0 P/O OF DIRC. BHA TO CSG SHOE. - - 48.00 23-Aug 25 41.76 5.8 7.26 21 N/down BOP & M/arrangement for casing RIH. 1223 0.08 2.0 10.44 21 wiper trip as per hole condition & again RIH to bottom. 730 0.17 4.0 5.04 21 N/down BOP & M/arrangement for casing RIH. 1020 0.13 3.0 9.54
1-Aug-22 EDC-072-D9 R0 WORKING ON MP#1 - - 48.00 24-Aug 55.76 26.24 5.0 5.25 22 RIH 5 1/2" casing & circulate 2 cycles to maintain mud as per cementer. 1223 0.35 8.5 10.79 22 Continue drilling & drill down to BCS target. 930 0.67 16.0 5.71 22 RIH 5 1/2" casing & circulate 2 cycles to maintain mud as per cementer. 1020 0.38 9.0 9.92
2-Aug-22 EDC-072-D9 R0 WORKING ON MP#2 & MP#1 - - 48.00 25-Aug 82 44 7.5 5.87 23 Rig-up Cementing unit & casing cementing job. 1223 0.33 8.0 11.13 23 Circulate to Hole Clean, Trip according to hole condition 930 0.21 5.0 5.92 23 Rig-up Cementing unit & casing cementing job. 1020 0.33 8.0 10.25

