MCQ
MCQ
B. 20 mm (ans)
A. 10mm
C. 30 mm
D. 40 mm
3. Form releasing agent act as a ____ to prevent the forms from absorbing water from the wet
concrete.
•sealer
A. stripping [ANS]
B. shoring
C. clamping
D. installion
5. Form releasing agent improves the ____ of the contact surface of the torm so that it can be
used more times.
C. durability(ans)
A. hardness
C. consistency
D. roughness
6. Column formwork has to be plumbed in direction perpendicular to each other for verticality
check.
• two
7. What is the maximin lateral pressure on the Formwork of height 2m, width 0.5 m and length
1.5m, assuming concrete density is 2450 kg/m3.
A. 49 kN/m2 [ANS]
B. 2450 kN/m2
C. 3675 kN/m2
11. One safety considerations you must observed during formwork construction ……….
A. sufficient nailing
13. How many days later can you remove the vertical Formwork to the side of the column and
wall?
A. 1
14. How many days later can you remove the soffit formwork of cantilever slab?
C. 7 (ans)
A. 3
B. 9
D. 28
•21 days
16. To reuse the Formwork many times, Formwark chould be kept in designated ____ .
A. storage area
17. To reuse the formwork many times ,form work should not slide on rough surfaces or dropped
from ____ .
A. height
19. To reuse Formwork many times, Formwork should not be lifted using ____ cable.
A. wire
20. To reuse the formwork many times, they should be lifted using _____
A. nyon rope
• fixing
22. Name the part of the Formwork system indicated by the arrow.
•Bearer
23. Name the part of the formwork system indicated by the arrow.
24.CIRIA report formula calculate lateral pressure -wh. We should choose smaller value.
• TRUE
26. When can we remove the soffit formwork of a 600mm thick slab after c………
D. According to PE recommendation
27. All effective bracing system shall consist of one horizontal bracing to the shore _____ of the
top.
•within 150 mm
•60
29. An effective bracing system, bracing shall be fixed to shores at all ____ .
D. crossings
•plumb bob
32. The reason for choosing permanent formwork is due to high ____ in formwork removal.
B. cost (ans)
A. strength
C. rigidity
D. nailing
34. The picture shows a concrete water tank. Which type of system Formwork is suitable for the
construction of this structure?
•Slip formwork
35. The picture shows a lift shaft construction, Which of the following type of formwork is suitable
for this construction?
A climbing formwork (ans)
B. table formwork
C. flying formwork
D. sliding formwork
36. Increase rate of pour of concrete will ____ lateral pressure on formwork.
• increase
A. increase [ANS]
B. decrease
C. remain the same
D.collapse
39. Table formwork means of adjustment for aligning and ____ the forms.
A. leveling
40. Table formwork has sufficient means of moving the forms to clear the structure to a point
where they can be attached to the for lifting and repositioning.
A. crane [ANS]
B. concrete truck
C. skip
D. chain
41. Table Formwork has a means of providing a ____ at the external edge of the slab to eliminate
the need for an independent scaffold.
•tightness
43. A good Formwork should have sufficient strength to support the weight of the concrete and
other _ loads.
A. live [ANS]
B. workers dead
C. managers
45. Formwork must be sufficiently ____ to prevent bulging, sagging and movement.
•rigid
•Honeycomb