Professional Documents
Culture Documents
Page 03
Page 03
Page 03
SCALE: 1:10MTS.
APPROVED BY: RECOMMENDED BY: REVIEWED BY: CHECKED BY: SHEET CONTENT SHEET NO.
C-003
PROJECT TITLE / LOCATION:
JONATHAN D. TAN RONNIE R. YAMBAO ATTY. MARTIN KRISTOFFER F. ROMAN JEROME M. MARTINEZ LILIBETH S. BAZA
REHABILITATION OF FENDER SYSTEM AT BOTON WHARF SDA for Operations DA for Port Operations General Manager, Seaport Department OIC, Port Engineering Division DRAWN BY:
Chairman and Administrator
BOTON WHARF, SUBIC BAY FREEPORT ZONE WTZ