R0 WORKING ON MP#2, CHANGED MP#2, FBARICATION, CONNECTION. - - 48.00 24 Rig down cementing gear / Install 5 1/2" casing on 9 5/8" casing head & Rig released. 1223 0.13 3.0 11.25 24 Continue drilling & drill down to TD. 1030 1.00 24.0 6.92 24 Rig down cementing gear / Install 5 1/2" casing on 9 5/8" casing head & Rig released. 1020 0.13 3.0 10.38
3-Aug-22 EDC-072-D9
4-Aug-22 EDC-072-D9 0:00 3:00 3.00 R0 WORKING ON MP#2, CONNECTION, TEST DONE. 3.00 0.13 48.00 Total Drilling Duration (Dry Well Time) 11.25 270.0 11.25 25 Circulate to hole clean for final POOH 1030 0.06 1.5 6.98 Total Drilling Duration (Dry Well Time) 10.38 249.0 10.38
4-Aug-22 EDC-072-D9 3:00 5:00 2.00 R0 SHALLOW TEST OF DIRC TOOL DONE 2.00 0.21 48.00 26 POOH to surface & lay down BHA. 1030 0.21 5.2 7.19
STARTED RIH 12 1/4" DIRC BHA, WASH DOWN LAST SINGLE, RESUMED DRILLING
4-Aug-22 EDC-072-D9 5:00 7:00 2.00 R0 2.00 0.29 48.00 27 Open Hole Logging 1030 0.29 7.0 7.49
@48.00m
4-Aug-22 EDC-072-D9 42.00 7:00 17:15 10.25 R1 CONTD ROT. DRLG FROM 48.00M TO 90.00M, CIRCULATED 10.25 0.72 90.00 28 N/down BOP & M/arrangement for casing RIH. 1030 0.08 2.0 7.57
5.00 17:15 17:45 0.50 R1 CONTD SLDNG FROM 90.00M TO 95.00M 0.50 0.74 95.00
Planned v/ s Actual days 29 RIH 5 1/2" casing & circulate 2 cycles to maintain mud as per cementer. 1030 0.30 7.2 7.87
4-Aug-22 EDC-072-D9
4-Aug-22 EDC-072-D9 2.00 17:45 18:15 0.50 R1 CONTD ROT. DRLG FROM 95.00M TO 97.00M 0.50 0.76 97.00
0 1 2 3 4 5 6 7 8 9 10 11 12 30 Rig-up Cementing unit & casing cementing job. 1030 0.25 6.0 8.12 Planned Time Depth Curve
CONTD SLDNG FROM 97.00M TO 98.00M
1.00 18:15 18:30 0.25 R1 0.25 0.77 98.00 0 31
Rig down cementing gear / Install 5 1/2" casing on 9 5/8" casing head &
1030 0.13 3.0 8.24
4-Aug-22 EDC-072-D9 Rig released.
MUD PUMP #1 UNDER MAINTENANCE, CHANGED SEAL, MEANWHILE WELL 0 1 2 3 4 5 6 7 8 9 10 11
4-Aug-22 EDC-072-D9 18:30 23:30 5.00 R0 5.00 0.98 98.00 Total Drilling Duration (Dry Well Time) 8.2 197.8 8.2 0
UNDER CIRCULATION FROM MUD PUMP #2
4-Aug-22 EDC-072-D9 23:30 0:00 0.50 R0 P/O DIRC BHA TO SHOE, MEANWHILE CHECK MUD PUMP#1 0.50 1.00 98.00 100
5-Aug-22 EDC-072-D9 0:00 5:30 5.50 R0 P/O DIRC BHA TO SHOE, MEANWHILE CHECK AND REPAIRED MUD PUMP#1 5.50 1.23 98.00
5-Aug-22 EDC-072-D9 5:30 15:00 9.50 R0 CIRCULATE TANK TO TANK, MEANWHILE REPAIR MP#1 9.50 1.63 98.00
5-Aug-22 EDC-072-D9 15:00 16:30 1.50 R0 RIH 12 1/4" DIRC. BHA TO 89M AND GOT HELD UP, WASH DOWN TO 98M. 1.50 1.69 98.00 200
5-Aug-22 EDC-072-D9 7.13 16:30 17:30 1.00 R1 CONTD. ROTARY DONE FROM 98M TO 105.13M 1.00 1.73 105.13 150
0.75 MP#1 BREAKDOWN, REPAIRED THE SAME, MEANWHILE WELL KEPT ON CIRC. 0.75 1.76 105.13
5-Aug-22 EDC-072-D9 17:30 18:15 R0
5-Aug-22 EDC-072-D9 26.98 18:15 22:45 4.50 R1
FROM MP#2
110.13M TO 113.57M, CONTD. SLIDING DONE FROM 113.57M TO 117.07M, CONTD. 4.50 1.95 132.11 300
ROTARY DONE FROM 117.07M TO 122.67M, CONTD. SLIDING DONE FROM 122.67M
5-Aug-22 EDC-072-D9 22:45 0:00 1.25 R2 P/O 4 DP & RIH 4 HWDP 1.25 2.00 132.11
6-Aug-22 EDC-072-D9 0:00 1:00 1.00 R2 P/O 4 DP & RIH 4 HWDP 1.00 2.04 132.11
400 300
6-Aug-22 EDC-072-D9 1:00 2:30 1.50 R0 PROBLEM WITH SLIPS OF HWDP WHILE CONNECTING HWDP AND DP, REFABRICATED 1.50 2.10 132.11
37.26 4.50 CONTD. DIRC. DRLNG FROM 132.11M TO 169.37M ROTARY AND SLIDING DRILLING 4.50 2.29 169.37
6-Aug-22 EDC-072-D9 2:30 7:00 R1
DONE
6-Aug-22 EDC-072-D9 7:00 8:30 1.50 R2 P/O 4 DP & RIH 4 HWDP 1.50 2.35 169.37 500
3.25 WHILE LOWERING 4" IF TO 2 7/8" X-OVER SEEN DAMAGED REPLACED HWDP & X- 3.25 2.49 169.37
6-Aug-22 EDC-072-D9 8:30 11:45 R0

Depth(m) in MD
OVER
6-Aug-22 EDC-072-D9 11:45 12:00 0.25 R1 WELL UNDER CIRCULATION 0.25 2.50 169.37 450
6-Aug-22 EDC-072-D9 4.50 12:00 13:00 1.00 R1 CONTD. DIRC. DRLNG FROM 169.37M TO 173.87M. ROTARY AND SLIDING DRILLING D 1.00 2.54 173.87 600

