The inspection release note summarizes the inspection of equipment for a Vapour Recovery Unit project for Hindustan Petroleum Corporation. It lists 3 items: 1) a machine skid with vacuum pump and feed blower, 2) a piping skid with shutoff valves and piping assemblies, and 3) pumps and piping for supply and return with associated valves, meters and transmitters. All items were found to meet fabrication drawings and specifications and were approved for dispatch to the project site.
The inspection release note summarizes the inspection of equipment for a Vapour Recovery Unit project for Hindustan Petroleum Corporation. It lists 3 items: 1) a machine skid with vacuum pump and feed blower, 2) a piping skid with shutoff valves and piping assemblies, and 3) pumps and piping for supply and return with associated valves, meters and transmitters. All items were found to meet fabrication drawings and specifications and were approved for dispatch to the project site.
The inspection release note summarizes the inspection of equipment for a Vapour Recovery Unit project for Hindustan Petroleum Corporation. It lists 3 items: 1) a machine skid with vacuum pump and feed blower, 2) a piping skid with shutoff valves and piping assemblies, and 3) pumps and piping for supply and return with associated valves, meters and transmitters. All items were found to meet fabrication drawings and specifications and were approved for dispatch to the project site.
PO no : MPES/160001/VKE/03/2023 (MCIL to Vishwakarma Enterprise)
Sr. No. Supply Item Description Observations Qty
Vacuum Pump - 3nos.
1 Machine Skid One Assembly and Feed Blower - 2nos.
Shut Down Valves - 3nos,
2 Piping Skid-1 along with Piping spools, Cable tray Fabrication of Piping, One Assembly installation, cabeling with Junction Box. Hydrotest and Assembly completed as per P&ID DRG No 1001-Rev02 Supply Pump - 2nos, and Return Pump - 2nos, DRG No 1002-Rev02 Shut Down Valves - 2nos, One Assembly Control Valve - 2nos, (Supply Pumps & Return 3 Pumps / Piping Skid-2 Mass Flow Meter - 2nos, Pressure pumps packed individually Transmitter and Temperature Element for dispatch) along with Piping spools, Cable tray Installation, cabeling with Junction Box.