FR-04-BIMD-002-rev.

0
Project:
AVIDA TOWERS MAKATI SOUTH POINT
REQUEST FOR APPROVAL Location:
Brgy. Bangkal Chino Roces Ave. Makati City

To: Date:
NBF 6/9/2022
Attention: Date Required:
ALDRIEN DULAY/MARK FLORA/WILBERT VALDEZ 6/21/2022
Copy To:
Ritz Bernal (ADD) Philip Gregor Ramos (CMG) Reynard Maranan (CMG)

Submittal No: MDC-TSD-ATMS-T2-RFA-PL-033 Previous Submittal No:


submittal project trade type division no continuous count rev submittal project trade type csi continuous count rev

New Submittal Resubmittal 1 2 3 Date:


Submittal Type: SD SHOPDRAWING/DRAWING MAT SAMPLE MATERIAL DOCS PRODUCT DATA/SPECS/METHODS/TEST RESULTS/CERTIFICATIONS/ETC

Title/Description/Manufacturer/Location of Application Specification, Section, Title and Paragraph/Drawing Detail Reference


Quantity

Approval of 20mm outside diameter CWL which was originally


MCI
20mm inside diameter as per IFC

Other Remarks on Submittal:

For MDC Contract Scope & Site Condition:


Reviewed & Checked By: as per contract scope Reviewed & Checked By: site is ready

ARMY GUIRIBA/ VINCENT GARCIA NOT as per contract scope GARETH GALANG site is NOT ready
MEPFS ENGINEER PROJECT MANAGER
Remarks: Remarks:

For Design/Drawings/Specifications:
Reviewed & Checked By: Date Received Date Returned Date required "+/- (Days)"
by Consultant by Consultant by MDC
RECIL FAYE ORIBELLO
BIMD SUPERVISOR BIMD OFFICER BIMD MANAGER
Remarks:

Approver's Response:

A Approved B Approved as Commented C Revise and Resubmit D Disapproved


ALDRIEN DULAY/MARK FLORA/WILBERT VALDEZ
NBF Signature Over Printed Name and Date

Other Remarks on Response:


SEE REMARKS! 15/06/2022

FOR MDC USE ONLY - INSTRUCTION AS PER APPROVER'S RESPONSE.

GARETH GALANG PHILIP GREGOR RAMOS/REYNARD MARANAN


PM/PIC/QS CMG PD/CMG Officer
Signature Over Printed Name and Date Signature Over Printed Name and Date
Remarks & Instruction: Remarks & Instruction:

Copy Distribution To:


BIMD QS PROCUREMENT QA FE/FA SUBCONTRACTOR Others: ____________________________
MEPFS EXTERIOR UTILITIES

NBFCI NOTE:
-20mm SHOULD BE INSIDE DIAMETER (NOMINAL) AS PER OUR PLANS.

15/06/2022

➢ CWL stub-out should be 20mm inside diameter. Actual onsite is 20mm outside diameter
➢ WC stub-out conflict with pipe chase enclosure, should be 170mm from wall as per plan. Actual site is 130mm
For approval of 20mm outside diameter CWL which was originally 20mm inside diameter as per IFC

NBFCI NOTE:
-20mm SHOULD BE INSIDE DIAMETER (NOMINAL) AS PER OUR PLANS.