Depth(m) in MD
6-Aug-22 EDC-072-D9 13:00 18:30 5.50 R0 MP#1 UNDER MAINTENANCE, REPAIRED THE SAME, RIH TO BOTTOM 5.50 2.77 173.87
6-Aug-22 EDC-072-D9 32.94 18:30 0:00 5.50 R1 CONTD. DIRC. DRLNG FROM 173.87M TO 206.81M. 5.50 3.00 206.81
7-Aug-22 EDC-072-D9 18.54 0:00 3:30 3.50 R1 CONTD. DIRC. DRLNG FROM 206.81M TO 225.35 M. ROTARY AND SLIDING DRILLING 3.50 3.15 225.35 700
600
7-Aug-22 EDC-072-D9 3:30 5:00 1.50 R2 P/O 4 DP & RIH 2 HWDP & 2 DP 1.50 3.21 225.35
7-Aug-22 EDC-072-D9 5:00 8:00 3.00 R0 P/O 4 DP & RIH 2 HWDP & 2 DP 3.00 3.33 225.35
9.14 3.25 3.25 3.47 234.49
800
7-Aug-22 EDC-072-D9 8:00 11:15 R1 CONTD. DIRC. DRLNG FROM 225.35 M TO 234.49 M. ROTARY AND SLIDING DRILLING
7-Aug-22 EDC-072-D9 11:15 12:15 1.00 R0 SUBMERSIBLE PUMP B/D, MAINTENANCE DONE. MEANWHILE WELL UNDER CIRC. 1.00 3.51 234.49
7-Aug-22 EDC-072-D9 61.35 12:15 0:00 11.75 R1
CONTD. DIRC. DRLNG FROM 234.49 M TO 295.84 M. ROTARY AND SLIDING 11.75 4.00 295.84
900 750
DRILLING DONE
8-Aug-22 EDC-072-D9 28.92 0:00 8:00 8.00 R1 CONTD. DIRC. DRLNG FROM 295.84 M TO 324.76 M. ROTARY AND SLIDING DRILLING 8.00 4.33 324.76
8-Aug-22 EDC-072-D9 8:00 9:00 1.00 R3 DRILLING STOPPED, B/D OF SUBMERSIBLE PUMP, DUMPED MUD WITH TANKER 1.00 4.37 324.76
8-Aug-22 EDC-072-D9 45.70 9:00 20:30 11.50 R1 CONTD. DIRC. DRLNG FROM 324.76 M TO 370.46 M. ROTARY AND SLIDING DRILLING 11.50 4.85 370.46 1000
8-Aug-22 EDC-072-D9 20:30 21:30 1.00 R1 PUMPED 2 ALPINE STICKE, 2 CYCLE CIRC. GIVEN. 1.00 4.90 370.46
CONTD. DIRC. DRLNG FROM 370.46 M M TO 379.60 M. ROTARY AND SLIDING 900
8-Aug-22 EDC-072-D9 9.14 21:30 0:00 2.50 R1 2.50 5.00 379.60
DRILLING DONE
9-Aug-22 EDC-072-D9 82.88 0:00 16:00 16.00 R1 CONTD. DIRC. DRLNG FROM 379.60 M TO 462.48 M. ROTARY AND SLIDING DRILLING 16.00 5.67 462.48 1100
9-Aug-22 EDC-072-D9 16:00 17:00 1.00 R0 PROBLEM IN DERICK ENGINE. 1.00 5.71 462.48 Planned
9-Aug-22 EDC-072-D9 17:00 18:30 1.50 R1 P/O 15 DP OF 12 1/4" DIRC BHA TO 270.54 M COMPLETED, TIGHT SPOT WAS OBSERVED 1.50 5.77 462.48 Column
9-Aug-22 EDC-072-D9 18:30 18:45 0.25 R1 CLEARED TIGHT SPOT FROM 270.54 M TO 279.68M 0.25 5.78 462.48 1200 R 1050
1.50 P/O REMAINING 16 DP OF 12 1/4" DIRC BHA TO 178.52 M COMPLETED. (SLOW P/O AS 1.50 5.84 462.48
9-Aug-22 EDC-072-D9 18:45 20:15 R1
HANDLING
2.50 P/O 4 HWDPTOOLS OPERATION
OF 12 1/4" DIRC BHAWAS NOT SMOOTH)
TO 148.11 M COMPLETED. (SLOW P/O AS 2.50 5.95 462.48
9-Aug-22 EDC-072-D9 20:15 22:45 R3
HANDLING TOOLS OPERATION WAS NOT SMOOTH) 1300
