This inspection release note documents the completion of three assemblies for a Vapour Recovery Unit project at HPCL in Hassan. The first assembly included a machine skid with vacuum pumps and feed blowers. The second was a piping skid with shutoff valves, piping, and cable trays. The third assembly contained supply and return pumps, valves, flow meters, and associated piping and instrumentation on a pumps/piping skid. Mobile Communications certified that the fabricated items met the specifications in the project drawings and documents. HPCL accepted the completed assemblies.
Evaluation of Green Building in The Existing Building of The Department of The Environment of DKI Jakarta Province in The Order of Reducing Greenhouse Gas Emissions
International Journal of Innovative Science and Research Technology
This inspection release note documents the completion of three assemblies for a Vapour Recovery Unit project at HPCL in Hassan. The first assembly included a machine skid with vacuum pumps and feed blowers. The second was a piping skid with shutoff valves, piping, and cable trays. The third assembly contained supply and return pumps, valves, flow meters, and associated piping and instrumentation on a pumps/piping skid. Mobile Communications certified that the fabricated items met the specifications in the project drawings and documents. HPCL accepted the completed assemblies.
This inspection release note documents the completion of three assemblies for a Vapour Recovery Unit project at HPCL in Hassan. The first assembly included a machine skid with vacuum pumps and feed blowers. The second was a piping skid with shutoff valves, piping, and cable trays. The third assembly contained supply and return pumps, valves, flow meters, and associated piping and instrumentation on a pumps/piping skid. Mobile Communications certified that the fabricated items met the specifications in the project drawings and documents. HPCL accepted the completed assemblies.
This inspection release note documents the completion of three assemblies for a Vapour Recovery Unit project at HPCL in Hassan. The first assembly included a machine skid with vacuum pumps and feed blowers. The second was a piping skid with shutoff valves, piping, and cable trays. The third assembly contained supply and return pumps, valves, flow meters, and associated piping and instrumentation on a pumps/piping skid. Mobile Communications certified that the fabricated items met the specifications in the project drawings and documents. HPCL accepted the completed assemblies.
PO no : MPES/160001/VKE/03/2023 (MCIL to Vishwakarma Enterprise)
Sr. No. Supply Item Description Observations Qty
Vacuum Pump - 3nos.
1 Machine Skid One Assembly and Feed Blower - 2nos.
Shut Down Valves - 3nos,
2 Piping Skid-1 along with Piping spools, Cable tray Fabrication of Piping, One Assembly installation, cabeling with Junction Box. Hydrotest and Assembly completed as per P&ID DRG No 1001-Rev02 Supply Pump - 2nos, and Return Pump - 2nos, DRG No 1002-Rev02 Shut Down Valves - 2nos, One Assembly Control Valve - 2nos, (Supply Pumps & Return 3 Pumps / Piping Skid-2 Mass Flow Meter - 2nos, Pressure pumps packed individually Transmitter and Temperature Element for dispatch) along with Piping spools, Cable tray Installation, cabeling with Junction Box.