Rate and NMR Bill - 01.03.2023
Rate and NMR Bill - 01.03.2023
5 OHT base slab concrete finishing work 120 Villa 1.00 225 225.00
1 External plastering work@ South side 119 Sqft 437.23 20.00 8744.65
2 OHT cover slab concrete work 119 Villa 1.00 2000.00 2000.00
3 OHT cover slab concrete finishing work 119 Villa 1.00 225.00 225.00
II 100mm AAC
1 Bedroom
North wall Sqm 1 3.05 2.675 8.16
Deduction D2 Sqm -1 0.9 2.1 -1.89
East wall Sqm 1 3.44 2.675 9.20
Deduction D3 Sqm -1 0.75 2.1 -1.58
2 Toilet
North wall Sqm 1 1.38 2.9 4.00
East wall Sqm 1 2.24 2.675 5.99
3 Store
North wall Sqm 1 1.105 2.675 2.96
East wall Sqm 1 1.2 2.675 3.21
Deduction OP2 Sqm -1 0.75 2.1 -1.58
4 Kitchen
North wall Sqm 1 1.5 2.675 4.01
Deduction OP1 Sqm -1 0.9 2.1 -1.89
Total 5
ABSTRACT
CONTRACTOR : Surya Kala DATE: 01.03.2023
AMOUNT
S.NO DESCRIPTION VILLA NO UNIT QTY RATE (Rs.)
1 Final deep cleaning work 123 Villa 1.00 5000 5000.00