9-Aug-22 EDC-072-D9 22:45 0:00 1.25 R1 R/I 4 HWDP OF 12 1/4" DIRC BHA 178.52 M COMPLETED. 1.25 6.00 462.48
8/10/2022 EDC-072-D9 0:00 0:30 0.50 R1 R/I 6 DP OF 12 1/4" DIRC BHA TO 238.52 M COMPLETED. 0.50 6.02 462.48
1200
8/10/2022 EDC-072-D9 0:30 1:15 0.75 R0 R/I 6 DP OF 12 1/4" DIRC BHA TO 238.52 M COMPLETED. 0.75 6.05 462.48
8/10/2022 EDC-072-D9 1:15 2:30 1.25 R1 R/I 25 DP OF 12 1/4" DIRC BHA TO 462.48 M COMPLETED. 1.25 6.10 462.48
8/10/2022 EDC-072-D9 2:30 2:45 0.25 R0 R/I 25 DP OF 12 1/4" DIRC BHA TO 462.48 M COMPLETED. 0.25 6.11 462.48
8/10/2022 EDC-072-D9 2:45 3:15 0.50 R1 WASH DOWN LAST SINGLE, DD TOOK SURVEY, START DRILLING 0.50 6.14 462.48
8/10/2022 EDC-072-D9 6.52 3:15 4:15 1.00 R1 CONTD. ROTARY DIRC. DRLNG FROM 462.48 M TO 469.00 M. 1.00 6.18 469.00
8/10/2022 EDC-072-D9 4:15 5:00 0.75 R1 PUMPED 10 BBL HI-VIS. GIVEN FINAL CIRC. BEFORE POOH. 0.75 6.21 469.00
8/10/2022 EDC-072-D9 5:00 6:00 1.00 R1 P/O 22 DP OF 12 1/4" DIRC BHA TO 270.54 M COMPLETED 1.00 6.25 469.00
8/10/2022 EDC-072-D9 6:00 7:30 1.50 R0 P/O 22 DP OF 12 1/4" DIRC BHA TO 270.54 M COMPLETED 1.50 6.31 469.00
8/10/2022 EDC-072-D9 7:30 8:00 0.50 R1 P/O REMAINING 10 DP OF 12 1/4" DIRC BHA TO 178.52 M COMPLETED 0.50 6.33 469.00
8/10/2022 EDC-072-D9 8:00 8:30 0.50 R0 P/O REMAINING 10 DP OF 12 1/4" DIRC BHA TO 178.52 M COMPLETED 0.50 6.35 469.00
8/10/2022 EDC-072-D9 8:30 9:00 0.50 R1 P/O 10 HWDP BHA OF 12 1/4" DIRC BHA TO 85.25 M COMPLETED 0.50 6.38 469.00
8/10/2022 EDC-072-D9 9:00 11:30 2.50 R0 P/O 10 HWDP BHA OF 12 1/4" DIRC BHA TO 85.25 M COMPLETED 2.50 6.48 469.00
8/10/2022 EDC-072-D9 11:30 12:00 0.50 R1 P/O BHA OF 12 1/4" DIRC BHA COMPLETED. BIT ON SURFACE 0.50 6.50 469.00
8/10/2022 EDC-072-D9 12:00 16:30 4.50 R0 P/O BHA OF 12 1/4" DIRC BHA COMPLETED. BIT ON SURFACE 4.50 6.69 469.00
8/10/2022 EDC-072-D9 16:30 18:30 2.00 R2 M/A FOR 9 5/8" CSG LOWERING 2.00 6.77 469.00
8/10/2022 EDC-072-D9 18:30 19:30 1.00 R1 R/I 10 JTS OF 9 5/8" CSG TO 101.19M COMPLETED. 1.00 6.81 469.00
8/10/2022 EDC-072-D9 19:30 22:00 2.50 R0 R/I 10 JTS OF 9 5/8" CSG TO 101.19M COMPLETED. 2.50 6.92 469.00
8/10/2022 EDC-072-D9 22:00 23:00 1.00 R1 R/I 20 JTS OF 9 5/8" CSG TO 201.09M COMPLETED. 1.00 6.96 469.00
8/10/2022 EDC-072-D9 23:00 0:00 1.00 R0 R/I 20 JTS OF 9 5/8" CSG TO 201.09M COMPLETED. 1.00 7.00 469.00
8/11/2022 EDC-072-D9 0:00 0:30 0.50 R1 0.50 7.02 469.00
8/11/2022 EDC-072-D9 0:30 2:00 1.50 R0 1.50 7.08 469.00
