Engineering Checklist

Region: / Plant : ID CM02

SAP ID : Projec ID : Project Jaya Date: 21/12/2023


Phase II

Responsible person: Budi Hutagaol ( Project Manager )

Eko Budi Setiawan (Supervisor)

Dae Robby Ariansyah (Engineer)

Activity: - Dismantling Platform FMT1-4 and New Install Platform


- Dismantling Mechanical, Pipe and Electrical Instruments
- Reinstall Mechanical,pipe, electrical instrument after new
platform installation

Comments: make sure all work preparations are ready and safe to use

To be completed by the responsible Engineering / Maintenance : Yes No N/A

Tool reconciliation:

- Ensure all preparation of work tools and other supporting tools (work access)

- Tools : Machine weld,Machine Orbital, Machine grinding, Machine drill, Measuring


tape, Ring spanner, Slit/Cross screwdriver, Calipers, hand gloves, etc. (All tools used
already checked from at working area).

Work Activity : December 22, 2023 - Jan 02, 2024

1). Dismantling Mechanical, Pipe and Electrical Instruments

2). Dismantling Platform FMT1-4

3). New install Platform FMT1-4

4). Reinstall Mechanical,pipe, electrical instrument after new platform


installation

To be completed by the responsible Engineering / Maintenance : Yes No N/A

Job Description :

1. Dismantling Mechanical, Pipe and Electrical Instruments as :

a) . Make sure all control valves CA,DPG, are closed (LOTO)


b) . Make sure all panel at FMT 1-4 position OFF (LOTO)
c) . Ensure CIP FMT1-4 has been carried out and
d) . Drain inside pipe line DPG
e) . Ensure Exhaust Fan the position OFF

Post Maintenance Check List Cimmangis Rev1.1 1/3


f) . Finishing / cleaning

2. Dismantling Platform FMT1-4 :

a). Make sure all mechanical part, pipe and electrical instrument demolition has
been carried out.
b). Dismantling Railing, Checker plate / Floor
c). Install the support frame on the tank FMT1-4
d). Dismantling H beam & Legs Platform

3. New install Platform FMT1-4

a) . Marking & Installing Chemical Anchors


b) . Installed Column New Platform
c) . Installed Bracing New Platform
d) . Install the gantry for the tank lifting process
e) . Installed Railing, Floor, Ladder & safety Cage
f) . Installed Protection Area
g) .Modification Ducting FMT 1 ~ 4 2 Units

4. Reinstall Mechanical,pipe, electrical instrument after new platform


installation
FMT 1-2
a) Connect and Termination cable to part and component to tank FMT 1&2
b) Additional Valve and Modification Pipe DPG FMT 1 & 2 and connect to tank
c) Install Pipe Inlet including Connection part to top tank FMT 1 & 2
d) Install Pipe Outlet including Connection part to bottom tank FMT 1 & 2
FMT 3-4
a) Connect and Termination cable to part and component to tank FMT 3 & 4
b) Additional Valve and Modification Pipe DPG FMT 3 & 4 and connect to tank
c) Install Pipe Inlet including Connection part to top tank FMT 3 & 4
d) Install Pipe Outlet including Connection part to bottom tank FMT 3 & 4
FMT 5-6
a) Complete Hot water for Cleaning
b) Complete Platform Grounding and new Grounding Pit
c) Fit & Weld Manual Valve for DPG FMT -6
d) Blind Line Compressed Air with temporary just connect to FMT5 & 6 Line
e) Test AGT, Lamp or all Part And component at Tank FMT 5 & 6
f) Hand Over

Post cleaning:

- Have all objects such as screws, washers, nuts, bolts, tapes, glues, grease,
lubricants and other small items that could potentially contaminate water products
been removed from the work area?

To be completed by the affected department. Yes No N/A

- Did the work lead to changes on the equipment / infrastructure that could impact
food safety/GMP Compliance (e.g. different paint or colour etc.)? If yes please
inform the Food Safety Team/QM Team and/or introduce it to the MOC process.

- Check operation machine. Ensure the machine runs normal.

- Is the equipment, its infrastructures and the environment back in clean status?

2/2
Affected Department Date Signature

Boccard : Budi Hutagaol, Eko Budi


Setiawan, Dae Robby, Ariansyah

Archetype ; Erwin, Kaliri, Rafi

Givaudan :

Note : Please tick off appropriate columns (Yes, No, N/A) or cross out not appropriate items. Above
signature approves that equipment is back in clean and intact status.