8/11/2022 EDC-072-D9 2:00 3:30 1.50 FM 1.50 7.15 469.00
8/11/2022 EDC-072-D9 3:30 5:30 2.00 R1 2.00 7.23 469.00
8/11/2022 EDC-072-D9 5:30 12:30 7.00 R2 7.00 7.52 469.00
8/11/2022 EDC-072-D9 12:30 14:30 2.00 R2 2.00 7.60 469.00
8/11/2022 EDC-072-D9 14:30 15:30 1.00 R2 1.00 7.65 469.00
8/11/2022 EDD-007-D2 15:30 0:00 8.50 ILM 14.00
8/12/2022 EDC-072-D9 0:00 3:00 4.00 R2 14.00
8/12/2022 EDD-007-D2 3:00 6:00 2.00 ILM 14.00
8/12/2022 EDD-007-D2 6:00 0:00 18.00 ILM 14.00
8/13/2022 EDD-007-D2 0:00 0:00 24.00 ILM 14.00
8/14/2022 EDD-007-D2 0:00 2:30 2.50 ILM 2.50 0.10 14.00
8/14/2022 EDD-007-D2 2:30 4:00 1.50 R3 1.50 0.17 14.00
8/14/2022 EDD-007-D2 45.42 4:00 6:00 2.00 R1 2.00 0.25 59.42
8/14/2022 EDD-007-D2 6:00 6:30 0.50 R1 0.50 0.27 59.42
8/14/2022 EDD-007-D2 6:30 7:00 0.50 R1 0.50 0.29 59.42
8/14/2022 EDD-007-D2 7:00 9:30 2.50 R0 2.50 0.40 59.42
8/14/2022 EDD-007-D2 9:30 9:45 0.25 R1 0.25 0.41 59.42
8/14/2022 EDD-007-D2 9:45 10:30 0.75 R1 0.75 0.44 59.42
8/14/2022 EDD-007-D2 10:30 15:30 5.00 R0 5.00 0.65 59.42
8/14/2022 EDD-007-D2 15:30 16:30 1.00 R1 1.00 0.69 59.42
8/14/2022 EDD-007-D2 16:30 17:00 0.50 R1 0.50 0.71 59.42
8/14/2022 EDD-007-D2 17:00 18:30 1.50 FM 1.50 0.77 59.42
8/14/2022 EDD-007-D2 21.09 18:30 20:30 2.00 R1 2.00 0.85 80.51
8/14/2022 EDD-007-D2 20:30 21:00 0.50 R1 0.50 0.88 80.51
8/14/2022 EDD-007-D2 3.49 21:00 22:30 1.50 R1 1.50 0.94 84.00
8/14/2022 EDD-007-D2 16 22:30 0:00 1.50 R1 1.50 1.00 100.00
8/15/2022 EDD-007-D2 82 0:00 11:00 11.00 R1 11.00 1.46 182.00
8/15/2022 EDD-007-D2 11:00 13:00 2.00 R1 2.00 1.54 182.00
8/15/2022 EDD-007-D2 13:00 14:30 1.50 R0 1.50 1.60 182.00
8/15/2022 EDD-007-D2 56.31 14:30 0:00 9.50 R1 9.50 2.00 238.31
8/16/2022 EDD-007-D2 73.12 0:00 13:00 13.00 R1 13.00 2.54 311.43
8/16/2022 EDD-007-D2 13:00 17:00 4.00 R3 4.00 2.71 311.43
8/16/2022 EDD-007-D2 17:00 20:30 3.50 R0 3.50 2.85 311.43
8/16/2022 EDD-007-D2 20:30 0:00 3.50 R0 3.50 3.00 311.43
8/17/2022 EDD-007-D2 0:00 2:00 2.00 R0 2.00 3.08 311.43
8/17/2022 EDD-007-D2 2:00 2:30 0.50 R0 0.50 3.10 311.43
8/17/2022 EDD-007-D2 2:30 4:30 2.00 R0 2.00 3.19 311.43
8/17/2022 EDD-007-D2 4:30 6:30 2.00 R0 2.00 3.27 311.43
8/17/2022 EDD-007-D2 6:30 7:00 0.50 R0 0.50 3.29 311.43
8/17/2022 EDD-007-D2 11.57 7:00 10:00 3.00 R1 3.00 3.42 323.00
8/17/2022 EDD-007-D2 10:00 17:00 7.00 R0 7.00 3.71 323.00
8/17/2022 EDD-007-D2 17:00 21:00 4.00 R3 4.00 3.88 323.00
8/17/2022 EDD-007-D2 21:00 0:00 3.00 R0 3.00 4.00 323.00
8/18/2022 EDD-007-D2 0:00 1:30 1.50 R0 1.50 4.06 323.00
8/18/2022 EDD-007-D2 1:30 3:30 2.00 R0 2.00 4.15 323.00
8/18/2022 EDD-007-D2 3:30 10:15 6.75 R0 6.75 4.43 323.00
8/18/2022 EDD-007-D2 86 10:15 0:00 13.75 R1 13.75 5.00 409.00
8/19/2022 EDD-007-D2 3.56 0:00 12:30 0.50 R1 0.50 5.02 412.56
8/19/2022 EDD-007-D2 12:30 1:00 0.50 R1 0.50 5.04 412.56
8/19/2022 EDD-007-D2 1:00 4:30 3.50 R1 3.50 5.19 412.56
8/19/2022 EDD-007-D2 4:30 7:30 3.00 R1 3.00 5.31 412.56
8/19/2022 EDD-007-D2 7:30 12:15 4.75 R0 4.75 5.51 412.56
8/19/2022 EDD-007-D2 12:15 12:30 0.25 R1 0.25 5.52 412.56
8/19/2022 EDD-007-D2 12:30 15:30 3.00 R2 3.00 5.65 412.56
8/19/2022 EDD-007-D2 15:30 19:00 3.50 R1 3.50 5.79 412.56
8/19/2022 EDD-007-D2 19:00 23:15 4.25 R0 4.25 5.97 412.56
8/19/2022 EDD-007-D2 23:15 0:00 0.75 R2 0.75 6.00 412.56
8/20/2022 EDD-007-D2 0:00 12:30 0.50 R2 R/U CMNT HEAD, R/U CMNT UNIT I/P 0.50 6.02 412.56
8/20/2022 EDD-007-D2 12:30 1:00 0.50 R1 M/A FOR CEMENTING, MEANWHILE CIRCULATING TO CONDITION MUD 0.50 6.04 412.56
8/20/2022 EDD-007-D2 1:00 4:00 3.00 R0 MIXING IN PROGRESS, MP#2 CONNECTION NOT AVAILABLE ARRANGED FROM RIG: 3.00 6.17 412.56
8/20/2022 EDD-007-D2 4:00 5:00 1.00 R1 MIXING COMPLETED, MEANWHILE CIRCULATING TO CONDITION MUD. 1.00 6.21 412.56
8/20/2022 EDD-007-D2 5:00 5:30 0.50 R2 CEMENTING JOB STARTED, FLUSHED CEMENT LINES AND PUMPED SPACER 0.50 6.23 412.56
8/20/2022 EDD-007-D2 5:30 7:30 2.00 R2 CEMENTING JOB COMPLETED 2.00 6.31 412.56
8/20/2022 EDD-007-D2 7:30 8:30 1.00 R2 R/D CEMENT UNIT AND CEMENT LINES 1.00 6.35 412.56
8/20/2022 EDD-007-D2 8:30 13:30 5.00 R2 DISMANTLED MUD PUMPS AND MUD TANKS 5.00 6.56 412.56
8/20/2022 EDD-007-D2 13:30 14:00 0.50 R2 TOP JOB DONE, 5 BBL CMNT OF 15PPG 0.50 6.58 412.56
8/20/2022 EDD-007-D2 14:00 16:00 2.00 R1 MUD TANK CLEANING COMPLETED 2.00 6.67 412.56
8/20/2022 EDD-070-D4 16:00 16:15 0.25 ILM RIG MAST DOWN. RIG RELEASED TO EDI-70-D4 0.25 - 25.00
8/20/2022 EDD-070-D4 16:15 0:00 7.75 ILM LOADING AND CONTINUED ILM 7.75 0.32 25.00
8/21/2022 EDD-070-D4 0:00 0:00 24.00 ILM CONTINUE ILM AND UNLOADING AT NEW SITE 24.00 1.32 25.00
22-Aug-22 EDD-070-D4 0:00 0:00 24.00 ILM COMPLETE R/U, MP#2 REPAIRING I/P 24.00 2.32 25.00
23-Aug-22 EDD-070-D4 0:00 16:30 16.50 ILM COMPLETE R/U, MP#2 REPAIRING COMPLETED 16.50 3.01 25.00
23-Aug-22 EDD-070-D4 41.76 16:30 22:15 5.75 R1 SPUD WELL @ 16:30 HRS, CONTD. DRILLING WITH SLICK BHA TO 66.76M 5.75 3.25 66.76
23-Aug-22 EDD-070-D4 22:15 23:00 0.75 R1 BIT CHOKED, SPP SHOOTS UP TO 1100PSI, TRIED TO INCREASE SPM WITH STRING UP, 0.75 3.28 66.76
23-Aug-22 EDD-070-D4 23:00 0:00 1.00 R1 P/O SLICK BHA TO SURFACE, FOUND BIT CHOKED. 1.00 3.32 66.76
24-Aug-22 EDD-070-D4 0:00 12:30 12.30 R0 MP#1 & MP#2 UNDER MAINTENANCE. 12.30 3.84 66.76
24-Aug-22 EDD-070-D4 12:30 14:30 2.00 R1 RIH WITH 12.25" PDC BIT + BIT SUB + 8" D/C + DP & TAGGED BOTTOM @ 25 MTRS. 2.00 3.92 66.76
24-Aug-22 EDD-070-D4 26.24 14:30 19:30 5.00 R1 STARTED DRILLING & DD UPTO 93 MTRS. 5.00 4.13 93.00
24-Aug-22 EDD-070-D4 19:30 20:00 0.30 R1 CIRCULATION GIVEN. 0.30 4.14 93.00
24-Aug-22 EDD-070-D4 20:00 21:30 1.30 R1 POOH COMPLETED. 1.30 4.19 93.00
24-Aug-22 EDD-070-D4 21:30 22:00 0.30 R1 BIT B/U & LAY DOWN. 0.30 4.21 93.00
24-Aug-22 EDD-070-D4 22:00 0:00 2.00 R2 MA FOR RIH BHA. 2.00 4.29 93.00
25-Aug-22 EDD-070-D4 0:00 1:00 1.00 R1 P/U & M/U PDC BIT, SURFACE TEST OF MM DONE. 1.00 4.33 93.00
25-Aug-22 EDD-070-D4 1:00 4:00 3.00 R1 SHALLOW DEPTH TEST OF MWD TOOL DONE. FOUND OKAY. 3.00 4.46 93.00
25-Aug-22 EDD-070-D4 4:00 6:30 2.50 R0 WHILE RIH FOUND MM & NMDC SLIGHTLY OFFCENTRE. ADJUSTED CENTERING BY R 2.50 4.56 93.00
25-Aug-22 EDD-070-D4 6:30 11:00 4.50 R1 CONTINUED RIH, FOUND HELDUP @ 76 MTRS, CLEARED THE SAME WITH ROTATION 4.50 4.75 93.00
25-Aug-22 EDD-070-D4 44 11:00 18:30 7.50 R1 RESUMED DRILLING & DD FROM 93 M TO 137 M. 7.50 5.06 137.00
25-Aug-22 EDD-070-D4 18:30 19:00 0.50 R3 2ND SHALE SHAKER FOUND NOT WORKING, SO P/O STRING UPTO 96 M. 0.50 5.08 137.00
25-Aug-22 EDD-070-D4 19:00 22:30 3.50 R3 REPAIRED 2ND SHALE SHAKER POWER RELAY & CONTACTOR SYSTEM & MOTOR. M 3.50 5.23 137.00
25-Aug-22 EDD-070-D4 22:30 0:00 1.50 R0 RIH & TAGGED BOTTOM @ 137 M & GIVEN CIRCULATION. 1.50 5.29 137.00
5
May-22 Jun-22 Jul-22 Aug-22 Plan V/s A
4 4
ABP Plan 4 4 4 4 4
Revised Plan 0.5 4
3
Actual 2.5
Actual Complete Well 2

0
May-22 Jun-22

ABP Plan

10.00
ROP (mts / day)
8.54
8.00 7.25

5.81
6.00 5.27 Rig Name
Schramm
4.00
Schramm
2.00
RD-20
RD-20
0.00 RD-20
EDI-046-D3 EDI-046-D2 EDC-072-D9 EDD-007-D2
Plan V/s Actual (Drilling)
4 4 4 4

2.5

0.5

May-22 Jun-22 Jul-22 Aug-22

ABP Plan Revised Plan Actual

ROP (mts / day)


10.00
Well NameROP (mts / day)
EDI-046-D3 5.81 8.00
EDI-046-D2 8.54
EDC-072-D 5.27 6.00

EDD-007-D 7.25
EDD-070-D 6.26 4.00

2.00

0.00
EDI-046-D3 EDI-046-D2 EDC-072-D9 EDD-007-D2 EDD-070-D4
Schramm Schramm RD-20 RD-20 RD-20
D-070-D4
RD-20